Design and installation of quality catering equipment. Come hell or high water. www.scobiemcintosh.com At Scobie McIntosh, we never fall out of our depth in undertaking challenging projects. That’s why we were awarded the contract to manage the design, development and installation of catering facilities aboard an offshore oil facility in the North Sea. Case Study: Offshore Oil Rig, North Sea Project Overview Scobie McIntosh were awarded the contract to design, develop and install the catering facilities on board an offshore oil facility situated in the North Sea. Scobie McIntosh designed, Scobie’s management approach and the breadth of its service capabilities were critical factors in the client awarding us the contract. highly skilled engineers who The Scobie team are fully conversant with the specialised requirements relating to working within an offshore environment. Accustomed as we were to operate in a logistically challenging environment with demanding security and safety requirements. Business Challenge The Scobie team overcame significant challenges including adopting extensive health and safety standards and utilising the limited space available. Since the Piper Alpha incident, there are particular challenges to offshore projects in that every aspect of supplying the required equipment is subject to extensive health and safety requirements. created and managed a team of equipped the oil platform with high quality galleys. The team were responsible for successfully installing high quality equipment while undergoing some of the most rigorous health and safety checks Despite the logistical constraints of delivering this project on board an oil rig, the project team was able to draw on experience from earlier projects to successfully deliver the project. Scobie McIntosh also encountered other challenges. Electricity supplies can vary depending on which sector of the North Sea the rig is positioned, and the nationality of the company that operate the rig. We had to ensure that this was taken into account when designing and installing. To further complicate matters, our team had to take into consideration the expected yaw and pitch of a rig when it is being moved or operated which can be quite considerable. Solutions Worldwide WWW.SCOBIECATERING.COM Deliverable Design management Project management Stainless steel manufacturing Installation of galley and catering equipment Production of detailed O&M manuals with recommended spare parts packs Compliance with advanced health and safety, and environmental policies Solutions Design and Project Management Full project management delivering seamless transition from design to installation Safety was the utmost importance on site. Scobie worked carefully to ensure compliance with all the health and safety requirements Supply and Installation Manufacture and installation of the bespoke galley a complete catering solution from inception to completion Supply and installation of market leading equipment The Result Project Delivery The project presented challenges to time and cost, but teamwork, dedication and the capabilities of the Scobie McIntosh team delivered this project on schedule and within target spend. Solutions Worldwide WWW.SCOBIECATERING.COM Scobie McIntosh London Head Office Leeds Gothic House, 3 The Green, Richmond Surrey TW9 1PL t: +44 (0)20 8614 7770 f: +44 (0)20 8940 1593 Oakwell Business Centre, Dark Lane Birstall, West Yorkshire, WF17 9LW t: +44 (0)1924 432 940 f: +44 (0)1924 432 942 Edinburgh 1 Broomhills Steading 45 Frogston Road East, Edinburgh, EH17 8RT t: +44 (0)131 672 9220 f: +44 (0)131 672 1094
© Copyright 2026 Paperzz