ROADWAY LIGHTING PROGRAM Public Works Department February 10, 2015 Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Background 200 Miles $2.6M Annual Operating Cost Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Benefits • Neighborhood Safety • Community Spirit • Accident Reduction Benefits • Neighborhood Safety • Community Spirit • Accident Reduction Benefits • Neighborhood Safety • Community Spirit • Accident Reduction Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Challenges Light Trespass Challenges Light Trespass Challenges Light Pollution Challenges Light Fixtures High Pressure Sodium LED Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Standards • Duke Energy • Orlando Utilities Commission (OUC) Standards Light Poles • Existing Wood Poles • Concrete Poles • Aluminum Poles Standards Light Poles • Existing Wood Poles • Concrete Poles • Aluminum Poles Standards Light Poles • Existing Wood Poles • Concrete Poles • Aluminum Poles Standards LED Light Fixtures Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Current Program 100 Miles $1.2M Annual Operating Cost Current Program Roadway Lighting Evaluation • • • • Continuity of roadway lights Number of night time accidents Crime rate in the area Activity centers, such as, bus routes, churches & schools • Speed limit and traffic volumes Current Program First Year To Be Lighted – FY 14/15 • Apopka-Vineland Road Conroy-Windermere Road to Westover Roberts Road • Clarcona-Ocoee Road SR 429 to Hiawassee Road • Pine Hills Road Silver Star Road to North Lane • Econlockhatchee Trail SR 408 to Trevarthon Road • John Young Parkway Central Florida Parkway to Beach Line Expressway Current Program First Year To Be Lighted FY 14/15 • Rouse Road SR 50 to Corporate Blvd • Silver Star Road Orange Blossom Trail to Maury Road • Americana Boulevard John Young Parkway to Orange Blossom Trail • Good Homes Road Old Winter Garden Road to SR 50 • John Young Parkway Oak Ridge Road to I-4 (continued) Current Program Design in Progress by Power Companies • Clarcona-Ocoee Road Ocoee-Apopka Road to Hiawassee Road • Pine Hills Road Silver Star Road to North Lane • John Young Parkway Oak Ridge Road to I-4 Current Program Construction Pending • Rouse Road SR 50 to Corporate Boulevard • Silver Star Road Orange Blossom Trail to Maury Road • Americana Boulevard John Young Parkway to Orange Blossom Trail • Good Homes Road Old Winter Garden Road to SR 50 Current Program Construction Pending (Continued) • John Young Parkway Central Florida Parkway to Beach Line Expressway • Apopka-Vineland Road Conroy-Windermere Road to Westover Roberts Road • Econlockhatchee Trail SR 408 to Trevarthon Road Current Program Second Year To Be Lighted – FY 15/16 • Alafaya Trail Innovation Way to Lake Underhill Road • Apopka-Vineland Road Westover Roberts Road to Old Winter Garden Road • Darryl Carter Parkway International Drive to Palm Parkway • Apopka-Vineland Road I-4 to Lake Street Current Program Second Year To Be Lighted – FY 15/16 • Valencia College Lane SR 417 to Econlockhatchee Trail • John Young Parkway SR 528 to Oak Ridge Road • Destination Parkway International Drive to Tradeshow Boulevard • Piedmont Wekiva Road Orange Blossom Trail to Semoran Boulevard Current Program Program Status • Re-assign staff to manage projects • Requested designs in January 2014 • Power companies dedicate staff for designs; develop costs & invoice procedures • 7 of 10 designs complete • Installation will depend upon power company’s workload Presentation Outline • Background • Benefits • Challenges • Standards • Current Roadway Lighting Program • Next Steps and Summary Next Steps and Summary Next Steps • Power companies will complete lighting design for 3 first-year roadways and light them • Power companies will perform designs for second-year roadways. Next Steps and Summary Summary • All County four-lane and six-lane roads lighted at end of five year program • Utilize current LED technology • $6.1M capital expense over five years • $1.2M annual ongoing operational expense ROADWAY LIGHTING PROGRAM Public Works Department February 10, 2015
© Copyright 2026 Paperzz