C1 10mm European Oak by ScandaFloor on 18mm ply by GC on separating layer 55mm min of RMC Supaflo Alpha Hemi Hydrate floor screed totally encapsulating Wirsbo 20 UFP pipe matrix system on 50mm Wirsbo Rolltec EHD/A expanded polystyrene insulation board and woven membrane all installed by an approved contractor. C3 as existing C2 Provide screw fixings to the ne decking All in accordance with the Structural Engineers details. Overlay the floor boarding with insulation C3 Existing carpet floor finish is to be lifted and replaced upon completion of the work. The existing floor boards are to be lifted and removed form site Provide and fix 32mm x 25mm tanalised roofing battens to the sides of the existing joists. Cut 10mm shuttering ply panels and drop into the joist spacings. The general contractor is to provide and lay 2 layers of Gyplas 3611at 80mm thickness each. The heating contractor compresses the insulation with the heat reflecting plates and installs the heat tubing. The general contractor provides and fixes 18mm flooring grade ply screw fixed to the joists. The general contractor refixes the carpet. 75mm of insulation 150mm of insulation 123.3 NEW SANCTUARY PLATFORM STRUCTURE. NEW FONT PLATFORM. Carefully set out the platform for inspection by the Architect and the specialist marble contractor. The top surface is to finish 60mm lower than the proposed marble finished level. A142 mesh Form shuttering. This may be permanent by using concrete brickwork to the perimeter shape. The heating contractor will then pump 55mm min of RMC Supaflo Alpha Hemi Hydrate floor screed totally encapsulating Wirsbo 20 UFP pipe matrix system on varying thicknesses of expanded polystyrene insulation board and woven membrane as approved by Wirsbo. For insulation set outs see Drawing 01/341/9 forming part of previous faculty application. New heat source to be high efficiency model 2 Archie Kidd Thermal boiler balanced flue through the stonework at 2m above ffl. Below the boiler cut hit and miss pockets into the brickwork. Form downstand shuttering and cast 200mm thick concrete floor slab reinforced with 12mm dia stainless steel reinforcing bars caged and bent to edge beam All in accordance with Structural Engineers details. Trim timbers around the slab leaving 30mm air space to full perimeter. No Change to these areas. Provide and fix new Oak panelled cupboard with access door the front Drugasar C4 The existing Drugasar heaters in the meeting room are to be operational after the other Drugasar heaters are removed. Lounge Drugasar Drugasar Drugasar Drugasar Vestry The general contractor (Corgi registered) is to isolate the existing Drugasar Heaters from power and gas and remove the units from the walls. The inner leaf is to be built up in clay brickwork and plaster finished to match the existing. The existing balamnce fkues are to be removed and the grit stone is to be infilled with matching material pointed with hydrated lime mortar. C3 Existing gas meter is located in the basement in this corner NEW MARBLE ON SCREED STRUCTURE 300 C5 C2 Plan C1 Ex 100mm sq oak corners Altar C5 C5 4 3 Meeting room/ Functions Ex 125mm x 50mm oak door framing. Ex 75mm x 25mm oak v jointed boarding Front door to be side hung with 75mm brass hinges. Pair of brass knobs and sash lock. Side panels fixed to ex 50mm sq sw framing with brass cups and screws for removal Top box front panels hinged. Ex 75mm x 50mm sw framing finished with 18mm ply to form shelf. Cupboard to be satin seal finished. 2 Lady Chapel Heating pipes encapsulated in RMC screed on insulation 721 900 C2 C1 CDM regulations apply. Method statements required for floor board removal. Boiler installation. Removal of Drugasar heaters. Sealant application. Cutting of boards. Kitchen 1220 Boiler elevation Risk of fall through floor. Provide working boards and protect open flooring. Hard hats to be worn at basement level. Heating pipes with heat reflector plates within insulated timber flooring with ply applied from basement side. 300 1220 C5 Designers Risk assessment. Care should be taken when handling wood products Gloves should be worn. Projecting nails from existing removed board are to be withdrawn as the board are removed. Risk of foot and hand injury. Knee pads should be considered when work for long periods bend down. Qualified gas fitters to be in charge of gas piping and boiler installations. Ventilation required when floor sanding and sealing. Masks to be worn at all times. Restricted access for 12hrs after sealant applied. 560 2100 1600 Line of gallery over C4 Male 1 C4 0 Font Drugasar Female Heating pipes with heat reflector plates within insulated timber flooring with no access from below therefore ply dropped in from above Drugasar Drugasar Drugasar Existing incoming water and electric entry point in the Basement The general contractor is to provide and screw fix 10mm shuttering ply to the underside of the floor joist (Basement side) Scandafloor specialist joiners are to remove the existing pews and store on site and upon completion of the woodstrip re fix the pews. HEATING PROPOSALS In areas where it is not possible to access the joists from below ie each side of the centre aisle the general contractor is to remove the floor board from above and provide and fix British gypsum galvanised steel metal component ref GA3 32mm x 19mm x 0.9mm angle securely fixed into the face of the joist. Provide and cut to joist spacings 10mm shuttering ply and drop into place. remaining construction as C4 The general contractor is to remove the existing carpet floor finish and remove the existing softwood floor boards from site. The general contractor is to provide temporary working boards to lay across the joists. The general contractor is to infill the joists with 2 layers of 80mm Gyplas 3611 insulation. JUNE 2002 ALAN The heating contractor will compress the insulation with aluminium heat reflecting trays and lay the heating pipes. C4 as existing The general contractor with provide and lay 18mm flooring grade plywood screw fixed to the joists. Scandafloor will finish the ply with 10mm European oak wood strip. Stain finished JAMES HURST. CHARTERED ARCHITECT TEL: C4 C5 0161 456 1203 SCALE 1:100 1:20 at A2 01/341/12
© Copyright 2026 Paperzz