Mallee Regional Catchment Strategy (2013-19): Mid-term Review Report Mallee Catchment Management Authority Looking after our environment together www.malleecma.vic.gov.au Publication details Acknowledgements Mallee Regional Catchment Strategy The Mallee CMA acknowledges Aboriginal (2013-19): Mid-term Review Report Traditional Owners past and present within the region, their rich culture and spiritual connection to Country. We also recognise Date: February 2017 Author: Jo Latta, Manager Strategy and and acknowledge the contribution and Mallee Catchment interest of Aboriginal people and Management Authority organisations in land and natural resource www.malleecma.vic.gov.au management. PO Box 5017 Mildura 3502 Policy. Telephone 03 5051 4377 Cover images Facsimile 03 5051 4379 Top: Mallee wheat field. Photo: IStock. Middle: Hattah Lakes. Photo: Mallee CMA. Copyright Bottom: Aboriginal Reference Group at © Mallee Catchment Management Lindsay Almond grove. Photo: Mallee CMA. Authority 2017 Disclaimer Publications produced by the Mallee Catchment Management Authority may be of assistance to you but the Mallee Catchment Management Authority and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular Version Prepared Author Reviewed Final Draft 3/2/2017 Jo Latta MCMA Board Final 28/2/2017 Jo Latta purpose and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in any Mallee Catchment Management Authority publication. Contents Executive Summary _____________________________________________________________________________________ 7 Overview _________________________________________________________________________________________________________7 Background ___________________________________________________________________________________________________7 Objectives _____________________________________________________________________________________________________7 Outcomes ______________________________________________________________________________________________________7 Principles ______________________________________________________________________________________________________7 Stakeholder Consultation ____________________________________________________________________________________8 Regional Assets ________________________________________________________________________________________________ 10 Delivery Framework ___________________________________________________________________________________________ 12 Implementation ________________________________________________________________________________________________ 13 Recommendations _____________________________________________________________________________________________ 16 1. Regional Assets____________________________________________________________________________________ 19 1.1 Rivers and Wetlands _______________________________________________________________________________________ 20 Valuing our Rivers and Wetlands __________________________________________________________________________ 20 Strategic Directions for the Management of our Rivers and Wetlands __________________________________ 21 Condition of our Rivers and Wetlands ____________________________________________________________________ 23 1.2 Threatened Species and Communities ___________________________________________________________________ 25 Valuing our Threatened Species and Communities ______________________________________________________ 25 Strategic Directions for the Management of our Threatened Species and Communities ______________ 25 Condition of our Threatened Species and Communities _________________________________________________ 26 1.3 Terrestrial Habitat _________________________________________________________________________________________ 28 Valuing our Terrestrial Habitat ____________________________________________________________________________ 28 Strategic Directions for the Management of our Terrestrial Habitat ____________________________________ 29 Condition of our Terrestrial Habitat _______________________________________________________________________ 30 1.4 Soils and Agricultural Land _______________________________________________________________________________ 32 Valuing our Soils and Agricultural Land___________________________________________________________________ 32 Strategic Directions for the Management of our Soils and Agricultural Land __________________________ 32 Condition of our Soils and Agricultural Land _____________________________________________________________ 34 1.5 Groundwater _______________________________________________________________________________________________ 36 Valuing our Groundwater __________________________________________________________________________________ 36 Strategic Directions for the Management of our Groundwater __________________________________________ 36 Condition of our Groundwater _____________________________________________________________________________ 37 1.6 Culture and Heritage ______________________________________________________________________________________ 38 Valuing our Culture and Heritage __________________________________________________________________________ 38 Strategic Directions for the Management of our Culture and Heritage _________________________________ 38 Condition of our Culture and Heritage ____________________________________________________________________ 40 1.7 Community Capacity for NRM ____________________________________________________________________________ 41 Valuing our Community’s Capacity for NRM ______________________________________________________________ 41 Strategic Directions for the Management of our Community’s Capacity for NRM _____________________ 41 Condition of our Community’s Capacity for NRM ________________________________________________________ 42 2. Delivery Framework ______________________________________________________________________________ 44 2.1 Integrating and Targeting Delivery _______________________________________________________________________ 45 Integrating Delivery ________________________________________________________________________________________ 45 Targeting Delivery __________________________________________________________________________________________ 45 2.2 MERI Framework __________________________________________________________________________________________ 49 MERI _________________________________________________________________________________________________________ 49 Program Logic _______________________________________________________________________________________________ 49 3. Implementation - Regional Assets _______________________________________________________________ 50 3.1 Waterways _________________________________________________________________________________________________ 52 Strategic Actions ____________________________________________________________________________________________ 52 Management ________________________________________________________________________________________________ 53 3.2 THREATENED SPECIES AND COMMUNITIES ___________________________________________________________ 54 Strategic Actions ____________________________________________________________________________________________ 54 Management ________________________________________________________________________________________________ 54 3.3 TERRESTRIAL HABITAT __________________________________________________________________________________ 56 Strategic Actions ____________________________________________________________________________________________ 56 Management ________________________________________________________________________________________________ 56 3.4 SOILS AND AGRICULTURAL LAND _______________________________________________________________________ 58 Strategic Actions ____________________________________________________________________________________________ 58 Management ________________________________________________________________________________________________ 59 3.5 COMMUNITY CAPACITY FOR NRM _______________________________________________________________________ 60 Strategic Actions ____________________________________________________________________________________________ 60 Management ________________________________________________________________________________________________ 62 4. Implementation – Delivery Framework _________________________________________________________ 64 4.1 Integrating and Targeting Delivery _______________________________________________________________________ 65 Strategic Actions ____________________________________________________________________________________________ 65 Implementation _____________________________________________________________________________________________ 66 4.2 Monitoring, Evaluation, Reporting and Improving Delivery ____________________________________________ 69 Strategic Actions ____________________________________________________________________________________________ 69 Implementation _____________________________________________________________________________________________ 71 Appendices _____________________________________________________________________________________________ 74 Appendix 1: Victorian Catchment Management Council Guidelines for Review of Regional Catchment Strategies _______________________________________________________________________________________________________ 75 Appendix 2: Mallee RCS Monitoring, Evaluation, Reporting and Improvement (MERI) Framework ____ 76 Appendix 2: Annual Management Outputs and Activities __________________________________________________ 79 Figure 1: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes ...... 15 Figure 2: Examples of Mallee RCS Regional Assets ............................................................................................................... 19 Figure 3: Waterway Management Units established by the Mallee Waterway Strategy (2014-22). ............... 20 Figure 4: Example of waterway prioritisation within a Mallee Waterway Strategy (2014-22) Waterway Management Unit (Belsar Yungera). ............................................................................................................................................ 21 Figure 5: Link to Mallee Waterway Strategy (2014-22)..................................................................................................... 21 Figure 6: Mallee Waterway Strategy Monitoring, Evaluation and Reporting Plan (2014-22) ........................... 24 Figure 7: Relative priority of Terrestrial Habitat Assets – NaturePrint Version 3 (State of Victoria 2014) . 28 Figure 8: Link to Mallee Natural Resource Management Plan for Climate Change (2016-19). ......................... 29 Figure 9: Link to 2015 Irrigated Horticulture Crop Report (June 2016) ..................................................................... 32 Figure 10: Registered Aboriginal Parties and Registered Aboriginal Party Applicants. ....................................... 39 Figure 11: Link to Our Catchments, Our Communities (2016-19) ................................................................................. 41 Figure 12: Link to Mallee Regional Community Capacity for NRM - Detailed Condition Report (2013) ...... 42 Figure 13: Examples of assets occurring within the Avoca Basin Terminal Lakes System and Creeklines Catchment priority landscape (Catchment Asset). ................................................................................................................ 44 Figure 14: Priority of action for interventions within each of the 17 biophysical Catchment Assets. ........... 47 Figure 15: Priority of action for interventions within each of the 5 Priority Corridors. ...................................... 48 Figure 16: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes. ... 51 Figure 17: Monitoring delivery outcomes example. ............................................................................................................. 64 Figure 18: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes. ... 67 Figure 19: Link to DELWP Output Data Standards (2015) ................................................................................................ 72 Figure 20: Example data available from Fenner School of Environment and Society: % exposed soil (2015) and % change (2000-2015); and % tree cover (2015) and % change (1972-2015). ............................................ 72 Figure 21: Link to Victorian Catchment Management Authorities Actions and Achievements Report (201415) ............................................................................................................................................................................................................... 73 Table 1: Stakeholder consultation undertaken to inform the Mallee RCS mid-term review. ................................. 9 Table 2: Key strategic, policy and knowledge changes identified by this Review as having occurred since the RCS was released. ......................................................................................................................................................................... 10 Table 3: Regional Asset condition trend statements at the time of this review (2016). ....................................... 11 Table 4 Key strategic, policy and knowledge changes identified by this Review as having occurred since the RCS was released. ......................................................................................................................................................................... 12 Table 5: Progress against RCS long term (20 year) objectives for Regional Assets and Foundation Activities. .................................................................................................................................................................................................. 13 Table 6: Proportion (%) of 2013-16 outputs delivered within each of the RCS’s Catchment Assets. ............. 14 Table 7: Summary of recommendations .................................................................................................................................... 16 Table 8: Assessment criteria developed for annual condition reporting. ................................................................... 49 Table 9: Headline theme, Regional Asset and definition ..................................................................................................... 50 Table 10: Progress against RCS Strategic Actions for Waterways ................................................................................... 52 Table 11: Waterway management outputs and activities delivered under funding received by the Mallee CMA. ........................................................................................................................................................................................................... 53 Table 12: Progress against RCS Strategic Actions for Threatened Species & Communities ................................ 54 Table 13: Threatened Species & Communities management outputs and activities delivered under funding received by the Mallee CMA. ............................................................................................................................................................ 55 Table 14: Progress against RCS Strategic Actions for Terrestrial Habitat. .................................................................. 56 Table 15: Terrestrial Habitat management outputs and activities delivered under funding received by the Mallee CMA.............................................................................................................................................................................................. 56 Table 16: Progress against RCS Strategic Actions for Soils and Agricultural Land.................................................. 58 Table 17: Soils and Agricultural Land Management Outputs and Activities delivered under funding received by the Mallee CMA. ............................................................................................................................................................ 59 Table 18: Progress against RCS Strategic Actions for Culture and Heritage and Community Capacity for NRM. ........................................................................................................................................................................................................... 60 Table 19: Community Capacity for NRM Outputs and Activities delivered under funding received by the Mallee CMA.............................................................................................................................................................................................. 63 Table 20: Progress against RCS Strategic Actions for Integrating and Targeting Delivery. .................................. 65 Table 21: Proportion (%) of 2013-16 outputs delivered under funding received by the Mallee CMA occurring within each of the RCS’s Catchment Assets. ........................................................................................................ 68 Table 22: Progress against RCS Strategic Actions for monitoring, evaluating, reporting and improving delivery. ..................................................................................................................................................................................................... 69 Executive Summary OVERVIEW Background The Mallee Regional Catchment Strategy (RCS) is prepared under the provisions of the Catchment and Land Protection Act, 1994 (CaLP Act) in partnership with regional stakeholders, as a framework for strategic action to support and focus the ongoing coordinated efforts of the region’s land managers, government agencies and community groups. It is the primary integrated planning framework for land, water and biodiversity management in each of the ten catchment management regions of Victoria. The RCS is also the overarching strategic framework for action, under which are found a range of sub-strategies and action plans for each region. The CaLP Act states that an RCS must “….provide for the review of the strategy” s.24 (2) (g). All Victorian Catchment Management Authorities (CMA’s) committed to undertaking a review of their current RCS in line with the guidelines provided by the Victorian Catchment Management Council (VCMC). A working group comprising representatives from East Gippsland CMA and the VCMC was established to develop RCS Review guidelines, which were subsequently accepted by the Victorian Catchment Management Authority’s (VCMA’s) CEO’s and Chairs; and by the VCMC (see Appendix 1). On completion (CMA Board endorsement), each region’s mid-term review is to be provided to the VCMC and to the DELWP Catchments Branch. Objectives The primary objective of the RCS mid-term review project is to assess the Strategy in terms of: Performance and learnings to date; New approaches, information and technologies; and Aspects or issues which are no longer relevant. Outcomes Delivery of the RCS mid-term review project will enhance regional capacity to: Understand and record the successes (or otherwise) and knowledge that have resulted from RCS implementation to date; and Plan for RCS renewal post 2019. Principles The RCS mid-term review was delivered according to the following principles. The review will adhere to VCMC guidelines (see Appendix 1). The review will align with the Mallee RCS monitoring, evaluation, reporting and improvement (MERI) framework (see Appendix 2). The review outcomes and recommendations will be considered by subsequent program/project planning and delivery; sub-strategy development and reviews; and regional planning for the remainder of the RCS 2013-2019 implementation period. This report should be considered an ’addendum’ to the 2013-19 RCS (i.e. it does not replace the current 2013-2019 RCS document); and the recommendations detailed within it integrated into future implementation, evaluation and reporting. Stakeholder Consultation Existing Mallee CMA stakeholder forums were used as the primary consultation/engagement mechanism for the RCS mid-term review. Detail on the specific groups engaged is provided in Table 1. Table 1: Stakeholder consultation undertaken to inform the Mallee RCS mid-term review. Forum Regional Stakeholder Representation Consultation Mechanism Purpose MCMA Board Six Board members representing wide range of regional interests (e.g. agricultural, economic, horticultural, environmental) Agenda items and presentations/workshops at scheduled meetings. Consideration of project approach. Input into RCS performance/implementation to date; any changes going forward (2017-19); and renewal (>2019) considerations. Approval of Final Draft. Land & Water Advisory Committee Nine community members representing Mallee sub-regions (northern, central, eastern, southern) and landscapes (productive and environmental) Agenda items and presentations/workshops at scheduled meetings. Feedback on RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations. Aboriginal Reference Group Nine Aboriginal community members representing Mallee sub-regions (northern, central, eastern, southern) Agenda items and presentations/workshops at scheduled meetings. Feedback on RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations. Biodiversity Technical Advisory Committee Mildura Rural City Council, Swan Hill Rural City Council, DEDJTR (Biosecurity), DELWP (Regional), Lower Murray Water, Trust for Nature, Parks Victoria, Mallee CMA. Agenda items and presentations/workshops at scheduled meetings. Identification of data/information to address key gaps; Input into RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations. Land Technical Advisory Committee Birchip Cropping Group, Mallee Sustainable Farming, Dodgshun Medlin, DEDJTR (extension), DEDJTR (research), Vic-No-Till Farming Association, Mallee Landcare, Mallee CMA. Agenda items and presentations/workshops at scheduled meetings. Identification of data/information to address key gaps; Input into RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations. Water Technical Advisory Committee DEDJTR, DELWP (Regional), Grampians Wimmera Mallee Water, Mildura Rural City Council, Parks Victoria, Lower Murray Water. Agenda items and presentations/workshops at scheduled meetings. Identification of data/information to address key gaps; Input into RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations. MCMA Staff Mallee CMA Biodiversity, Land, Water, Salinity, Floodplain and Infrastructure Program Managers Workshops Identification of data/information to address key gaps (Nov). Input into RCS performance/implementation to date; any changes going forward (2017-19); renewal (>2019) considerations (Nov). Feedback on draft review documentation. REGIONAL ASSETS The RCS groups key elements of the region’s natural, cultural and productive landscapes into nine Regional Asset Classes; Rivers; Wetlands; Threatened Species, Populations and Communities; Terrestrial Habitat; Soils; Agricultural Land; Groundwater; Culture and Heritage; and Community Capacity for Natural Resource Management (NRM). This review identifies that while this approach establishes an effective framework overall, further consolidation in the next iteration of the RCS should be considered. Specifically that: River and Wetland Assets be integrated into a ‘Waterways Asset’, aligning with the Mallee Waterway Strategy (2014) framework; and Further investigations on the pros and cons of integrating the Soils and Agricultural Land Assets be undertaken. Table 2 summarises the key strategic, policy and knowledge changes identified by this Review as having occurred since the RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19). Please note: this summary includes only those instruments which were complete at the time of review. Further detail on strategies, plans etc. that are currently being progressed is provided in Section 1. A complete list of recommendations developed by this review to inform future (2017-19) implementation, evaluation and reporting of the RCS, and guide development of the next iteration of a regional strategy is provided in Table 7. Background information relating to each of these recommendations is detailed in the corresponding section of this report. Table 2: Key strategic, policy and knowledge changes identified by this Review as having occurred since the RCS was released. Regional Asset Key Changes Rivers & Wetlands Mallee Waterway Strategy (2014) including application of a new prioritisation framework and MER Plan Victorian Floodplain Management Strategy (2016) and commencing development of the Mallee Floodplain Strategy. Water for Victoria (2016) Plan Mallee Biolinks Plan (2016) NaturePrint version 3 (2014) National Soil Research, Development and Extension Strategy (2014) Aboriginal Heritage Act Amendment (2016) Management areas for Registered Aboriginal Parties and Applicants Our Catchments, Our Communities - Integrated Catchment Management in Victoria (2016) Mallee Regional Landcare Support Strategy (2013) Terrestrial Habitat Soils & Agriculture Culture & Heritage Community Capacity for NRM Mallee CMA Indigenous Participation Plan (2016) Regional Community Capacity Monitoring Tool (2013) Table 2 summarises Regional Asset condition trend statements at the time of this review (2016). Further detail on the data associated with these assessments is provided in Section 1. Table 3: Regional Asset condition trend statements at the time of this review (2016). Regional Asset Condition Statement Rivers & Wetlands Threatened Species & Communities Terrestrial Habitat Soils & Agricultural Land Groundwater Culture & Heritage Community Capacity for NRM Stable to improving Moderate to poor condition and some are in decline within their constrained ranges Stable to improving Stable to improving Stable Insufficient data Improving DELIVERY FRAMEWORK The RCS sets out a framework for integrating and targeting the delivery of actions to ensure that available resources are applied effectively and efficiently. Twenty individual target areas of Catchment Assets are identified which group Regional Assets into significant landscapes for priority attention. A Monitoring, Evaluation, Reporting and Improvement (MERI) framework was also established by the RCS to form the basis of effective review and reporting processes. This review provides continued support for the established frameworks and their ongoing application. There were however several key strategic, policy and knowledge changes identified as having occurred since the RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) (see Table 4). Please note: this summary includes only those instruments which were complete at the time of review. Further detail on strategies, plans etc. that are currently being progressed is provided in Section 2. A complete list of recommendations developed by this review to inform future (2017-19) implementation, evaluation and reporting of the RCS, and guide development of the next iteration of a regional strategy is provided in Table 7. Background information relating to each of these recommendations is detailed in the corresponding section of this report. Table 4 Key strategic, policy and knowledge changes identified by this Review as having occurred since the RCS was released. Delivery Framework Key Changes Targeting Delivery MERI Mallee Natural Resource Management Plan for Climate Change (2016) Statewide Annual Catchment Condition Indicators (2016) IMPLEMENTATION This review rated 2013-16 progress against each of the RCS’s long term (20 year) objectives for the management of Regional Assets, and foundational activities identified as being required to support implementation of the regional delivery framework. These qualitative assessments applied a five point scale of excellent, very good, good, poor and very poor; and are based on stakeholder consideration of the proportion of strategic (6 year) actions delivered against to date, and the scale/impact of associated on-ground actions (see Table 5). Detail on mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for these long term objectives and foundation activities is provided in Sections 3 (Regional Assets) and 4 (Delivery Framework). A complete list of recommendations developed by the review in relation to RCS Implementation is provided in Table 7. Table 5: Progress against RCS long term (20 year) objectives for Regional Assets and Foundation Activities. Regional Asset Theme Waterways 2013-16 Progress Very Good Threatened Species Good Terrestrial Habitat Good Soils and Agricultural Land Good Culture and Heritage Good Community Capacity for NRM Foundational Activity Very Good 2013-16 Progress Integrating And Targeting Delivery Good Monitoring, Evaluating, Reporting and Improving Delivery Poor The scale and distribution of management activities delivered between 2013-16 under each of the RCS Regional Asset themes and Catchment Asset areas is shown in Figure 1. The specific quantity of outputs delivered for each theme is detailed in Section 3, with highlights including: 229,946 hectares of pest animal control; 106,482 hectares of pest plant control; 2,317 hectares of native vegetation established; 147 environmental watering sites; 1,686 hectares of irrigation infrastructure installed; 254 kilometres of fencing; 167 hectares of rubbish removal; 599 management agreements; 24,967 participants at engagement events; and 772 publications. Please note that management activity quantities considered by this review only represent those outputs achieved under funding received by the Mallee CMA. It does not include activities delivered by regional NRM providers where the funding for those activities was not provided by the CMA. This has been recognised as a key gap in the application of the RCS MERI framework as the extent of regional delivery not being captured is expected to be significant. A large proportion of 2013-16 management activity was delivered within priority landscapes (Catchment Assets). As presented in Table 6, between 43 and 100 percent of selected output types were targeted to the 17 biophysical Catchment Asset Areas; with the area of water regimes, rubbish removal and fencing occurring within these landscapes all being more than 90 percent. Detail on the proportion of these outputs delivered in each of the 17 Catchment Assets is provided in Section 3. Table 6: Proportion (%) of 2013-16 outputs delivered within each of the RCS’s Catchment Assets. Output Type % Delivered in Priority Landscapes % Delivered outside Priority Landscapes Pest Animal Control 62% 38% Weed Control 43% 57% Water Regime 99% 1% Revegetation 82% 18% Irrigations Infrastructure 89% 11% Rubbish Removal 100% - Fence 94% 6% Figure 1: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes RECOMMENDATIONS A complete list of recommendations developed by this review to inform future (2017-19) implementation, evaluation and reporting of the RCS, and guide development of the next iteration of a regional strategy is provided in Table 7. Background information relating to each of these recommendations is detailed in the corresponding Section of this report. Table 7: Summary of recommendations Section Component Recommendation 1. REGIONAL ASSETS 1.1 Rivers & Wetlands Value 1.1.1: Apply the Mallee Waterway Strategy prioritisation framework to River and Wetland related activities. Strategic Directions 1.1.2: Apply Mallee Waterway Strategy Regional Work Plans to River and Wetland related activities. 1.1.3: Where appropriate, integrate the planning, delivery and reporting of River and Wetland related activities. 1.1.4: Consider integrating River and Wetland Regional Assets into a ‘Waterway’ Asset in future iterations of the RCS. 1.1.5: Consider the Victorian Floodplain Management Strategy (2016) and the Water for Victoria (2016) Plan in River and Wetland related activities. 1.1.6: Apply Regional Riparian Action Plan priorities and aspirational targets to River and Wetland related activities. 1.1.7: Add the following ‘Strategic Action’ to both the Rivers and Wetlands Regional Assets Support the development and implementation of Water Resource Plans for the Wimmera-Mallee and Victorian Mallee areas. 1.1.8: Once finalised, consider the State Environment Protection Policy (Waters) review in River and Wetland related activities. 1.2 Threatened Species & Communities Condition 1.1.8: Apply the Mallee Waterway Strategy MER Plan (2014-22) to the monitoring, evaluation and reporting of River and Wetland related activities Strategic Directions 1.2.1: Once finalised, consider the new state biodiversity strategy ‘Protecting Victoria's Environment Biodiversity 2036’ and any changes to the Flora and Fauna Guarantee Act in Threatened Species and Communities related activities. 1.3 Terrestrial Habitat Value 1.3.1: Apply the updated NaturePrint spatial models (version 3) to Terrestrial Habitat related activities. Strategic Directions 1.3.2: Apply Mallee Biolink Plan (2016-19) priorities to Terrestrial Habitat related activities. 1.3.3: Once finalised, consider the new state biodiversity strategy ‘Protecting Victoria's Environment Biodiversity 2036’ and any changes to the Flora and Fauna Guarantee Act and Native Vegetation Clearing Regulations in Terrestrial Habitat related activities. 1.4 Soils and Agricultural Land 1.4.1: Consider the National Soil Research, Development and Extension Strategy (2014) in Soils and Agricultural Land related activities. 1.4.2: Once finalised, incorporate outcomes of the Victorian Mallee Irrigation Region Land and Water Management Plan (2011) review into Soils and Agricultural Land related activities. 1.4.3: Once finalised, consider the Victorian Soil Health Strategy (2012) review outcomes in Soils and Agricultural Land related activities. 1.4.4: Consider the Water for Victoria (2016) strategy in River and Wetland related activities. 1.4.5: Support the development and implementation of Water Resource Plans in the region as part of Recommendation1.1.7. 1.4.6: Once finalised, consider the State Environment Protection Policy (Waters) review in Irrigated Agriculture related activities. 1.4.7: Consider the Basin Salinity Management 2030 strategy (2015) in Soils and Agricultural Land related activities. 1.5 Groundwater Strategic Directions 1.5.1: Once finalised, apply the Murrayville Local Management Plan to Groundwater related activities. 1.5.2: Support the development and implementation of Water Resource Plans in the region as part of Recommendation1.1.7. 1.6 Culture & Heritage Strategic Directions 1.6.1: Consider 2016 amendments to the Aboriginal Heritage Act (2006) in Culture and Heritage related activities. 1.6.2: Recognise Registered Aboriginal Parties, Registered Aboriginal Applicants and associated management areas in Culture and Heritage activities. Condition 1.6.3: Report annually on changes in the number of culturally significant sites recognised in the region. Strategic Directions 1.7.1: Consider the Our Catchments, Our Communities (2016-19) Strategy in Community Capacity for NRM related activities. 1.7.2: Add the following strategic actions to the Community Capacity for NRM Regional Asset Community Capacity for NRM Implement and review the Mallee Regional Landcare Support Strategy. Implement and review the Mallee CMA Indigenous Participation Plan. SECTION COMPONENT RECOMMENDATION 2. DELIVERY FRAMEWORK 2.1 Integrating & Targeting Delivery Targeting Delivery 2.1.1: Apply priority corridors identified by the Mallee Natural Resource Management Plan for Climate Change (2016-19) to targeted delivery processes. 2.2 Monitoring, Evaluating, Reporting & Improving Delivery MERI 2.2.1: Apply statewide standard indicators to annual condition reporting processes. 4. IMPLEMENTATION – DELIVERY FRAMEWORK 4.1 Integrating and Targeting Delivery Implementation 4.1.1: Continue to advocate for investment programs which support integrated catchment management outcomes. 4.1.2: Determine the proportion/extent of activities delivered in each Catchment Asset area according to Regional Asset headline themes to support assessments of integrated delivery outcomes at the landscape scale. 4.1.3: Promote the availability and application of the RCS Implementation Plan to regional delivery partners. 4.2 Monitoring, Evaluation, Reporting and Improving Delivery Implementation 4.2.1: Identify opportunities for wider application/interpretation of output data standards to deliver against the region’s annual management reporting requirements. 4.2.2: Establish an inventory of regional monitoring activities/methodologies and consider opportunities for improving the consistency and application of associated data. 4.2.3: Identify new state and federal scale monitoring activities/data and apply to regional MERI processes where appropriate. 4.2.4: Develop and publish a regional version of the VCMA’s Actions and Achievements Report to promote RCS delivery annually. 4.2.5: Change Strategic Action 15.1.1 to – Conduct reviews of Catchment Asset prioritisation outcomes and the RCS Implementation Plan when substantial information impacting on management action priorities becomes available. 1. Regional Assets Regional Assets are key elements of natural, cultural and productive landscapes that apply at a whole-ofregion scale. The Mallee RCS considers nine such Regional Asset classes: Rivers; Wetlands; Threatened Species, Populations and Communities; Terrestrial Habitat; Soils; Agricultural Land; Groundwater; Culture and Heritage; and Community Capacity for Natural Resource Management (NRM). The purpose of this section is to evaluate the currency of information presented by the RCS on each of these asset classes; and to identify any associated consequences for RCS implementation in both the short (i.e. 2016-19) and longer (i.e. as part of RCS renewal processes) term. Please note that the information presented on the following Regional Assets has been combined in order to reduce the amount of material repeated within the Review: Rivers and Wetlands Soils and Agricultural Land Figure 2: Examples of Mallee RCS Regional Assets 1.1 RIVERS AND WETLANDS The RCS defines the Rivers Regional Asset as ‘rivers, streams, their tributaries, and surrounding riparian land (the area of land that adjoins, influences, or is influenced by the river), including the floodplain’. Wetlands are defined as ‘individual wetlands, wetland complexes, and their associated floodplain ecosystems (including groundwater dependent ecosystems and the groundwater flow systems and aquifers they rely on).’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Rivers and Wetlands Regional Assets. Valuing our Rivers and Wetlands The Mallee Waterway Strategy (2014-22) identifies priority reaches and wetlands for future management using an Asset Based Approach; facilitating targeted planning and implementation processes to deliver greatest social, cultural and economic returns on our efforts. Each of these individual waterway assets is grouped into planning units, termed Waterway Management Units (MWU’s) which recognise their interconnectedness and the commonality of threats impacting on their values (see Figure 3). Each waterway asset occurring within a WMU is ascribed a priority of ‘high’, ‘medium’, ‘low’, or ‘additional’ (see Figure 4). This prioritisation framework replaces that outlined in the RCS and is being actively applied to the development of implementation of waterway related activities in the region. Figure 3: Waterway Management Units established by the Mallee Waterway Strategy (2014-22). Figure 4: Example of waterway prioritisation within a Mallee Waterway Strategy (2014-22) Waterway Management Unit (Belsar Yungera). Recommendations 1.1.1: Apply the Mallee Waterway Strategy prioritisation framework to River and Wetland related activities. Strategic Directions for the Management of our Rivers and Wetlands The RCS acknowledges that regional priorities and management targets will be further informed by development of the 2014-22 Mallee Waterway Strategy. This document was released in October 2014, providing a single regional planning document for the management of our waterways (rivers, creeks, lakes, wetlands) and surrounding riparian land. This includes Regional Work Plans (RWP’s) for each of the 23 WMU’s (see Figure 3) which detail specific management activities to address key threats to priority waterways occurring within these landscapes. The Mallee Waterway Strategy (2014-22) also represents a key departure from previous approaches in that it considers both Rivers and Wetlands within the one planning framework; replacing both the Mallee River Health Strategy (2006) and the Mallee Wetland Strategy (2006). Figure 5: Link to Mallee Waterway Strategy (2014-22) Several state based strategies and plans have also been released post 2013 which inform waterway management in the region, specifically: Victorian Floodplain Management Strategy (2016) sets out the roles and responsibilities of government agencies and authorities involved in flood management. It establishes a framework to facilitate improved evaluation and communication of flood risks so communities and relevant agencies can take better-informed action to manage floods. A key action of the Strategy is for Catchment Management Authorities to develop regional Floodplain Management Strategies in partnership with key stakeholders (as per RCS strategic action for Rivers Asset). Water for Victoria (2016) is the State Governments strategic plan for managing water resources into the future within the context of climate change and population growth. The Plan identifies four landscapes in the Mallee that represent priorities for future large scale waterway projects; (Merbein Common wetlands, Lindsay Wallpolla Islands, Belsar Yungera Floodplain, and Kings Billabong – Woorlong complex. All of which are identified as high priorities in the Mallee Waterway Strategy (2014-22). Regional Riparian Action Plan is a five-year plan (2015-20) to accelerate on-ground riparian management works to improve the health of riparian land along Victoria's regional rivers, estuaries and wetlands. Riparian management activities and associated outcome targets are established for each catchment management region; aligning with and further prioritising management actions identified in the associated region’s Waterway Management Strategy. The Mallee is required to develop, implement and report regional waterway activities delivered by state initiatives in line with this Plan. Water Resource Plans are currently being developed under the Basin Plan for 36 regions. These Plans will build on Basin states existing water management plans and will include Water Quality Management Plans, with two Water Resource Plan areas occurring in the Mallee: Wimmera-Mallee and Victorian Murray. Regional stakeholders are required to support the development, implementation and review of these Plans, in partnership with stakeholders from neighboring Victorian regions. A review of the State Environment Protection Policy in regards to surface and groundwater is also being undertaken. This review aims to ensure that Victoria has clear and relevant standards, legal rules and statutory obligations to protect and improve the health of water environments. A Policy Impact Assessment is expected to be released for public comment in 2017. Recommendations 1.1.2: Apply Mallee Waterway Strategy Regional Work Plans to River and Wetland related activities. 1.1.3: Where appropriate, integrate the planning, delivery and reporting of River and Wetland related activities. 1.1.4: Consider integrating River and Wetland Regional Assets into a ‘Waterway’ Asset in future iterations of the RCS. 1.1.5: Consider the Victorian Floodplain Management Strategy (2016) and the Water for Victoria (2016) strategy in River and Wetland related activities. 1.1.6: Apply Regional Riparian Action Plan priorities and aspirational targets to River and Wetland related activities. 1.1.7: Add the following ‘Strategic Action’ to both the Rivers and Wetlands Regional Assets • Support the development and implementation of Water Resource Plans for the WimmeraMallee and Victorian Mallee areas. 1.1.8: Once finalised, consider the State Environment Protection Policy (Waters) review in River and Wetland related activities. Condition of our Rivers and Wetlands The RCS applies the Index of Stream Condition (ISC) and the Index of Wetland Condition (IWC) to determine the condition of regional River and Wetland Assets. While no additional ISC or IWC data has become available post 2013, recent site-based assessments have identified improvements in the health of landscapes where both environmental water and targeted threat mitigation activities are being delivered. For example, long-term monitoring (2006-07 to 2015-16) being conducted at the Hattah Lakes Ramsar site demonstrates that all measured indicators of environmental condition (i.e. floodplain trees, vegetation communities, lignum, fish assemblages and waterbirds) have improved significantly as a result of water application and associated works programs (Henderson M, Freestone F, Vlamis T, Cranston G, Huntley S, Campbell C and Brown P (2014): The Living Murray Condition Monitoring at Hattah Lakes 2015–16: Part A – Main Report). Similarly, regulation of Cowanna Billabong enabled the wetland to be dried and the inundation extent increased; removing large bodied carp and producing a significant increase in submerged macrophytes ((Murray-Darling Freshwater Research Centre (2016): Vegetation Mapping at Cowanna Billabong. Unpublished data for the Mallee CMA). Based on these site based assessments, the most recent (2015-16) condition trend statement for regional waterways assets is that they are stable to improving. Further work has also been undertaken to establish a whole of region monitoring, evaluation, and reporting framework for waterway management. The Mallee Waterway Strategy Monitoring, Evaluation and Reporting (MER) Plan (2014-22) was developed to support adaptive management from planning and implementation to Strategy completion. The MER plan establishes the framework under which progress against condition targets (long term), management outcomes (medium term) and output targets (short term) for regional waterways will be monitored and reported. Figure 6: Mallee Waterway Strategy Monitoring, Evaluation and Reporting Plan (2014-22) Recommendations 1.1.8: Apply the Mallee Waterway Strategy MER Plan (2014-22) to the monitoring, evaluation and reporting of River and Wetland related activities. 1.2 THREATENED SPECIES AND COMMUNITIES The RCS defines the Threatened Species and Communities Regional Asset as ‘Populations of threatened or significant species; occurrences of threatened communities.’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Threatened Species and Communities Regional Asset. Valuing our Threatened Species and Communities The RCS applies a ‘conservation status’ framework to the prioritisation of the region’s Threatened Species and Communities assets; with those species at greater risk of extinction being of higher priority. While no alternative approach to this framework has been investigated or developed since 2013, the specific species/communities listed at either federal (EPBC Act 1999) or state (FFG Act 1988 or VROTS) level which occur in the Mallee has been updated as part of the RCS Implementation Plan review process (see Section 4.2). Strategic Directions for the Management of our Threatened Species and Communities Limited change in regional, state or federal instruments to inform Threatened Species and Communities management in the region was identified by this review. It is recognised however that Victoria is currently preparing a new biodiversity strategy and undertaking a review of the Flora and Fauna Guarantee Act 1988. Protecting Victoria's Environment - Biodiversity 2036 will establish statewide targets and investment priorities to support effective management activities and enhanced appreciation of biodiversity, within the context of a changing climate. Public consultation on a draft plan closed in May 2016, with release of the final expected to occur in 2017. Review of the Flora and Fauna Guarantee Act 1988 is currently underway with a consultation paper released for public comment in January 2017. The overarching aims of this review is to improve the effectiveness and efficiency of the Act within the context of new environmental conditions (e.g. climate change and population growth), to increase public participation, and to reflect partnerships with Traditional Owners. Recommendations 1.2.1: Once finalised, consider the new state biodiversity strategy ‘Protecting Victoria's Environment - Biodiversity 2036’ and any changes to the Flora and Fauna Guarantee Act in Threatened Species and Communities related activities. Condition of our Threatened Species and Communities The RCS recognises the complexities of providing an evidence based statement on the current condition or any trends in condition of this Asset. To help address this, it recommends that proxy condition indicators are developed using data that is available on ‘representative’ species and/or communities (i.e. their presence and population structure reflects the health of other species/communities that may rely on the same habitat). This approach has been progressed over the 2013-16 period, with the most recent (2015-16) condition trend statement for regional Threatened Species and Communities assets being that they are generally in moderate to poor condition and some are in decline within their constrained ranges. An overview of the studies on which this statement is based is provided below. A study of semi-arid woodland birds found the number of woodland blocks where White-browed Treecreepers (Climacteris affinis) were present had fallen from 2006 to 2011 (Hurley 2012). Similarly, a recent study on the Arid Bronze Azure Butterfly revealed that there was no evidence of the butterfly within the formerly occupied area of Pink Lakes. This suggests that the distribution of the butterfly may have contracted, with the remaining known populations restricted to Hattah-Kulkyne National Park and adjacent freehold land (Douglas, F (2012): The distribution and conservation of the Arid Bronze Azure Butterfly in the Mallee area of north-western Victoria. Unpublished report for the Mallee CMA). Furthermore, the loss of Black-eared miner habitat after the 2014 Bronzewing Flora and Fauna reserve fire has reduced the range of this species to just one site in Victoria, Murray-Sunset National Park; making them extremely vulnerable to any future pressures (Boulton, R : Unpublished). Threat mitigation actions to support specific species have however been shown to be effective in the Mallee. For example, Pine Plains in Wyperfeld National Park supports the largest known population of Major Mitchell’s Cockatoo; providing key habitat of Slender Cypress Pine trees that are around 170 years old and have cavities large enough for nesting. As a consequence of the 2014 fires in Pine Plains, 93% of these hollow bearing trees were lost. Subsequent works to ‘create’ cavities within suitable habitat is currently sustaining the Major Mitchell’s Cockatoo population in Pine Plains at 2013 levels (Hurley, V.G. and E.M. Stark (2015) Characteristics and uptake of simulated natural cavities for Major Mitchell’s Cockatoo in Slender Cypresspine. Department of Environment, Land, Water and Planning, Mildura). A further example is the delivery of environmental water to Brickworks Billabong in 2013 and 2015, specifically to support a translocation site for Murray Hardyhead. Following their release in March 2015, monitoring has determined that the relocated fish are successfully breeding, with juveniles estimated to be 2-3 months old detected (Murray-Darling Freshwater Research Centre (2015): Murray Hardyhead translocation. Unpublished data for the Mallee CMA). The ability of some species to respond to favourable conditions is also an important consideration when assessing the condition of these Regional Assets. Long-term monitoring of Malleefowl mounds in Victoria has shown breeding numbers in 2012 were higher than at any time in the past, a response to good rains and maturing habitat. Numbers have declined significantly over following years however as a result of ongoing dry winter conditions; with numbers at several Mallee sites in 2015 being lower than all but the drought year of 2002 (Benshemesh J, Stokie P: Malleefowl monitoring in Victoria: 2012-13, 2013-14, 2014-15, 201516. Unpublished reports to the Victorian Malleefowl Recovery Group). Similarly, the exceptionally wet spring/summer of 2010-11 facilitated an increase in the regeneration of many flora species, with studies identifying some good recovery for several threatened shrubs including the Desert Lantern, Sandhill Spurge, Bush Hibiscus and Spear-fruit Copperburr (Kenny et al 2012). While the above represents an advance from 2013, further monitoring and development of these proxy indicators is still required to better evaluate the impact of both investment and environmental conditions on the overall condition of Threatened Species and Communities assets. 1.3 TERRESTRIAL HABITAT The RCS defines the Terrestrial Habitat Regional Asset as ‘Individual ecological classes or spatial occurrences of ecological vegetation classes based on their intrinsic value to their contribution to landscape processes.’ Key strategic, policy and knowledge that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Terrestrial Habitat Asset. Valuing our Terrestrial Habitat The RCS applies the DELWP NaturePrint model to determine the relative contribution (and therefore priority) of vegetated areas to the full range of biodiversity values and biodiversity conservation in a statewide context. An updated version (v3) of this planning tool was completed post RCS release (see Figure 7); the key change being the incorporation of additional species records and subsequent improvements in species habitat distribution models. This prioritisation framework replaces that outlined in the RCS and is being actively applied to the development of implementation of Terrestrial Habitat related activities in the region Figure 7: Relative priority of Terrestrial Habitat Assets – NaturePrint Version 3 (State of Victoria 2014) Recommendations 1.3.1: Apply the updated NaturePrint spatial models (version 3) to Terrestrial Habitat related activities. Strategic Directions for the Management of our Terrestrial Habitat The RCS acknowledges that regional priorities and management actions will be further informed by development of the review and renewal of the Mallee Native Vegetation Plan and the development of an accompanying Regional Biolinks Plan. While no progress has been made at either the state or regional scale in regards to the Native Vegetation Plan, a Mallee Biolinks Plan was developed in 2016 as a component of the Mallee Natural Resource Management Plan for Climate Change (2016-19). Figure 8: Link to Mallee Natural Resource Management Plan for Climate Change (2016-19). The Biolinks Plan identifies five priority areas or landscapes that collective experience and science to date suggests are the best places to for biodiversity linkages between two or more Catchment Assets (see Section 2.1Error! Reference source not found.). Priority of intervention for otential management actions are detailed for each of the five priority corridor areas, providing the basis on which to identify, plan and implement Terrestrial Habitat related activities in the Mallee. While limited change in state or federal instruments to inform Terrestrial Habitat management in the region was identified by this review, it is recognised that Victoria is currently progressing the following strategic and regulatory frameworks: Protecting Victoria's Environment - Biodiversity 2036 will establish statewide targets and investment priorities to support effective management activities and enhanced appreciation of biodiversity, within the context of a changing climate. Public consultation on a draft plan closed in May 2016, with release of the final expected to occur in 2017. Review of the Flora and Fauna Guarantee Act 1988 is currently underway with a consultation paper released for public comment in January 2017. The overarching aims of this review is to improve the effectiveness and efficiency of the Act within the context of new environmental conditions (e.g. climate change and population growth), to increase public participation, and to reflect partnerships with Traditional Owners. Review of Native Vegetation Clearing Regulations is currently underway with public consultation on an outcomes paper closing in February 2017 and implementation of regulatory changes expected to occur from March 2017. These proposed changes aim to provide for better consideration of important biodiversity values in decision making (e.g. key habitats for dispersed rare or threatened species, large trees), result in fairer offset obligations for removal of scattered trees, by acknowledging the greater habitat values of large trees, and reducing the offset requirements for smaller trees, and to provide greater transparency. Recommendations 1.3.2: Apply Mallee Biolink Plan (2016-19) priorities to Terrestrial Habitat related activities. 1.3.3: Once finalised, consider the new state biodiversity strategy ‘Protecting Victoria's Environment - Biodiversity 2036’ and any changes to the Flora and Fauna Guarantee Act and Native Vegetation Clearing Regulations in Terrestrial Habitat related activities. Condition of our Terrestrial Habitat The RCS evaluated the condition of Terrestrial Habitat in the region using state-wide modelled data (Site Condition Assessment and Patch-based Landscape Context Assessment) that provides a ‘relative condition score’ for native vegetation. While this modelled data has not been reproduced since 2013, recent site-based assessments indicate that trends in measures of the region’s terrestrial assets remain largely stable to improving. For example, trends in measures of condition within major parks and reserves remain stable, if not slightly improving, as a result of the removal of grazing over 20 years ago and some large rainfall events experienced in the region. This finding provides a good indication of the timeframe required for the recovery and restoration of Mallee habitats following the removal of grazing. Surveys conducted in 2012 reported that semi-arid, non-eucalypt woodlands in Mallee national parks and reserves were mostly in average condition, with a low rate of recruitment (Kenny S, Moxham C, Cheal D (2012). Mapping of the condition of semi-arid non-eucalypt woodlands in high priority national parks and reserves. Unpublished report for the Mallee CMA). A re-assessment of woodland condition conducted within ecologically important areas impacted by the 2014 fire events found that while there was a significant reduction in tree cover, the presence of regrowth had increased significantly since the initial assessment. This was attributed to several factors including the boom in natural regrowth after the La Nina of 2010-11, a high standard of rabbit control, and the position of pine regrowth in the landscape (i.e. on sandy dunes with little ground fuel meaning that often only the edges of regrowth areas were impacted by fire) (Schneider K. Parks Victoria: Based on Galey, B (2014) ‘Re-evaluation of the post-bushfire relative condition of non-eucalypt woodlands in Pine Plains-Wyperfeld NP using highresolution infra-red imagery’. Unpublished report for the DEPI and Parks Victoria). Within the more fragmented areas of the landscape, remnant vegetation subjected to interventions has also remained generally stable. For example, work to quantify the impact of stock exclusion fencing on remnants found that sites ungrazed for five years had improvements in native vegetation condition. These included an increase in the total cover of native species, perennial species and native shrubs, litter, and to a lesser extent native grass and tree canopy cover. These changes did not occur in the long ungrazed reference sites, and therefore may be attributed to recovery following stock exclusion fencing. Species richness declined over the monitoring period in both the recently ungrazed ‘fenced’ sites and the long ungrazed reference sites, indicating that factors other than the management intervention may be influencing vegetation composition (e.g. rainfall variability and seed availability) (Moxham, C., Kenny, S., and Duncan M. Arthur Rylah Institute for Environmental Research (2016); Quantifying the impact of land management practices on priority remnant vegetation across the dryland Mallee landscape: five year monitoring. Report for the Mallee CMA). It is also recognised that due to continuing threatening processes, declines in some measures of condition would be expected within many remnants, especially those where threat mitigation actions have not occurred. 1.4 SOILS AND AGRICULTURAL LAND The RCS defines the Soils Regional Asset as ‘All soils in our region regardless of the tenure and type of land systems to which they are subject.’ The Agricultural Land Regional Asset is defined as ‘all parts of the landscape that have been developed for the purpose of dryland and irrigated agricultural production.’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Soils and Agricultural Land Regional Assets. Valuing our Soils and Agricultural Land The RCS identifies that no criteria are available to differentiate the relative value of the region’s soil and agricultural assets. As such they are considered a ‘dispersed’ asset of equal value for the purposes of the RCS. This approach still holds, with the prioritisation and targeting of management actions continuing to rely on assessments of risk likelihood and impact. Within this context, the identification of changes in Agricultural Land management and associated productivity continue to be undertaken by the region. Overall, data continues to suggests an increasing trend in both the area of irrigable land irrigated and the area of productive land (dryland) cropped or in pasture over time. Of particular note is the 2015 Irrigated Horticulture Crop Report which applied updated satellite imagery and spatial information to support further assessment of irrigation areas in the Mallee region and demonstrated the dynamics of changes in irrigation areas, crop type and watering systems. A key finding of the published Crop Report was that nut crops (99% represented by almonds) have superseded grapes as the dominant crop type grown in the Mallee region for the first time since soldier settlement. Figure 9: Link to 2015 Irrigated Horticulture Crop Report (June 2016) Strategic Directions for the Management of our Soils and Agricultural Land A National Soil Research, Development and Extension Strategy - 'Securing Australia’s soil for profitable industries and healthy landscapes' was released in 2014; establishing goals, strategic direction, priority actions, and roles and responsibilities for future RD&E activities. Several regional, state or federal instruments to inform Soils or Agricultural Land management are also currently being reviewed and/or developed: Development of a Mallee Sustainable Agriculture Strategy is underway to provide a single planning document for the management of dryland agricultural land by establishing regional priorities and targets. It is anticipated that this Strategy will be completed in 2017 and ultimately feed into a broader Mallee Soil Health Plan to encompass both public and private land tenure. This is identified as a strategic action in the RCS. Review of the Victorian Mallee Irrigation Region Land and Water Management Plan (2011) commenced in 2016 to identify the successes or otherwise of the Plan’s implementation to date, predominantly in terms of the performance against targets; and the impact of any changes in the policy landscape that inform the framework under which the Plan is delivered. This work represents a mid-term review of the Plan, with timeframes regarding Plan renewal still to be determined by DELWP. Review of the Victorian Soil Health Strategy – ‘Protecting soil health for environmental values on public and private land’ (2012) has commenced (timelines for finalisation are not currently known). Water for Victoria (2016) is the State Governments strategic plan for managing water resources into the future within the context of climate change and population growth. The Plan identifies specific actions for Mallee irrigated agriculture. Water Resource Plans are currently being developed under the Basin Plan for 36 regions. These Plans will build on Basin states existing water management plans and will include Water Quality Management Plans, with two Water Resource Plan areas occurring in the Mallee: Wimmera-Mallee and Victorian Murray. Regional stakeholders are required to support the development, implementation and review of these Plans, in partnership with stakeholders from neighbouring Victorian regions. A review of the State Environment Protection Policy in regards to surface and groundwater is also being undertaken. This review aims to ensure that Victoria has clear and relevant standards, legal rules and statutory obligations to protect and improve the health of water environments. A Policy Impact Assessment is expected to be released for public comment in 2017. Murray-Darling Basin - Basin Salinity Management 2030 (2015) replaces the Basin salinity management strategy (2001-2015) to establish a co-ordinated program of salinity management for the next 15 years. The focus of BSM2030 is to: o maintain the cap on salinity through the existing Basin Salinity Target and the existing accountability framework; o bring environmental water fully into the accountability framework; o support Basin Plan flow management obligations to have regard to the salinity targets for managing water flows; o support basin states managing salinity in their catchments through their land and water management plans and be consistent with their Basin Plan water resource plan obligations; and o develop fit-for-purpose governance arrangements which reduce the frequency of audit, reporting and reviews. Recommendations 1.4.1: Consider the National Soil Research, Development and Extension Strategy (2014) in Soils and Agricultural Land related activities. 1.4.2: Once finalised, incorporate outcomes of the Victorian Mallee Irrigation Region Land and Water Management Plan (2011) review into Soils and Agricultural Land related activities. 1.4.3: Once finalised, consider the Victorian Soil Health Strategy (2012) review outcomes in Soils and Agricultural Land related activities. 1.4.4: Consider the Water for Victoria (2016) strategy in River and Wetland related activities. 1.4.5: Support the development and implementation of Water Resource Plans in the region as part of Recommendation1.1.7. 1.4.6: Once finalised, consider the State Environment Protection Policy (Waters) review in Irrigated Agriculture related activities. 1.4.7: Consider the Basin Salinity Management 2030 strategy (2015) in Soils and Agricultural Land related activities. Condition of our Soils and Agricultural Land The RCS considers the condition of the regions Soils, Agricultural Land and Groundwater assets to be stable to improving. This is supported by information that has become available in the ensuing (2013-16) period. For example, widespread changes in dryland agricultural management practices over recent years continues to dramatically reduce the risk, incidence and severity of soil erosion. The use of conventional fallow, for instance, has been reduced considerably, from between 30% to 50% of monitored sites in the 1990s to an average of around 10% over the past five years. A practice change which has significantly increased vegetation cover, soil aggregation and overall soil stability (Mallee Soil Erosion and Land Management Survey). Assessing land health condition in relation to irrigation principally relies on the region’s established modelling platforms, which in turn directly rely on groundwater and surface water monitoring data inputs. Data collected in the last five years suggest the long-term observed downward trends in drainage outfalls to the Murray River and its environs, and groundwater mounds beneath the older irrigation areas, are continuing. The 2010-11 high record breaking rainfall season provided a brief diversion to these longer term trends in some areas. Observations in the 2015-16 period indicate the surface water drainage flows and regional groundwater levels have mostly resumed the downward trend; with some drainage catchments resuming flows representative of those observed in the early 2000s. Towards the end of the Millennium drought, large tracts of irrigated land were dried off in response to low water allocations, high water prices and adverse economic conditions. These areas were often left covered with dead plantings which can harbour pest plant and animal populations and increase biosecurity risks. The extent of dried-off areas peaked in 2010-11, encompassing some 5,158ha or 29% of irrigable land within the pumped irrigation districts. In 2015 this had decreased to 4,180ha or 24% of pumped districts not irrigated. Of the total area that remains dried-off from irrigation within the pumped irrigation districts, 50% is being actively managed through clearing, regular slashing or conversion to horse paddocks. However, 30% of the total remains covered in dead and dying plantings. 1.5 GROUNDWATER The RCS defines the Groundwater Regional Asset as ‘groundwater resources within the Mallee that are utilised for human use such as irrigation or stock and domestic water supplies.’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Groundwater Regional Asset. Valuing our Groundwater As detailed in the RCS, the Murray Group Limestone Aquifer is the only recognised Groundwater Asset in the region. With its value being linked to the social and economic services it provides to the local community and rural landholders. This review did not identify any additional information to that applied in developing this section of the RCS. Strategic Directions for the Management of our Groundwater The Murray Group Limestone Aquifer is managed in accordance with the Murrayville Area Groundwater Management Plan (2001). This plan is currently being reviewed and renewed as the Murrayville Local Management Plan to ensure that groundwater in the area is managed in accordance with current Victorian government policy. It is anticipated that the Plan will be released in early 2017. Water Resource Plans are currently being developed under the Basin Plan for 36 regions. These Plans will build on Basin states existing water management plans and will include Water Quality Management Plans, with two Water Resource Plan areas occurring in the Mallee: Wimmera-Mallee and Victorian Murray. With the Murrayville Groundwater Management Area occurring within the boundary for the Wimmera Mallee Plan. Regional stakeholders are required to support the development, implementation and review of these Plans, in partnership with stakeholders from neighbouring Victorian regions. Recommendations 1.5.1: Once finalised, apply the Murrayville Local Management Plan to Groundwater related activities. 1.5.2: Support the development and implementation of Water Resource Plans in the region as part of Recommendation1.1.7. Condition of our Groundwater Under the Water Act 1989, the land area over the Murray Group Limestone Aquifer was declared a Water Supply Protection Area (WSPA) in 1998. The subsequent implementation of the Murrayville Area Groundwater Management Plan (GMP) from 2001 requires ongoing monitoring of groundwater levels, salinity and metered extraction; providing detailed information on groundwater condition and trends. The RCS identifies that while there was some variability over previous years, asset condition is relatively stable. More recent data supports this with the current levels within the permissible consumptive volumes for the Murrayville Groundwater Management Area. In 2015, metered extraction was 1,400ML more than recorded in 2014, however, the seasonal drawdown and subsequent recovery was similar to that observed in 2013/14. Salinity levels have remained relatively stable throughout the WSPA (GWMWater, (2015) Murrayville Water Supply Protection Area Groundwater Management Plan, Annual Report 2014/15). 1.6 CULTURE AND HERITAGE The RCS defines the Culture and Heritage Regional Asset as ‘locations that have recognised cultural, historical or spiritual significance to all or part of the Mallee community and/or the Australian community.’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Culture and Heritage Regional Asset. Valuing our Culture and Heritage The RCS identifies that no criteria are available to differentiate the relative value of the region’s culturally significant locations. As such all recognised sites are afforded equal value for the purposed of the RCS. This approach still holds, with the prioritisation and targeting of management actions continuing to rely on assessments of risk likelihood and impact. Strategic Directions for the Management of our Culture and Heritage Several state based policy instruments have also been released post 2013 which inform Culture and Heritage management in the region, specifically: The Aboriginal Heritage Act 2016 Amendment established a range of reforms to the 2006 Act in regards to: Preliminary Aboriginal Heritage Tests; Aboriginal Cultural Heritage Land Management Agreements; and The registering of Aboriginal Intangible Heritage. Barengi Gadjin Land Council Aboriginal Corporation area of registration was extended in October 2013 and a remaining application area is currently being considered (see Figure 10). First People of the Millewa-Mallee Aboriginal Corporation submitted an application for registration as a Registered Aboriginal Party in January 2016 (see Figure 10). This application is currently under consideration. Wadi Wadi Wemba Wamba Barapa Barapa First Nations Aboriginal Corporation submitted an application for registration as a Registered Aboriginal Party in August 2014 (see Figure 9). This application is currently under consideration. Recommendations 1.6.1: Consider 2016 amendments to the Aboriginal Heritage Act (2006) in Culture and Heritage related activities. 1.6.2: Recognise Registered Aboriginal Parties, Registered Aboriginal Applicants and associated management areas in Culture and Heritage activities. Figure 10: Registered Aboriginal Parties and Registered Aboriginal Party Applicants. Condition of our Culture and Heritage The RCS recognises the complexities of providing an evidence based statement on the current condition or any trends in condition of this Asset. To help address this, it recommends that proxy condition indicators are developed using data from the Victorian Heritage Databases and Cultural Heritage Management Plans. This is based on the assumption that recognition under these instruments affords some level of protection. This review identified that limited progress has been made in the application of this approach over the 201316 period. Additional culturally significant sites are identified and/or registered on an ongoing basis. Regular reviews of regional changes are required to inform regional planning and delivery processes; and ultimately to enable the development of condition statements and the identification of trends. Recommendations 1.6.3: Report annually on changes in the number of culturally significant sites recognised in the region. 1.7 COMMUNITY CAPACITY FOR NRM The RCS defines the Community Capacity for NRM Regional Asset as ‘the inherent knowledge, understanding and willingness that the community has for effective and sustainable natural resource management.’ Key strategic, policy and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below according to RCS subheadings for the Community Capacity for NRM Regional Asset. Valuing our Community’s Capacity for NRM The RCS identifies that no criteria are available to differentiate the relative value of our Communities Capacity for NRM. As such all components of this Asset are afforded equal value for the purposes of the RCS. This approach still holds, with the prioritisation and targeting of management actions continuing to rely on assessments of risk likelihood and impact. Strategic Directions for the Management of our Community’s Capacity for NRM A key policy change which occurred post 2013 to inform Community Capacity for NRM activities was the release of the Our Catchments, Our Communities - Integrated Catchment Management in Victoria (2016-19), This statewide strategy was developed by DELWP and the ten Catchment Management Authorities to establish a framework under which catchment management is planned, delivered and reported. Priority actions and associated success measures are set out under five goals: Effective community engagement in catchment management; Better connections between state, regional and local planning; Strengthened implementation of Regional Catchment Strategies; Clearer roles, strengthened accountability and coordination; and Improved monitoring, evaluation and reporting. Figure 11: Link to Our Catchments, Our Communities (2016-19) A number of regional strategies and plans relating to Community Capacity for NRM have also been developed over the 2013-2019 timeframe, specifically. Mallee Regional Landcare Support Strategy (2013-18) establishes a strategic planning and investment framework to support the development and capacity building of Landcare and other communitybased NRM groups in the region. Mallee CMA Indigenous Participation (2016) establishes objectives and targets to increase and enhance Indigenous involvement in the planning and delivery of regional NRM activities. A Reconciliation Action Plan is also being developed to help formalize existing strategies and build on already established partnerships between the Mallee CMA, Traditional Owners and Aboriginal Community members. Recommendations 1.7.1: Consider the Our Catchments, Our Communities (2016-19) Strategy in Community Capacity for NRM related activities. 1.7.2: Add the following strategic actions to the Community Capacity for NRM Regional Asset • Implement and review the Mallee Regional Landcare Support Strategy. • Implement and review the Mallee CMA Indigenous Participation Plan, Condition of our Community’s Capacity for NRM The RCS recognised that no regional scale baseline information existed at that time on which to make an assessment of the current condition of Community Capacity for NRM and recommends that this gap is addressed as part of RCS delivery. Significant progress has been made over the ensuing (2013-16) period, with the development of a Regional Community Capacity Monitoring Tool. This tool provides a measurable and repeatable assessment of the condition of community capacity for natural resource management at a regional scale. It is based on the Rural Livelihoods Framework, which identifies Community Capacity for NRM as a combination of human, social, natural, physical and financial capital. Scoring criteria have been assigned to each measure identified across the five categories of capital. Based on the data, each measure is scored on a five-point scale, where one indicates ‘low capacity’ and five indicates ‘high capacity’. Figure 12: Link to Mallee Regional Community Capacity for NRM Detailed Condition Report (2013) The Regional Community Capacity Tool was applied during 2012-13 to collect baseline data from which scores for each of the five capitals were assigned. This assessment indicated that, overall, our community has ‘medium’ levels of capacity for natural resource management in the region (RMCG (2013) Mallee Regional Community Capacity for NRM: Detailed Condition Report). While trends in overall community capacity cannot be determined until the tool is re-applied, evaluation surveys undertaken for all engagement activities as part of the Targeted Community Capacity for NRM monitoring tool provide assessments on their ‘effectiveness’ and some measures of community capacity. For example, in 2015-16 there were 8,556 participants at Mallee CMA engagement activities (e.g. workshops, field days, meetings). Of those surveyed 64% rated the overall delivery of these activities as excellent, and 29% as good. In regards to their primary motivations for participating, 59% cited ‘learning about a topic’, and a further 18% as ‘maintaining/strengthening social connections or professional networks’. Members of Mallee CMA Community and Technical Advisory Committees rated the overall delivery of information at their meetings as being excellent (58%) or good (42%). Opportunities to provide feedback were also rated highly (60% excellent, 31% good); with 85% reporting that they have a high level of confidence that the feedback and advice they provided was being listened to and acted on. Participants in Mallee CMA tender and incentive programs identified a ‘desire to contribute to the general environmental management of the region’ (39%) and ‘addressing priorities within my Farm Plan’ as their primary reasons for participating. The level of communications and support they received through these programs was rated as either excellent (39%) or good (48%); with 92% likely to apply for similar programs in the future. The region also has many examples of individual programs that have helped deliver increased capacity for NRM within their specific target audience. One of the most successful of these has been the Environmental Management Action Planning Program (EMAP). Since commencing in 2005, EMAP has supported some 644 farm businesses, representing 1.25 million ha or over 50% of agricultural land in the region to develop whole farm environmental plans. Some 131 workshops have been delivered across 11 target areas to support landholders plan and carry out works to increase sustainability, productivity and profitability as well as develop action plans specific to their property. To date participants have collectively identified and mapped 9,069 works, covering 201,660ha (Mallee CMA (2016). Environmental Management Action Planning. Unpublished data). Based on these results, the most recent (2015-16) condition trend statement for the region’s Community Capacity for NRM asset is that it is improving. It is also noted however that the Targeted Community Capacity Monitoring Tool is only applied to capacity building events that are delivered through funding received by the Mallee CMA, meaning that the impact of a significant number of activities designed to build capacity are not being captured. This has been recognised as a key gap in the application of the RCS MERI framework (see Section 4), as the extent of regional delivery not being captured is expected to be significant. 2. Delivery Framework The RCS sets out a framework for integrating and targeting the delivery of actions to ensure that available resources are applied effectively and efficiently. Twenty individual target areas of Catchment Assets are identified which group Regional Assets into significant landscapes for priority attention. A Monitoring, Evaluation, Reporting and Improvement (MERI) framework was also established by the RCS to form the basis of effective review and reporting processes. The purpose of this section is to evaluate the currency of information presented by the RCS on these frameworks; and to identify any associated consequences for RCS implementation in both the short (i.e. 2016-19) and longer (i.e. as part of RCS renewal processes) term. Figure 13: Examples of assets occurring within the Avoca Basin Terminal Lakes System and Creeklines Catchment priority landscape (Catchment Asset). 2.1 INTEGRATING AND TARGETING DELIVERY Key strategic and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below. Integrating Delivery This review did not identify any new information relevant to this section of the RCS that should be considered in future (2013-19) implementation. Targeting Delivery The RCS identified the need to prioritise each of the region’s Catchment Assets based on assessments of their environmental, social and economic value; the severity of threatening processes; and the availability of effective interventions. While these assessments of each Catchment Asset have been undertaken, they have not been ranked in order of priority. This decision was based on the learning that the asset x threat x intervention interactions occurring within each Catchment Asset are extremely complex, and while their relative values within the landscape can be differentiated; cross landscape (i.e. Catchment Asset) application was not practical. This review has recognised the validity of this modified approach as it has supported the level of flexibility required when developing and delivering NRM programs and projects. That is, the specific priority landscape (Catchment Asset) that resources are directed to can based on assessments of investor priorities, existing co-investment, gap analyses, local priorities and stakeholder capacity. The specific management interventions that are a priority for delivery within the selected landscape are then informed by asset x threat x intervention assessments (see Figure 14) which have considered: the value of Regional Assets occurring within the landscape, or landscapes that the specific corridor intersect with; the priority to address a threatening process to those values; the capacity of the management action to address the threatening process; and the level of investment (in both of time and money) required to exercise that capacity. Development of the Mallee Natural Resource Management Plan for Climate Change (2016-19) built on the RCS’s targeted delivery framework by identifying five priority areas or landscapes that collective experience and science to date suggests are the best places for biodiversity linkages between two or more Catchment Assets. The specific management interventions that are a priority for delivery within each of these corridors were also identified by applying the asset x threat x intervention assessment process detailed above (see Figure 15). Recommendations 2.1.1: Apply priority corridors identified by the Mallee Natural Resource Management Plan for Climate Change (2016-19) to targeted delivery processes. Figure 14: Priority of action for interventions within each of the 17 biophysical Catchment Assets. Figure 15: Priority of action for interventions within each of the 5 Priority Corridors. 2.2 MERI FRAMEWORK Key strategic and knowledge changes that have occurred since the Mallee RCS was released, and which require consideration and/or application in the remaining three years of implementation (2017-19) have been identified through consultation with regional stakeholders. Detail on these and any associated recommendations is provided below. MERI The ten Victorian CMA’s, DELWP and the Victorian Catchment Management Council (VCMC) have developed a set of ‘standard’ indicators for annual reporting on the condition of catchments. These indicators establish a framework on which to base assessments of the region’s environment; the impact of annual actions (management) and extreme events; and any observed change in condition. Indicators have been established under five themes; waterways, biodiversity, land, coasts and community. Assessments use the criteria detailed in Table 8 and are based on available science, expert advice, and evidence gained during the preceding year. Table 8: Assessment criteria developed for annual condition reporting. Assessment Criteria 1. Positive An optimistic future with evidence that events during the year will have a positive impact on the longer term. 2. Neutral A largely neutral state, where events during the year may have been significant but are within expected variation and will have little impact in the longer term. 3. Concerned A level of concern that significant events during the year may have an adverse impact in the longer term. 4. Highly concerned A high level of concern that significant events during the year are likely to have an adverse impact in the longer term. Recommendations 2.2.1: Apply statewide standard indicators to annual condition reporting processes. Program Logic This review did not identify any new information relevant to this section of the RCS that should be considered in future (2013-19) implementation. 3. Implementation - Regional Assets The Mallee RCS (2013-19) sets an aspirational vision for the management of our natural, cultural and productive landscapes; long term (20 year) objectives for the condition of assets within these landscapes; and the short-term (6 year) strategic actions required to achieve these objectives. The purpose of this section is to report progress against the strategic actions set for each of the RCS’s nine Regional Assets and their associated management actions. Please note that Regional Asset information is presented under five ‘headline’ themes (see Table 9) in order to reduce the amount of material repeated within the Review: Table 9: Headline theme, Regional Asset and definition Headline theme RCS Regional Asset Definition Waterways Rivers Rivers, streams, their tributaries, and surrounding riparian land (including the floodplain). Wetlands Individual wetlands, wetland complexes, and their associated floodplain ecosystems (including groundwater dependent ecosystems and the groundwater flow systems and aquifers they are reliant on). Threatened species and communities Threatened species and communities Populations of threatened or significant species; occurrences of threatened communities. Terrestrial habitat Terrestrial habitat Individual ecological classes or spatial occurrences of ecological vegetation classes based on their intrinsic value to their contribution to landscape processes (e.g. connectivity, refugia, buffering etc.). Soils and agriculture Soils All soils regardless of their tenure and type of land system to which they are subject. Agricultural land All parts of the landscape that have been developed for the purpose of agricultural production. Groundwater Groundwater resources that are utilised for human use such as irrigation or stock and domestic water supply. Community capacity for NRM The inherent knowledge, understanding and willingness that the community has for effective and sustainable natural resource management. Culture and heritage Locations that have recognised cultural, historical or spiritual significance to all or part of the Mallee and/ or Australian community. Community capacity for NRM Figure 16 illustrates the spatial distribution of outputs delivered under each of these headline themes between 2013 and 2016. Please note that these only represent those outputs achieved under funding received by the Mallee CMA. It does not include activities delivered by regional NRM providers where the funding for those activities was not provided by the CMA. This has been recognised as a key gap in the application of the RCS MERI framework (see Section 4), as the extent of regional delivery not being captured is expected to be significant. The specific output types and quantities delivered against each headline theme are detailed in the following sections. Figure 16: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes. 3.1 WATERWAYS The RCS sets the long term (20 year) objective for River and Wetland management in the Mallee as being ‘to protect and enhance the environmental values of the Mallee’s watercourses, wetlands, and associated riparian ecosystems and, in turn, the social, economic and environmental services that they provide to the community’. This review rated 2013-16 progress against this objective as being ‘very good’ (using a five point scale of excellent, very good, good, poor and very poor). This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of associated on-ground actions. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for waterway assets is summarised in Table 10. Additional actions recommended for inclusion by this review have also been included for future reference. Table 10: Progress against RCS Strategic Actions for Waterways STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS 1.1.1. Review the Mallee River Health Strategy, and the Mallee Wetland Strategy; and develop and implement the Mallee Regional Waterway Strategy. Mallee River Health Strategy (2008) review completed 2013. Mallee Wetland Strategy (2006) review completed 2013. Mallee Waterway Strategy released October 2014 - two years into 8 year (2014-22) implementation phase. Regional priorities considered in the development of relevant funding bids and subsequent implementation. Significant progress being made against regional management targets. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 1.1.2. Review, update and implement the Mallee Floodplain Management Plan. Mallee Regional Floodplain Strategy (2001) review completed 2016. Mallee Floodplain Management Strategy under development - due for completion in December 2017. 1.1.3. Continue to implement actions from the Northern and Western Region Sustainable Water Strategies that apply to Mallee rivers and riparian ecosystems. Ongoing delivery against relevant actions assumed – not actively monitored or reported at regional scale. 1.1.4. Support the development and implementation of Water Resource Plans for the Wimmera-Mallee and Victorian Mallee areas (new – see Section 1.1). Wimmera-Mallee Water Resource Plan under development due for completion in January 2018. Management Key management outputs and associated activities delivered in 2013-16 for the protection and enhancement of the region’s priority waterway assets are reported in Table 11. The categories under which these are reported align with the DELWP Output Data Standard (2015). Regional stakeholders engaged in the planning and delivery of these waterway related outputs included Mallee CMA, DELWP, Parks Victoria, water authorities, local government, Landcare and other community based NRM groups, Indigenous community, and private land managers. Table 11: Waterway management outputs and activities delivered under funding received by the Mallee CMA. Output Activity Unit 2013-16 Delivery Crossing Install No. 9 Earth works Establish No. 35 Fence/Bollards Install, maintain, remove, replace Km. 49 Pest animal control Maintain Ha. 72,076 Pump Establish, maintain No. 35 Road/Trail Install, maintain, modify Km. 155 Rubbish removal Establish Ha. 141 Vegetation (native indigenous) Establish, maintain Ha. 33 Water regime Deliver, dewater No. 147 Waterway structure Install, maintain No. 44 Weed control Maintain Ha. 12,991 3.2 THREATENED SPECIES AND COMMUNITIES The RCS sets the long term (20 year) objective for Threatened Species and Communities management in the Mallee as being “to protect and enhance the present diversity of Mallee threatened species and communities.” This review rated 2013-16 progress against this objective as being ‘good’ (using a five point scale of excellent, very good, good, poor and very poor). This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of associated on-ground actions. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for the Threatened Species and Communities Regional Asset is summarised in Table 12. Table 12: Progress against RCS Strategic Actions for Threatened Species & Communities STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS 3.1.1. Continue to implement actions consistent with federal, state and regional prioritisation frameworks. Considered in the development of relevant funding bids and subsequent implementation. 3.1.2. Continue to support the development, implementation and review of Action Statements and Recovery Plans for the region’s threatened species and communities. Some progress being made in relation to priority management actions at both the individual species/communities and whole of landscape (Catchment Asset) scale. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. Limited opportunities to support the development or review of Action Statements/Recovery Plans. 3.1.3. Support the implementation of ecologically appropriate burning regimes for protection of threatened species and communities. Ongoing management and support provided by regional delivery partners - not actively monitored or reported at regional scale. Management Key management outputs and associated activities delivered in 2013-16 for the protection and enhancement of the region’s priority Threatened Species and Communities assets are reported in Table 13 The categories under which these are reported align with the DELWP Output Data Standard (2015). Regional stakeholders engaged in the planning and delivery of these outputs included Mallee CMA, DELWP, DEDJTR, Parks Victoria, water authorities, local government, Trust for Nature, Greening Australia, Landcare and other community based NRM groups, Indigenous community, and private land managers. Table 13: Threatened Species & Communities management outputs and activities delivered under funding received by the Mallee CMA. Output Activity Unit 2013-16 Delivery Fence Install, maintain, replace Km. 77 Pest animal control Maintain Ha. 77,345 Rubbish removal Establish Ha. 24 Threatened species response Establish No. 2 Vegetation (native indigenous) Establish, maintain Ha. 410 Weed control Maintain Ha. 40,082 3.3 TERRESTRIAL HABITAT The RCS sets the long term (20 year) objective for Terrestrial Habitat management in the Mallee as being “to protect and enhance the extent, condition and ecological connectivity of high value terrestrial habitat across all Mallee Land tenures”. This review rated 2013-16 progress against this objective as being ‘good’ (using a five point scale of excellent, very good, good, poor and very poor). This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of associated on-ground actions. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for the Terrestrial Habitat Regional Asset is summarised in Table 14. Table 14: Progress against RCS Strategic Actions for Terrestrial Habitat. STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS 4.1.1. Review, update and implement the Mallee Native Vegetation Plan. No progress regarding review/update of Mallee Native Vegetation Plan - requires State Government direction. Ongoing delivery against regional priorities and management actions assumed – not actively monitored or reported at regional scale. 4.1.2. Develop and implement a Regional Biolinks Plan to guide the delivery of cross-tenure habitat enhancement programs. Mallee Biolinks Plan released June 2016 as part of the Mallee NRM Plan for Climate Change (2016-19). Regional priorities considered in the development of relevant funding bids and subsequent implementation. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. Management Key management outputs and associated activities delivered in 2013-16 for the protection and enhancement of the region’s priority Terrestrial Habitat assets are reported in Table 15. The categories under which these are reported align with the DELWP Output Data Standard (2015). Regional stakeholders engaged in the planning and delivery of these outputs included the Mallee CMA. DELWP, DEDJTR, Parks Victoria, water authorities, local government, Greening Australia, Trust for Nature, Landcare and other community based NRM groups, Indigenous community, and private land managers. Table 15: Terrestrial Habitat management outputs and activities delivered under funding received by the Mallee CMA. Output Activity Unit 2013-16 Delivery Earth Works Establish, modify No. 6 Fence Install, maintain, replace Km. 128 Pest animal control Maintain Ha. 80,525 Rubbish removal Establish Ha. 2 Vegetation (native indigenous) Establish, maintain Ha. 1,874 Weed control Maintain Ha. 53,409 3.4 SOILS AND AGRICULTURAL LAND The RCS sets the long term (20 year) objective for the Soil Regional Asset as being “to protect and enhance the environmental values and ecosystem services provided by Mallee soils”; and for Agricultural Land as being “to optimise the productive capacity of Mallee agricultural landscapes, while minimising any adverse impacts of associated management practices (both current and historical) on our natural and cultural landscapes”. This headline theme also includes the Groundwater Regional Asset, for which the RCS set a long term (20 year) objective of “to protect the quality and availability of the Mallee’s groundwater resource for current and future users”. This review rated 2013-16 progress against these objectives as ‘good’ (using a five point scale of excellent, very good, good, poor and very poor). This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of associated on-ground actions. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for the Soils, Agricultural Land and Groundwater Regional Assets is summarised in Table 16. Table 16: Progress against RCS Strategic Actions for Soils and Agricultural Land. STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS 5.1.1. Develop and implement a Regional Soil Health Plan for the Mallee. No progress regarding development of Region Soil Health Plan – pending finalisation of Mallee Sustainable Agriculture Strategy (6.1.2 below). 6.1.1. Continue to implement the Victorian Mallee Irrigation Region Land and Water Management Plan. Regional priorities considered in the development of relevant funding bids and subsequent implementation. Significant progress being made against regional targets. Implementation actively monitored and reported Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. Mid-term review underway – due for completion June 2017. 6.1.2. Develop and implement a strategy for Mallee dryland agricultural land as part of the Regional Soil Health Plan. Mallee Sustainable Agriculture Strategy under development - due for completion in June 2017. 7.1.1. Continue to implement the Murrayville Groundwater Supply Protection Area Management Plan. Ongoing implementation actively monitored and reported – GWMWater. Regional priorities considered in the development of relevant funding bids and subsequent implementation. 7.1.2. Continue to implement actions from the Western Region Sustainable Water Strategy that apply to the Murrayville Groundwater Supply Protection Area. Ongoing delivery against relevant actions assumed – not actively monitored or reported at regional scale. Management Key management outputs and associated activities delivered in 2013-16 for the protection and enhancement of the region’s priority Soils and Agricultural Land assets are reported in Table 17. The categories under which these are reported align with the DELWP Output Data Standard (2015). Regional stakeholders engaged in the planning and delivery of these outputs included the Mallee CMA, DELWP, DEDJTR, NSW Office of Environment and Heritage, water authorities, local government, Landcare, community based NRM groups, Birchip Cropping Group, Mallee Sustainable Farming,, Vic No-Till, public sector industry groups, and private land managers. Table 17: Soils and Agricultural Land Management Outputs and Activities delivered under funding received by the Mallee CMA. Output Activity Unit 2013-16 Delivery Agricultural practices Modify No. 64 Earth Works Establish, modify No. 39 Fence Install, maintain, replace Km. 12 Irrigation infrastructure Install Ha. 1,686 3.5 COMMUNITY CAPACITY FOR NRM The RCS sets the long term (20 year) objective for Community Capacity for NRM in the Mallee as being ‘to increase community capacity for, awareness of, and participation in efforts to protect the Mallee’s natural, cultural and agricultural landscapes’. This headline theme also includes the Culture and Heritage Regional Asset, for which the RCS set a long term (20 year) objective of ‘to protect the extent and condition of Cultural Heritage (Indigenous and non-Indigenous) sites across all Mallee Land Tenures’. This review rated 2013-16 progress against this the Community Capacity objective as being ‘very good’ and ‘good’ for the Culture and Heritage objective (using a five point scale of excellent, very good, good, poor and very poor). This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of associated on-ground actions. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for Community Capacity for NRM and Culture and Heritage assets is summarised in Table 18. Additional actions recommended for inclusion by this review have also been included for future reference. Table 18: Progress against RCS Strategic Actions for Culture and Heritage and Community Capacity for NRM. STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS 8.1.1. Continue to support the development and implementation of Local Government Heritage Overlays in the Mallee. Ongoing review and application of Heritage Overlays as part of local council planning schemes. Amendments actively monitored and reported through LGA planning processes. 8.1.2. Continue to support the development and implementation of Cultural Heritage Management Plans in the Mallee. Ongoing development and implementation of Cultural Heritage Management Plans in line Aboriginal Heritage Regulations. Actively monitored and reported through the Victorian Aboriginal Heritage Register. 8.1.3. Continue to support the protection and management of cultural heritage sites as an integral component of all land, water and biodiversity management processes. Continuous improvement being sought in regional Cultural Heritage assessment and management processes. Development and application of regional tools to support improved identification and management of cultural heritage sites (e.g. regional field guides for managing pest plants and animals in cultural landscapes. Consideration and incorporation of cultural heritage values in regional strategies and management plans (e.g. Mallee Waterway Strategy, Mallee Floodplain Management Strategy, and site based Environmental Watering Management Plans). 9.1.1. Continue to support the development and implementation of community education programs to increase awareness of the Mallee’s natural, cultural and agricultural assets; and to encourage actions Significant number of both targeted and whole of community NRM education activities delivered. Delivery mechanisms included workshops, field days/walks, education tools, presentations, print and social media, newsletters. STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS which contribute to their protection and enhancement. Implementation actively monitored and reported – Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 9.1.2. Continue to support the development and implementation of programs which support land managers to act as responsive and effective stewards of our natural, cultural and productive landscapes. Significant number of programs delivered to support private land mangers implement priority management actions (e.g. revegetation, pest plant and animal control, dune reclamation, exclusion fencing, irrigation system upgrades). Delivery mechanisms included market based instruments (e.g. tenders and incentives), performance based grants, education/training opportunities, and ongoing technical support. Opportunities to enhance public land management outcomes actively sought and delivered through programs such as Green Army, Biodiversity Fund, National Landcare Programme, Victorian Environmental Partnerships Program, Our Catchments Our Communities, 20 Million Trees and The Living Murray. Only activities funded through the MCMA are captured by 201316 RCS MERI processes. 9.1.3. Continue to develop and implement programs which support land managers to identify, and where appropriate respond to emerging threats and opportunities. Delivery of several threat response programs including: Victorian Government’s drought response package (employment and incentive programs); Natural Disaster Relief and Recovery Arrangements (replacement of infrastructure impacted by 2014 bushfires); and seasonal adjustments of Annual Use Limits to assist irrigators respond to extreme conditions. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 9.1.4. Continue to support the development and review of whole farm and landscape scale management plans which consider natural, cultural and productive landscapes. Ongoing support to dryland farmers for the development and review of Environmental Management Action Plans to inform on farm NRM. Ongoing support to irrigators for the development of Irrigation, Drainage Management Plans to inform system upgrades. Ongoing development, review and renewal of Environmental Watering Management Plans to inform regional and landscape scale management of the environmental water reserve. Development (2013) and ongoing review (2016) of RCS Implementation Plan to inform management of priority landscapes (Catchment Assets) Development and implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 9.1.5. Continue to develop and implement programs which support Indigenous communities to promote Ongoing support to, and participation in the Mallee Aboriginal Reference Group to facilitate member participation in the planning and delivery of regional NRM activities. STRATEGIC (6 YR) ACTIONS MID-TERM PROGRESS and apply traditional ecological knowledge. Opportunities to incorporate and promote traditional ecological knowledge actively sought and delivered through programs such as National Landcare Programme, Victorian Waterway Health Program, Our Catchments Our Communities, and The Living Murray. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 9.1.6. Continue to support, enhance and participate in regional NRM partnerships to plan, deliver and report on the Mallee RCS and associated management plans. Establishment of a Regional Operational Agreement (MCMA, Parks Victoria, and the then DSE – Regional Services and DPI) to support effective, efficient and accountable service delivery – Due for review and renewal in 2017 as part of Our Catchments, Our Community Strategy implementation. Establishment of regional steering committees to guide the development and review of key management strategies and plans (e.g. Mallee Waterway Strategy, Mallee Sustainable Agriculture Strategy, Mallee Floodplain Management Strategy, Victorian Land and Water Management Plan Mid-term Review). Ongoing support to, and participation in regional advisory committees to facilitate a partnership approach to the development, implementation and review of NRM activities. Co-investment and leveraging opportunities actively identified and delivered through programs such as Green Army, Biodiversity Fund, National Landcare Programme, Our Catchments Our Communities, 20 million trees, and the Victorian Drought Response package. Implementation actively monitored and reported - Only activities funded through the MCMA are captured by 2013-16 RCS MERI processes. 9.1.7 Implement and review the Mallee Regional Landcare Support Strategy (new – see Section 1.7). Mallee Regional Landcare Support Strategy (2013-18) released October 2013. Regional priorities considered in the development of relevant funding bids and subsequent implementation. Significant progress being made against regional targets. Implementation actively monitored and reported 9.1.8 Implement and review the Mallee CMA Indigenous Participation Plan (new – see Section 1.7). Mallee CMA Indigenous Participation Plan released 2016. Framework established to support implementation monitoring/reporting. Management Key management outputs and associated activities delivered in 2013-16 for the protection and enhancement of the region’s Community Capacity for NRM Regional Asset are reported in Table 19. The categories under which these are reported align with the DELWP Output Data Standard (2015). Regional stakeholders engaged in the planning and delivery of these outputs included the Mallee CMA, DELWP, DEDJTR, Parks Victoria, water authorities, local government, Trust for Nature, Landcare and community based NRM groups, Birchip Cropping Group, Mallee Sustainable Farming, Vic No-Till, private sector industry groups, Traditional Owners, Indigenous community, and private land managers. Table 19: Community Capacity for NRM Outputs and Activities delivered under funding received by the Mallee CMA. Output Activity Unit 2013-16 Delivery Approval and advice Establish, maintain No. 643 Assessment Establish, maintain No. 1,693 Engagement event Attend, coordinate, establish No. participants 24,967 Information management system Establish, maintain No. 70 Management agreement Establish, maintain No. 599 Monitoring structure Install, maintain No. 68 Partnership Establish, maintain No. 787 Plan Establish, review, modify No. 677 Publication Establish, maintain No. 772 4. Implementation – Delivery Framework The Mallee RCS (2013-19) identifies foundational activities required to support delivery of the regional delivery framework, and the short-term (6 year) strategic actions required to achieve these. The purpose of this section is to report progress against the strategic actions set for each of the RCS’s foundational activities and identify associated implementation priorities. Figure 17: Monitoring delivery outcomes example. Top left: Example of a long ungrazed (> 10 years) monitoring site in the Dry Woodland EVD, in spring 2009 (left) and spring 2012 (right). Bottom left: Example of a more recently ungrazed (< 10 years) monitoring site in the Dry Woodland EVD, in spring 2010 bottom (left) and in spring 2012 (right). 4.1 INTEGRATING AND TARGETING DELIVERY The RCS sets the following foundational activities to support integrated and targeted delivery: ‘Develop and deliver landscape (Catchment Asset) scale programs which address key threats to multiple asset classes (e.g. Wetlands, Soils, Terrestrial Habitat)’. ‘Direct investment/ effort to priority landscapes (Catchment Assets)’’. This review rated 2013-16 progress against these activities as being ‘good’. This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of their implementation. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for integrating and targeting delivery is summarised in Table 20. Table 20: Progress against RCS Strategic Actions for Integrating and Targeting Delivery. Strategic (6 year) actions Mid-term progress 10.1.1 Continue to develop and implement landscape scale programs which address key threats to the Mallee’s natural, cultural and agricultural landscapes; and deliver environmental outcomes for multiple asset classes. Limited opportunities provided by current State and Federal investment programs as primarily seeking delivery against one asset type (e.g. waterways, biodiversity or land). Greater ability to incorporate community capacity outcomes. Region has been able to demonstrate some progress by applying the Catchment Asset framework and considering coinvestment/leveraging opportunities to select delivery landscapes. 10.1.2 Continue to develop and implement programs which encourage private land managers to deliver environmental outcomes; and where possible integrate delivery across asset classes. As per above, limited opportunities under current investment programs. Some progress through regional approaches to coinvestment/leveraging. 11.1.1 Apply regional prioritisation framework to each of the RCS’s 20 priority landscapes (Catchment Assets) and identify ‘highest priority’ for inclusion in targeted delivery programs. Prioritisation framework applied to 17 of the RCS’s Catchment Assets. The three remaining landscapes represent diffuse assets that cannot be spatially represented as a discrete landscape (i.e. Agricultural Land – Dryland and Irrigated, and the Murrayville Water Supply Protection Area). Priority management actions relating to these Assets are detailed in corresponding Strategies/Plans (i.e. Victorian Land and Water Management Plan (under review), Mallee Sustainable Agriculture Strategy (in dev.) and Murrayville Groundwater Supply Protection Area Management Plan (under review). Strategic (6 year) actions Mid-term progress Ranking the 17 biophysical Catchment Assets in order of priority was found to be an impractical approach to targeting delivery and was therefore not applied. 11.1.2 Develop a Mallee RCS Implementation Plan to document high priority landscapes (Catchment Assets), their asset values and key threatening processes; the priority management actions required to address these threats, and the roles and responsibilities of regional delivery partners. RCS Implementation Plans developed for each of the 17 biophysical Catchment Assets (December 2013). Implementation Figure 18 illustrates the spatial distribution of outputs delivered within each of the RCS’s 17 Catchment Assets between 2013 and 2016 for each ‘headline theme’. Please note that these only represent those outputs achieved under funding received by the Mallee CMA. It does not include activities delivered by regional NRM providers where the funding for those activities was not provided by the CMA. This has been recognised as a key gap in the application of the RCS MERI framework (see Section 4), as the extent of regional delivery not being captured is expected to be significant. Further analysis of this distribution has identified that a large proportion of 2013-16 regional NRM activity was delivered within priority landscapes (Catchment Assets). As detailed in Table 21, between 43 and 100 percent of selected output types were targeted to the 17 biophysical Catchment Asset Areas; with the area of water regimes, rubbish removal and fencing occurring within these landscapes all being more than 90 percent. No regional analysis of the proportion/extent of activities delivered within each Catchment Asset area according to headline theme (i.e. Waterways, Terrestrial Habitat, Threatened Species and Communities, Soils and Agriculture, and Community Capacity for NRM) is currently available. Addressing this gap would support further assessment of integrated delivery outcomes at the landscape scale. This review also identified that while regional stakeholders generally understood the RCS Integrated and Targeted Delivery framework, there is limited awareness of the RCS Implementation Plan and its role in informing landscape scale management activities. Recommendations 4.1.1: Continue to advocate for investment programs which support integrated catchment management outcomes. 4.1.2: Determine the proportion/extent of activities delivered in each Catchment Asset area according to Regional Asset headline themes to support assessments of integrated delivery outcomes at the landscape scale. 4.1.3: Promote the availability and application of the RCS Implementation Plan to regional delivery partners. Figure 18: Spatial distribution of outputs delivered (2013-16) under each of the RCS headline themes. Table 21: Proportion (%) of 2013-16 outputs delivered under funding received by the Mallee CMA occurring within each of the RCS’s Catchment Assets. CATCHMENT ASSET PEST ANIMAL CONTROL WEED CONTROL WATER REGIME REVEG IRRIGATION I’STRUCTURE RUBBISH REMOVAL FENCE Annuello 1.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% Avoca Basin Terminal Lakes System & Creeklines 30.0% 12.4% 2.4% 11.8% 0.0% 14.9% 31.7% Bronzewing Dunefields 0.5% 0.3% 0.0% 0.1% 0.0% 0.0% 1.8% Cardross Lakes 0.0% 0.0% 2.4% 0.0% 19.1% 0.0% 0.0% Hattah-Kulkyne Lakes System & National Park 7.7% 0.9% 43.1% 0.0% 3.0% 0.0% 0.0% Murray River Floodplain: Merbein to SA border 1.1% 0.5% 21.9% 9.0% 0.0% 7.7% 3.8% Murray River Floodplain: Nyah to Robinvale 0.6% 1.3% 16.1% 0.0% 15.3% 0.0% 11.2% Murray River Floodplain: Robinvale to Merbein 0.3% 0.4% 12.6% 5.9% 47.6% 77.4% 15.3% Murray Sunset National Park Dunefields 1.9% 1.6% 0.0% 0.3% 0.0% 0.0% 7.7% North Wimmera Creeklines 0.6% 1.1% 0.1% 0.0% 0.0% 0.0% 1.1% North West Woodlands 0.6% 0.7% 0.0% 0.0% 3.7% 0.0% 3.5% Outlet Creek and Wirrengen Plains 1.9% 0.0% 0.0% 0.0% 0.0% 0.0% 1.9% Pink Lakes 7.0% 12.5% 0.0% 54.2% 0.0% 0.0% 9.6% Raak Plain 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Wandown 1.8% 6.9% 0.0% 0.0% 0.0% 0.0% 0.2% Wathe Dunefields 6.3% 3.5% 0.0% 0.2% 0.0% 0.0% 6.4% Wyperfeld / Big Desert Dunefields 0.5% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% % Targeted Outputs 62% 42.6% 98.6% 81.6% 88.7% 100.0% 94.2% % Non-Targeted Outputs 38% 57.4% 1.4% 18.4% 11.3% 0.0% 5.8% 4.2 MONITORING, EVALUATION, REPORTING AND IMPROVING DELIVERY The RCS sets the following foundational activities to support the monitoring, evaluation, reporting and improvement of regional delivery: ‘Continuous improvement through enhancement of the regions evidence base on: our asset values; the incidence, severity and potential impacts of threatening processes; and the effectiveness and efficiency of available interventions’. ‘Evaluation of the short term impacts of program/project delivery at the landscape (Catchment Asset) scale (i.e. threat abatement at point of investment)’. ‘Identify and respond to improved knowledge and new/emerging threats and opportunities’. ‘Evaluate and communicate RCS achievements against each of its objectives and strategic directions’. This review rated 2013-16 progress against these activities as being ‘poor’. This qualitative assessment was based on stakeholder consideration of the proportion of strategic actions delivered against to date, and the scale/impact of their implementation. Strategic Actions Mid-term (2013-16) progress against each of the six year strategic actions established by the RCS for monitoring, evaluation, reporting and improving delivery is summarised in Table 22. Table 22: Progress against RCS Strategic Actions for monitoring, evaluating, reporting and improving delivery. Strategic (6 year) actions Mid-term progress 12.1.1. Continue to support investigations into the extent and distribution of the region’s natural, cultural and agricultural assets. Mallee waterway spatial layer reviewed and updated as part of Mallee Waterway Strategy development (2014). Irrigation Status Reports to record changes to irrigation within the region. Triennial Irrigation Crop Report (2016) to measure irrigation status and development within the region. Site and/or species based flora/fauna surveys and recording of data in associated databases (e.g. Atlas of Living Australia). Ongoing identification of cultural sites through Local Government Heritage Overlays and the Victorian Aboriginal Heritage Register. 12.1.2. Continue to support investigations into the values and services provided by the region’s natural, cultural and agricultural assets. Primarily undertaken in response to regional and site based planning processes. For example development of the Mallee Waterway Strategy (2014), the Mallee Sustainable Agriculture Strategy (in dev.) and Environmental Watering Management Plans (ongoing). 12.1.3. Continue to support investigations into the extent, incidence and potential impacts of key threatening processes. Ongoing delivery of a limited number of whole of region or whole of landscape investigations (e.g. Parks Victoria Rabbit Transect Monitoring Program, Mallee Groundwater Monitoring Program). Strategic (6 year) actions Mid-term progress 12.1.4. Continue to support the identification and validation of management actions which address key threats to the region’s natural, cultural and productive landscapes. Ongoing delivery of a limited number of whole of region assessments (e.g. Quantification of stock exclusion fencing). 13.1.1. Support the ongoing measurement, and where required development of asset condition indicators to allow for effective and efficient long term evaluation and reporting at the regional scale. Waterways – no new whole of region data (i.e. ISC/IWC) available over 2013-16 timeframe; with site based assessments used as interim measures. Threatened Species and Communities – proxy indicators partly developed and applied. Terrestrial Habitat - no new whole of region data (condition x landscape context) available over 2013-16 timeframe; with site based assessments used as interim measures. Soils and Agricultural Land – ongoing application and reporting of Murrayville Groundwater Supply Protection Area monitoring program and Triennial Irrigated Horticulture Crop Reports. Mallee Land Management (dryland agriculture) currently unfunded. Community Capacity for NRM – regional monitoring framework developed and applied for collection of baseline data (2013). Regional support provided to the development of state-wide (DELWP, VCMA’s and VCMC) catchment condition indicators (2016). 14.1.1. Support the ongoing measurement, and where required development of integrated threat incidence and impact monitoring programs to allow for effective and efficient short term evaluation and reporting at the landscape (i.e. Catchment Asset Scale). Primarily undertaken as part of individual project and/or investor requirements resulting in limited application at the landscape/multiple asset scale (e.g. different methodologies). 15.1.1. Conduct annual reviews of Catchment Asset prioritisation outcomes and of the RCS Implementation Plan. RCS Implementation Plan reviewed to incorporate new information (2016). A key document which informed this review was the Mallee Natural Resource Management Plan for Climate Change (2016) which re-evaluated the region’s NRM priorities as set out in the RCS Implementation Plan. This re-evaluation incorporated the potential influence of climate change on: Regional Assets; the scale and impact of threatening processes; and the capacity, efficacy and appropriateness of planned management interventions. 15.1.2. Conduct mid and full-term reviews of the 2012-18 RCS. Mid-term review complete – this report (December 2016) Full term review due December 2019. 16.1.1. Provide an annual report on the condition and management of the Annual condition and management reports completed as part of MCMA Annual Report. Strategic (6 year) actions Mid-term progress region’s natural, cultural and agricultural assets. Regional management also reported within statewide (VCMA’s) annual Actions and Achievements Report. Management reporting has captured activities funded through the MCMA, not the required (under CaLP Act) whole of region activities. 16.1.2. Provide a mid and full-term report on progress against the RCS’s stated long term objectives and short term measures. Mid-term report complete – incorporated into this mid-term review report (December 2016) 16.1.3. Maintain and update a Regional Evidence Base to record and communicate all aspects of RCS delivery and evaluation. No whole of region evidence base framework in place, knowledge primarily sits within individual agencies and organisations. Limited communication and/or promotion of whole of RCS delivery (i.e. focus on individual project/program achievements). Implementation Section 19B of the CaLP Act, requires that CMA’s submits to the Minister each year, a report on the condition and management of land and water resources in its region. The Mallee CMA has delivered against this requirement as part of its Annual Reporting processes. The ‘condition’ of Regional Assets, and any trends in that condition has historically (2013-16) been determined through application of the RCS condition indicators; where available (see Section 1). This framework has recently been improved with the establishment of statewide annual Catchment Condition Indicators. These standards (see Section 2.2) will be incorporated into regional and Mallee CMA annual reporting processes from 2016-17. This review has identified regional ‘management’ reporting processes as a key gap in the application of the RCS MERI framework. Regional reports detailing the management activities and associated outputs delivered in a given year currently only include those outputs achieved under funding received by the Mallee CMA; with no established process for collecting data on activities delivered by regional NRM providers where the funding for those activities was not provided by the CMA. It is expected that extent of regional delivery not being captured in annual management reports is significant. All state investment programs delivered under the Victorian Water Group Investment Framework (i.e. Waterway Health, Environmental Water, Our Catchments Our Communities, Sustainable Irrigation, Floodplain Management, and Basin Plan Implementation) and the Victorian Landcare Program require that regional delivery is reported spatially and textually using the DELWP output data standard (2015). Figure 19: Link to DELWP Output Data Standards (2015) The Mallee CMA has extended this requirement to include all state and federal investment programs that they receive funding from (e.g. National Landcare Programme, Murray Darling Basin Authority, and The Living Murray), and although this internal requirement is often in addition to existing investor standards; it does support the collection and reporting of consistent data. While this review does not anticipate that all regional providers will apply the DELWP Output Data Standard to the monitoring and reporting of their management activities; it is expected that further work can be done in the short term to collect existing information in its current format and apply the output standards where appropriate; allowing for the collation and reporting of a consistent data set. This review also acknowledges that there are currently a limited number of regional scale investigations into the extent and value of assets; the extent, incidence and impacts of key threatening processes, and the impact/appropriateness of associated management interventions. These assessments form the basis of regional prioritisation processes and consequently, influence the effectiveness of investment. It is also recognised that while MERI requirements/expectations are increasing, there are limited resources made available at the project/program scale to deliver against regional requirements. This review has identified that new and innovative technologies are being applied at a state and regional scale for MERI related activities and that there may be the potential to apply this information at a regional scale and address key data gaps. One example of this is the recent work undertaken by the Fenner School of Environment and Society which collates spatial information on environmental conditions for 13 indicators, across 6 Themes: land cover, bushfire, water availability, rivers and wetlands, landscape health, and carbon storage. All associated data can be accessed online at Australia's Environment in 2015. Figure 20: Example data available from Fenner School of Environment and Society: % exposed soil (2015) and % change (2000-2015); and % tree cover (2015) and % change (1972-2015). Another shortcoming in the implementation of the RCS MERI framework identified by this review is the limited promotion of whole of region (i.e. whole of RCS) and priority landscape activities and achievements. It is recognised that communication of regional NRM activities tends to focus on project/program outcomes; with limited resources available to support broader applications. In 2012-13, the ten Victorian CMA’s piloted an annual report to highlight the actions and achievements delivered both collectively and individually. This and subsequent reports (2013-14, 2014-15, and 2015-16) applies the DELWP output standards to document actions delivered annually by all funding administered by each of the CMA’s, through partnerships with government agencies, industry, land managers and the wider community. This review has recognised the potential for further expanding the scope of this report to incorporate (where possible) outputs delivered under funding administered by other regional providers. The production of a stand-alone ‘Mallee’ document would also support improved communication and promotion of the RCS. Figure 21: Link to Victorian Catchment Management Authorities Actions and Achievements Report (2014-15) Recommendations 4.2.1: Identify opportunities for wider application/interpretation of output data standards to deliver against the region’s annual management reporting requirements. 4.2.2: Establish an inventory of regional monitoring activities/methodologies and consider opportunities for improving the consistency and application of associated data. 4.2.3: Identify new state and federal scale monitoring activities/data and apply to regional MERI processes where appropriate. 4.2.4: Develop and publish a regional version of the VCMA’s Actions and Achievements Report to promote RCS delivery annually. 4.2.5: Change Strategic Action 15.1.1 to – Conduct reviews of Catchment Asset prioritisation outcomes and the RCS Implementation Plan when substantial information impacting on management action priorities becomes available. Appendices APPENDIX 1: VICTORIAN CATCHMENT MANAGEMENT COUNCIL GUIDELINES FOR REVIEW OF REGIONAL CATCHMENT STRATEGIES (i) How is the RCS performing? Is it effective in supporting delivery of its priority strategic actions? (ii) How is implementation going? How are we progressing with delivery of the 6 year programs? Is any corrective action required? If so, then what? (iii) Is the RCS still saying the things we think it should? What new information has appeared? Is there new or additional information which needs to be considered (for the remaining life of this RCS, and to initiate our thinking for the 2019 RCS? Is there anything which we plan to not take any further action on? (iv) What do our key stakeholders think? What might any consultation look like? (v) What do we need to do to prepare for renewal in 2019? Issues to be monitored? Issues to be investigated? APPENDIX 2: MALLEE RCS MONITORING, EVALUATION, REPORTING AND IMPROVEMENT (MERI) FRAMEWORK A critical component of any strategic instrument such as this RCS is the capacity for adaptive management. That is can it be flexible in the face of new information, unexpected outcomes and the uncertainty that is inherent to natural resource management. A monitoring, evaluation, reporting and improvement (MERI) framework is one way to provide that flexibility. This framework is a simple mechanism that can be used to incorporate the principles of MERI into the implementation of the RCS. It will provide the capacity to understand and record the successes (or otherwise) and knowledge that comes from RCS implementation. The primary intention of the framework is that it will form the basis to adequately review and report on the RCS at key points throughout its implementation period. A secondary intention is that it supports all regional stakeholders to incorporate their achievements into the implementation and reporting of the RCS. For this to occur as part of each stakeholders own annual reporting requirements, the framework must provide for a variety of delivery and reporting approaches. Table 6 provides an outline of the foundational activities required to implement the MERI framework and associated actions to be delivered over the life of the RCS. Delivery of these strategic actions will be incorporated into the wider RCS implementation process. Table 6: Foundational activities and strategic directions for continuous improvement and RCS evaluations. Foundational Activity Strategic (6 yr.) actions Applying an Asset Based Approach: Continuous improvement through enhancement of the regions evidence base on: • our asset values; • the incidence, severity and potential impacts of threatening processes; and • the effectiveness and efficiency of available interventions. Continue to support investigations into the extent and distribution of the region’s natural, cultural and agricultural assets. Continue to support investigations into the values and services provided by the region’s natural, cultural and agricultural assets. Continue to support investigations into the extent, incidence and potential impacts of key threatening processes. Continue to support the identification and validation of management actions which address key threats to the region’s natural, cultural and productive landscapes. Monitoring Asset Condition (long-term): Evaluation of the long term changes in the condition of our cultural, natural and agricultural assets at the whole of region scale. Support the ongoing measurement, and where required development of asset condition indicators to allow for effective and efficient long-term evaluation and reporting at the regional scale. Monitoring Delivery Outcomes (short-term): Evaluation of the short term impacts of program / project delivery at the landscape (Catchment Asset) scale (i.e. threat abatement at point of investment). Support the ongoing measurement, and where required development of integrated threat incidence and impact monitoring programs to allow for effective and efficient short-term evaluation and reporting at the landscape (i.e. Catchment Asset Scale). Adaptive Management: Identify and respond to improved knowledge and new/emerging threats and opportunities. Conduct annual reviews of Catchment Asset prioritisation outcomes and of the RCS Implementation Plan. Conduct mid and full term reviews of the 2013-19 RCS. Recording and Communicating Outputs and Outcomes: Evaluation of RCS achievements against each of its objectives and strategic directions. Provide an annual report on the condition and management of the region’s natural, cultural and agricultural assets. Provide a mid and full term report on progress against the RCS’s stated long-term objectives and short-term measures. Maintain and update a Regional Evidence Base to record and communicate all aspects of RCS delivery APPENDIX 2: ANNUAL MANAGEMENT OUTPUTS AND ACTIVITIES WATERWAY MANAGEMENT OUTPUTS AND ACTIVITIES OUTPUT ACTIVITY UNIT 2013-14 2014-15 2015-16 TOTAL (2013-16) DELIVERY Crossing Install No. - - 9 9 Earth works Establish No. - 5 30 35 Fence/Bollards Install, maintain, remove, replace Km. 10 26 13 49 Pest animal control Maintain Ha. 24,168 32,646 15,262 72,076 Pump Establish, maintain No. 13 15 7 35 Road/Trail Install, maintain, modify Km. 33 70 52 155 Rubbish removal Establish Ha. 5 10 118 141 Vegetation (native indigenous) Establish, maintain Ha. 15 12 6 33 Water regime Deliver, dewater No. 44 45 58 147 Waterway structure Install, maintain No. 1 18 25 44 Weed control Maintain Ha. 4,406 5,898 2,687 12,991 THREATENED SPECIES/COMMUNITIES OUTPUTS AND ACTIVITIES OUTPUT ACTIVITY UNIT 2013-14 2014-15 2015-16 2013-16 DELIVERY Fence Install, maintain, replace Km. 10 5 62 77 Pest animal control Maintain Ha. 24,151 14,900 38,294 77,345 Rubbish removal Establish Ha. - - 24 24 Threatened species response Establish No. - 2 - 2 Vegetation (native indigenous) Establish, maintain Ha. 173 102 135 410 Weed control Maintain Ha. 24,151 268 15,663 40,082 TERRESTRIAL HABITAT OUTPUTS AND ACTIVITIES OUTPUT ACTIVITY UNIT 2013-14 2014-15 2015-16 2013-16 DELIVERY Earth Works Establish, modify No. - - 6 6 Fence Install, maintain, replace Km. 1 48 79 128 Pest animal control Maintain Ha. 26,939 24,908 28,678 80,525 Rubbish removal Establish Ha. - 2 - 2 Vegetation (native indigenous) Establish, maintain Ha. 293 436 1,145 1,874 Weed control Maintain Ha. 19,177 8,557 25,675 53,409 SOILS AND AGRICULTURAL LAND OUTPUTS AND ACTIVITIES OUTPUT ACTIVITY UNIT 2013-14 2014-15 2015-16 2013-16 DELIVERY Agricultural practices Modify No. 5 44 15 64 Earth Works Establish, modify No. - - 39 39 Fence Install, maintain, replace Km. - - 12 12 Irrigation infrastructure Install Ha. 230 289 1,167 1,686 COMMUNITY CAPACITY FOR NRM OUTPUTS AND ACTIVITIES OUTPUT ACTIVITY UNIT 2013-14 2014-15 2015-16 2013-16 DELIVERY Approval and advice Establish, maintain No. 117 159 367 643 Assessment Establish, maintain No. 432 553 708 1,693 Engagement event Attend, coordinate, establish No. participants 8,895 7,487 8,585 24,967 Information management system Establish, maintain No. 29 23 18 70 Management agreement Establish, maintain No. 76 164 359 599 Monitoring structure Install, maintain No. 15 35 18 68 Partnership Establish, maintain No. 317 302 168 787 Plan Establish, review, modify No. 306 245 126 677 Publication Establish, maintain No. 229 197 346 772 Mallee Catchment Management Authority www.malleecma.vic.gov.au PO Box 5017 Mildura 3502 Telephone 03 5051 4377 Facsimile 03 5051 4379
© Copyright 2026 Paperzz