Gas Quality Stakeholders’ Technical Committee Meeting August 9, 2005 Natural Gas Quality: Power Turbine Performance During Heat Content Surge William Walters Aspen Environmental Group Sponsored by the California Energy Commission CALIFORNIA ENERGY COMMISSION Summary of Findings • Uncontrolled NOx emissions increase with increasing natural gas heat content number, but that increase is different for each turbine. • Controlled NOx was not found to increase, the emission controls were able to compensate • Additional ammonia was used for the gas turbines with Selective Catalytic Reduction in order to compensate. • Additional data is necessary to determine full impact to the natural gas fired power plants. • Study will be published in draft form for comment sometime in the next month. CALIFORNIA ENERGY COMMISSION Natural Gas Excursion Event • • • PG&E pipeline coming from Canada experienced heat content excursion for three days. Heat content excursion due to outage at a liquids extraction plant in Canada. Operating and fuel data from four power plants were obtained around the excursion event. CALIFORNIA ENERGY COMMISSION 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 Heat Content (Btu/scf) 1100 1070 1060 1355 1050 1040 1350 1030 1000 8-Jun-05 9-Jun-05 10-Jun-05 11-Jun-05 12-Jun-05 Wobbe Number Pipeline Natural Gas Heat Content and Wobbe 1370 1090 1365 1080 1360 Redding Delta Delta Wobbe 1345 1020 1010 1340 1335 13-Jun-05 CALIFORNIA ENERGY COMMISSION Major Components - Pittsburg 93 5 92 4 91 3 90 2 87 10-Jun 11-Jun 12-Jun Ethane, Propane, and Inerts (mole %) 96 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM Methane (mole %) Pipeline Gas Composition 7 95 6 94 Methane Ethane Propane Inerts 89 88 1 0 13-Jun CALIFORNIA ENERGY COMMISSION 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM 12:00 AM 2:00 AM 4:00 AM 6:00 AM 8:00 AM 10:00 AM 12:00 PM 2:00 PM 4:00 PM 6:00 PM 8:00 PM 10:00 PM Butane and Pentane (mole %) 0.500 0.350 0.250 0.015 0.200 0.150 0.000 10-Jun 11-Jun 12-Jun C6 Plus (mole %) Pipeline Gas Composition Minor Components - Pittsburg 0.035 0.450 0.030 0.400 0.025 0.300 0.020 Butanes Pentanes C6Plus 0.010 0.100 0.050 0.005 0.000 13-Jun CALIFORNIA ENERGY COMMISSION 6-Jun-05 9-Jun-05 7-Jun-05 10-Jun-05 8-Jun-05 11-Jun-05 9-Jun-05 12-Jun-05 10-Jun-05 13-Jun-05 11-Jun-05 12-Jun-05 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 Btu/scf (HHV) • Sutter Fuel Data 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM 4:00 AM 8:00 AM 12:00 PM • LMEC Fuel Data Heat Content (Btu/scf) Turbine Fuel Heat Content Variability 1050 1040 1030 1020 1010 1000 990 980 970 14-Jun-05 1,080.00 1,070.00 1,060.00 1,050.00 1,040.00 1,030.00 1,020.00 1,010.00 13-Jun05 CALIFORNIA ENERGY COMMISSION Power Plant Descriptions • All of the power plants that were monitored are combined cycle power plants. • Redding is a “muni”, while Sutter, Delta and LMEC are Calpine owned merchant plants. • Specific Plant Turbine and Emissions Control Descriptions are provided below. Facility Redding Sutter Delta LMEC Turbine Type (Number) Alstom GTX100 (1) Westinghouse 501FD (2) Westinghouse 501FD (3) General Electric 207FA (2) MW (Turbine/Plant) 43/56 (Unit 5 only) 175/540 175/861 172/555 Emission Control Technologies SCONOx DLN, SCR, and Oxidation Catalyst DLN, SCR DLN, SCR, and Oxidation Catalyst CALIFORNIA ENERGY COMMISSION Power Plant Data Ammonia Flow Process Status Uncontrolled NOx Controlled NOx Controlled CO Oxygen Content X X X X X X X X X N/A X X X X X - X X - X X X X X X X X X X X X X2 X2 SCR Catalyst Temperature Efficiency Est. - Turbine/Stack Exhaust Temperatures MW Output (GT only) -1 X2 X2 Exhaust Data Heat or Fuel Input X X X X Performance Data Pipeline Gas Inert Composition Pipeline Gas Hydrocarbon Composition Facility Redding Sutter LMEC Delta Btu Content (as used) Natural Gas Data -/- N/A X/X X X/X/- 1 – Data supplied includes blended gas composition data. 2 – Data supplied from PG&E pipeline adjacent to Delta gas blending facility, but blended gas composition data for Delta was not supplied. CALIFORNIA ENERGY COMMISSION 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 0:00:00 4:00:00 8:00:00 12:00:00 16:00:00 20:00:00 • Sutter Turbines Heat Input Rate (MMBtu/hr) 9-Jun-05 9-Jun-05 10-Jun-05 10-Jun-05 11-Jun-05 11-Jun-05 12-Jun-05 13-Jun-05 12-Jun-05 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 20:00:00 16:00:00 12:00:00 8:00:00 4:00:00 0:00:00 • Redding Turbine MMBtu/hr Gas Turbine Load Variability 425 400 375 350 325 300 13-Jun-05 2000 1800 1600 1400 1200 1000 CT1 800 CT2 600 400 200 0 14-Jun-05 CALIFORNIA ENERGY COMMISSION Uncontrolled NOx Emissions vs. Heat Content Sutter Turbine 2 Redding 28 30 Uncontrolled NOx PPM Uncontrolled NOx PPM 28 26 24 27 26 22 25 20 970 980 1030 1020 1010 1000 990 Natural Gas Heat Content (Btu/scf) 1040 1050 1020 1030 1040 1050 Natural Gas Heat Content (Btu/scf) 1060 CALIFORNIA ENERGY COMMISSION Ammonia Consumption vs Heat Content 110 Sutter Turbine 2 ammonia injection rate vs. natural gas heat content at near similar operating loads Ammonia Injection Rate (lbs/hour) 105 100 95 90 85 80 75 70 975 980 985 990 995 1000 1005 1010 1015 1020 1025 1030 1035 Natural Gas Heat Content (Btu/scf) CALIFORNIA ENERGY COMMISSION Controlled NOx Emissions vs. Heat Content 0.44 0.43 Redding Controlled NOx Controlled NOx PPM 0.42 0.41 0.40 0.39 0.38 0.37 0.36 0.35 0.34 1020 1025 1030 1035 1040 1045 1050 1055 1060 Natural Gas Heat Content (Btu/scf) 2.4 Sutter Controlled NOx NOx Emissions PPM 2.3 2.2 Turbine 1 Turbine 2 2.1 2 1.9 1.8 980 990 1000 1010 1020 1030 1040 Natural Gas Heat Content (Btu/scf) CALIFORNIA ENERGY COMMISSION Conclusions • Results of this study may not apply to all newer combined cycle gas turbine facilities; particularly different turbine models/makes and those with different combustors. • Additional data from other combined cycle plants, including any 7F turbine base load plants, should be collected when similar natural gas heat content excursion events occur. • Additional data from simple cycle plants should be collected. • Additional data from other older facilities that make up the bulk of the current natural gas fired power plant emissions (i.e. cogeneration units, perhaps even steam boilers). • Additional data should include gas specific density for the as used turbine fuel so that comparisons with Wobbe number can be made. CALIFORNIA ENERGY COMMISSION
© Copyright 2026 Paperzz