Case Study:
Offshore Oil Rig, North Sea
Project Overview
Scobie McIntosh were awarded the contract to design, develop and
install the catering facilities on board an offshore oil facility situated
in the North Sea.
Scobie McIntosh designed,
Scobie’s management approach and the breadth of its service
capabilities were critical factors in the client awarding us the contract.
highly skilled engineers who
The Scobie team are fully conversant with the specialised requirements relating to working within an offshore environment. Accustomed as we were to operate in a logistically challenging environment with demanding security and safety requirements.
Business Challenge
The Scobie team overcame significant challenges including
adopting extensive health and safety standards and utilising the
limited space available. Since the Piper Alpha incident, there are
particular challenges to offshore projects in that every aspect of
supplying the required equipment is subject to extensive health
and safety requirements.
created and managed a team of
equipped the oil platform with
high quality galleys. The team
were responsible for successfully
installing high quality equipment
while undergoing some of the
most rigorous health and safety
checks
Despite the logistical constraints of delivering this project on board
an oil rig, the project team was able to draw on experience from
earlier projects to successfully deliver the project.
Scobie McIntosh also encountered other challenges. Electricity supplies can vary depending on which sector of the North Sea the rig
is positioned, and the nationality of the company that operate the
rig. We had to ensure that this was taken into account when designing and installing.
To further complicate matters, our team had to take into consideration the expected yaw and pitch of a rig when it is being moved or
operated which can be quite considerable.
Solutions Worldwide
WWW.SCOBIECATERING.COM
Deliverable
Design management
Project management
Stainless steel manufacturing
Installation of galley and catering equipment
Production of detailed O&M manuals with recommended spare
parts packs
Compliance with advanced health and safety, and environmental
policies
Solutions
Design and Project Management
Full project management delivering seamless transition from
design to installation
Safety was the utmost importance on site. Scobie worked
carefully to ensure compliance with all the health and safety
requirements
Supply and Installation
Manufacture and installation of the bespoke galley
a complete catering
solution from inception
to completion
Supply and installation of market leading equipment
The Result
Project Delivery
The project presented challenges to time and cost, but teamwork,
dedication and the capabilities of the Scobie McIntosh team
delivered this project on schedule and within target spend.
Solutions Worldwide
WWW.SCOBIECATERING.COM
Scobie McIntosh
London Head Office
Leeds
Gothic House, 3 The Green, Richmond
Surrey TW9 1PL
t: +44 (0)20 8614 7770
f: +44 (0)20 8940 1593
Oakwell Business Centre, Dark Lane
Birstall, West Yorkshire, WF17 9LW
t: +44 (0)1924 432 940
f: +44 (0)1924 432 942
Edinburgh
1 Broomhills Steading
45 Frogston Road East, Edinburgh, EH17 8RT
t: +44 (0)131 672 9220
f: +44 (0)131 672 1094