DATE: 24/06/2014 WHS&E - Site Safe Work Method and Management System Policy /Statement (WHSE) Site Safety Management Plan 1 of 49 Date: 24/06/2014 (WHSE) Site Safety Management Plan Project Name Organisation Name [INSERT COMPANY NAME HERE] Address Phone Fax Email ACN/ABN ACN: ABN: (WHSE) Site Safety Management Plan 2|P a g e Date: 24/06/2014 Contents ( Indicates Forms can be filled in on-line at BuildLearn.com.au) The table of contents is empty because none of the paragraph styles selected in the Document Inspector are used in the document. (WHSE) Site Safety Management Plan 3|P a g e Date: 24/06/2014 WHSE 001 – Document Control [INSERT COMPANY NAME HERE]: Maintains an up to date version of this (WHSE) Site Safety Management Plan (SSMP). Retains all obsolete pages of the Site Safety Management Plan for a minimum of seven (7) years to demonstrate a record of WHSE management practices. Provides a copy of the current version of the Site Safety Management Plan (SSMP) to Site Contractors and Sub-contractors during the tendering process. Reviews the Site Safety Management Plan on a periodic basis. Ensures all amendments to the SSMP are recorded in the Register of Amendments. Register of Amendments Date 24/06/14 Page/Form No. ALL Version No. Draft Description of Amendments New Document Prepared by Approved by A.W. BuildLearn Distribution Register Version No. Date of Issue Name of Recipient Position / Organisation (WHSE) Site Safety Management Plan 4|P a g e Date: 24/06/2014 (WHSE) Site Safety Management Plan Version _____ Page 5 of 59 Date: 24/06/2014 WHSE 002 – Project Details and Introduction Organisation Details [INSERT COMPANY NAME HERE] Business/ Trading Name ACN/ABN Contract Job Number Director/Manager Address Phone Fax Mobile Email The following table sets out a brief description of the work to be carried out by [INSERT COMPANY NAME HERE] during the course of the contract/agreed works on site. Date Description of Works No of Contractors /subcontractors and employees (incl. subcontractors) The table below identifies the designated person on site responsible for the management of Work Health Safety and Environment. Name Contact Details [INSERT COMPANY NAME HERE] does / does not intend to subcontract all or part of the works. Manager: Date Print Name: (WHSE) Site Safety Management Plan Version _____ Page 6 of 59 Date: 24/06/2014 WHSE 003 – Work Health Safety and Environment Policy At [INSERT COMPANY NAME HERE], a commitment to Work Health Safety and the Environment is part of the business. This is achieved through: Complying with the Work Health and Safety Act 2013 (SA), the Work Health and Safety Regulations 2013 (SA), Environmental Protection Act 1993 (SA) and supported by the various Codes of Practice; Setting up objectives and targets with the aim of eliminating work related incidents in relation to our activities, products and services; and Defining roles and responsibilities for Work Health Safety and the Environment. Strategies will include: Ensuring Work Health Safety and Environment management principles are included in all organisational site planning activities; Providing ongoing education and training opportunities through BuildLearn to all of our Contractors and Sub-contractors; Consulting with contractors and sub-contractors and other parties to improve decision-making on Work Health Safety and Environment matters; Ensuring incidents are logged, investigated and lessons are learnt within the organisation; Distributing Work Health Safety and Environment information, including this policy, to all contractors and sub-contractors contractors /sub-contractors and employees and interested parties during tendering; Providing resources to ensure Work Health Safety and Environment is a central part of the organisation; and Ensuring effective injury management and rehabilitation is provided to contractors /sub-contractors and employees . Director / Manager: Print Name: (WHSE) Site Safety Management Plan Date Version _____ Page 7 of 59 Date: 24/06/2014 WHSE 004 – Hazard Identification, Risk Assessment and Control [INSERT COMPANY NAME HERE] will not commence construction work at a site of work unless: The contractors or sub-contractors have provided [INSERT COMPANY NAME HERE] have signed the tender documents stating that they have read this document, understand its meaning, implications and will abide by the relevant parts of this workplace (WHSE) Site Safety Management Plan and the legislation; [INSERT COMPANY NAME HERE] has undertaken an assessment of the risks associated with the work activities and has provided to the contractor / sub-contractor with a BuildLearn on-line Safe Work Method Statement (SWMS); and [INSERT COMPANY NAME HERE] has provided induction training opportunities to all contractor / sub-contractors and contractors /sub-contractors and employees through BuildLearn.com.au. [INSERT COMPANY NAME HERE] maintains and updates the SWMS, and provides the updated SWMS and SSMP to the contractors and sub-contractors as updates are required in a timely fashion. [INSERT COMPANY NAME HERE] has identified potential hazards of the proposed work activities, assess the risks involved and developed control measures to eliminate, or minimise, the risks. The risk management process is carried out in consultation with contractor / sub-contractor and contractors /sub-contractors and employees . Identify Hazards: [INSERT COMPANY NAME HERE], breakdowns of specific work activities into job steps to assist in identifying all potential hazards. These work activities are detailed in a SSMP on-line at BuildLearn.com. The SSMP is a list of job steps and other work related practices. For each of the work activities and associated job steps identified in the SSMP, [INSERT COMPANY NAME HERE] has identified potential hazards and their risks. To assist in identifying hazards and risks, [INSERT COMPANY NAME HERE] has considered the use of resources such as codes and standards, industry publications (i.e. safety alerts; hazard profiles for specific trade groups), workplace experience and consultation (i.e. Toolbox Meetings). Assess Risks: [INSERT COMPANY NAME HERE] has identified a risk class/ranking for potential workplace hazards by referring to the categories ranging from high to low in a Risk Matrix. The Risk Matrix is used to determine the level of danger or seriousness (i.e. the consequence) of the risk, how likely it is that this risk will occur (i.e. likelihood/probability) and therefore how detailed control measures will need to be to utilised to eliminate or minimise the risk. (WHSE) Site Safety Management Plan Version _____ Page 8 of 59 Date: 24/06/2014 WHSE 005 – Hazard Categories The following is a list of the hazards [INSERT COMPANY NAME HERE] has identified arising from the tender documents for contracted/agreed work activities. These hazards are addressed within the Safe Work Method Statement(s). Work Health Safety x Access & egress x Confined/enclosed spaces x Coring/chasing x Dangerous Goods (Oxy/other) x Demolition/dismantling x Electricity (power tools/other) x Explosive/pneumatic power tools x Fatigue (shift work/hours of work) x Formwork erection/dismantling Fire/explosion Fumes/gas x Hazardous substances x Flying/falling objects/debris x Height & falls x Hazardous material x Hot/cold working environment x Hot work (cutting/welding/grinding) x Lighting x Manual handling (lifting or twisting) x Machine/equipment guarding x Moving plant/traffic x Materials handling (crane/forklift/other) x Plant & equipment operation x Noise (hearing) x Structural alterations/support x Public (pedestrians/other) x Services (underground/overhead) Subsidence x Ultra Violet Light (sunlight) Lasers x Trenching/excavation Other: x Work near/over water Other: Young workers/unskilled labour Other: Biological/bacteria Other: Environment x Air quality (dust/emissions) x Bulk excavation/spoil x Concrete or paint wastes x Contaminated soil/water x Dewatering/pump out x Habitats (protected flora/fauna) Heritage & Archaeology x Noise or vibration x Noisy work (neighbourhood) x Spills & response x Slurry or other discharges x Traffic & parking x Waste hazardous (paint sludge, synthetic min fibre, asbestos/other x Dangerous Goods/Hazardous Substances (use/storage/spills) x Stormwater/sediment control Other: x Waste disposal Other: (WHSE) Site Safety Management Plan Version _____ Page 9 of 59 Date: 24/06/2014 WHSE 006 – Risk Matrix [INSERT COMPANY NAME HERE] has identified a risk class/ranking for potential workplace hazards by referring to the categories in the matrix below. Step 1: The organisation identifies the consequence for each potential risk by using the table below. Note: If a combination of harm, loss or damage could occur the worst case consequence is selected. Level Description of Consequence High (1) (High level of harm) Potential death, permanent disability or major structural failure/damage. Offsite environmental discharge/release not contained and significant long-term environmental harm. Medium (2) (Medium level of harm) Potential temporary disability or minor structural failure/damage. On-site environmental discharge/release contained, minor remediation required, short-term environmental harm. Low (3) (Low level of harm) Incident that has the potential to cause persons to require first aid. On-site environmental discharge/release immediately contained, minor level clean up with no short-term environmental harm. Step 2: Using the following table, the organisation determines how likely it is that the risk will occur and result in the consequence identified above. Level Likelihood / Probability Likely Could happen frequently Moderate Could happen occasionally Unlikely May occur only in exceptional circumstances. Step 3: Using the risk matrix below, the organisation identifies the risk class/ranking. Likelihood / Probability Consequence Likely Moderate Unlikely High (1) 1 1 2 Medium (2) 1 2 3 Low (3) 2 3 3 Class/Ranking Description / Requirements 1 Will require detailed pre-planning. Actions will be recorded on a Safe Work Method Statement 2 Will require operational planning. Actions will be recorded on a Safe Work Method Statement 3 Will require localised control measures (WHSE) Site Safety Management Plan Version _____ Page 10 of 59 1 WHSE 007 – Safe Work Method Statement (SWMS) Organisation Details Organisation Name: ACN/ABN Address: [INSERT COMPANY NAME HERE] Contact Name:: James Wagner ACN: ABN: 60 Arthur Street, Payneham S.A. 5070 (08) 7230 0173 OR (08) 8298 4444 Contact Position: Manageing Director Contract Phone No: Project Details: Project: All Area: All This SWMS has been developed in consultation with: Activity: Residential Construction / rennovation BuildLearn.com.au Reviewed By James Wagner Position Manageing Director Date 24/6/14 Resources / Trades Involved: All Trades specific to construction of residential or commercial building Equipment Used: Refer On-Line SSMP Maintenance checks: Daily Materials Used: Various Work Health Safety or Work Health & Safety ACT 2013 Environmental (SA) Legislation: Codes or Construction Regulations and Standards applicable to the applicable Codes Of Practices works: Likelihood / Probability Level Description of Consequence or Impact Potential death, permanent disability or major structural failure/damage. Off-site environmental H (1) (High level of harm) discharge/release not contained and significant long-term environmental harm. Potential temporary disability or minor structural failure/damage. M (2) (Medium level of On-site environmental discharge/release harm) contained, minor remediation required, short-term environmental harm. Incident that has the potential to cause persons to require first aid. L (3) On-site environmental discharge/release (Low level of harm) immediately contained, minor level clean up with no short-term environmental harm. (WHSE) Site Safety Management Plan Consequenc e M L U Moderat Likely Unlikely e H (1) (High) 1 1 2 M (2) (Medium) 1 2 3 L (3) (Low) 2 3 3 Version _____ Page 11 of 59 1 Level Likelihood / Probability Likely Could happen frequently Moderate Could happen occasionally Unlikely May occur only in exceptional circumstances Item Job steps Hazards Risk Class/ Ranking Arrive on site, survey and Site assess job to be done levellin ensuring compliance with, Slips, trips, sprains L3 g SafeWork SA guidelines & WH&S ACT 2013 (SA) Put on all PPE equipment NIL required for job String Lines Trips L3 Secure area with bunting & signage to ensure safety of 3rd parties and ensure area Trips & cuts L3 is fenced to minimise injuries to create a safe work environment Trench Slips, trips, sprains, Foundations, storm water, Examp minor L3 water, electrical le only cuts/abrasions Foundation steel placement Sunburn, lifting new sheets/cutting Back injuries, cuts and Manual Handling is conducted in accordance L3 with SafeWork SA Minor cuts, injuries guidelines complying to the from trips, slips safe manual handling resulting in training in accordance with spains/strains WHS regulations Clean off site overburden, Minor cuts, injuries load equipment dispose of from L3 waste lifting/shoveling Name of persons responsible for work Controls SafeWork Guidelines/WH&S (SA) Act SA 2013 Visual awareness PPE/Fencing/SafeWorkSA/sign age Training/PPE/Manual Handling/visual awareness UV Protection Manual Handling awareness/training, Backbrace lifting, appropriate PPE Training/PPE/Backbracesfor lifting/ManualHandlingTrg Appropriate PPE worn. Environmental appropriate cartage used Found ation Qualifications and experience required to Personnel, Duties and Responsibilities complete the task (Supervisory staff and others) Training Required to Complete Work E.G. Site Supervisor PC – MS Suite Applications (WHSE) Site Safety Management Plan Version _____ Page 12 of 59 1 Engineering Details / Certificates / WorkCover Approvals: E.G. Soil Sample – Engineer Name - outcomes This SWMS has been developed through consultation with our contractors /sub-contractors and employees and has been read, understood and signed by all contractors, sub-contractors and contractors /sub-contractors and employees undertaking the work on site: Print Names: Signatures: Dates: Antonie Wissenburg for BuildLearn Review No 01 02 24/06/2014 03 04 05 06 07 08 09 Initial: (WHSE) Site Safety Management Plan Version _____ Page 13 of 59 1 Date: (WHSE) Site Safety Management Plan Version _____ Page 14 of 59 Date: WHSE 008 – Objectives and Targets [INSERT COMPANY NAME HERE] has established the following objectives and targets to support and maintain the effectiveness of the WHSE Site Safety Management Plan. Planning Objective: Contractors /sub-contractors and employees are provided with regular and up-to-date information on WHSE for the duration of the contracted/agreed works. Target: Review the content of the WHSE Site Safety Management Plan at maximum 3 month intervals (or more frequent as required) to maintain the currency of information provided to contractors /sub-contractors and employees and others. Risk Management Objective: Contractors /sub-contractors and employees are familiar with hazards and risks associated with the contracted/agreed works that are assessed as a medium to high risk. Target: Safe Work Method Statement(s) or the equivalent list as a minimum those hazards and risks associated with the contracted/agreed works that are assessed as a medium to high risk. Consultation Objective: Contractors /sub-contractors and employees are regularly consulted on matters that affect WHSE. Target: Toolbox/Pre-start or other agreed methods of consultation are undertaken on a regularly basis. Training Objective: Contractors /sub-contractors and employees are provided with training by their respective employer’s to enable work practices to be undertaken that are safe and minimise risk to themselves/environment. Target: All contractors /sub-contractors and employees involved with the contracted/agreed work have undertaken as a minimum the levels of induction training, i.e. general industry (safety awareness) training, site specific training and work activity training as noted in the Safe Work Method Statement(s) specific to the contracted/agreed works. Other Objective: Target: (WHSE) Site Safety Management Plan Version _____ Page 15 of 59 Date: 24/06/2014 2013 WHSE 009 – Personal Protective Equipment (PPE) [INSERT COMPANY NAME HERE] maintains the following register of all PPE required by contractors /subcontractors and supplied to employees where such PPE is specified as a control measure in the Safe Work Method Statement. Contractors /sub-contractors ensure that all items of PPE are manufactured, used and maintained in accordance with the relevant Standard. Proof of Standard compliance may be checked on site by the Site Supervisor if requested, e.g. labelling. Each employee has been instructed and trained in the correct use of the PPE issued. Signature of recipient Employee name Date of Issue/ replacement (WHSE) Site Safety Management Plan Item supplied I have received the listed PPE with appropriate instruction/training in its correct use. Version _____ Page 16 of 59 Date: 24/06/2014 WHSE 010 – Roles and Responsibilities [INSERT COMPANY NAME HERE] provides the following key trained and competent personnel on site. Heritage Building Group Works Manager Injury Management Coordinator Site Supervisor WHSE Coordinator Contractor/sub-contractor/ Employees (WHSE) Site Safety Management Plan Version _____ Page 17 of 59 Date: 24/06/2014 Roles and Responsibilities Defined The roles and responsibilities of contractors /sub-contractors and employees within [INSERT COMPANY NAME HERE] regarding WHSE are below. Works Manager [INSERT NAME/s] are responsible for WHSE at the workplace and duties include: Implementing the WHSE Management Plan; Using the Hierarchy of Controls in all design, fabrication and construct activities to minimise WHSE risks; Communicating with the site supervisor to consult with contractor/sub-contractor to reduce risks; Being a part of the planning and design stages of trade activities; Deciding when training on WHSE is required; Leading by example and promoting sound WHSE practices at every opportunity; Ensuring safe equipment and plant is provided and maintained; Reviewing WHSE reports and inspections, and following up on recommendations; Coordinating incident investigations and reporting to the appropriate workplace / relevant authorities, as required; Coordinating WHSE office meetings and programs; Monitoring compliance with the WHSE Site Safety Management Plan, including Safe Work Method Statement; and Assisting injured and employees to return to their pre-injury duties as soon as practicable after a work-related injury. Signed by: ______________________ Date: ___ / ___ / ___ Works Supervisor [INSERT NAME/s] is responsible for WHSE at the work site place and duties include: Implementing the WHSE Management Plan; Observing all WHSE rules and regulations; Making sure that work activities are carried out in a safe and environmentally sound manner; Planning to do all work safely including any interface with other work activities; Providing advice and assistance on WHSE matters to contractors /sub-contractors and employees ; Being part of the planning and design stages of trade activities; Deciding when training on WHSE is required; Actioning WHSE reports and carrying out workplace inspections; Setting up WHSE toolbox meetings and programs; Helping to prepare Safe Work Method Statements for the organisation’s work activities; Investigating hazard reports and ensuring that they are completed and corrective actions undertaken; Carrying out project inductions, Toolbox and team meetings; Being a part of incident investigations; Leading by example and promoting sound WHSE practices at every opportunity; Undertaking inspection of the contracted or planned works to ensure that WHSE control measures are implemented and effective; and Other WHSE duties as directed by the Administration Manager. Signed by: ______________________ Date: ___ / ___ / ___ (WHSE) Site Safety Management Plan Version _____ Page 18 of 59 Date: 24/06/2014 Work Health Safety Environment Coordinator [INSERT NAME/s] is responsible for WHSE at the workplace and duties include: Communicating WHSE performance to the Works Manager; Assisting the Site Supervisor to develop and implement the WHSE Plan; Providing advice on WHSE to all contractors /sub-contractors and employees ; Being a part of planning and design in work activities; Determining WHSE legal requirements for the work activity or trade; Making sure WHSE work procedures are followed; Coordinating injury management / return to work for injured contractors /sub-contractors and employees ; Reviewing WHSE reports and inspections; Setting up and being a part of WHSE meetings and programs; Insisting on sound WHSE practices at all times; Setting up and conducting WHSE inductions for employees; Conducting incident investigations; Communicating with the Manager/Site Supervisor on WHSE matters; Making sure records are kept under these guidelines; Other WHSE duties as directed by the Manager Director. Signed by: ______________________ Date: ___ / ___ / ___ Injury Management Coordinator [INSERT NAME/s] is responsible for the management of employee injuries at the workplace and duties include: Assisting injured employees to return to their pre-injury duties as soon as practicable after a work-related injury; Ensuring that, where appropriate, the injured employee is given access to occupational rehabilitation services; Liaising with any parties involved in the occupational rehabilitation of, or provision of medical services, to the injured employee; Monitoring the progress of the injured employee’s capacity to work; Taking steps to prevent recurrence or aggravation of the relevant injury upon the injured employee's return to work; and Providing assistance to meet all legal requirements regarding injury management and return to work. Signed by: ______________________ Date: ___ / ___ / ___ Contractors /sub-contractors and employees Are responsible for the following: Working in a safe manner without risk to themselves, others or the environment; Complying with the WHSE Site Safety Management Plan including all Safe Work Method Statements; Reporting all incidents to the Works Supervisor; Reporting all injuries and illnesses to the designated First Aid Officer; (WHSE) Site Safety Management Plan Version _____ Page 19 of 59 Date: 24/06/2014 Reporting any WHSE hazards to the Site Supervisor; Providing suggestion, through agreed consultation methods, on how to improve WHSE issues; Seeking assistance if unsure of WHSE rules; Reporting any faulty tools or plant to the Site Supervisor; Complying with site rules; Correctly using all Personal Protective Equipment; and Complying with emergency and evacuation procedures. Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ Name:_____________________________ Signed by: ______________________Date: ___ / ___ / ___ (WHSE) Site Safety Management Plan Version _____ Page 20 of 59 Date: 24/06/2014 WHSE 011 – Training and Competency Register Having regard to the hazards and risks associated with the work activities, [INSERT COMPANY NAME HERE] has assured that all contractors /sub-contractors and employees are trained and competent to perform the tasks contracted for in a way that is safe and does not adversely impact on themselves, others or the environment. The following register contains details of the skills and competencies of the organisation’s contractors /subcontractors and employees. Employee Name Work on this project James Wagner Managing Director [INSERT NAME/s] Administrative Manager [INSERT NAME/s] Site Supervisor Skills / Competencies / Experience (e.g. tickets / qualifications) Card No. / Reg. No. Date of Course Duration White card, Building Contractor Licence, Responsible Officer White card, Tradesman, Supervisors licence, First Aid Cert Concreter Carpenter Electrician Plumber Roofer Foundation steel fixer (WHSE) Safety Management Plan Version _____ Page 21 of 59 Date: 24/06/2014 WHSE 012 – Consultation [INSERT COMPANY NAME HERE] promotes the active participation of all contractors /sub-contractors and employees in WHSE decisions. Contractors /sub-contractors and employees are consulted and given opportunity, encouragement and training opportunities to be proactively involved in WHSE matters affecting the organisation and their work activities. Consultation occurs in reference to, but not limited to, the following subjects / topics: Hazard identification and risk assessment processes; Control measures for the management of hazards and risks; Changes to the organisation's policies and procedures or work routines which may affect WHSE; Make up of and representation on relevant committees; and All workplace consultation is recorded and occurs on a regular monthly basis as per legislative requirements. (WHSE) Site Safety Management Plan Version _____ Page 22 of 59 Date: 24/06/2014 WHSE 013 – Toolbox/Pre-Start Meetings All Toolbox / Pre-start meetings undertaken on behalf of [INSERT COMPANY NAME HERE] are recorded on this form and signed by participants. All corrective actions noted on this form are implemented and signed by the nominated person. It is the responsibility of the Site Supervisor to ensure that all corrective actions are completed and reviewed for effectiveness. Toolbox / Pre-start Talks Workplace: Subject of Talk: Presented by: Duration: Date: [INSERT NAME/s] Print Name: Signature: Print Name: Signature: Points Raised / Comments: (WHSE) Site Safety Management Plan Version _____ Page 23 of 59 Date: 24/06/2014 Corrective Action Action Complete Action by Sign off (WHSE) Site Safety Management Plan Version _____ Date Page 24 of 59 Date: 24/06/2014 WHSE 014 – Workplace Inspection Checklist [INSERT COMPANY NAME HERE] inspects the work activity(s) and work area, and provide a completed Workplace Inspection Checklist each week to Administration Manager for the duration of the works. Workplace Inspection Workplace All Date Inspected By All Contractors /sub-contractors and employees Signature Item Access/Egress Access paths clear Access paths defined (signage tape, other) Prohibited areas display warning signs and barricaded Dust/Air Quality Dust suppressed/watered down Stock piles protected from wind Plant & equipment maintained to minimise emissions Electrical Electrical equipment tested & tagged Register of tagging current Portable generator fitted RCD Portable Residual Current Device (RCD) tested/ tagged First Aid/Emergency/Injury First aid kit provided Kit stocks refreshed First Aid Officer available Evacuation procedure in place Emergency contacts displayed Fire extinguisher/equipment available Manual Handling Trolleys/aids in use SWMS followed Training/job rotation undertaken Hazardous Substances/Dangerous Goods Item Correct Action Priority Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes Yes No No n/a n/a 1 1 2 2 3 3 Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes Yes No No n/a n/a 1 1 2 2 3 3 Yes No n/a 1 2 3 Yes Yes Yes Yes Yes No No No No No n/a n/a n/a n/a n/a 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 Yes No n/a 1 2 3 Yes Yes Yes No No No n/a n/a n/a 1 1 1 2 2 2 3 3 3 Register current Yes No n/a 1 2 3 MSDS available SWMS lists precautions for use Storage area secure Refuelling SWMS followed Height work Yes Yes Yes Yes No n/a No x n/a No x n/a No x n/a 1 1 1 1 2 2 2 2 3 3 3 3 (WHSE) Site Safety Management Plan Action By Close Out Close Out By Date Managing Director Site Supervisor Version _____ Page 25 of 59 Date: 24/06/2014 Item Perimeter protection Handrails in place Penetrations covered Fall restraint/arrest system in use SWMS followed Housekeeping Materials stacked Work area lit Bins available & in use Signage in place Leads suspended Walkway/stairs/work area clear Noise Plant & equipment maintained Site hours observed Noisy works identified Hearing protection used (SWMS) Personal Protective Equipment Available and used when required (SWMS) Correctly used by contractors /subcontractors and employees Plant & Equipment Plant register current Item Correct Action Priority Yes Yes Yes Yes Yes No No No No No n/a n/a n/a n/a n/a 1 1 1 1 1 2 2 2 2 2 3 3 3 3 3 Yes Yes Yes Yes Yes Yes No No No No No No n/a n/a n/a n/a n/a n/a 1 1 1 1 1 1 2 2 2 2 2 2 3 3 3 3 3 3 Yes Yes Yes Yes No No No No n/a n/a n/a n/a 1 1 1 1 2 2 2 2 3 3 3 3 Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes No n/a 1 2 3 Action By All All All All Maintenance records provided Yes No n/a 1 2 Daily log book completed Operator ticketed/competency verified SWMS followed Public Protection Work area secure from public Overhead protection provided Stormwater/run off Silt control fences in place Stormwater inlets protected Discharges contained, e.g. pump out, slurry/other Training All contractors /sub-contractors and employees have: - General industry (safety awareness) training - Site specific induction training - Work activity (SWMS) training Vegetation Fencing around drip line of retained trees No material/equipment stored within drip line Waste Management Waste reduction plan in place Waste contractor records available Yes No n/a 1 2 Contractor / Sub-contractor 3 to provide to Site Supervisor 3 Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes Yes No No n/a n/a 1 1 2 2 3 3 Yes Yes No No n/a n/a 1 1 2 2 3 3 Site Supervisor Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes Yes No No n/a n/a 1 1 2 2 3 3 Yes No n/a 1 2 3 Site Supervisor Yes No n/a 1 2 3 Yes Yes No No n/a n/a 1 1 2 3 3 (WHSE) Site Safety Management Plan 2 Close Out Close Out By Date All All Version _____ Page 26 of 59 Date: 24/06/2014 Item Item Correct Bins for litter/cigarette butts/other provide Hazardous wastes captured & correct disposal, e.g. paint sludge/ contaminated soil/other Action Priority Yes No n/a 1 2 3 Yes No n/a 1 2 3 Yes Yes Yes No No No n/a n/a n/a 1 1 1 2 2 2 3 3 3 Action By Close Out Close Out By Date Engineer Site Supervisor Other All items noted for correction have been rectified Name Signed Date Time (WHSE) Site Safety Management Plan Version _____ Page 27 of 59 Date: 24/06/2014 WHSE 015 – Plant and Equipment [INSERT COMPANY NAME HERE] requires that contractors and sub-contractors carry out regular inspections and maintenance on their plant and equipment. [INSERT COMPANY NAME HERE] requires that contractors and sub-contractors carry out regular inspections and maintenance on their plant and equipment in accordance with the manufacturer’s recommendations. Plant and equipment owners are responsible for and able to provide a inspection and maintenance history of each item used on the work site is documented. Certain items of plant and equipment will be ‘Item Registered’ and or ‘Design Registered’ by the Regulatory Authority where required by Legislation, responsibility for this rests with the owner of the plant or equipment. [INSERT COMPANY NAME HERE] ensures control measures are implemented and documented for all plant and equipment, including its operation, deemed as high risk. The effect of all plant and equipment on the workplace is considered and documented in the SafeWork SA Method Statement Pre-start checks, schedule of maintenance and fault reports are notified to the plant/equipment owner and documented in plant log books and made available to relevant parties on request. Where plant and equipment is hired, the same requirements as above apply. (WHSE) Site Safety Management Plan Version _____ Page 28 of 59 Date: 24/06/2014 WHSE 016 – Plant and Equipment Register The following register contains details of all plant and equipment to be used by [INSERT COMPANY NAME HERE] during the course of the work activities. Examples include lifting gear, firefighting equipment, mobile plant, fall restraint equipment, company vehicles and other. Plant Type Authority Registratio Date last Registratio Required Log Serial No. / n with service or Alteration Date n Expiry Maintenan Book Registratio Make / Model Authority maintenance Details Y / On Date ce Availabl n No. Required? record N / NA Site (if Frequency e Y/N available applicable) (WHSE) Site Safety Management Plan Version _____ Page 29 of 59 Date: 24/06/2014 WHSE 017 – Plant and Equipment PreStart Checklist [INSERT COMPANY NAME HERE] completes the following checklist prior to initial plant operation at the workplace. Item Description A checklist should identify general hazards and associated risks relating to the use of the plant & equipment e.g. entanglement, Risk assessment crushing, striking, electrical or other. The checklist should then detail control measures to eliminate or minimise risk. Check Yes No Log Book A current log book recording daily safety Pre-start checks. These Yes are subject to random inspection. N/A No Maintenance Reports Proof of ongoing maintenance, i.e. maintenance records. The records should note the most recent inspection and who conducted that inspection. It may also describe any repair work carried out on the plant. Most importantly, there should be no outstanding items noted for repairs. Yes No Operator’s Manual An operator’s manual relevant to the item of plant and which is to Yes be kept with the plant. No Operator Certification Copy of operator’s certification or licence to operate the plant. Where no statutory certification is required, evidence of competence by the operator in the use of the plant. No Yes N/A Plant Provider Name Signature Date Plant Inspected Plant Type / Make Serial No. Company Inspection Verified By Name (WHSE) Site Safety Management Plan Signature Version _____ Date Page 30 of 59 Date: 24/06/2014 WHSE 018 – Plant and Equipment Regular Checklist The following checklist is completed by [SERVICE PROVIDERS NAME] as a general and regular check on plant operation at the workplace. Plant and Equipment Checklist Service Provider name Plant type / make Include vehicles owned by [INSERT COMPANY NAME HERE] Plant No. Serial No: Description Check Risk assessment Yes No n/a x Operator’s manual Yes No n/a Maintenance reports Yes No n/a Log Book Yes No n/a Competency ticket/licence of operator Yes No n/a Fire extinguisher Yes No n/a Crack test reports Yes No n/a Chains tested and tagged Yes No n/a Regulatory Authority plant registration Yes No n/a Flashing light Yes No n/a Forward/reverse beeper Yes No n/a Tested and tagged electrically Yes No n/a Seat belt Yes No n/a Roll over Protection (ROPS) Yes No n/a Plant Provider Name Signature Date Inspection Verified By Name Signature Date In undertaking regular checks of plant and equiplent, [Service Provider] includes consideration of relevant aspects as follows: (WHSE) Site Safety Management Plan Version _____ Page 31 of 59 Date: 24/06/2014 Scissor Lifts / Boom Lifts Excavators / Backhoes / Bob Cats Risk Assessment Risk Assessment SWMS SWMS Operators Manual Operators Manual Maintenance Reports Maintenance Reports Log Book Log Book Certification/Competency of Operator Certification/Competency of Operator Safety Booklet Fire Extinguisher Company Name Seat Belt Flashing Light Forward & Reverse Beeper Fork Lifts / Manitou’s Cranes Risk Assessment Risk Assessment SWMS SWMS Operators Manual Operators Manual Maintenance Reports Maintenance Reports Log Book Log Book Certification/Competency of Operator Certification/Competency of Operator Fire Extinguisher Fire Extinguisher Seat Belt Crack Test Report Flashing Light Regulatory Authority Plant Registration Forward & Reverse Beeper Chains Tested and Tagged Other… Concrete Pumps Risk Assessment SWMS Operators Manual Maintenance Reports Log Book Certification/Competency of Operator Fire Extinguisher Crack Test Report Line thickness Testing Regulatory Authority Plant Registration (WHSE) Site Safety Management Plan Version _____ Page 32 of 59 Date: 24/06/2014 WHSE 019 – Hazardous Substances/ Dangerous Goods [INSERT COMPANY NAME HERE] maintains a current (within 5 years of the date of issue) MSDS for all products and substances to be used on the work site. Before a product or substance is used on the work site, [INSERT COMPANY NAME HERE] reviews the Material Safety Data Sheet (MSDS) to determine if the product or substance is classified as hazardous. All contractors /sub-contractors and employees involved in the use of products classified as hazardous, are to provide information to [INSERT COMPANY NAME HERE] and have relevant training to allow safe use of the hazardous substance for the completion of the required task. As a minimum standard, all safety and environmental precautions for use listed on the MSDS are to be followed when using the substance and are to be provided by contractors/sub-contractors and included in the Safe Work Method Statement. No products or substances, including chemicals or fibrous materials, are brought to the site workplace without a current MSDS being provided to the Site Supervisor for inclusion into the Hazardous substances register. [INSERT COMPANY NAME HERE] considers the following when selecting chemicals and substances for use on site: Flammability and exclusivity; Toxicity (short and long term); Carcinogenic classification if relevant; Chemical action and instability; Corrosive properties; Safe use and engineering controls; Environmental hazards; and Storage requirements. All storage and use of hazardous substances and dangerous goods is in accordance with the MSDS and legislative requirements. All hazardous substances and dangerous goods are stored in their original containers with the label intact at all times. Hazardous substances and dangerous goods of any quantity are not stored in amenities, containers (unless properly constructed for the purpose), sheds or offices. (WHSE) Site Safety Management Plan Version _____ Page 33 of 59 Date: 24/06/2014 WHSE 020 – Hazardous Substances/Dangerous Good Register The following hazardous substances exist in the site work place. A copy of the MSDS has been forwarded to the person responsible for First Aid. Product Name Application Qty Product labelled MSDS Classified as Hazardous in the MSDS e.g. Methylated Spirits Adhesive removal 5 Ltr Yes x No Yes x No Yes x No e.g. Silicon Adhesive 24 Tube Yes x No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No (WHSE) Safety Management Plan Version _____ If YES: The risks and control measures associated with the use of the product/ substance and the precautions for its use are outlined in the Safe Work Method Statement Page 34 of 59 Date: 24/06/2014 WHSE 021 – Electrical Equipment [INSERT COMPANY NAME HERE] ensures that the use of electrical wiring, equipment, portable tools and extension leads is in accordance with applicable codes and standards including AS3012, Electrical Installations – Construction and Demolition Sites and AS3000, Wiring Rules. [INSERT COMPANY NAME HERE] ensures that all electrical equipment brought on site is listed in the Electrical Equipment Register. The register is completed prior to commencement of the works and maintained for the duration of the works on site. All electrical equipment including leads, portable power tools, junction boxes and earth leakage, or residual current, devices are inspected and tested by a suitably qualified person and labelled with a tag of currency before being used on site. The responsibility for providing the evidentiary proof of test and tag remains with the owner of the plant or equipment and will be provided to [INSERT COMPANY NAME HERE] upon request. (WHSE) Site Safety Management Plan Version _____ Page 35 of 59 Date: 24/06/2014 WHSE 022 – Electrical Equipment Register [INSERT COMPANY NAME HERE] records all electrical equipment brought on site in the Electrical Equipment Register. Note: Testing and Tagging frequency is as required by State or Territory Legislation, codes and relevant standards. Electrical Equipment Workplace Site Name / project number Equipment Description Date of Plant / Serial Inspection/ No. Test Date Results and/or Electrician’s / trip current Date of next qualified License/ (less 30mA) for Inspection/Test person’s Registration No. Earth Leakage Signature Device Cordless Drill Charger EXAMPLES All leads Generator Elect Concrete Mixer Power Drills Kettle Microwave Electrical item Tools & leads or electrical equipment Frequency of inspection / test (in accordance with relevant requirements) 6 months for protectively earthed, 12 months for double insulated Sub-board earth leakage device (WHSE) Site Safety Management Plan Version _____ Page 36 of 59 Date: 24/06/2014 WHSE 023 – Hazard Reporting [INSERT COMPANY NAME HERE] encourages all contractors /sub-contractors and employees to report hazards immediately to the Site supervisor and MUST complete the Online associate BuildLearn forms. Where the hazard cannot be corrected immediately, [INSERT COMPANY NAME HERE] records the details of the hazard in the Hazard Register [INSERT COMPANY NAME HERE] investigates all reported hazards and implements control measures to eliminate and/or minimise the likelihood of an incident or injury. [INSERT COMPANY NAME HERE] identifies a risk class/ranking for all hazards by referring to the categories ranging from high to low in the Risk Matrix. The Risk Matrix is used to determine the level of danger or seriousness (i.e. the consequence) of the risk, how likely it is that this risk will occur (i.e. likelihood/probability) and therefore how detailed control measures will need to be to eliminate or minimise the risk. [INSERT COMPANY NAME HERE] regularly reviews and evaluates the effectiveness of control measures until the hazard is addressed and/or all risks have been mitigated or reduced. [INSERT COMPANY NAME HERE] will issue a copy of any completed Hazard Report form to the principal contractor, as required. (WHSE) Site Safety Management Plan Version _____ Page 37 of 59 Date: 24/06/2014 WHSE 024 – Hazard Report Where a hazard cannot be immediately corrected, [INSERT COMPANY NAME HERE] records the hazard in the Hazard Report. General Date Workplace Submitted By Signature Submitted To Signature Details of Hazard Location Work Activity Hazard identified in relation to the work activity Details of Risk Risk Class High (1) Medium (2) Low (3) Control Measures Corrective Action Required By Whom By Whom When Immediate Within 24 hrs Within 7 Days Completion Corrective Action Completed By Signature Time Date Confirmed By Signature (WHSE) Site Safety Management Plan Version _____ Page 38 of 59 Date: 24/06/2014 WHSE 025 – Injury and Incident Investigation Injuries: All injuries are reported to the desiganted First Aid Officer in the workplace. [INSERT COMPANY NAME HERE] records all injuries on the Register of Injuries. Where the injury requires medical attention or off site treatment, [INSERT COMPANY NAME HERE] completes an Incident Investigation Report Form through their online system. In the event of medical attention copies of Incident Investigation Report are provided to SafeWork SA, within 24 Hours as required. Reports can be found and completed on-line at www.BuildLearn.com.au Incidents: For all incidents involving near misses, property/plant damage or injury to the public or the environment, [INSERT COMPANY NAME HERE] investigates and records the details in an Incident Investigation Report. Copies of completed Incident Investigation Reports are provided to the [INSERT COMPANY NAME HERE] and to SafeWork SA within 24 Hours as required. Reports can be found and completed on-line at www.BuildLearn.com.au Notifiable Incidents: [INSERT COMPANY NAME HERE] reports all notifiable incidents to the relevant Authority (Safe Work SA). Where such an incident has occurred, [INSERT COMPANY NAME HERE] considers whether the site needs to be preserved for investigation by the relevant Authority. Reports can be found and completed on-line at www.BuildLearn.com.au Record Keeping: [INSERT COMPANY NAME HERE] keeps records of incidents and injuies in accordance with Statutory requirements, and online submitted forms are simutaneously safed to the systems Information System Hard Drive (via www. BuildLearn.com.au) (WHSE) Site Safety Management Plan Version _____ Page 39 of 59 Date: 24/06/2014 WHSE 026 – Register of Injuries [INSERT COMPANY NAME HERE] records all injuries in the following register Note complete Online form. General Workplace Location Injured Persons Name Home Address Date of Birth Gender Male Female Occupation Employers Name Employers Address Details of Injury Date of Injury Time of Injury am pm Activity in which the person was engaged at the time of injury Exact location where injury occurred Nature of injury e.g. fracture, burn, sprain, foreign body in eye. Body location of injury e.g. ear, eye, face, neck Details of Treatment Treatment provided by First Aid Officer Follow up treatment required Doctor/ Medical Centre attended Yes No Remarks: Yes No If yes, an Incident Investigation Report must be completed with 24 hours Date attended Medical Certificate Received Yes No Injury Management required Yes No Treatment i.e. x-ray, prescription Further consultation required Yes No If yes, notify the Return to Work Coordinator Name of Witness Address of Witness: Name of Person Providing First Aid Signature (WHSE) Site Safety Management Plan Date Version _____ Page 40 of 59 Date: 24/06/2014 WHSE 027 – Incident Investigation Report [INSERT COMPANY NAME HERE] completes an Incident Investigation Report in the event of any injury involving medical attention or off site treatment or in the event of any incidents involving a near miss, property/plant damage or injury to the public or the environment. The [INSERT COMPANY NAME HERE] will be informed immediately by the responsible person on site, in the event of the above. Following discussions with the contractor/sub-contractor, a decision will be made as to who will conduct the incident investigation and report the incident to SafeWork SA. Reports can be found and completed on-line at www.BuildLearn.com.au Class of Incident Reported Injury Property/Plant Damage Near Miss Environmental Other: Yes No Details: Further Action Required Report to Authorities Other: Details of Incident Date of Incident Time of Incident Witness Name Witness Contact am pm Nature of Incident Location of Incident Description of Incident Details of damage to equipment / property? Injured Person/s (if applicable) Name Address Date of Birth Occupation Employer Referred/transferred to Recommended Preventive Action Details Completed By (WHSE) Site Safety Management Plan Version _____ Page 41 of 59 Date: 24/06/2014 Name Position Signature Date (WHSE) Site Safety Management Plan Version _____ Page 42 of 59 Date: 24/06/2014 WHSE 028 – WHSE Site Safety Management Plan Checklist [INSERT COMPANY NAME HERE] reviews all WHSE policies and procedures on a Quarterly basis to determine the effectiveness of the WHSE Site Safety Management Plan in addressing WHSE in the workplace. General Project Name All Location [INSERT COMPANY NAME HERE] Auditor Other Attendees Activities Reviewed Conforms Changes and distribution of the WHSE Management Plan are recorded Yes No Project details / Description of works / Organisation details are current Yes No WHSE Policy signed and dated by Director/Manager Yes No Hazards are identified and risks are assessed Yes No Controls for high risk activities are documented (Safe Work Method Statement(s)) Yes No Training and Competency Register is current Yes No Site Specific Induction on-line Training records are current Yes No SWMS Training is current Yes No Roles and responsibilities are allocated and signed Yes No Consultation arrangements (nature, topics, intervals) are documented Yes No Plant / Equipment Register is current Yes No Hazardous Substances / Dangerous Goods Register is current Yes No Personal Protective Equipment Register is current Yes No Periodic Workplace Inspection Checklists are completed Yes No Register of Injuries is current Yes No Incident Investigation Reports are completed Yes No Hazard Reports are completed Yes No Electrical Equipment Register is current Yes No Injury Management and Return-to-Work Program is displayed Yes No Workers Compensation Information is current Yes No Other: Yes No Items Identified for Correction (WHSE) Site Safety Management Plan Version _____ Page 43 of 59 Date: 24/06/2014 Outstanding Issues and Recommendations Follow up actions required Yes No When Completed By Name Position Signature Date (WHSE) Site Safety Management Plan Version _____ Page 44 of 59 Date: 24/06/2014 WHSE 029 – Injury Management and Return-To-Work Our Commitment: [INSERT COMPANY NAME HERE] is committed to the return to work of injured contractors /subcontractors and employees . As part of this commitment, we will: Prevent injury and illness by providing a safe and healthy working environment; Participate in the development of an injury management plan and ensure that injury management commences as soon as possible after an employee is injured; Support the injured employee and ensure that early return to work is a normal expectation; Provide suitable duties for an injured employee as soon as possible; Ensure that our injured employees (and anyone representing them) are aware of their rights and responsibilities – including the right to choose their own doctor and rehabilitation provider, and the responsibility to provide accurate information about the injury and its cause); Ensure that our injured contractors /sub-contractors (and anyone representing them) are aware of their rights and responsibilities – including the their responsibility to provide accurate information about the injury and its cause) to [INSERT COMPANY NAME HERE] for investigation and reporting purposes; Consult with our employees and, where applicable, unions to ensure that the return-to-work program operates as smoothly as possible; Maintain the confidentiality of injured employee’s records. Not dismiss an employee as a result of a work related injury within six months of becoming unfit for employment. To support the above, [INSERT COMPANY NAME HERE] has established the following procedures. Notification of Injuries: All injuries must be notified to the Site Supervisor as soon as possible. All injuries will be recorded in the Register of Injuries. Safe work SA will be notified where injuries or significant near miss incidents occure as per legislative requirements; Our Workers Compensation Scheme Agent will be notified of any injuries that may require compensation within 48 hours. Reports can be found and completed on-line at www.BuildLearn.com.au Recovery: All injured contractors /sub-contractors and employees will receive appropriate first aid or medical treatment as soon as possible. The injured employee must nominate a treating doctor who will be responsible for the medical management of the injury and assist in planning return to work. Note that the BuildLearn Sign has the QR reader code for the location of the nearest medical facility (WHSE) Site Safety Management Plan Version _____ Page 45 of 59 Date: 24/06/2014 Return To Work: A suitable person will be arranged to explain the return to work process to the injured employee. The injured employee will be offered the assistance of a WorkCover - accredited rehabilitation provider if it becomes evident that they are not likely to resume their pre-injury duties, or cannot do so without changes to the workplace or work practices. Suitable Duties: An individual return to work plan will be developed when the injured employee, according to medical advice, is capable of returning to work. The injured employee will be provided with suitable duties that are consistent with medical advice and are meaningful, productive and appropriate to the injured employee’s physical and psychological condition. Depending on the individual circumstances of the injured employee, suitable duties may be at the same workplace or a different workplace, the same job with different hours or modified duties, a different job and may involve full-time or part-time hours. Dispute Resolution: If disagreements about the return to work program or suitable duties arise, the organization will work with the injured employee and any union representing them to try to resolve the issue. If all parties are unable to resolve the dispute, the organization will seek to involve the Scheme Agent, an accredited rehabilitation provider, the treating doctor or an injury management consultant. Contacts: Serenity Home’s workplace contact for the return-to-work is: Name Organisation [INSERT COMPANY NAME HERE] Contact Details (08) 8298 4422 [INSERT COMPANY NAME HERE] ‘s preferred Work Cover-accredited rehabilitation providers are: Name Organisation Contact Details [INSERT COMPANY NAME HERE] workers’ compensation Scheme Agent is: Name (WHSE) Site Safety Management Plan Organisation Version _____ Contact Details Page 46 of 59 Date: 24/06/2014 WHSE 030 – Emergency Plan FOR ALL EMERGENCIES REQUIRING POLICE, AMBULANCE OR FIRE BRIGADE RING: 000 OR FROM DIGITAL PHONES RING 112 IF NO PHONES ARE AVAILABLE ATTEMPT CONTACT ON TWO-WAY RADIO. Procedure: 1. If significant SPILL Use Environmental Emergency Procedure: Make Safe from Traffic. Stop traffic if necessary. Be sure to facilitate access for emergency vehicles 2. Give immediate First Aid and extinguish any fire. 3. Assess the situation, call 000 or 112 and tell the operator: Name of Organisation: Name of Responsible person: Name of First Aiders Nature of emergency Road Name: Locality: Kilometres N / S / E / W of nearest town (approx) OR Nearest cross street State number of people trapped or injured State number people missing If a spill: Quantity, Chemical, UN number and Hazchem Code Other problems e.g. Fire, Risk of Fire, Fallen power lines, Flood, Weather [INSERT COMPANY NAME HERE] ANY ANYWHERE 4. While waiting for Emergency Services. Continue first aid if appropriate. 5. When Emergency Services arrive, they will take control. Give them details of the incident & any further actions you have taken and Assist as directed with traffic control etc. 6. Call (08) 8363 5922 number and inform them. As soon as practicable report on the Incident using [INSERT COMPANY NAME HERE] Accident / Incident Report form on-line at BuildLearn.com.au using the QR reader code on the BuildLearn Sign located on the security fence of the work site Note: a second QR reader on sign for nearest Medical Centre or Doctor for Attention. Under your obligation to 'Duty of Care' requirements. The PCBU (Principal Builders) - Site requirements include A company sign Security fencing (WHSE) Site Safety Management Plan Version _____ Page 47 of 59 Date: 24/06/2014 Warning signs Security lock Access and egress driveway, delivery and loading area Essential services and amenities Emergency planning First aid provisions Refuse area Traffic management area Storage location Safety provisions - safety bin Working drawings Site entry instructions - BuildLearn QR code Site Safety Management Plan All Trades, stakeholders and visitors to site MUST: Complete site entry form Read Site Specific Site Safety Management Plan Check tools are Tested / Tagged and Current Consult/engage Site Supervisor and other stakeholder on site via a Toolbox meeting Survey the site Complete site entry form Complete safe work method statement Toolbox meeting Soil sample Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Deliver of amenities (toilet) Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Temporary fencing Complete Site Entry Form Complete Site Specific Safe Work Method Statement Read Site Specific Site Safety Management Plan (WHSE) Site Safety Management Plan Version _____ Page 48 of 59 Date: 24/06/2014 Toolbox meeting Installation of cellar Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Installation of swimming pool Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Footing trenches over 1.5m deep Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Delivery of rubble base Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Spread of rubble base and compact Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Excavate Trenches Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Underfloor Plumbing Complete site entry form High risk construction method identified (if digger is used) Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 49 of 59 Date: 24/06/2014 Toolbox meeting Engineering report Complete site entry form Complete safe work method statement Toolbox meeting Delivery of foundation steel reo Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Install Fortecon, steel reo to foundations, box up form work Complete site entry form Complete safe work method statement Toolbox meeting Install electrical sleeve and earth stake Complete site entry form Complete safe work method statement Toolbox meeting Engineering report Complete site entry form Complete safe work method statement Toolbox meeting Concrete pump and screed footing Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Install termite barrier Complete site entry form Complete safe work method statement Toolbox meeting Trench main sewer drain Complete site entry form High risk construction methods identified Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 50 of 59 Date: 24/06/2014 Toolbox meeting Delivery of structural steel Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Erection of structural steel Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Delivery of wall & roof frame timber Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Carpenter to erect wall frames Complete site entry form High risk construction Methods identified Complete safe work method statement Toolbox Meeting Crane up roof trusses Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Carpenter erect roof frame Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Delivery & installation of fall protection Complete site entry form High risk construction methods identified Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 51 of 59 Date: 24/06/2014 Toolbox meeting Delivery of roofing materials Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Installation of roofing materials Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Delivery of bricks Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Removal of fall protection Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Delivery of brick sand Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Installation of brickwork Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Installation of stone veneer Complete site entry form High risk construction methods identified Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 52 of 59 Date: 24/06/2014 Toolbox meeting Installation of first fix plumbing Complete site entry form Complete safe work method statement Toolbox meeting Bobcat site clean Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Installation of first fix gas plumbing Complete site entry form Complete safe work method statement Toolbox meeting Installation of first fix electrical Complete site entry form Complete safe work method statement Toolbox meeting Installation of first fix A/C Complete site entry form Complete safe work method statement Toolbox meeting Installation of render Complete site entry form Complete safe work method statement Toolbox meeting Delivery of insulation Complete site entry form Complete safe work method statement Toolbox meeting Installation of insulation Complete site entry form Complete safe work method statement Toolbox meeting (WHSE) Site Safety Management Plan Version _____ Page 53 of 59 Date: 24/06/2014 Delivery of brick sundries Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Delivery of Gyprock Complete site entry form Complete safe work method statement Toolbox meeting Installation of Gyprock Complete site entry form Complete safe work method statement Toolbox meeting Flushing of Gyprock Complete site entry form Complete safe work method statement Toolbox meeting Sanding of Gyprock Complete site entry form Complete safe work method statement Toolbox meeting Delivery of Bath & laundry trough cabinet Complete site entry form Complete safe work method statement Toolbox meeting Installation of Bath & laundry trough cabinet Complete site entry form Complete safe work method statement Toolbox meeting Cornicing of Gyprock Complete site entry form Complete safe work method statement Toolbox meeting Delivery of 2nd fix timber & eave material Complete site entry form Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 54 of 59 Date: 24/06/2014 Toolbox meeting Window installation and glazing Complete site entry form Complete safe work method statement Toolbox meeting Waterproof wet areas Complete site entry form Complete safe work method statement Toolbox meeting Carpenter to fix 2nd timber & eave material Complete site entry form Complete safe work method statement Toolbox meeting Delivery of cabinets Complete site entry form Complete safe work method statement Toolbox meeting Installation of cabinets Complete site entry form Complete safe work method statement Toolbox meeting Delivery and installation of bench tops Complete site entry form Complete safe work method statement Toolbox meeting Delivery and installation of splashbacks Complete site entry form Complete safe work method statement Toolbox meeting Delivery of interior tiles Complete site registration form Complete safe work method statement Toolbox meeting Timber flooring and finish Complete site registration form Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 55 of 59 Date: 24/06/2014 Toolbox meeting Install paint work Complete site entry form Complete safe work method statement Toolbox meeting Installation of 2nd fix electrical Complete site entry form Complete safe work method statement Toolbox meeting Delivery of all 2nd fix sanitary ware Complete site entry form Complete safe work method statement Toolbox meeting Installation of 2nd fix plumbing Complete site entry form Complete safe work method statement Toolbox meeting Installation of Interior tiles Complete site entry form Complete safe work method statement Toolbox meeting Installation of robes & shower screens Complete site entry form Complete safe work method statement Toolbox meeting Installation of garage doors Complete site entry form Complete safe work method statement Toolbox meeting Installation of Air Conditioning system Complete site entry form Complete safe work method statement Toolbox meeting Installation of carpets Complete site entry form Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 56 of 59 Date: 24/06/2014 Toolbox meeting Cleaning of house Complete site entry form Complete safe work method statement Toolbox meeting Delivery & fitting of fly screens Complete site entry form Complete safe work method statement Toolbox meeting Delivery of appliances Complete site entry form Complete safe work method statement Toolbox meeting Delivery of Hot Water Service (HWS) Complete site entry form Complete safe work method statement Toolbox meeting Gas appliance install Complete site entry form Complete safe work method statement Toolbox meeting Kitchen electrical appliances to install Complete site entry form Complete safe work method statement Toolbox meeting Retaining walls Complete site entry form Complete safe work method statement Toolbox meeting Fencing Complete site entry form Complete safe work method statement Toolbox meeting Paving Complete site entry form Complete safe work method statement (WHSE) Site Safety Management Plan Version _____ Page 57 of 59 Date: 24/06/2014 Toolbox meeting Cement paving or driveway Complete site entry form Complete safe work method statement Toolbox meeting Landscape Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Site clean up Complete site entry form High risk construction method identified Complete safe work method statement Toolbox meeting Handover Complete site entry form Complete safe work method statement Toolbox meeting Other building details Details Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Landscaping Complete site entry form High risk construction methods identified Complete safe work method statement Toolbox meeting Site Safety Rules Contractors / Subcontractors to make their workers aware of the contents of the Site Safety Management Plan and ensure they understand the site safety rules No access to the site unless Building Site Supervisor is informed prior to attendance If an area is barricaded do not enter the barricaded area unless authorized to do so (WHSE) Site Safety Management Plan Version _____ Page 58 of 59 Date: 24/06/2014 All contractors & subcontractors to have first aid kits available in their vehicles whenever working on site Work areas are to be kept clean and tidy at all times & rubbish to be placed in appropriate bins or cages All nails on waste timber to be removed or bent over No alcohol or drugs (other than prescription drugs) to be consumed on this site No worker is to enter the site while under the influence of alcohol or illicit drugs Fighting, bullying, harassment or aggressive behaviour by anyone on this site will not be tolerated All persons must leave site amenities in a clean, tidy and hygienic state after use - notify the Building Site Supervisor should a problem arise All site workers must immediately inform Building Site Supervisor when / if an unforseen risks or Hazard arises so that applicable safety controls can be implement. I have read, understood and will comply with the Site Safety Management Plan and Site Safety Rules Yes No Site Address: PROJECT ID #: Contractor, Sub-contractor or their nominated Responsible Person Name: Email: Signature: Site Supervisor or nominated Responsible Officer for PCBU Name: Email: Signature: Person Conducting Business or Undertaking – Principal Builder, Manager Name: (WHSE) Site Safety Management Plan Signature: Version _____ Page 59 of 59
© Copyright 2026 Paperzz