Power pulsing of AFTER in magnetic field D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya , S. Mukhopadhyay i r f u s a c la y Linear Collider Power Distribution & Pulsing Workshop May 10th, 2011 Introduction • Proposal: – Use existing electronics and adapt it for power pulsing to read out the detector pads: • Integrated T2K electronics • Having a two power states: low and nominal • Switching between state as fast as possible – In parallel, use constant current charging circuits to readout the detector mesh (see J.-P. Martin’s talk) – Using an 55Fe source to monitor the signal and gain – Operating in 5T magnet in DESY [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 2 AFTER-based electronics 1 FEM, 6chip FECs, chips :1728 ch • AFTER (72 24 channels/chip) from T2K experiment: – – – – – – 12-bit ADC, 6 channels multiplexed low-noise (700 e-) pre-amplifier-shaper Zerowave Suppression (FPGA) full samplingcapability by SCA (511 time bins) ~14-25 120 fC tomW/channel 600 fC tunable gain 100 ns to 2 μs tunable peaking time pulser for calibration 25 W, 5V at 5 A (0,5 W/chip) AFTER chip wire bonded FEC [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 3 Front-End Mezzanine (FEM) 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector 30 pins connector AFTER ADC SRAM FPGA Xilinx V5 Xilinx Prom Optical connector Test Pulser 30 pins connector [email protected] 30 pins connector 30 pins connector 30 pins connector 30 pins connector May 10, 2011 - LC Power Distribution and Pulsing Workshop 30 pins connector 4 Design of the integrated electronics [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 5 Electronics in DESY 1T magnet • Picture and events taken last week in DESY with electron beam • 1726 pads read out by the AFTER-based electronics • Power consumption of 25W was measured and confirmed Large prototype TPC 3 GeV electron Beam [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 6 Project design • DESY 5T magnet has to be reinstalled • Endplate ø 32 cm • Field cage length not yet defined • 1 FEM and 4 FEC to readout 1136 pads of 3,7×3,7mm² E B [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 7 Readout Pads 16 independent HV connections read out by constant current charging system [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 8 Low power state conditions • Specific firmware of the for the FPGA Xilink 5 will be done • Switch on and off the regulator TPS70402 for powering 3.3 V: t<1 ms [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 9 Summary of the plan • Try power switching on both the (segmented) mesh readout as studied by Jean-Pierre Martin (see the next talk) and the T2K electronics • For T2K electronics, power switching might be done on the mezzanine card (FEM) developed for the 7-module configuration of the Large Prototype Micromegas TPC • The test will consist in checking the properties of known X-ray lines with and without pulsing • The mechanical effects will be studied by having a large enough number of channels (1200) and a large magnetic field (5T) close to realistic conditions [email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop 10
© Copyright 2026 Paperzz