report oil rig gwdc project

March-2014
ACI CARGO
REPORT
TRANSPORT OF AN OIL RIG IN 184 PIECES FROM POZO GIGANTE 5/HUILA
TO BARRANQUILLA PORT, THEN TO BE EXPORTED TO CHINA.
Made by:
ACI CARGO LOGÍSTICA S.A.S
ACI Cargo highly specializes on heavy lift, break bulk, and projects cargo. With
over 30 years of experience in the industry, we can offer “the difference”.
Raul Gonzalez
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
TABLE OF CONTENTS
INTRODUCTION
1. Objective
2. Cargo Description
3. Transportation
3.1 To prepare the cargo
3.2 Inland Transportation
3.3 Port operations and custom brokerage operation
4. Conclusion
1
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
INTRODUCTION
This document will explain briefly the Logistic process to transport 184 pieces
corresponding to GWDC’s oil rig, a company who carry out perforations services
and well reparation not just In Colombia but also in the world. These pieces were
located in Huila at Oil well named Gigante 5 location to be transported to
Barranquilla port by land and there, these were loaded in Rickmers Yokohama
Vessel to be transported to Dalian Port in China finally.
In this way, we present a specific photographic description about Aci Cargo’s
logistic’s transport for this operation.
1. Objective:
-Coordinate Logistic to transport an Oil Rig in 184 pieces from Oil well, Gigante 5 in
Huila to Barranquilla port and then be loaded on a Vessel with destiny China.
-Perform export custom brokerage.
2. Cargo Description:
Commodity: Oil Drill
No Pieces: 184
Total Cargo: 6x20’STD Containers and 3x40’ STD Containers.
The General products that were exported with this shipment were:
2
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
Back up Generator
Bolt
Cat walk
Elevador de tubería
Backbone
BOP hydraulic line
CATHEAD
Evacuation lane
Base of BOP
Bushing
Centralizer
Flange plate
Basement oblique stand
Butterfly valve
Certificate of equipments
Floor support
Beam of monkey board
Cable box
Choke manifold
GAS LINE
Bend
CARDAN SHAFT
Clamp loader
Generator Set for Camp
Bend of standpipe
Casing Elevator
CONNECT BOARD
Generator Set1,2,3 #
Casing head
Connecting pipe of mud
tank
Handrail
Casing slip
Connector
Handwheel handle
Board
Casing tong
Container27(40‘’)
HC Valve
Container35(20‘’)
Crown block
Drill Pipe Elevator
Heavy weght drill pipe
Container37(20‘’)
Cuña de tubería del
Drill pipe slip
Heavy weight DP
Container42(20‘’)
Derrick Back, Base, Brace
Driller console
High pressure drilling hose
Drilling board
HIGH PRESSURE LINE
Drilling crossover
High pressure pipe
Bit breaker
Blowoutprevention pipe
Container52(20‘’)
Container64(20‘’)
Deviational Seurvey Air
Winch
DIFFERENTIAL
MECHANIEM
Container65(40‘’)
Doghouse
Drilling jar
HOISTING ROPE
Container72(20‘’)
Double ram blowout
preventer
Drilling line
Hook
Crane
Drawwork
Drilling line spool
Horizontal scroll discharge
decanter centrifuge
Cross over
Drill collar
Crossover
Drill pipe
Drilling optimization
device
Electric cable
Hydraulic tongs
Pin
SHALE SHAKE HOPPER
Valve set
Hydraulic winch
Pneumatic winches
Short drill collor
Winch of monkey board
Hydrualic control unit
Pressure sensor
Short drillpipe
X-over
KILL LINE
PROTECTIVE SUB
Single ram blowout
preventer
Test plug&Running
tools
Spider
Tool basket
Spinner
Spiral Drill Pipes
Stand base
Stand pipe
Top floor Base
Traverling block
STRETCHER
Screw rod
Sub-structure
Section filter of mud
pump
Kill manifold
Ladders
Lift of mud pump
Lift sub
Lifting device of BOP
Link
Pump pressure sensor
hose
Ramp
REDUCING COUPLING
Ring gasket
Riser
Rotary table base
framework
Monkey board stamp
RUBBER HOSE
MUD OFF RUBBER
HOSE
Mud Pump
Mud tank
Mud tank1#
Rubber of weight
sensor
SCR House
Screw cap
Screw of casing head
SURVEY EQUIPMENT
Swivel
Oil tank
Oil tubing Slips
Hydraulic line trough
Hydraulic station
Tubing Elevator
Valve seat
SH Perfection Links
Shaker
Oilcan
Mud valve manifold
3
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
3. Transportation.
3.1 To prepare the cargo
Origin: Pozo Gigante 5 in Huila, Colombia
The GWDC’s oil Rig was located at Gigante 5 Huila zone, so initially, we proceed
to verify if the cargo was ready to be transported and to ensure that all the pieces
were described at packing list. In this way and during three days, we made an
inventory modifying some items and volume of pieces with the correct digits.
4
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
5
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
3.2 Inland transportation:
Origin: Pozo Gigante 5 in Huila, Colombia
Destination: Barranquilla Port, Colombia
Transporting pieces, from oil well to Barranquilla, was made at 2nd December/2013
day. The reception zone of the cargo in Barranquilla was Compas port terminal and
the receipt of the cargo was finalized at 19th December/2013. The inland logistic
was made at the following way:
EQUIPMENT
Cama Alta
Cama Alta Especial
Cama Baja
Cama Baja Especial
Cama Baja Especial 4 ejes
Cama Baja Especial Hidráulica
No. ESTIMATED TRAVELS
31
16
7
7
7
1
To the transport of these pieces on the Colombian roads, our professional
equipment intervened in many meetings with the relevant authorities in order to his
transport didn’t have drawbacks (We talk with communities of the region directly for
this transport)
6
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
3.4 Loads at Port
To this Export Process, our professional team met with Antinarcotics National
Policy in many times in order to comply with the due process, specifically with
antinarcotics authority. So, our team explains him about our complete logistic in
order to get approves for this process.
Two weeks before Rickmers Yokohama arrives at port, we proceed to make the
inspection of each container, being this inspection satisfactory. The Vessel arrived
at March 3 of 2014 and it finalize day 7th of March/2014. We loaded all 184 pieces
in this vessel successfully.
7
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
8
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
9
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
10
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
11
Executive Report March-2014
ACI CARGO
Logistic to transport of an OILRIG in 184 pieces from Huila to Barranquilla Port (Final Destination China)
4. Conclusion
With our professional coordination, Aci Cargo Logistic successfully achieved this
operation. We transported 184 pieces from Huila to Barranquilla Port, performed
successfully the custom export process and port operations.
One more time, Aci Cargo shows his experience and professionalism to handling
Break Bulk cargo, coordinating his logistic with strong allies, culminating
successfully with all his operations.
12