Status of Retirement / Replacement of more than 25 years old Coal based Thermal Power Plants (as on 01.02.2017) In July 2016, CEA in consultation with various Power Utilities identified about 9000 MW capacity coal based thermal power plants in Govt. Sector which are more than 25 years old for retirement / replacement by new super-critical units on the basis of un-economic operation. Out of which, since Sept.'2015 to Jan.'2017, capacity of 3530 MW has been retired and deleted from National Installed Capacity by CEA (details given at Table ‘A’). Further, the status of the new super-critical thermal units (totaling 10180 MW capacity), which have been proposed to be set up as replacement against the retired / proposed to be retired old subcritical units (totaling 5228 MW capacity) is given at Table ‘B’. Table ‘A’ : Coal based Thermal Units Retired [Since Sept.'15 to Jan.' 17] Unit No. Capacity (MW) Amarkantak TPS (2x120 MW) 3&4 240 HPGCL Panipat TPS (4x110 MW) 1 to 4 440 3 MAHAGENCO Koradi TPS (4x105 MW) 1 to 4 420 4 MAHAGENCO Chandrapur TPS (2X210 MW) 1&2 420 5 MAHAGENCO Parli TPS 3 210 6 DVC Durgapur TPS 3 140 7 DVC Chandrapur TPS 1 130 8 WBPDCL 1 to 4 480 9 PVUNL 1, 2, 3, 5 & 8 360 10 TANGEDCO Ennore TPS (60 + 3x110 MW) 1 to 5 450 11 GSECL Gandhinagar TPS (2x120 MW) 1&2 240 Total: 3530 S.No. Name of the Utility 1 MPPGCL 2 Name of the Station Santaldih TPS (4x120 MW) Patratu TPS (3x50 +100+ 110 MW) Table ‘B’ : Status of the super-critical thermal units as replacement of old subcritical units STATE SECTOR PROJECTS : State Plant Capacity Retired / proposed for Retirement (MW) Haryana Panipat TPS (440) Proposed replacement Cap. (MW) 800 Pit Head / Load Centre Present status Load Centre 660 660 Load Centre Load Centre TOR for Environment Clearance (EC) for 800 MW unit obtained. Haryana Govt. has decided to retire Unit 1 to 4 in its meeting held on 09.12.2015. Order for 660 MW unit placed in September 2015 EC yet to be obtained. NIT for 660 MW unit floated. 2x660 Pit Head Setting up of super critical units is in proposal stage Pit Head Pit Head Setting up of super critical units is in proposal stage Setting up of super critical units is in proposal stage. U.P. U.P. Harduaganj TPS (290) Panki TPS (210) U.P. Obra TPS (438) M.P. M.P. Amarkantak TPS (280) Satpura TPS (312.5) 660 660 Maharashtra Nasik TPP (250) 660 Load Centre Land available, Water & Fuel tied up, PPA agreement is available. Process for aviation and MoEF clearance is in progress. Maharashtra Bhusawal Unit 2 (62.5) 660 Load Centre Proposed replacement unit at Bhusawal. EC for 660 MW Bhusawal unit-6 obtained in Nov. 2012. The ICB tender on EPC basis was invited and the Bid evaluation report is submitted to Competent Authority for approval. Ukai TPS (240 ) 660 Load Centre Setting up of super critical units is in proposal stage. Kothagudem TPS Stage I to IV & Ramagundem’ B (782.5) Ennore TPS (450) 800 Pit Head 660 Load Centre DPL TPS (280) 660 Load Centre TSGENCO has taken up the works for replacement unit. EC obtained. Order placed on BHEL. Zero date commenced on 01/01/15. TANGEDCO has proposed for replacement unit. TOR obtained. Setting up of super critical units is in proposal stage. Paras Unit 2 (62.5) Gujarat Telangana Tamilnadu West Bengal Sub Total 4098 8200 CENTRAL SECTOR PROJECTS : State West Bengal Jharkhand Plant Capacity Retired / proposed for Retirement (MW) DVC Durgapur (350 ) DVC (780 ) Chandrapura Proposed Pit Head / replacement Load Centre Cap. (MW) 660 Load Centre 2x660 Sub Total 1130 1980 TOTAL 5228 10180 Pit Head Present status Setting up of super critical units is in proposal stage. Fund constraint. Setting up of super critical units is in proposal stage.
© Copyright 2026 Paperzz