Appendix 13-70 North Bay Shortcut Segment – Stewartville Section

Energy East Pipeline Ltd.
Consolidated Application
Volume 13: Maps
Appendix 13-70
Appendix 13-70
North Bay Shortcut Segment – Stewartville Section
Detailed Route Map (Sheet 52)
May 2016
LAT: N 45-27-44
LONG: W 76-35-23
ALEXANDER STEWART
PROVINCIAL PARK
(NATURE RESERVE CLASS)
Ñ
White Lake
Proposed Valve Site
00
+0
40
00
+0
45
00
00
+0
+0
50
00
+0
55
00
00
+0
30
C I T Y
M I L L S
O F
O T T A W A
MLV 1217-2
#
*
MLV 1217-2 Richmond Sales Tap Meter Station
to be disconnected from Line 1200-2
7
S
T
Mi s
s iss
ipp
i
DRIP:
1217-2-1
Huntley
Richmond
Fen
Manion Corners
Ri
ve
(Long Swamp)
BURNT LANDS PROVINCIAL PARK (NATURE RESERVE CLASS)
Lake / Water Body
Ñ
§
Wetland Complex
East Burnt Lands
River / Creek
Gas Valve Site - To Be Removed
Drip Assembly - To Be Removed
Primary Roads
Minor Roads
Railways
Municipal Boundaries
Provincial Parks
City / Town
Conservation Reserve
Aboriginal Land
Conservation Area
Teranet property mapping NOT A PLAN OF SURVEY
© 2014 Teranet Enterprises Inc. and its suppliers. All rights reserved.
STSEP-BV-48-0
STSEP-SV-48-0
STSEP-SV-48-1
%
r
§
§
M I S S I S S I P P I
Former Proposed Facility
Compressor Station
%
§ §
Huntley
Pakenham
Mountain
Wetland
Complex
Energy East Mainline (Stewartville Section) 1000m KP
Energy East Mainline
(Ontario North Bay Shortcut Segment Supplemental Report No. 5)
Private Ownership
Energy East Mainline
(Ontario North Bay Shortcut Segment Supplemental Report No. 5)
Crown Ownership
Energy East Mainline - Original NEB Application
RICHMOND
#
*
§
Legend
%
25
Packenham
§
STATION No.1217 - STITTSVILLE
Goulbourn Wetland Complex
MLV 1216-2
0
§
STWVP-BV-47-0
STWVP-SV-47-0
STWVP-SV-47-1
Proposed Facility
+0
00
+0
15
00
STWVP-BV-47-1
+0
§
10
#
*
STITTSVILLE PUMP STATION
LAT: N 45-13-11
LONG: W 75-55-30
Corkery Creek
§
STWVP-BV-47-2
STWVP-BV-47-6
00
ka
§
STEWARTVILLE PUMP STATION
LAT: N 45-23-48
LONG: W 76-29-22
#
*
#
*
STWVP-BV-47-4
See Sheet 53
d aw
as
See Sheet 51
R iv
er
§
a
Ü
STITTSVILLE
35
STWVP-BV-47-3
M C N A B - B R A E S I D E
00
0
PMBEP-BV-46-6
M
417
S
T
§
00
RFWEP-BV-47-0
RFWEP-SV-47-0
RFWEP-SV-47-1
§
STWVP-BV-47-5
+0
§
dawaska
Lake Ma
20
#
*
17
S
T
0
0+
00
0
RENFREW
ARNPRIOR
5+
No New Watercourse crossing currently planned
Latitude Longitude
00
Crossing ID
17
S
T
5+
Index No.
Water Crossing Reference Table
Watercourse Name
Primary Crossing Method
0+
§
ENERGY EAST PIPELINE LTD
Wetland, Provincially Significant
ENERGY EAST MAINLINE
NORTH BAY SHORT CUT SEGMENT
(STEWARTVILLE SECTION)
National Migratory Bird Sanctuary
Caribou Range
Crown Owned Segment Lengths - 0.1 km
Privately Owned Segment Lengths - 56.3 km
Note: Corridor widths shown are not to scale
and serve only as cartographic representations.
1:50,000
Note: Kilometre Posts (KP) shown
are horizontal grid distances.
ALMONTE
DETAILED ROUTE MAP
0
0.75
1.5
December 6, 2015
JDB-J8-MAP-052
Sheet 52
Alignment Route: EEL_Conversion_CL_RevC
km
3
Revision No. 2