Reference list of projects similar to Plomin C, completed over
the past 5 years
PROJECT TITLE
COUNTRY
PROJECT DESCPRITION
CLIENT
YEAR
Croatia
Main design, detailed design
PLINACRO D.O.O.
2009
Croatia
Main design, detailed design, as-built
HEP-PROIZVODNJA D.O.O.
2010
ELEKTROPRIVREDA HRVATSKE ZA-
2010
ELEKTROPROJEKT d.d.
GAS PIPELINE SYSTEM OF LIKA AND
DALMATIA REGION
TE-TO ZAGREB UNIT
“L”
design
MOSTARSKO BLATO
Bosnia and
HYDROELECTRIC
Herzegovina
Main design, detailed design
JEDNICE HERCEG BOSNA
POWER PLANT
RECONSTRUCTION
Croatia
Main design, detailed design
HRVATSKA ELEKTROPRIVREDA D.D.
2010
Croatia
Conceptual design
ADRIA LNG D.O.O.
2010
Chechnya
Pre-investment planning, conceptual
RIKO D.O.O.
2011
HEP - PROIZVODNJA D.O.O.
2011
Preliminary design, main design, detailed HEP-TOPLINARSTVO D.O.O.
2011
OF ZAKUČAC HYDROELECTRIC POWER PLANT
ADRIA LNG TERMINAL
ARGUN HYDROELECTRIC POWER PLANT
THERMAL POWER
design
Croatia
PLANT SISAK, UNIT
Pre-investment planning, conceptual
design, main design,
“C”
STEAM AND HEAT
Croatia
PIPES FOR DUBRAVA
design
HYDROELECTRIC
POWER PLANT
BIOMASS POWER-
Croatia
Pre-investment planning
Croatia
Pre-investment planning, conceptual
“HRVATSKA ELEKTROPRIVREDA”
PLANT
PLOMIN C-500 THER-
2011
D.O.O.
MAL POWER PLANT
“AGLOMERACIJA
HEP-OBNOVLJIVI IZVORI ENERGIJE
2012
design
D.D.
Croatia
Conceptual design, main design
“ZAGORSKI VODOVOD” D.O.O.
2012
Croatia
Pre-investment planning, main design,
INSTITUT GRAĐEVINARSTVA HR-
2012
detailed design, as-built design, docu-
VATSKE D.D.
ZABOK”
LEŠĆE HYDROELECTRIC POWER PLANT
mentation related to accessory structures
OMBLA HYDROELEC-
Croatia
Conceptual design, main design,
TRIC POWER PLANT
FIRE SAFETY SYS-
“HRVATSKA ELEKTROPRIVREDA”
2012
D.D.
Kosovo
Main design, detailed design
TEMS FOR KOSOVO A
KORPORATA ENERGJETIKE E
2012
KOSOVES SH.A
I KOSOVO B
Đuro Đaković TEP d.o.o.
26.0203
Finland
Boiler pressure parts
Metzo
2012
26.0204
Austria
Boiler pressure parts
Andritz E&E
2012
26.0207
Switzerland
Waste-to-energy boiler
Hitachi-Zesen
2012
The Association of Croatian Thermal
Power Plant Construction Companies
26.0208
France
Boiler pressure parts
CNIM
2012
26.0209
Switzerland
Waste-to-energy boiler
Hitachi-Zesen
2012
26.0193
Austria
Boiler pressure parts
Andritz E&E
2011
26.0197
France
Boiler pressure parts
CNIM
2011
26.0199
Switzerland
Waste-to-energy boiler
Hitachi-Zesen
2011
26.0200
Germany
Boiler pressure parts
FISIA -Babcock
2011
27.4210
Croatia
Heat exchanger
HEP Pogon TE_TO
2011
27.4223
Germany
Evaporating system
Borsig Servis
2011
27.4225
Croatia
Roof reconstruction VK5
HEP Pogon TE_TO
2011
27.4227
Croatia
Steam superheater
HEP Pogon TE Rijeka
2011
26.0183
Switzerland
VASSA boiler
AE&E INOVA
2010
26.0187
Czech Re-
Thermal power plant KAKANJ - Steam
AE&E CZ s.r.o.
2010
public
superheaters
Piping erection
Kraftanlagen München GmbH,
Germany
2012-
Bilfinger Đuro Đaković Montaža d.o.o
PP Kladno K7
Phase II
CzechRe-
PP Walsum
Germany
Unit 10, boiler reconstruction
Babcock Borsig Steinmüller GmbH,
Germany (Hitachi)
2012-
PP Belchatow 8
Poland
fabrication, dismantling and assembly of
firing system (mills, burners, ducts, classifiers, diffusers)
Babcock Borsig Steinmüller GmbH,
Germany
2012
PP Shell Wesseling
Germany
ESP assembly
Hamon Environmental GmbH, Germany
2012
PP Wuppertal
Germany
Dismantling and erection of boiler steel
structure
Fisia Babcock Environment GmbH,
Germany
2012
PP Wedel
Germany
Dismantling and assembly of air ducts
Balcke Duerr GmbH, Germay
2012
PP Duisburg
Germany
Dismantling and assembly of boiler preheating unit
Babcock Borsig Steinmüller GmbH,
Germany
2012
PP Rijeka
Croatia
Replacement of PP 2 and MPP 2
ĐĐ TEP d.o.o., Croatia
2012
PP Plomin 1
Croatia
Replacement of header K 90 and joining
pipes
HEP d.d., Croatia
2012
PP Plomin 2
Croatia
Overhaul, replacement of pipes in boiler
pressure part, replacement of balls and
plates in mills
HEP d.d., Croatia
2012
NPP Krško
Slovenia
Repair and replacement of valves and
secondary equipment
NEK d.o.o., Slovenia
2012
PP Belchatow 7
Poland
Fabrication, dismantling and assembly of
firing system (mills, burners, ducts, classifiers, diffusers)
Babcock Borsig Steinmüller GmbH,
Germany
2011 2012
PP Medupi 6
SouthAfrica
Supervision of boiler pressure parts assembly
Steinmüller Africa, South Africa
2011 2012
TE Rijeka
Croatia
Fabrication, dismantling and assembly of
stack steel shell
HEP d.d., Croatia
2011 2012
PP Mannheim
Germany
Assembly of ESP and REA
Fisia Babcock Environment GmbH,
Germany
2011 2012
ShellWesseling
Germany
Assembly of boiler, ducts, equipment and Standardkessel GmbH, Germany
piping
public
2011 2012
PP Westfalen
Germany
Unit D/E, erection of boiler interna lpiping
BHR Hochdruck – Rohrleitungsbau
GmbH, Germany
2011-
Zagreb TPP
Croatia
Recovery of Block K, utilizators No. 1 and
2, HP - superheaterand LP - vaporizer
HEP d.d., Croatia
2011
Belišće d.d. (PP)
Croatia
Installation of reinforcement
Belišće d.d., Croatia
2011
HEP Toplinarstvo,
Osijek
Croatia
Boiler repair
HEP d.d., Croatia
2011
PP Rijeka
Croatia
Disassembly and erection of components DAR d.o.o., Croatia
and piping
2011
VA StahlLinz II
Austria
Boiler erection
J. Christof GmbH, Austria
2011
PP Kladno K7
CzechRe-
Piping erection
Kraftanlagen München GmbH,
Germany
2011
public
PP Niederausem
Germany
Dismantling and assembly of boiler walls
and preheater part
Babcock Borsig Steinmüller GmbH,
Germany
2011
PP Offenbach
Germany
Boiler pressure parts overhaul
Babcock Borsig Steinmüller GmbH,
Germany
2011
PP Stuttgart Münster
Germany
Boiler overhaul, boiler grid revision
Babcock Borsig Steinmüller GmbH,
Germany
2011
PP München
Germany
Disassembly and assembly of burner
Babcock Borsig Steinmüller GmbH,
Germany
2011
IHKW Andernach
Germany
Boiler pressure parts overhaul
Oschatz GmbH, Germany
2011
Herten
Germany
Boiler pressure parts overhaul
E.ON Anlagenservice GmbH, Germany
2011
PP Altbach
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2011
MiROKarlsruhe
Germany
Revision of electrostatic precipitators
Babcock Borsig Service GmbH,
Germany
2011
PP Farge
Germany
Boiler pressure parts overhaul
BabcockBorsig Service GmbH, Germany
2011
TPP Hannover
Germany
Boiler and pipings overhaul
BHR Hochdruck – Rohrleitungsbau
GmbH, Germany
2011
PP Zolling
Germany
Disassembly and assembly of ducts, boiler and burner overhaul
Babcock Borsig Steinmüller GmbH,
Germany
2011
PraxairHürth
Germany
Erection of housing for production of
technical gases
BHR Hochdruck – Rohrleitungsbau
GmbH, Germany
2011
PP Moorburg
Germany
Assembly of electrostatic precipitators
Fisia Babcock Environment GmbH,
Germany
2011
SPP Lünen
Germany
Erection of feed water pipings
BHR Hochdruck – Rohrleitungsbau
GmbH, Germany
2010 2011
GDF Suez PP Wilhelmshaven
Germany
Piping erection – auxiliary systems
Kraftanlagen München GmbH,
Germany
2010 2011
TE Frimmersdorf
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2010
SW München- HKW
Nord
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2010
EnBW Stuttgart
Münster
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2010
TE Mannheim
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2010
SW Duisburg
Germany
Boiler pressure parts overhaul
Babcock Borsig Service GmbH,
Germany
2010
PP Neurath, BoA 2/3
Germany
Ducts preassembly
Hitachi Power Europe GmbH /
Alstom, Germany
2010
PP Datteln, blok 4
Germany
Erection of a boiler unit, internal pipings
and coal grinders
Hitachi Power Europe GmbH, Germany
2010
The Association of Croatian Thermal
Power Plant Construction Companies
PP Belchatów 5 & 6
Poland
Erection of equipment, ducts and pipings Babcock Borsig Service GmbH,
Germany
2010
GSPP Braunschweig
, PP Mitte
Germany
Piping erection
BHR Hochdruck- Rohrleitungsbau
GmbH, Germany
2010
Kandit Premijer
Osijek Sugar Factory
Croatia
Revision of boiler units
Kandit - Premijer d.o.o., Croatia
2010
NPP Krško
Slovenia
Annual overhaul
NEK d.o.o., Slovenia
2010
PP Belchatów 5
Poland
Fabrication and assembly of new boiler
unit firing system
SteinmüllerInstandsetzung Kraftwerke GmbH, Germany
2010
PP Voerde
Germany
Dismantling of old and assembly of new
coal dust ducts
Babcock Borsig Service GmbH,
Germany
2009
Kandit Premijer
Osijek Sugar Factory
Croatia
Revision of boiler units
Kandit - Premijer d.o.o., Croatia
2009
NPP Krško
Slovenia
Annual overhaul
NEK d.o.o., Slovenia
2009
Mecklenburger
KartofelveredelungGmbH Hagenow
Germany
Boiler plant erection
Oschatz GmbH, Germany
2009
Marica-Iztok 3
Bulgaria
Flue ducts assembly
AE&E CZ s.r.o., Czech Republic
2009
PP Neurath, BoA 2/3
Germany
Assembly of fuel gas cleaning unit
Austrian Energy &Environment AG
&Co KG, Austria
2009
PP Neurath, BoA 2/3
Germany
Assembly of piping system LAB
Babcock Borsig Service GmbH,
Germany
2009
PP Neurath, BoA 2/3
Germany
Assembly of electrostatic precipitators
Fisia Babcock Environment GmbH,
Germany
2009
PP Neurath, BoA 2/3
Germany
Assembly of auxiliary piping system
Kraftanlagen München GmbH,
Germany
2009
PP Belchatów 4
Poland
Fabrication and assembly of new boiler
unit firing system
SteinmüllerInstandsetzung Kraftwerke GmbH, Germany
2009
NPP Krško
Slovenia
Secondary valves and secondary equipment overhaul
NEK d.o.o., Slovenia
2009
TPP Zagreb
Croatia
L boiler assembly
ĐĐ TEP d.o.o., Croatia
2008
PP Rijeka
Croatia
Replacement of steamline
ĐĐ TEP d.o.o., Croatia
2008
Belišće d.d. (PP)
Croatia
Replacement of K4 boiler drum
ĐĐ TEP d.o.o., Croatia
2008
RZZ Herten 2
Germany
Erection of 2 boiler plants
Fisia Babcock Environment GmbH,
Germany
2008
PP Plomin 1
Croatia
Boiler pressure parts overhaul
HEP d.d., Croatia
2008
PP Neurath, BoA 2/3
Germany
Preassembly of air and flue ducts boiler
F, G
Logicom GmbH, Germany
2008
IHKW Andernach
Germany
Boiler plant erection
Oschatz GmbH, Germany
2008
MONTING d.o.o.
PP SISAK BLOK C
CROATIA
CONSTRUCTION OF 230/50 MW POWER-
HEP
PLANT
20092013
TE - TO ZAGREB
CROATIA
WK5 BOILER ERECTION
ĐĐ TEP
2012
EL-TO ZAGREB
CROATIA
WK4 BOILER ERECTION
ĐĐ TEP
2010
TE-TO ZAGREB
CROATIA
RECONSTRUCTION OF SUPERHEATED
ĐĐ TEP
2009
TE-TO ZAGREB
CROATIA
HEP
2008
KAM-BERLIN
2010-
STEAM GENERATORS
REPLACEMENT OF A PART OF THE JOINT
AIR AND FLUE GAS DUCTING IN BOILERS
K6, WK1, WK3, WK4, K6 to K8
PP HAMBURG-MOR-
GERMANY
BURG 2x820 MW
INSTALLATION OF MEDIUM-PRESSURE
AND LOW-PRESSURE PIPELINES
2012
NP OLKILUOTO
FINLAND
PIPELINE INSTALLATION
BHR-ESSEN
2009-
MAINNOVA AG
GERMANY
DEINSTALLATION AND INSTALLATION OF
BHR-ESSEN
2009
CB&I LUMUS
2008-
2013
FRANKFURT
HYDROCRACKER
PIPELINE AND PIPELINE EQUIPMENT
CROATIA
COMPLEX
CONSTRUCTION AND ERECTION OF
STEEL STRUCTURES, EQUIPMENT INSTAL-
2010
LATION
HP TORINO
ITALY
PP CHIVASSO
ITALY
INSTALLATION OF THREE WATER-TUBE
DEMONT
BOILERS
INSTALLATION OF BOILERS 3 X
20052006
DEMONT
250/130MW
20032004
Zagreb Montaža Grupa
Waste incineration
CH-Hinwill
plant
Thermal power
Delivery and installation of flue gas
VonRoll
treatment systems
20112012
D-Lünen
Delivery of electrical filter parts, Vikom
SPX/BakkeDürr
2011
D-Hannover
Production of steel structure and bridges
Eiffel Deutschland
2010-
plant
Steel constructions
and bridges
Thermal power
2012
CZ-Ledvice
Erection of steel structure – TPP Ledvice
Metrostav
Airport building
D-Berlin
Erection of steel construction of Berlin/
Eiffel Deutschland
Plinacro building
HR-Ivanić
plant
20102011
Schönefeld airport building
20092010
Construction of Plinacro building
Plinacro
2010
Construction of hydrogen production
Technip KTI
2010
Hitaci
2009-
Grad
Hydrogen produc-
HR-Rijeka
tion unit
Thermal power
plant in Rijeka Oil Refinery
D-Datteln
plant
Erection of steel construction - termoelektrana Datteln
Waste incineration
GB-New
Construction, delivery and installation of
plant
Haeven
flue gas treatment plants
Thermal power
D-Lunen
Construction and installation of air and
plant
Thermal power
VonRoll
2010
AE&A
2010
Construction and installation of flue gas
Austrian Energy &AustriaGmbH,
2008-
treatment systems
Graz
2009
Construction and equipping
Zagrebački holding d.o.o.
2008-
flue gas ducting
D-Glückstadt
plant
ER
-2011
HR-Zagreb
2009
The Association of Croatian Thermal
Power Plant Construction Companies
Šubićevac, residen-
HR-Šibenik
tial area
Design and construction of “turnkey”
Zagreb-Montaža, vlastiti projekt
2008
residential area
Störbrücke
D-Itzehoe
Erection of steel construction
Eiffel DeutschlandStahltechnologie
2008
KlimahausOstund
D-Bremer-
Erection of steel construction
Eiffel DeutschlandStahlbauGmbH
2007-
Plaza
haven
Oberhafenkanal-
D-Hamburg
Erection of steel construction of a bridge
Eiffel DeutschlandStahltechnologie
2008
brückeundEisen-
20072008
bahnüberführung
Kennedybrücke
ThyssenKrupp Steel
D-Bonn-
Reconstruction of steel construction of
Beuel
a bridge
Eiffel DeutschlandStahltechnologie
2007-
D-Duisburg
Erection of steel construction
MAURER SÖHNE GmbH&Co.
2007
D-Duisburg
Blast furnace installation
MAURER SÖHNE GmbH&Co.
2007
D-Wenden
Installation of dust collection systems
BALCKE-DÜRR GmbH
2007
HR-Zagreb
Preparatory works for construction of
Vodovod hrvatsko primorje-južni
2006-
Stinica pumping station in Hrmotine –
ogranak d.o.o.
2007
HaslingerStahlbauGmbH
2005-
2009
AG Hochofen HO 8
ThyssenKrupp Steel
AG Hochofen HO 8
ThyssenKrupp Steel
AG Hochofen HO 8
Procrpna stanica
“Stinica”
Karlobag pipeline
NeueMesse Hala 8
D-Stuttgard
Erection of steel construction
2006
SachtlebenChe-
D-Duisburg-
Delivery and installation of electrical
mieGmbH
Homberg
filters
Administration
HR-Zagreb
Interior and exterior reconstruction and
building
functional adaptation
ALSTOM Power Service GmbH
2005
Plinacro d.o.o.
2005