Status of Retirement / Replacement of more than 25 years old Coal

Status of Retirement / Replacement of more than 25 years old
Coal based Thermal Power Plants (as on 01.02.2017)
In July 2016, CEA in consultation with various Power Utilities identified about 9000 MW
capacity coal based thermal power plants in Govt. Sector which are more than 25 years
old for retirement / replacement by new super-critical units on the basis of un-economic
operation. Out of which, since Sept.'2015 to Jan.'2017, capacity of 3530 MW has been
retired and deleted from National Installed Capacity by CEA (details given at Table ‘A’).
Further, the status of the new super-critical thermal units (totaling 10180 MW capacity),
which have been proposed to be set up as replacement against the retired / proposed to
be retired old subcritical units (totaling 5228 MW capacity) is given at Table ‘B’.
Table ‘A’ : Coal based Thermal Units Retired [Since Sept.'15 to Jan.' 17]
Unit No.
Capacity
(MW)
Amarkantak TPS
(2x120 MW)
3&4
240
HPGCL
Panipat TPS
(4x110 MW)
1 to 4
440
3
MAHAGENCO
Koradi TPS
(4x105 MW)
1 to 4
420
4
MAHAGENCO
Chandrapur TPS
(2X210 MW)
1&2
420
5
MAHAGENCO
Parli TPS
3
210
6
DVC
Durgapur TPS
3
140
7
DVC
Chandrapur TPS
1
130
8
WBPDCL
1 to 4
480
9
PVUNL
1, 2, 3, 5 & 8
360
10
TANGEDCO
Ennore TPS
(60 + 3x110 MW)
1 to 5
450
11
GSECL
Gandhinagar TPS
(2x120 MW)
1&2
240
Total:
3530
S.No.
Name of the Utility
1
MPPGCL
2
Name of the
Station
Santaldih TPS
(4x120 MW)
Patratu TPS
(3x50 +100+ 110
MW)
Table ‘B’ : Status of the super-critical thermal units as replacement of old subcritical units
STATE SECTOR PROJECTS :
State
Plant Capacity Retired /
proposed for Retirement
(MW)
Haryana
Panipat TPS (440)
Proposed
replacement
Cap. (MW)
800
Pit Head /
Load Centre
Present status
Load Centre
660
660
Load Centre
Load Centre
TOR for Environment Clearance (EC) for 800 MW unit
obtained. Haryana Govt. has decided to retire Unit 1 to 4 in
its meeting held on 09.12.2015.
Order for 660 MW unit placed in September 2015
EC yet to be obtained. NIT for 660 MW unit floated.
2x660
Pit Head
Setting up of super critical units is in proposal stage
Pit Head
Pit Head
Setting up of super critical units is in proposal stage
Setting up of super critical units is in proposal stage.
U.P.
U.P.
Harduaganj TPS (290)
Panki TPS (210)
U.P.
Obra TPS (438)
M.P.
M.P.
Amarkantak TPS (280)
Satpura TPS (312.5)
660
660
Maharashtra
Nasik TPP (250)
660
Load Centre
Land available, Water & Fuel tied up, PPA agreement is
available. Process for aviation and MoEF clearance is in
progress.
Maharashtra
Bhusawal Unit 2 (62.5)
660
Load Centre
Proposed replacement unit at Bhusawal. EC for 660 MW
Bhusawal unit-6 obtained in Nov. 2012. The ICB tender on EPC
basis was invited and the Bid evaluation report is submitted to
Competent Authority for approval.
Ukai TPS (240 )
660
Load Centre
Setting up of super critical units is in proposal stage.
Kothagudem TPS Stage I
to IV & Ramagundem’ B
(782.5)
Ennore TPS (450)
800
Pit Head
660
Load Centre
DPL TPS (280)
660
Load Centre
TSGENCO has taken up the works for replacement unit. EC
obtained. Order placed on BHEL. Zero date commenced on
01/01/15.
TANGEDCO has proposed for replacement unit. TOR
obtained.
Setting up of super critical units is in proposal stage.
Paras Unit 2 (62.5)
Gujarat
Telangana
Tamilnadu
West Bengal
Sub Total
4098
8200
CENTRAL SECTOR PROJECTS :
State
West Bengal
Jharkhand
Plant Capacity
Retired / proposed
for Retirement (MW)
DVC Durgapur (350 )
DVC
(780 )
Chandrapura
Proposed
Pit Head /
replacement Load Centre
Cap. (MW)
660
Load Centre
2x660
Sub Total
1130
1980
TOTAL
5228
10180
Pit Head
Present status
Setting up of super critical units is in proposal
stage. Fund constraint.
Setting up of super critical units is in proposal
stage.