Energy Process Equipment Monfalcone Plant & Dock Direct access to the Dock TOTAL AREA 280.000 m2 COVERED AREA 46.700 m2 QUAY 900 x 12 mt Length Draft No restrictions in Equipment diameter and weight Mission A new and modern business vision based on the pillars of Expertise, Market Knowledge, Delivery Reliability integrated with the existing huge industrial capacity, technology and safety organization. Our aim is to fabricate Process equipment as Vessels, Columns, Reactors and Heat Transfer components being part of our knowledge and skills. In detail, design and fabrication of process equipment for different industries: Upstream pressure equipment for exploitation, drilling and development of reservoirs. Midstream pressure equipment for Oil & Gas treatment and transportation Downstream pressure equipment for Refining (Hydrotreatment, Catalytic Reforming, Coking, Distillation, Vacuum Process…), Gas Liquefaction, Gas To Liquid, Scrubbing, De-Hydration. Petrochemical pressure equipment for processes of Nitrogen-Hydrogen plants (Urea-Ammonia) or Alcohol (Methanol). Chemical pressure equipment for “Plastic Products” as Polyethylene (Low Density, Ultra Low Density, High Density), Polypropylene (PP), Polyethylene Terephthalate (PET), Polyvinyl Chloride (PVC). Power pressure equipment for Steam Condensing, Waste Heat Recovery, Heaters. In addition to Carbon Steel, materials as Low Alloy Steel (Cr-Mo, Cr-Mo-V and Ni), Stainless Steel and Nonferrous are treated using dedicated processes and methods. BEYOND WELDING Fabrication Technology Pieter Schelte TLS Project Allseas 15 April 2014 - Revised Schedule to level 4 (Strengthening and Lengthening Activities Included) ID Description Start Finish Actual Start Actual Finish Duration Work % complete 1 2 3 4 5 6 PIETER SCHELTE TOP SIDE LIFTING SYSTEM TLS BEAM CONSTRUCTION TLS BEAM STRENGTHENED CONSTRUCTION (12 BEAMS) Completion 3rd Jig Completion 4th Jig Clarification by ALLSEAS of material to be used for strengthening of 12 beams (TQ 240) TLS Beam 1 Cutting and Bevelling Sub Assemblies Construction Frame Construction Plates Joining Panel Line T-Casting TS100 Beam Head Mk 1000 Completion Heat Treatment TS200 Panels Construction Mk 2000 Panel completion Mk 2001 Panel completion Mk 2003 LP Completion Mk 2004 Back Locking pawl TS300 Panels Construction Mk 3000 Panel completion Mk 3001 Panel completion Mk 3002 Panel completion TS400 Panels Construction Arrow construction Mk 4000 Panel completion Mk 4001 Panel completion Mk 4002 Panel completion Mk 4003 Panel completion Mk 4004 Panel completion Mk 4005 Panel completion Mk 4006 Panel completion Mk 4007 Panel completion Mk 4008 Panel completion Mk 4009 Panel completion Mk 4010 Panel completion Mk 4011 Panel completion Beam Construction TS200 Lower Front Box Mk 2002-2004-ribs Assembly Mk 2003 Assembly - Welding Heat Treatment Mk 2000 Assembly Mk 2001 Assembly Welding of TS200 TS300 Lower Rear Box Mk 3000, 3002 Assembly Mk 3001 Assembly Welding TS300 TS400 Upper Box Mk 4008 Assembly box Mk 4009 Assembly box Mk 4010 Assembly box Mk 4004 Assembly box Mk 4011 Assembly box Mk 4000 Assembly box Mk 4001 Assembly box Mk 4005 Assembly box Mk 4006 Assembly box Mk 4002 Assembly box Mk 4007 Assembly box Mk 4003 Assembly box Welding TS400 Mk 1000 Assembly Final Beam Assembly Assembly of TS300 Assembly of TS200 Final Welding Welding of stainless steel Final Machining Beam Completion Rack welding / Locking Pawl Machining Outfitting plates Painting Beam Rotation Beam Outfitting Preassembly of lever Outfitting of the beam Lever installation Extending of Locking Pawl Push Rod Manifold block 9300 installation Install N2 accumulator 8330 + Manifold 8333, N2 accumulator 8340 + Manifold 8343 Locking pawl installation Install N2 accumulator 2690 Bracket & Cylinder Pre-assembly AHC Accumulator 9500 AHC Installation 9200 FL Cylinders installation 8200 Painting Touch up Closing / ancillary activities TLS Beam 2 Cutting and Bevelling Sub Assemblies Construction Frame Construction ven 07/09/12 ven 07/09/12 ven 07/09/12 lun 14/10/13 lun 05/05/14 mar 22/04/14 gio 30/04/15 gio 30/04/15 sab 20/12/14 lun 14/10/13 lun 05/05/14 mar 22/04/14 ven 07/09/12 ven 07/09/12 ven 07/09/12 lun 14/10/13 NA mar 22/04/14 NA NA NA lun 14/10/13 NA mar 22/04/14 923,5 g 923,5 g 806,5 g 0g 0g 0g 2.106.382,48 h 1.619.994,47 h 1.149.822,35 h 0h 0h 0h 68% 64% 81% 100% 0% 100% ven 07/09/12 ven 07/09/12 lun 26/11/12 gio 14/02/13 lun 26/11/12 lun 14/01/13 gio 07/03/13 mar 19/03/13 mar 19/03/13 mar 09/07/13 lun 04/03/13 lun 06/05/13 mar 07/05/13 lun 04/03/13 lun 11/03/13 gio 07/03/13 mer 20/03/13 gio 07/03/13 gio 14/03/13 gio 07/02/13 gio 07/02/13 ven 29/03/13 mer 10/04/13 mer 17/04/13 ven 24/05/13 mer 20/03/13 gio 14/03/13 dom 19/05/13 mar 07/05/13 gio 14/03/13 gio 28/03/13 mer 17/04/13 gio 14/03/13 ven 10/05/13 ven 07/06/13 ven 07/06/13 gio 11/07/13 lun 29/07/13 gio 01/08/13 gio 01/08/13 lun 10/06/13 dom 26/05/13 dom 26/05/13 mer 29/05/13 gio 06/06/13 ven 10/05/13 ven 10/05/13 lun 13/05/13 mer 15/05/13 lun 20/05/13 mar 21/05/13 ven 24/05/13 mer 12/06/13 ven 14/06/13 ven 21/06/13 dom 23/06/13 mar 25/06/13 dom 30/06/13 mer 15/05/13 sab 27/07/13 mer 24/07/13 lun 29/07/13 lun 16/09/13 dom 04/08/13 mer 24/07/13 dom 20/10/13 sab 23/11/13 sab 23/11/13 sab 23/11/13 mer 12/02/14 gio 13/03/14 dom 01/12/13 dom 01/12/13 mer 19/03/14 mer 19/03/14 mer 02/04/14 lun 07/04/14 lun 07/04/14 mar 06/05/14 ven 11/01/13 mar 10/09/13 mer 03/04/13 lun 18/02/13 mer 03/04/13 sab 18/05/13 mar 10/09/13 mar 10/09/13 ven 12/07/13 mar 18/06/13 sab 01/06/13 lun 03/06/13 mar 18/06/13 gio 28/03/13 mar 28/05/13 mer 10/04/13 mar 28/05/13 sab 18/05/13 lun 24/06/13 mer 03/04/13 gio 23/05/13 mer 15/05/13 ven 17/05/13 lun 24/06/13 gio 16/05/13 mer 15/05/13 mar 04/06/13 ven 07/06/13 mar 07/05/13 sab 11/05/13 mer 15/05/13 lun 20/05/13 gio 31/10/13 mar 20/08/13 mer 03/07/13 dom 28/07/13 mer 31/07/13 lun 05/08/13 lun 05/08/13 mar 20/08/13 lun 15/07/13 mar 28/05/13 ven 31/05/13 lun 15/07/13 gio 31/10/13 dom 12/05/13 mar 14/05/13 ven 17/05/13 mar 21/05/13 mer 22/05/13 sab 25/05/13 gio 13/06/13 gio 20/06/13 sab 22/06/13 lun 24/06/13 sab 29/06/13 mar 02/07/13 gio 31/10/13 dom 28/07/13 lun 07/10/13 ven 02/08/13 mar 17/09/13 lun 07/10/13 lun 19/08/13 ven 22/11/13 mar 06/05/14 dom 05/01/14 gio 09/01/14 lun 03/03/14 sab 15/03/14 mar 06/05/14 mar 18/03/14 mar 06/05/14 mer 19/03/14 mer 02/04/14 lun 07/04/14 mer 09/04/14 ven 07/09/12 ven 07/09/12 lun 26/11/12 gio 14/02/13 lun 26/11/12 lun 14/01/13 gio 07/03/13 mar 19/03/13 mar 19/03/13 mar 09/07/13 lun 04/03/13 lun 06/05/13 mar 07/05/13 lun 04/03/13 lun 11/03/13 gio 07/03/13 mer 20/03/13 gio 07/03/13 gio 14/03/13 gio 07/02/13 gio 07/02/13 ven 29/03/13 mer 10/04/13 mer 17/04/13 ven 24/05/13 mer 20/03/13 gio 14/03/13 dom 19/05/13 mar 07/05/13 gio 14/03/13 gio 28/03/13 mer 17/04/13 gio 14/03/13 ven 10/05/13 ven 07/06/13 ven 07/06/13 gio 11/07/13 lun 29/07/13 gio 01/08/13 gio 01/08/13 lun 10/06/13 dom 26/05/13 dom 26/05/13 mer 29/05/13 gio 06/06/13 ven 10/05/13 ven 10/05/13 lun 13/05/13 mer 15/05/13 lun 20/05/13 mar 21/05/13 ven 24/05/13 mer 12/06/13 ven 14/06/13 ven 21/06/13 dom 23/06/13 mar 25/06/13 dom 30/06/13 mer 15/05/13 sab 27/07/13 mer 24/07/13 lun 29/07/13 lun 16/09/13 dom 04/08/13 mer 24/07/13 dom 20/10/13 sab 23/11/13 sab 23/11/13 sab 23/11/13 mer 12/02/14 gio 13/03/14 dom 01/12/13 dom 01/12/13 mer 19/03/14 mer 19/03/14 mer 02/04/14 lun 07/04/14 lun 07/04/14 NA ven 11/01/13 mar 10/09/13 mer 03/04/13 lun 18/02/13 mer 03/04/13 sab 18/05/13 mar 10/09/13 mar 10/09/13 ven 12/07/13 mar 18/06/13 sab 01/06/13 lun 03/06/13 mar 18/06/13 gio 28/03/13 mar 28/05/13 mer 10/04/13 mar 28/05/13 sab 18/05/13 lun 24/06/13 mer 03/04/13 gio 23/05/13 mer 15/05/13 ven 17/05/13 lun 24/06/13 gio 16/05/13 mer 15/05/13 mar 04/06/13 ven 07/06/13 mar 07/05/13 sab 11/05/13 mer 15/05/13 lun 20/05/13 gio 31/10/13 mar 20/08/13 mer 03/07/13 dom 28/07/13 mer 31/07/13 lun 05/08/13 lun 05/08/13 mar 20/08/13 lun 15/07/13 mar 28/05/13 ven 31/05/13 lun 15/07/13 gio 31/10/13 dom 12/05/13 mar 14/05/13 ven 17/05/13 mar 21/05/13 mer 22/05/13 sab 25/05/13 gio 13/06/13 gio 20/06/13 sab 22/06/13 lun 24/06/13 sab 29/06/13 mar 02/07/13 gio 31/10/13 dom 28/07/13 lun 07/10/13 ven 02/08/13 mar 17/09/13 lun 07/10/13 lun 19/08/13 ven 22/11/13 NA dom 05/01/14 gio 09/01/14 lun 03/03/14 sab 15/03/14 NA mar 18/03/14 NA mer 19/03/14 mer 02/04/14 lun 07/04/14 mer 09/04/14 587,5 g 126,5 g 281,88 g 49 g 85 g 80 g 73 g 168,88 g 168,88 g 4g 107 g 27 g 28 g 107 g 18 g 83 g 22 g 83 g 66 g 138 g 56 g 56 g 36 g 31 g 32 g 58 g 63 g 17 g 32 g 55 g 45 g 29 g 68 g 167,5 g 68 g 27 g 18 g 3g 5g 5g 65 g 51 g 3g 3g 40 g 167,5 g 3g 2g 3g 2g 2g 2g 2g 7g 2g 2g 5g 3g 162,5 g 2g 69 g 5g 2g 58 g 20 g 34 g 153 g 37 g 40 g 20 g 3g 145 g 100 g 45 g 1g 1g 1g 3g 120.700,98 h 7.059 h 64.158,98 h 4.978 h 5.999,98 h 5.900 h 900 h 11.582 h 11.582 h 0h 5.700 h 900 h 900 h 2.700 h 1.200 h 3.000 h 1.000 h 1.000 h 1.000 h 26.099 h 3.000 h 3.000 h 1.500 h 1.510 h 2.924 h 3.580 h 2.615 h 2.102 h 2.368 h 1.200 h 600 h 600 h 1.100 h 47.183 h 9.500 h 300 h 3.100 h 0h 100 h 100 h 5.900 h 1.990 h 200 h 210 h 1.580 h 30.130 h 140 h 100 h 120 h 100 h 150 h 180 h 200 h 540 h 310 h 260 h 290 h 340 h 27.200 h 200 h 5.563 h 760 h 1.143 h 3.500 h 160 h 0h 2.300 h 750 h 1.250 h 0h 300 h 0h 0h 0h 0h 0h 0h 0h 99% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 92% 100% 100% 100% 100% 86% 100% 58% 100% 100% 100% 100% mer 09/04/14 ven 11/04/14 mer 09/04/14 mar 08/04/14 sab 12/04/14 mer 16/04/14 sab 26/04/14 sab 26/04/14 sab 12/01/13 sab 12/01/13 lun 18/02/13 lun 18/02/13 ven 11/04/14 dom 13/04/14 gio 10/04/14 ven 11/04/14 mar 15/04/14 mar 29/04/14 ven 02/05/14 mar 06/05/14 lun 06/10/14 mer 20/02/13 mer 11/09/13 ven 24/05/13 mer 09/04/14 ven 11/04/14 mer 09/04/14 mar 08/04/14 sab 12/04/14 mer 16/04/14 NA NA sab 12/01/13 sab 12/01/13 lun 18/02/13 lun 18/02/13 ven 11/04/14 dom 13/04/14 gio 10/04/14 ven 11/04/14 mar 15/04/14 NA NA NA NA mer 20/02/13 mer 11/09/13 ven 24/05/13 3g 3g 2g 4g 4g 11 g 6g 10 g 606 g 40 g 199 g 96 g 0h 0h 0h 0h 0h 0h 0h 0h 103.824 h 5.000 h 50.746 h 4.028 h 100% 100% 100% 100% 100% 60% 0% 0% 90% 100% 100% 100% 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 The above schedule does not include relevant supply of outfitting material by ALLSEAS which is deemed being available on site at least 20 days before relevant installation. Tri 3, 2012 ago set Tri 4, 2012 ott nov dic Tri 1, 2013 gen feb mar Tri 2, 2013 apr mag giu Tri 3, 2013 lug ago set Tri 4, 2013 ott nov dic 4 Tri 1, 2014 gen feb mar Tri 2, 2014 apr mag giu Tri 3, 2014 lug ago set Tri 4, 2014 ott nov dic Tri 1, 2015 Tri 3, 2015 Tri 2, 2015 Tri 4, 2015 Tri 1, 2016 ott nov dic gen feb mar gen feb mar apr mag giu lug ago set PIETER SCHELTE TOP SIDE LIFTING SYSTEM TLS BEAM CONSTRUCTION TLS BEAM STRENGTHENED CONSTRUCTION (12 BEAMS) Completion 3rd Jig 5 6 Completion 4th Jig Clarification by ALLSEAS of material to be used for strengthening of 12 beams (TQ 240) TLS Beam 1 Cutting and Bevelling Sub Assemblies Construction Frame Construction Plates Joining Panel Line T-Casting TS100 Beam Head Mk 1000 Completion Heat Treatment TS200 Panels Construction Mk 2000 Panel completion Mk 2001 Panel completion Mk 2003 LP Completion Mk 2004 Back Locking pawl TS300 Panels Construction Mk 3000 Panel completion Mk 3001 Panel completion Mk 3002 Panel completion TS400 Panels Construction Arrow construction Mk 4000 Panel completion Mk 4001 Panel completion Mk 4002 Panel completion Mk 4003 Panel completion Mk 4004 Panel completion Mk 4005 Panel completion Mk 4006 Panel completion Mk 4007 Panel completion Mk 4008 Panel completion Mk 4009 Panel completion Mk 4010 Panel completion Mk 4011 Panel completion Beam Construction TS200 Lower Front Box Mk 2002-2004-ribs Assembly Mk 2003 Assembly - Welding Heat Treatment Mk 2000 Assembly Mk 2001 Assembly Welding of TS200 TS300 Lower Rear Box Mk 3000, 3002 Assembly Mk 3001 Assembly Welding TS300 TS400 Upper Box Mk 4008 Assembly box Mk 4009 Assembly box Mk 4010 Assembly box Mk 4004 Assembly box Mk 4011 Assembly box Mk 4000 Assembly box Mk 4001 Assembly box Mk 4005 Assembly box Mk 4006 Assembly box Mk 4002 Assembly box Mk 4007 Assembly box Mk 4003 Assembly box Welding TS400 Mk 1000 Assembly Final Beam Assembly Assembly of TS300 Assembly of TS200 Final Welding Welding of stainless steel Final Machining Beam Completion Rack welding / Locking Pawl Machining Outfitting plates Painting Beam Rotation Beam Outfitting Preassembly of lever Outfitting of the beam Lever installation Extending of Locking Pawl Push Rod Manifold block 9300 installation Install N2 accumulator 8330 + Manifold 8333, N2 accumulator 8340 + Manifold 8343 Locking pawl installation Install N2 accumulator 2690 Bracket & Cylinder Pre-assembly AHC Accumulator 9500 AHC Installation 9200 FL Cylinders installation 8200 Painting Touch up Closing / ancillary activities TLS Beam 2 Cutting and Bevelling Sub Assemblies Construction Frame Construction Duration of piping activities generally in yellow above are indicative and subject to confirmation by COMPANY. Duration of installation activities of manifold and AHC accumulator 9500 to be verified. ap Certificates Contact CIMOLAI ENERGY SRL OFFICES & FACTORIES Zona Industriale - Via Timavo, 69 34074 Monfalcone (GO) – ITALY Tel. (+39) 0481 – 281414 Fax (+39) 0481 - 281722 www.cimolai.com mail: [email protected] Monfalcone rt No cS ati dri hA ea REGISTERED OFFICE Via Ungaresca, 38 33170 Pordenone (PN) - ITALY TAX CODE & VAT CODE 01318230305 R.E.A PN-100071 Share Capital Fully Paid up € 31.200 Single Shareholder Company Company subject to management and coordination by CIMOLAI SpA Share Capital € 16.200.000 09.2015
© Copyright 2026 Paperzz