March-2014 ACI CARGO REPORT TRANSPORT OF AN OIL RIG IN 184 PIECES FROM POZO GIGANTE 5/HUILA TO BARRANQUILLA PORT, THEN TO BE EXPORTED TO CHINA. Made by: ACI CARGO LOGÍSTICA S.A.S ACI Cargo highly specializes on heavy lift, break bulk, and projects cargo. With over 30 years of experience in the industry, we can offer “the difference”. Raul Gonzalez Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) TABLE OF CONTENTS INTRODUCTION 1. Objective 2. Cargo Description 3. Transportation 3.1 To prepare the cargo 3.2 Inland Transportation 3.3 Port operations and custom brokerage operation 4. Conclusion 1 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) INTRODUCTION This document will explain briefly the Logistic process to transport 184 pieces corresponding to GWDC’s oil rig, a company who carry out perforations services and well reparation not just In Colombia but also in the world. These pieces were located in Huila at Oil well named Gigante 5 location to be transported to Barranquilla port by land and there, these were loaded in Rickmers Yokohama Vessel to be transported to Dalian Port in China finally. In this way, we present a specific photographic description about Aci Cargo’s logistic’s transport for this operation. 1. Objective: -Coordinate Logistic to transport an Oil Rig in 184 pieces from Oil well, Gigante 5 in Huila to Barranquilla port and then be loaded on a Vessel with destiny China. -Perform export custom brokerage. 2. Cargo Description: Commodity: Oil Drill No Pieces: 184 Total Cargo: 6x20’STD Containers and 3x40’ STD Containers. The General products that were exported with this shipment were: 2 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) Back up Generator Bolt Cat walk Elevador de tubería Backbone BOP hydraulic line CATHEAD Evacuation lane Base of BOP Bushing Centralizer Flange plate Basement oblique stand Butterfly valve Certificate of equipments Floor support Beam of monkey board Cable box Choke manifold GAS LINE Bend CARDAN SHAFT Clamp loader Generator Set for Camp Bend of standpipe Casing Elevator CONNECT BOARD Generator Set1,2,3 # Casing head Connecting pipe of mud tank Handrail Casing slip Connector Handwheel handle Board Casing tong Container27(40‘’) HC Valve Container35(20‘’) Crown block Drill Pipe Elevator Heavy weght drill pipe Container37(20‘’) Cuña de tubería del Drill pipe slip Heavy weight DP Container42(20‘’) Derrick Back, Base, Brace Driller console High pressure drilling hose Drilling board HIGH PRESSURE LINE Drilling crossover High pressure pipe Bit breaker Blowoutprevention pipe Container52(20‘’) Container64(20‘’) Deviational Seurvey Air Winch DIFFERENTIAL MECHANIEM Container65(40‘’) Doghouse Drilling jar HOISTING ROPE Container72(20‘’) Double ram blowout preventer Drilling line Hook Crane Drawwork Drilling line spool Horizontal scroll discharge decanter centrifuge Cross over Drill collar Crossover Drill pipe Drilling optimization device Electric cable Hydraulic tongs Pin SHALE SHAKE HOPPER Valve set Hydraulic winch Pneumatic winches Short drill collor Winch of monkey board Hydrualic control unit Pressure sensor Short drillpipe X-over KILL LINE PROTECTIVE SUB Single ram blowout preventer Test plug&Running tools Spider Tool basket Spinner Spiral Drill Pipes Stand base Stand pipe Top floor Base Traverling block STRETCHER Screw rod Sub-structure Section filter of mud pump Kill manifold Ladders Lift of mud pump Lift sub Lifting device of BOP Link Pump pressure sensor hose Ramp REDUCING COUPLING Ring gasket Riser Rotary table base framework Monkey board stamp RUBBER HOSE MUD OFF RUBBER HOSE Mud Pump Mud tank Mud tank1# Rubber of weight sensor SCR House Screw cap Screw of casing head SURVEY EQUIPMENT Swivel Oil tank Oil tubing Slips Hydraulic line trough Hydraulic station Tubing Elevator Valve seat SH Perfection Links Shaker Oilcan Mud valve manifold 3 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 3. Transportation. 3.1 To prepare the cargo Origin: Pozo Gigante 5 in Huila, Colombia The GWDC’s oil Rig was located at Gigante 5 Huila zone, so initially, we proceed to verify if the cargo was ready to be transported and to ensure that all the pieces were described at packing list. In this way and during three days, we made an inventory modifying some items and volume of pieces with the correct digits. 4 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 5 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 3.2 Inland transportation: Origin: Pozo Gigante 5 in Huila, Colombia Destination: Barranquilla Port, Colombia Transporting pieces, from oil well to Barranquilla, was made at 2nd December/2013 day. The reception zone of the cargo in Barranquilla was Compas port terminal and the receipt of the cargo was finalized at 19th December/2013. The inland logistic was made at the following way: EQUIPMENT Cama Alta Cama Alta Especial Cama Baja Cama Baja Especial Cama Baja Especial 4 ejes Cama Baja Especial Hidráulica No. ESTIMATED TRAVELS 31 16 7 7 7 1 To the transport of these pieces on the Colombian roads, our professional equipment intervened in many meetings with the relevant authorities in order to his transport didn’t have drawbacks (We talk with communities of the region directly for this transport) 6 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 3.4 Loads at Port To this Export Process, our professional team met with Antinarcotics National Policy in many times in order to comply with the due process, specifically with antinarcotics authority. So, our team explains him about our complete logistic in order to get approves for this process. Two weeks before Rickmers Yokohama arrives at port, we proceed to make the inspection of each container, being this inspection satisfactory. The Vessel arrived at March 3 of 2014 and it finalize day 7th of March/2014. We loaded all 184 pieces in this vessel successfully. 7 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 8 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 9 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 10 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 11 Executive Report March-2014 ACI CARGO Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China) 4. Conclusion With our professional coordination, Aci Cargo Logistic successfully achieved this operation. We transported 184 pieces from Huila to Barranquilla Port, performed successfully the custom export process and port operations. One more time, Aci Cargo shows his experience and professionalism to handling Break Bulk cargo, coordinating his logistic with strong allies, culminating successfully with all his operations. 12
© Copyright 2026 Paperzz