Implementation of circular economy and physical internet for the

Implementation of circular economy and physical internet
for the cities of tomorrow - Sviluppo dell'economia
circolare e del "physical internet" nelle città del futuro
19 maggio 2016
Prof. Ing. Franco Cotana
Dipartimento di INGEGNERIA
CIRIAF – CRB - Università degli Studi di Perugia
CIRIAF – Interuniversity Research Centre
on Pollution & Environment M. Felli
CRB – Biomass Research Centre
CRC – Climate
Research Centre
Department of
Engineering
First step: CIRCULAR ECONOMY: SMART GREEN
VILLAGE in HISTORIC BUILDINGS
Vegetable Oil
Pathway
(FACEB project)
1. Oil milling
plant
2.
Trigeneration
plant
3. The first
historic
building LEEDHB
4. Mini biogas
plant for the
community
Historic building refurbishment
The first historic LEED-HB under certifation building
in the world.
Objective: LEED-HB Gold rating > 60 points
Second step: Implementation of smart grid in physical internet
IT-concept | Positioning the Physical Internet
It is the network of physical objects (devices, vehicles,
buildings and other items) that enables these objects
to collect and exchange data
Transforming the way of physical objects are moved,
stored, realized, supplied, and used
PHYSICAL INTERNET
SMART MOBILITY: Pipe§net
The first prototype
PEAD
Linear electric motor
At the beginning of 2006 a limited length prototype has been realized, with
The characteristics of the final system, where the movement of the capsule is
generated by an underlying linear synchronous motor that produces a magnetic field.
The prototype was put into operation and exhibited at the Vittoriano in Rome
during the exhibition "60 years of the Italian Republic" took place in the months
of March and April 2006, chosen as representative of Italian innovation
project related to energy and transport.
SMART MOBILITY: Pipe§net
The binomial Drones + pipenet
The binomial
Drones +
Pipenet allows
to realize, for
light ware
typically up to
5kg, rapid
transport and
delivery. For
more weights
up to 30kg or
50 kg, the
pipenet must
be up to the
final delivery
but in this
case it comes
to factories or
activities'
business.
9.
Economics
Investment Costs = 5 M€
Operating Costs = 0,36 M€/a
Revenues = 1,6 M€/a
(Incentive Renew. Energy
+OFMSW Harvesting)
12.
1.
3.
7.
Payback period = 5 years
13.
9.
2.
10.
4.11.
8.
2 MW/800 mq
1.
2.
3.
4.
5.
6.
Photovoltaics roofing (180 kWe)
Photovoltaics skin
Mini-wind plant (25 kWe)
Geothermal heat pumps (1500 kWt)
Geothermal foundation piles
Underground tank
6.
5.
7.
8.
9.
10.
11.
12.
Overhead tank
Hydroelectric Turbine (30 kWe)
Anaerobic Digester
OFMSW Milling and loading
Cogenerator engine (300 kWe)
Informative systems , TLC, lighting,
enviromnental monitoring, videosorvellance
13. OFMSW transport Drone
SMART MOBILITY: GREEN POST
Third step: circular economy with smart grid and physical internet
Smart TEAM – Multifunctional Environmental Energy Tower
The Smart GRID