Resume - PlacementGulf.com

Cover Letter
TO,
Human Resource Manager
Mobile: +966-564129786
+966-536699607
Email: [email protected]
[email protected]
Respected Sir,
Subject: Application for the suitable post on the platform of Project Engineer, Senior Low
Current System Engineer, Programmer, CCTV Engineer.
Hope this mail finds you in Good Health and Thank you for taking time to read my Email & CV. I
take this opportunity to introduce myself as a Project Engineer, Senior Low Current System
Engineer, Programmer, CCTV Engineer.
I am B. Tech with ELECTRONICS AND COMMUNICATION ENGINEERING background have
6 Years + 8 Month of experience in Senior Low Current System Engineer (Designing,
Integration, Testing & Commissioning - Operation Department) under DAR-UL-HANDASA &
Perkins will (www.perkinswill.com)-USA consultants Project at King Saud Bin Abdul Aziz
University for Science & Health and the Client: National Health Guard
Affairs(www.ngha.med.sa) in Jeddah, Riyadh, Madinah, Dammam cities across the Saudi
Arabia, under SL-RASCH GmbH(sl-rasch.de) - Germany, Turner Arabia at Top of Tower H
(Makkah Clock) Project , QC Engineer under SAUDI ARAMCO Project at KAUST, Project
Engineer under DAR-UL-HANDASA at Dhaban MOICFP Project .
I am looking forward for a challenging assignment for career growth and diversification and
thereby would like to find a suitable placement as Senior Low Current System Engineer,
Programmer, Project Engineer, Designing Engineer, BMS Engineer, and MEP Engineer. If
you find my qualifications and experience suitable, then I would like to have the pleasure of
interacting with you for a placement to serve your esteemed organization. My detailed resume is
enclosed for your kind perusal.
Thank you for taking the time to consider me for available position.
Looking forward to your early and positive response.
Yours Sincerely,
Best Regards
Engr. Asalam Ali
Senior Low Current System Engineer (Designing, Integration, Testing & commissioning –
Operation Department)
CCTV Engineer
Project Engineer
CAREER OBJECTIVE:
To be part of highly motivated team, where I can prove my caliber to achieve the organization
as well as personal goals. As an individual I am creative, innovative and looking ahead to work
in challenging environment and strive for excellence in teamwork. in Project Engineer, Senior
Low Current System Engineer maintenance installation Testing & commissioning in a growth
oriented electronics, Electromechanical Consulting/contracting/construction organizations where
there is ample scope for individual and organization growth professional engineer with good allround electronics engineering skills with 6 Years + 8 Months of Real time experience .Very
capable with an ability deal with the entire electronics needs of a construction company.
Experienced in providing timely, as per client standards.
ACADEMIC PROFILE:
B.Tech “Bachelor of Technology in Electronics & communication Engineering” from JNTU
University in 2008, with an aggregate of second Class Grade, INDIA Professional with 6 Years’
+ 8 Months Experience in Project Engineer, Site Engineer, System Engineer,Programmer,in
Low Current Systems in KINGDOM OF SAUDI ARABIA (KSA).
TRAINING / CERTIFICATION:
 Member -132710 of (SCS)-Saudi council of engineers Electronics





Communication Engineer Degree
Certified in Tele -Communication Technology (VOIP& Wireless).
Diploma in computer application from government of India SISI-CMTES.
Advanced training in C programming and data structure.
Certified from ECHO in Soft Skill.
Urdu diploma language with grade A+ Ministry of Human Resource.
Development from government of India.
SUMMARY OF EXPERIENCE:
 Presently working as a Senior Low Current System Engineer in BTAT (Jeddah City)
since June 2009.
 6 Years + 8 Months of experience as a Low Current System Engineer and Project
Engineer for KSAU Project, KAUST Project & MOI Project. i.e. (King Abdullah
University for Science and Technology) and (Ministry of Interior) project for BTAT
Company (Saudi Bin Laden Group), Jeddah, KSA. From June 2009 to till date.
PROFESSIONAL SKILL SUMMARY:
 Having 6 years + 8 Months experience in, operations, installation, and design
and delivering large scale Commercial building, Mega projects and apartment
buildings for Minister of Interior (Government construction projects field) in Security
Systems CCTV Engineer, Structured cabling system & low current system.
 CCTV-Installing and operating the digital cameras from all kinds-Network camera
(PANASONIC) WV-SP306,WV-SP306E,(PANASONIC) LENS WV-LZA62/2E WV-
SF336,WV-SF336E
 Latest model of Panasonic digital IP Cameras which is required no power connection or
control wires, only cat6 IP cable need ,while cameras working using the PoE
 IP CISCO switches connection collected to patch panel then the switch and the server
which is specially stand alone for camera software the server include windows 2000
server with milestone software, which can Control every camera it is IP and the
technical adjustment, maintenance for all cameras ,for sure there will be another
computer as client.
 And be more then one as requested and from server you can give every user his
privileges to the server from full screen which can divide the picture into also, there
can installed an additional joystick for easier viewing zooming, taking a snap shot
etc.For sure all this views connected to the storage hard disk as mentioned before.
 I have 6+ years of Gulf Experience(KSA) in Implementing ,Testing & commissioning all
Light Current systems such as Access Control, CCTV, Fire Alarm system
 Study and review the issued for construction drawings, plans, details and specifications
to ensure that all works implemented and carried at site conforms to approved project
Quality program procedures and Requirements.
 Excellent working knowledge of company safety standard policies and Procedures.
 Productive, multi-task oriented, adapt well to change, good work ethics and meticulous.
 Excellent troubleshooting, problem-solving, and decision-making skills.
 Working knowledge of Word, Excel, Windows, E-mail and Internet.
SOFTWARE SKILLS:
 Operating Systems : Windows 98/ME/XP/Vista/win7/win8.
 Servers
: MS WINDOWS 2003 Server.
 Applications
: AutoCAD, MS Office2007 and GE-EST3-SDU Versions
3.7, 4.2.5.20.
 Language
: C ,Oracle
 Good knowledge in GE-EST3-SDU software for Programming Addressable EST3
Panels & conventional Fire alarm systems installation, testing & commission, Design.
 Codes and standards: - Familiar with NEC, IES, & NFPA standards.
PRESENT EMPLOYER:
Company
Project
Consultant
Designation
Duration
:
:
:
:
:
BT Applied Technology.
MOI-CFP-Dhaban- Jeddah, KSA.
Dar Al-Handasah.
Senior Security system Engineer.
April 2012 to till date
Roles &Responsibilities:
 Execution of the project work according to the specification and standards.
 I Involved in Installation, Testing & Commissioning, Implementing and Maintenance of
Fire Alarm system, Access control system, CCTV system and Public address system
according to NFPA-72 standards.
 Coordinate with consultant and main contractor for engineering and design issues.
 Coordinate with consultant and main contractor for technical submittal and shop drawing
requirements.
 Execution and supervision of project activities such as drawings, submittals,
procurement, follow-ups, manpower handling,
Installation, commissioning, handing over.
 Follow-up with main contractor for material submittal in line with approved schedule.
 Reviewing of weekly progress of works and forwarding the same to the main contractor.
 Performing inspection for materials delivered by different suppliers, sub-contractors and
client.
 Estimation experience in Low voltage systems (FAS, CCTV, ACS, PAS, I.COM TIME
ATTENDANCE).
 Good Implementation Knowledge on the site in Supervise, Control, monitor for First Fix,
Second Fix, Third Fix of the FAS,SCS,ACS,PAS,CCTV,Intercom.
 Monitoring the daily progress of the installation, testing, commissioning of the Fire Alarm
System, CCTV, ACS, PAS and submitting daily reports to the construction manager.
 Regular coordination with all subcontractors to fasten the completion of the project.
 Advising the subcontractors and solving any queries and difficulties faced by them.
 Checking physical installation as per DWG.
 Monitoring Cause and Effect matrix, functioning test for FAS and FM200 room integrity
test.
 Assisting and advising the draftsman in creation of CAD drawings.
 Project Consists of 37 EST3 CAB14 Panels networked together with smoke control
panel, Graphic command centre.
 Day-to-day management of the site, including supervising and monitoring the site labor
force and the work of any subcontractors.
 Day to day inspections of works and management of supervision team (2 no.).
 Extensive Client reporting on a daily, weekly and monthly basis.
 Monitor quality of works onsite. Coordinate and monitor activities of Project
Management Consultant.
 Analyze all drawings required for the job, asking if possible all missing drawing to be
sent from the engineering, so that to be able to identify every item required for the
whole job.
 Prepare daily progress report about the working in progress: the manpower used
(hours and duties), equipment etc.
 Prepare weekly progress report to the Construction and Project Managers to be able
to know the completed area every week and to meet client required progress.
 Excellent Knowledge to retain data from shop drawings.
 Engineering and technical validation project management.
 Ensure Validation Gaps and risk are identified and addressed.
 Supplier validation execution and management.
 SOP and technical report generation.
 Supervision & Surveillance of Security Systems works at site.
 Checking plans, drawings and quantities for accuracy of calculations.
 Supervision of cable termination, cable tray installation works.
 Ensuring all materials used and work performed are as per specifications.
 Liaising with clients and their representatives (architects, engineers and surveyors),
including attending regular meetings to keep them informed of progress.
 Create and Execute project work plans and revise as appropriate to meet changing
needs and requirements.
 Ensure system installations are in accordance with contract documents.
Company
:
SAUDI BINLADIN GROUP (BTAT), Jeddah, KSA.
Project
: KAUST- Thuwal, Jeddah, KSA.
Client
: SAUDI ARAMCO.
Designation: Senior Security system Engineer.
Duration
: July 2011 to March 2012.
Roles &Responsibilities:
 Coordinate with KAUST, SBG, CX, PID and KAUST IT teams to run successful project.
 Provide site work progress report to Project Manager, Site Managers on weekly and
monthly basis.
 Below are the lists of system work on in it during my service tendered.
 First Fix: Installation of Horizontal conduits, boxes & FACP Panel.
 Second Fix: Pulling Cables.
 Third Fix: Installation of base, smoke detector, heat detector, Monitor Module CR & Duct
smoke.
 Preparing pre commissioning and commissioning packages of low current systems.
 Closing EIL (Exceptional Item List).
 Attending meetings with Saudi ARAMCO and Saudi Bin laden Company for project work
progress.
 Co-ordinate with Aramco CX team (commissioning Team), KAUST IT and PID team.
 Excellent record of accomplishment of delivering construction projects at site as per
approved shop drawings.
 Experience in all duties of Electrical, Electronics Engineer at site including checking &
request for approving submittals by client and consultants.
 Ensure all team members follows safety rules and regulations during work hours.
 Confident in Consultant & Contractor interfacing, managing and coordinating with a team
of operations thorough knowledge of construction specifications, FIDIC and AutoCAD.
 Weatherproof camera housing: Type video tech (HEB) Version 230vac(when the power
supply voltage is 230vac Version 12vac/24vac(when the power supply voltage is
24vacExpertise in First fix, second fix, termination. .Analyze SHOP&IFC&ID &approved
by consultant drawings of DATA,IPTV,IPT,WP,MC,ACCESS CONTROL, etc.
 Wireless video intercom system: Type Panasonic(vl-sw102bx)connect own power
cable(220-240V AV)Minimum 3mm contact spacing inside the device and showing “ON”
& “OFF “Third, C.P.P, Switch’s, Module, Systemax) fix cabinet, P.P.F, Organizer.
 Fluke test: UTP cable testing device quickly and easily checks miswiring, open, short.
Etc. Complete details of frequency, (resistance (ohms) length of cable (Ft) Insertion loss
margin (dB) etc.
 Patch panel: Type panel (Systemax M2000) Mount panel to rack. Populate panel.
Secure cable. Cable management devices (flat panels) Attach label and label covers.
 SWITCH: Type switch (EX2200 ‘JUNIPER & CISCO’SWITCH QUICK START) Connect
power to the switch. Perform initial configuration.
Company
Project
:
:
SAUDI BINLADIN GROUP (BTAT), Jeddah, KSA.
King Saud Bin Abdul Aziz University for Science & Health. (MOI-KSA).
Client
: National Health Guard Affairs (www.ngha.med.sa) – Jeddah, Riyadh,
Madinah, Dammam
Consultant : Perkins will (www.perkinswill.com)-USA.
Designation: Site Engineer
Duration
: Jun 2009 to Jun 2011
Roles &Responsibilities:
 Execution of the project work according to the specification and standards.
 Involved in Installation, Testing & Commissioning, Implementing and Maintenance of
Fire Alarm system, Access control system, CCTV system and Building Automation
system according to NFPA-72 standards.
 As per design Creating Project configuring the 3-CPU ,3-LCD,Datacards(3SDDC),Audio source unit and Fire telephone(3-ASU/FTCU),Audio Zone amplifiers(3ZAXX) using SDU version 3.7 and software for EST3 CAB 21,CAB 14,CAB 7,CAB 5
type Fire alarm control panels.
 I Programmed 39 Fire alarm Control Panels at KSAU Bahra Site.
 Configuration, writing the database for 39 Fire Alarm Control Panels by programming.
 Configuration of Intelligent addressable devices by programming.
 Using SDU 3.7 and 5.2 Versions software for Programming of Sensors (Smoke &
Heat), Modules (Pull Station, Control Relays, Monitor Modules, and Control Modules).
 EST3 Network Using SMXLO for 3-FIBMB for 39 EST3 Fire Alarm control panels.
 3-CPU, 3-FIBMB class a network and Audio Fiber optic connections, Fiber optic data
and Audio riser.
 Data and Audio circuit for class a using SMXLO.
 I checked the fiber cable wiring through a fiber tester for communication of EST3
network of 39 fire alarm panels.
 I did Trouble shooting for fiber and copper wiring connection for EST3 network.
 Using copper cable wiring Class A network communication RS-485.
 Installation of Intelligent Analog initiating Devices, NAC for Wall horns and strobes,
Wall mounted and celling mounted speakers/strobes, Door Holder Relays.
 According to Cause and Effect matrix implementing system/ Function and SOP.
 I configured 64 IP Cameras connected through WAN with the support of Panasonic
Easy view IP setting software Ver. 4.24R01 and CCTV Panasonic System Networks
through Cisco Switches.
 According to Cause and Effect matrix, SOP implementing system/ Function Handover
To Dar Al Handasah consultant and client.
 Using 3-RS232 communication card for Fireworks.
 Good Implementation Knowledge on the site in Supervise, Control, monitor for First
Fix, Second Fix, Third Fix of the
FAS, SCS, ACS, PAS, CCTV, Intercom.
 Using Fireworks 1.7 version software for Fireworks graphical command interface with
EST3 panel, CCTV and ACS.
 Troubleshoots Fire Alarm System (FAS) hardware, circuits and wirings.
 Provides training and demonstration of EST’s FACP and devices to the
clients/contractors.
PERSONAL DETAILS:








Date of Birth
Nationality
Religion
Languages known
Marital Status
Driving License
Iqama Status
Present Address
 Corporate mail
: 20th July, 1985
: Indian
: Islam
: English, Arabic, Urdu, Hindi,
: Married.
: Yes (KSA and India).
: Valid with family
: Sharfiya, Jeddah, KSA.
: [email protected].
Declaration: I hereby declare that the above-mentioned information is correct up to my
knowledge and I bear the responsibility for the correctness of the above-mentioned
particulars.
DATE:
PLACE: Jeddah
[ASALAM ALI]