APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER Prior to the development of the Survey Programme, the Survey Planning Questionnaire should be completed by the Owner/Manager. It is essential that up-to-date information is provided when completing this questionnaire. 1. Particulars Ship name: IMO (LR) number: Flag State: Port of registry: Owner: Recognized organization (RO): Gross tonnage: Deadweight (metric tonnes): Date of delivery: A specific Survey Programme shall be worked out in advance of the renewal Survey by the Owner/Manager in co-operation with Lloyds Register. The Survey Programme shall be in written format and the Survey shall not commence until the Survey Programme has been agreed upon. Recognised Organisation (RO): This indicates the Classification Society. Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER 2. Information on access provision for close-up surveys and thickness measurement The means of access to the structures subject to close-up examination and thickness measurement shall be indicated in the table below. A close-up examination in an examination where the details of structural components are within the close visual inspection of the Surveyor, i.e. preferably within reach of hand. Hold/Tan Structure k No. Temporary Rafts Staging F.P. Fore Peak A.P. Aft Peak Hatch side coamings Topside sloping plate Cargo Holds Upper stool plating Cross deck Side shell, frames and brackets Transverse bulkhead Hopper tank plating Lower stool nks Ta Underdeck structure de psi To Tank top Document no; ESP_R10.0_2007_BULK Ladders Direct Other means Access (please specify) Side shell and APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER structure Sloping plate and structure Webs and bulkheads Hopper sloping plate and structure Side shell and structure Hopper Tanks Bottom structure Webs and bulkheads Double bottom structure Upper stool internal structure Lower stool internal Underdeck and structure Carriers Wing tanks of double Ore structure Side shell and structure Side shell vertical Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER web and structure Longitudinal bulkhead and structure Longitudinal bulkhead web and structure Bottom plating and structure Cross ties/stringers Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER 3. Assessment of Corrosion Risk The information below may assist in the assessment of corrosion risk and determination of areas subject to close-up examination and thickness measurement. History of bulk cargoes of a corrosive nature (e.g. high sulphur content) Document no; ESP_R10.0_2007_BULK 4. Owner’s inspections APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER The owner should provide details of the results of their inspections over the last 3 (three) years for the tanks/spaces that are subject to Survey. Hold/Tank No. Corrosion protection (1) Coating extent (2) Coating condition (3) Cargo holds Topside tanks Hopper tanks Document no; ESP_R10.0_2007_BULK Structural deterioration (4) Hold and tank history (5) APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER Double skin side tanks Double bottom tanks Upper stools Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER Lower stools Wing tanks (ore tankers) Fore peak Aft peak Miscellaneous other spaces: Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER Note: Indicate tanks which are used for oil/ballast (1) (2) (3) (4) (5) HC = hard coating; SC = soft coating; A = anodes; NP = no protection U = upper part; M = middle part; L = lower part; C = complete G = good; F = fair; P = poor; RC = recoated (during the last 3 years) N = no findings recorded; Y = findings recorded, description of findings should be attached to this questionnaire DR = Damage & Repair; L = Leakages; CV = Conversion (Description to be attached to this questionnaire) Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER 5. Reports of Port State Control inspections List the reports of Port State Control inspections containing hull structural related deficiencies, relevant information on rectification of the deficiencies: 6. Safety Management System List non-conformities related to hull maintenance, including the associated corrective actions: Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER Document no; ESP_R10.0_2007_BULK APPENDIX 1 SURVEY PLANNING QUESTIONNAIRE FOR A BULK CARRIER 7. Name and address of the approved thickness measurement company: Name of Owner’s representative: ……………………………………………………………………… …………………………… Signature:……………………………………... Date:…………………………………………… Document no; ESP_R10.0_2007_BULK
© Copyright 2026 Paperzz