Technical visit to french OCC 4 putting into service

PAI PARIS GARE DE LYON
PRESENTATION OF THE PROJECT
20/06/2017
TECHNICAL ORGANISATION OF THE COMMISSIONING
Dominique BERGÉ
DIRECTION DES PROJETS FRANCILIENS
SUMMARY
01. TECHNICAL ORGANISATION OF THE COMMISSIONING
–
01.1.
BEFORE COMMISSIONING
01.2
DURING COMMISSIONING
01.3.
AFTER COMMISSIONING
01.
TECHNICAL ORGANISATION OF THE
COMMISSIONING
–
COMMISSIONING ORGANISATION
STANDARD IN 3225
"Commissioning on safety installations“ Standard
Its goal: to prepare and carry out commissioning under optimum conditions of efficiency
and safety


Preparing the commissioning operation: Cutting plan in elementary operations
Safely: Implementation Plan for Regulatory Procedures

Shared by all: Traffic operation and overhead lines operation, Train Operating Companies, maintainers,
PROJECT team, …
–
COMMISSIONING ORGANISATION
Commissioning working group: EIC, INFRAPOLE, ITIF, TSEE, DCF, EF, PRI, EALE, ESTI…

Monthly meetings from september 2015

Definition of the test area

Definition of the Detailed Timeline

Follow-up of the Check List of the commission activities

Specific Risk Analysis for Commissioning (Organisational, external, technical, post
commissioning, fallback solutions, dysfunctions,…)
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14 COM.
ASS
01.1
COMMISSIONING ORGANISATION :
BEFORE COMMISSIONING
–
COMMISSIONING ORGANISATION
BEFORE COMMISSIONING
TEST AREA

Determine a perimeter to be protected by S6 / S9 / S11 measures to ensure the safety of
switching installation works and commissioning tests

Ensure that the boundary of the ZEPs and their associated devices remain compatible with
the tests to be carried out during the commissioning

Define, in accordance with the operators and the TOCs, the track occupancy in the area, as
well as the authorised movements requiring PS9E measures
 These documents must be known and shared by all the activities of the site
6105
zep 6171
1C
Pas de ZEP en protection
3+080
2C
ZEP6178
Z6102b
0+490
1270
1285
1083b
1057
1282
9+453
5
16a
Secteur ParisPompadour
9+453
1048b
1021b
z1023
1033b
z1029
1043a
1083a
1281
limite domaine
1049
pas de protection
1048a
1081a
9+517
1 bis circul
16b
10+680
36
35
PosteA
ZEP 517
z7A
9+301
X1056
32a
It 39
Poste B
1 bis circul
24 Imp
34
10
V24
V25 Départ Nord
V26
9+555
31b
It 31
10+836
5 à 12 Formation
V15 à 23
ZEP 765 PB
35
1256
1045
Cv13
Zep 773
1258
9+384
1046
1023a
VSG PA
Au 1016
10+353 2
1081b
1055
1253
TIV 3,4
z1710- z110
u S5
vers poste O
36b
1 circul
34
ZEP 387 PB
C57
1047a
31a
Secteur ParisPompadour
Cv1265
32
2 circul
M
Cv
1263
9+241
32b
1268 fictif
C55
1064a
1047b
1063
1252
1266
Au ES 2C
Cv54
VSG P1
1264 fictif
Cv53
PosteB
ZEP 756
z53 10+409
Cv49
1062b
1064b
ZEP 86+87
M
Cv
Cv41
Tiroir A
42
Cv48
z6
ZEP 82+83
Faisc reception
9+625
Au ES M1
Cv42
1262 fictif
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
COMMISSIONING ORGANISATION
BEFORE COMMISSIONING
COMMISSIONING TIMELINE

Sequencing all procedure, switching installation and commissioning testing activities

Dimension the number of agents (disciplines and accreditations) and the additional needs
(radios, vehicles, ...)



By geographical location for switching installation and testing activities
List and quantify specialised mobile teams
Organize team turnover taking into account HR constraints
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
COMMISSIONING ORGANISATION
BEFORE COMMISSIONING
CHECK-LIST OF ACTIVITIES OF THE COMMISSIONING: built on the experience of previous projects,
enriched and shared within the projects:

Editing the signalling notice

Technical documentation: Signalling scheme plan, Control tables, as-built drawings, Regulations, Works
contract,…

Training

Removal of installations: supply contracts, ...

Preparation of work and switching installation sheets

Preparation of commissioning tests sheets

Resources: call for volunteers, team sizing, reinforcements (EIC, EALE, Contractors) ...

Cleaning and maintenance: cleaning of pathways, deoxidation of rails,…

Logistics for commissioning: reception, directory, catering, accommodation, transport,…

Preparation of means of communication: radios, portables,…

Security for the area access

Communication : before, during and after the commissioning
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
COMMISSIONING ORGANISATION
BEFORE COMMISSIONING
Trial run for the protection operations of the test area:

Simulation of the protection procedures for the area (10 km of track, 2 hours of procedure, 15 operational signal boxes

Repetition concerning the EIC / EF / MOET management for verifying the test area protection regulation
Trial run for the test area closure operations:

Reconnaissance of the closure locations by the staff (Pk, voie, …)

Testing the means of communication

Checks of material means (SAM, detonators, DSh, ...)

Simulation of the closure implementation

Checks of organization, duration and sequencing of operations
Repetition of the commissioning for all agents:

Presentation of the project, organisation of the commissioning, planning of assignment by agent, visit of the site of
reception and intervention for each agent, provision of the worksheets for verification in order to detect any anomalies
or
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
01.2
COMMISSIONING ORGANISATION :
DURING COMMISSIONING
–
COMMISSIONING ORGANISATION
COMMISSIONING SEQUENCE
18/03/17
19/03/17
20/03/17
Reception
Closure
EIC
Technical
closure
Removal
IS
Switching works
PLX, Ag, CdV
Switching works and complementary
markings (KVB, SAAT, …)
Preliminary
tests records
Concordance tests and
Functional tests
End of
closure S11
End of
closure S9
Commissiong
records
S6/S9 Measures from 3h30 to 0h00
S11 Measures from 3h30 to 22h00
0h00
08h00
16h00
0h00
08h00
Internal / external communication: VIP, Media, Rooftop, ...
–
16h00
0h00
COMMISSIONING ORGANISATION
DURING COMMISSIONING: ORGANISATION OF THE GENERAL COORDINATION
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
01.3
COMMISSIONING ORGANISATION :
AFTER COMMISSIONING
–
COMMISSIONING ORGANISATION
AFTER COMMISSIONING

Transfer of the safety installations and removal of reservations identified before and during the
commissioning

Thermography: infrared camera detection of hot spots on all power supplies

Airproof sealing of technical rooms (REX Denguin, efficiency of automatic fire suppression)

Assistance after commissioning: Accompanying instructions for the Commissioning and the ASS (After
Sale Services):

Reinforcement EIC

MISTRAL testers: diagnostic aid to distinguish malfunctions from faults or nominal situations (operation in
dynamics of automatisms)

Reinforcement Infrapôle : assistance to the fault clearance, mainly located in the SER 1

Contractors Reinforcements (ANSALDO, ATOS, SIEMA, TECHNILOG, …)

Reinforcement IP-SYS and IP-SF, ISI
Preparation from Y-1
–
Preparation from M-6
to D-14
D-14
COM.
ASS
CHIFFRES CLÉS
–