CSN 7640 Library Renovation and Central Plant Structure N/A

NEVADA SYSTEM OF HIGHER EDUCATION
Prioritization of Proposed Two Percent Deferred Maintenance Projects
State Deferred Maintenance Categories
Each NSHE institution has prioritized its respective deferred maintenance projects (that were submitted to the State Public Works Division (SPWD) for the 2017-2019
CIP recommendation) using the criteria below. The criteria for prioritization are the same criteria used by the staff of the State Public Works Division to establish their
recommendations to the State Public Works Board. Because these criteria were established for all State agencies and facilities, not all prioritization areas may be
applicable to NSHE facilities.
Institution
CSN
TMCC
WNC
GBC
TMCC
UNLV
UNR
WNC
GBC
UNLV
WNC
UNLV
UNR
WNC
UNR
UNR
UNR
DRI
GBC
NSC
UNR
NSC
UNR
SPWD
Proj Number
Project Title
Campus
Priority
SPWD Cost Estimate
Other Funding
State Funding
Total
Legal Requirements: ADA, Court Orders/Legal Requirements, Life Safety/Code Violations/Seismic Retrofits
7640
Library Renovation and Central Plant Structure
N/A
$
$ 2,428,740 $ 2,428,740
7379
Mechanical Shaft Fire Protection Upgrades (Red Mtn. Building)
N/A
$
$
324,271 $
324,271
7699
ADA and Safety Retrofits (initiated previously; now NDE Audit Report)
N/A
$
$
987,601 $
987,601
Deferred Maintenance: Essential Facility (such as: prisons, hospitals, NHP Command, etc.)
N/A to NSHE
Deferred Maintenance: Governance Center (such as: Capital, Mansion, Grant Sawyer Building)
N/A to NSHE
Deferred Maintenance: Roofing, ADA, Fire Sprinklers, Indoor Air Quality, Paving
$
$ 1,025,528 $ 1,025,528
7656
HVAC Systems Renovations - Theater and Leonard Center - Elko Campus
1
7378
Renovate Exterior Finishes (Red Mtn. Building)
1
$
$ 3,445,472 $ 3,445,472
7665
Building Upgrades - Carlson Education Building
1
$
$ 8,041,349 $ 8,041,349
7474
Advanced Planning: High Temp Hot Water Pipe Replacement
1
$
$
136,499 $
136,499
7701
Advance Planning: Replace Multi-Zone HVAC Unit (Pinion Hall-Fallon)
1
$
$
231,686 $
231,686
$
$
1,750,999
$
1,750,999
7655
HVAC Systems Renovations and Lighting - Berg Hall - Elko Campus
2
$
$ 6,296,030 $ 6,296,030
7667
Infrastructure Improvements - Beam Hall
2
7700
Advance Planning: Replace Multi-Zone HVAC Unit (Sage Hall-Fallon)
2
$
$
37,764 $
37,764
$
$
645,342 $
645,342
7671
Advance Planning: Campus Water Line Infrastructure Improvements
3
7483
Air Handler Replacement & Control Systems
3
$
$ 5,066,379 $ 5,066,379
7647
Boiler Plant Renovations (Multiple buildings)
3
$
$
835,100 $
835,100
7482
Replace 4kV Electrical System (South Campus)
4
$
$ 7,226,866 $ 7,226,866
7478
Chilled Water Plant Expansion & Site Piping
5
$
$ 5,953,049 $ 5,953,049
7485
Repair Building Envelopes
6
$
$ 1,500,001 $ 1,500,001
Deferred Maintenance: Other Facilities (NSHE projects fit into this category, based on SPWD facility categories)
7523
1
$
$ 2,916,308 $ 2,916,308
Heat Pump and Piping Replacement - Las Vegas
7657
Construct Parking Lots, ADA access improvements - Elko and Winnemucca
1
$
$ 1,691,025 $ 1,691,025
7661
1
$
$
93,180 $
93,180
Lobby Renovation in Liberal Arts & Science Building
7479
Planning Renovate Chemistry Building
1
$
$ 11,499,998 $ 11,499,998
7662
2
$
$ 4,066,041 $ 4,066,041
Classroom Conversion to Wet Lab
7480
Planning Renovate Classrooms
2
$
$ 1,500,001 $ 1,500,001
Project Continuation: Ongoing phases of previously funded projects or projects funded with other funding (such as: fees or federal funds)
N/A
N/A
(BUSINESS, FINANCE & FACILITIES COMMITTEE 12/01/16) Ref. BFF-9, Page 1 of 1