sustainable solutions and cost-saving applications for small water

1
SUSTAINABLE SOLUTIONS AND COST-SAVING
APPLICATIONS FOR SMALL WATER SYSTEMS:
CASE STUDIES
2010 GWPC Water/Energy Sustainability Symposium
And Annual Forum
Pittsburgh, PA
September 26-29, 2010
2
PRESENTERS
James J. Rhoades, Jr., PE
Michael J. Peleschak, PE
Project Manager/Water Group Manager
Project Engineer
• Registered PE: PA, DE
• Registered PE: PA
• 17 years of Experience
• 11 years of Experience
• Licensed Water & Wastewater
Treatment Plant Operator in PA
• Certified Sewage
Enforcement Officer
alfred benesch & company
www.benesch.com
3
PRESENTATION OVERVIEW
Introduction
Background
Case Studies
- Innovative sustainable solutions for technical issues
- Ways to minimize life-cycle costs
- Sustainable O&M, reducing energy use and costs
Future
Questions
4
WHY IS OUR CURRENT FOCUS
ON SUSTAINABILITY?
Investment Needs and Shortfalls
in Drinking Water:
•2002 EPA Gap Analysis: 20-year
funding gap from $45B to $263B.
Annual shortfall of $11 B.
•ASCE 5-Year: Needs $255B;
Estimated Spending $146.4B;
Projected Shortfall $108.6B.
•2007 EPA DW Infrastructure Needs
Survey & Assessment: Need
$334.8B over 20 years.
•2008 PA Sustainable Water Task
Force 2008 - $38.9B needed over
20 years
5
WHY IS OUR CURRENT FOCUS
ON SUSTAINABILITY?
Client Needs Due To:
• Aging infrastructure
• New regulations with price tag to match
• New systems/Expansion of service – for more
revenue/economic development
• Ongoing O&M assistance – keep things running
• Increased annual O&M costs (electricity #1)
• Deferred maintenance due to limited financial resources
Water System Limitations:
• Technical – Need to meet current regulations
• Managerial – Many rural systems have volunteer operators
• Financial - Public water systems have limitations on rate
increases (affordability criteria, political influence, economic
condition impact)
6
CASE STUDIES
Innovative Sustainable Solutions for
Technical Issues
7
MADISONBURG WATER WORKS
MEMBRANE FILTRATION PLANT
• Pilot Study
• Innovative Technology
Permit from PADEP
• 90% of Backwash
Recycled
• Used Existing Foundation
Tank (3 Sections)
• Infiltration Bed in EV
Watershed
2010 ACEC/PA
Diamond Award
8
MADISONBURG WATER WORKS
MEMBRANE FILTRATION PLANT
9
NELSON TOWNSHIP AUTHORITY
CONVENTIONAL FILTRATION PLANT
• Riverbank Filtration
• Natural pre-filtration, reduce
energy needs
• SCADA
10
NELSON TOWNSHIP AUTHORITY
CONVENTIONAL FILTRATION PLANT
11
NELSON TOWNSHIP AUTHORITY
CONVENTIONAL FILTRATION PLANT
Raw
Max Settled
Max Filtered
Combined
Turbidity (NTU)
1000
Turbidity (NTU)
100
300
200
10
100
1
0
River
WTP
Final
Water Influent Effluent
0.1
0.01
Jan-07
Feb-07 Mar-07
Apr-07
May-07
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
12
AUSTIN BOROUGH WATER
DIRECT FILTRATION PLANT
• SCADA
• Source Water
Collection (Springs)
• Marcellus Shale
drillers bulk-hauling
station
13
CASE STUDIES
Sustainable Ways to Minimize Life-Cycle Costs
Capital Costs
• Solar Power for Remote Telemetry
• Innovative Construction Techniques
O&M Costs - Reduce Amount of Treated Water
• Leak Detection
• Water Conservation
• UAF Reduction
14
MOREA CITIZENS WATER COMPANY
SOLAR POWERED SCADA SYSTEM
• Solar panels to power the new controls saved
over $20,000 in electrical system construction
costs.
• Wireless radio controllers eliminated the need
for telephone lines saving $15,000.
• MCWC no longer loses millions of gallons of
water per year.
• Electrical & treatment expenses
associated with long system run times
have declined by almost 50%.
• Average daily demand reduced from
70,000 gpd to 30,000 gpd.
15
MAHANOY TOWNSHIP AUTHORITY
WATER DISTRIBUTION SYSTEM UPGRADES
Value Engineering/Asset Management Study
• Bentley WaterCAD Hydraulic Model
• 20-year Life Cycle Cost Analysis
Project Overview:
• 21,000 linear feet of new water mains
• 1,300 service connections
• 44 fire hydrants and associated appurtenances
Outcome:
• Improved water quality, pressures, and fire protection
• Eliminated dead ends, lines prone to freezing, and
shared services
• Reduced UAF from >50% to <25%
• Delinquent accounts from $80,000 to $11,000
• ADD Reduction of 200,000 GPD (650k to 450k)
16
MIFFLIN TOWNSHIP WATER
AUTHORITY – REDUCE UAF
System Deficiency
• UAF over 70% (ADD 230,000 gpd)
• Under Consent Order from PA DEP
Corrective Action
•Developed CAP for PA DEP
•Leak Detection Program
•Service Line Replac’mt Program
•Initiated a Trans Main Project
–WaterCAD Modeling
–Dedicated Main from Well to
Storage Tank
–PRV Stations in Dist Sys –
ave pressures over 120 psi
–SCADA System
UAF Down to 52%
17
CASE STUDIES
Sustainable O&M, Reducing Energy Use
Sustainable Planning
• Must think long-term in planning stages
• Total Quality Engineering (TQM™)
Replace Old Equipment/Controls
• Use of SCADA
• Use of VFDs
• Smart Meters
Modeling/Mapping/GIS
• Know what you have and where
• Model improvements before implementation
Implement Asset Management
• Long Term Plan to Replace/Rehab Assets
• Budgeting/Rate Structures
18
SCADA (SUPERVISORY CONTROL
AND DATA ACQUISITION)
Why SCADA?
• Better Operations
• Emergencies/Alarms
• Data Collection/Management
• Regulatory Reporting
• Remote Observation/Control
• Real-time Leak Detection (ALC –
Active Leak Control)
• Identify Preventative Maintenance
• Tie to Mapping/GIS
• Asset Management System
19
MODELING/MAPPING/GIS
Bentley WaterCAD
• WaterGEMS
• HAMMER
• SCADAConnect
Mapping/GIS
• GIS to Optimize O&M
• Asset Management
20
FUTURE
Sustainable Design/Management
• Protects Public Health
• Protects the Environment
• Promotes Economic Development
• Promotes Innovation
• Promotes Effective Management
• Promotes Efficient O&M
• Triggers New Financing Strategies
Incentives
• Bottom Line – Lower Customer Rates
• More SRF Funding 2011
• PENNVEST – Green Project Reserve (ARRA)
• Grants – Fed (ARRA)/Sate (PA CFA) – Be Shovel Ready!
21