Angel-Global Partner.com Adresse: Fatih cad.14 Sok 11/f Oba mah. Antalya/alanya Photovoltaic system sizing report 1012 KWp Kurulum Genel Gorunumu Project : Antalya 1 MWp Arazi Ustu Client : Zeki Kücükyarma Stephan Rindisbacher Address : Phone number : E-Mail : Fatih cad . 14 sok 11/f Oba mah. 07400 Antlaya/ Alanya +90 501 211 74 05 +90 543 960 3146 +41445860562 [email protected] [email protected] Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Panel Sehpasi Ve Tel Cit Uygulama Gorunumleri DC : 1012 KWp AC : 990 KW Toplam Guc Sebekeye Verilen Maksimum Guc 990 AC Output Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf . Hypothesis: Climate reference : Station name Latitude (°) Longitude (°) Altitude (m) Mean albedo - first quarter - second quarter - third quarter - fourth quarter Annual Data Direct irradiation (kWh/m2) Diffuse irradiation (kWh/m2) Global irradiation (kWh/m2) Antalya 36.86 30.73 50 0.20 0.20 0.20 0.20 1107.00 651.00 1758.00 Origin of meteorological data : Données MeteoNorm issues des bases de données Cythelia, Ta 1996-2005, Ins. 1983-1992 Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Site information : Site name Latitude (°) Longitude (°) Altitude (m) Annual solar irradiation Horizontal without mask (kWh/m²/yr) Horizontal with mask (kWh/m²/yr) Shadow Factor 36.86 30.73 50 1758 1752 1.00 Horizontal month solar irradiation (kWh/m2): Direct 150 141 141 Diffuse 124 125 121 118 102 100 89 75 75 50 54 49 75 73 68 80 71 53 50 46 50 39 38 33 31 31 25 0 Shading : 90° 85° 80° 75° 70° 65° 60° 55° 50° 45° 40° 35° 30° 25° 20° 15° 10° 5° 0° July Aug ust September October Nov ember Dec ember June May March Febr uary January -180° -150° -120° -90° -60° -30° 0° 30° 60° 90° 120° 150° 180° Diffuse model choice : Hay and Davies (Shadowing Factor = Solar Irradiation annual with mask / Solar Irradiation annual without mask) Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf . Results: Production results : Total module count Peak power (kWp) Year DC production (kWh) Year AC production (kWh) Year needs (kWh) DC specific production (kWh/kWp) AC specific production (kWh/kWp) Mean* performance ratio (%) Initial performance ratio** (%) 4048 1 012.0 1 503 921 1 405 338 0 1 486 1 389 79.26 82.88 Monthly production and consumption (kWh AC) : 175 000 167 523 168 245 159 283 150 282 150 000 138 743 132 393 125 000 118 070 101 591 100 000 77 656 75 000 68 026 66 545 56 983 50 000 25 000 0 Production (kWh/month) *Mean value of performance ratio during observation period **Mean value of initial performance ratio (year 0) Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Detailed results : Annual AC productions (kWh): 1 500 000 1 250 000 1 000 000 750 000 500 000 250 000 0 AC price (€/kWh) : 0.1000 0.0750 0.0500 0.0250 0.000 Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Annual incomes (€): 175 000 150 000 125 000 100 000 75 000 50 000 25 000 0 Return on investment time: 1 750 000 1 500 000 1 250 000 1 000 000 750 000 500 000 250 000 0 -250 000 -500 000 -750 000 -1 000 000 -1 250 000 -1 500 000 -1 750 000 Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Glossary : Peak Power: Power (in Wp) provided by modules in watts at STC (standard test conditions : 1 000 W/m², AM 1.5 spectrum, 25°C cell temperature) Yield: Energy produced by the photovoltaic installation, in kWh AC: Alternative Current DC: Direct Current Specific Yield: Productible normalized to installed power, in kWh/kWp Performance Ratio: ratio beetween specific yield and annual incident irradiation, expanded in % (kWh / kWp x h) Return on investment time: ratio beetween annual cash-flow and investment (expanded in years) NPV rate: rate representing the cost of access to capital NPV, Net Present Value: Generated Value at the end of observation period Actual return on investement time: Observation time zeroing the net present value Internal Rate of Return: NPV-rate nullifying the net present value Profitability Index: ratio beetween net present present value and investment BOS, Balance Of System: Cost including all components of a photovoltaic system, except modules LCOE, Levelized Cost Of Energy (or Overall discounted cost) : It is the ratio between the discounted cost of the project and the total energy produced over the observation period. This is the cost per kWh produced by the installation (€/kWh). Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf Technical description: Description of PV field 1 : PHOTOVOLTAIC FIELD 1 Field name PHOTOVOLTAIC FIELD 1 Modules - Manufacturer - Model - Technology - STC power (Wp) - Vpmax (V) - Isc (A) - STC efficiency (%) - Modus count - String modules - Modules branches - Installed power (kWp) - Surface (m²) - Surfacic mass (kg/m²) - Total mass (kg) Yingli Solar Yingli Solar - YL250P-29b multicrystalline (mc-Si) 250.0 29.8 8.92 15.3 2024 23 88 506.00 3 306.2 0.0 0.0 Inverter - Manufacturer - Model - Nominal power (W) - Max input voltage (V) - Inverters count - Total power (kW) - Maximum efficiency (%) - European efficiency (%) GH Huawei 20000 20 000 1 000 22 440.0 98.6 98.3 Geometry Tracking type : Orientation (°): Slope (°): Steady 0 25 Field degradation assumptions : Mismatch (%) : 1.00 Modules aging (%/year) : 0.43 Module back ventilation: 0.00 (back space < 2.5 cm) Angel-globalpartner.com Antalya 1 MWp Arazi Ustu-2014-08-15T14-52-52.pdf
© Copyright 2024 Paperzz