Repack Instructions

Detachable Modular Flotation System (DMFS)
PACKING INSTRUCTIONS
1
BLADDER INSPECTION

Inspect the entire assembly for cuts,
tears, abrasion damage, open
seams, loose or broken stitches, and
or contamination damage.
Remove the CO2 cartridge and inspect for
corrosion or debris around the actuator.
Note: Ensure you are using a 24 Gram CO2
Cartridge
Page 1
2
BEGIN REPACKING
Step 1: Fold the right side of the
bladder toward the center.
Note: Notice the Red lines; these lines
indicate a fan fold.
Step 2: Fold the left side of the bladder
in toward the center.
Step 3: Fold the bladder once more
toward the left side.
Page 2 Page
1Page 1
PACKING CONT.
Step 4: Make a fold from the bottom of the
bladder, just enough to cover the CO2
cartridge.
Note: At this point your bladder should have
the same fold lines as is indicated by the
Red indicator lines. Shown in Figure 4A
Figure 4A
Step 5: Tuck the bladder into the
casing. Leave approximately ¼ of the
bladder exposed.
Page 3
4
PACKING CONT.
Step 6: Fold the top portion
of the case over the
remaining exposed bladder.
Side View
Step 7: Tuck the top casing along
with the bladder, into the bottom
pouch.
Step 8: Fold the tabs down on
the left and right side of the
pull handle, and snap the tabs
to the casing.
Page 4
5
PACKING COMPLETED
Back view
Page 5