First Base Building - nai

For Lease
Up to ±85,000 RSF
Class A Office Building
First Base Building
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
BullStreet Development, South Carolina
For more information:
Roger Winn
+1 803.744.9843
[email protected]
Paul Hartley, SIOR
Paul Paschal
+1 803.744.9824
+1 803.744.9886
807
Gervais
Street, Suite 301
[email protected]
[email protected]
The information contained herein has been given to us by the owner of the property or other sources we deem reliable. We have no
reason to doubt its accuracy, but we do not guarantee it. All information should be verified prior to purchase or lease.
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
For Lease
First Base Building
BullStreet Development, SC
Bull Street: “Live, Work, Play”
• One of a kind opportunity to locate into Columbia’s newest
and most desirable Class A office building in the new 180
acre BullStreet mixed-use development
• Up to ±85,000/RSF of Class A office space
• The building will be constructed simultaneously with the new,
world-class Spirit Communications Park. The park, which
will be open year round, is the new City–owned multi-use
entertainment venue of Columbia’s new professional minor
league baseball team.
• Delivery: April 1, 2016
• Rental Rate: Upon Request
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
2
For Lease
First Base Building
BullStreet Development, SC
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
3
For Lease
First Base Building
BullStreet Development, SC
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
4
For Lease
First Base Building
Floor Plan: 2nd Floor
This side of building is situated along the first baseline of the
Spirit Communications Baseball Field
1
10
11
12
13
14
2
15
16
3
17
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18
THE C
THE CENTER FOR CONNECTIVE ARCHITECTURE
P
9
P
191 Peachtree Street NE
Suite 2400
Atlanta, GA 30303-1770
(404) 237-2000
coopercarry.com
NEW YORK
-
A4.02
WASHINGTON
N
ATLANTA
-
2
1
© 2014 COOPER CARRY
A7
A8
N
A6
N
8
P
7
A10
A11
A12
A13
A14
The Construction Documents have not been completed therefore this drawing may be
incomplete or not coordinated. The documents issued indicate the general scope of
the Project. The Contractor is responsible for complete and coordinated pricing and
Work, and shall include all items necessary for the proper execution and completion
of the Project, whether indicated or not. All components of the Project shall comply
with any and all requirements of national, state, and local codes. The Contractor shall
inform the Owner and Architect of any omissions, inconsistencies or errors in the
information provided. If no notice is given and any omissions, inconsistencies or
errors are discovered, the Architect's decisions on items of Work included in the
scope shall be binding on the Contractor, when consistent with the general scope and
quality of the Project.
---
2
SCOPE D
The Const
incomplete
the Projec
Work, and
of the Proj
with any an
inform the
information
errors are
scope sha
quality of t
A16
A4.11
---
B1
M
M
A15
SCOPE DOCUMENTS
M
BullStreet Development, SC
---
L
No.
Date
L
ISSUANCES
Drawing Issue Description
No.
2' - 0"
7' - 4"
L
B2
-
-
A5
---
2' - 0"
A6
J
B3
J
A4
3
A4.11
7' - 4"
A3
3' - 4"
A2
---
K
A1
K
K
8' - 0"
---
J
J
7' - 4"
31 SF
B4
2' - 0"
B4
E
B5
8' - 0"
B5
M
W
179 SF
140 SF
H
2' - 0"
H
H
UP
91 SF
7' - 4"
T
64 SF
B6
1
2' - 0"
G
7' - 4"
G
G
3' - 4"
B6
UP
1
A4.11
2' - 0"
F
F
8' - 0"
A4.11
E
8' - 8"
E
E
3' - 4"
F
7' - 4"
2ND FLOOR MIXED USE
34194 GSF
B7
B7
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 0"
3' - 8"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 4"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 8"
3' - 0"
5' - 0"
5' - 0"
5' - 0"
5' - 0"
3' - 0"
3' - 8"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 4"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 4"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 4"
7' - 4"
2' - 0"
8' - 0"
2' - 0"
7' - 4"
3' - 8"
11' - 4"
1' - 8"
BU
BULL STREET FIRST BASE
BUILDING
C
C
COLUMBIA, SOUTH CAROLINA
♦
HUGHES DEVELOPMENT
CORPORATION
C
PROJECT NUMBER: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING
SHEET NUMBER: A2.02A - FLOOR PLAN LEVEL 2 - SOUTH
M:\2014\20140355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt
1/19/2015 7:18:34 PM
D
D
D
3' - 4"
FLOO
B
B
FLOOR PLAN LAVEL 2 - NORTH
ROGER
B
SCALE: 1/8" = 1'-0"
Principal-in-Charge
Project No.
Approver
01/12/15
Project Manager
Date
8
9
10
11
12
13
14
15
2
4
8
Project Arch
16
ROGER
Project Architect
2
4
8
16
Author
1
2
3
Staff Architect
4
A2.02B
5
Drawing No.
7
Project Man
ROGER
Checker
A
A2.02B
FLOOR PLAN LEVEL 2 - NORTH
FLOOR PLAN LEVEL 2 - SOUTH
SCALE: 1/8" = 1'-0"
20140355
A
1
A2.02A
A
1
Principal-in-
ROGER
Designer
16
17
18
NOT ISSUED FOR CONSTRUCTION
6
7
8
9
10
11
12
13
14
15
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
16
17
5
18
Staff Archite
For Lease
First Base Building
Floor Plan: 3rd Floor
BullStreet Development, SC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
THE CENTER FOR CONNECTIVE ARCHITECTURE
191 Peachtree Street NE
Suite 2400
Atlanta, GA 30303-1770
(404) 237-2000
coopercarry.com
P
P
This side of building is situated along the first baseline of the
Spirit Communications Baseball Field
ATLANTA
NEW YORK
WASHINGTON
N
N
© 2014 COOPER CARRY
-
A7
A8
A10
A11
A12
A13
A14
M
2
A15
A16
-
A4.11
M
2
1
A6
The Construction Documents have not been completed therefore this drawing may be
incomplete or not coordinated. The documents issued indicate the general scope of
the Project. The Contractor is responsible for complete and coordinated pricing and
Work, and shall include all items necessary for the proper execution and completion
of the Project, whether indicated or not. All components of the Project shall comply
with any and all requirements of national, state, and local codes. The Contractor shall
inform the Owner and Architect of any omissions, inconsistencies or errors in the
information provided. If no notice is given and any omissions, inconsistencies or
errors are discovered, the Architect's decisions on items of Work included in the
scope shall be binding on the Contractor, when consistent with the general scope and
quality of the Project.
-
A4.02
SCOPE DOCUMENTS
---
-
ISSUANCES
Drawing Issue Description
No.
B1
Date
L
L
---
---
K
K
B2
3rd Floor Balcony
---
-
J
J
---
B3
H
H
B4
J
31 SF
B5
E
91 SF
M
W
179 SF
140 SF
G
G
T
64 SF
-
1
---
A4.11
F
F
B6
BULL STREET FIRST BASE
BUILDING
COLUMBIA, SOUTH CAROLINA
♦
HUGHES DEVELOPMENT
CORPORATION
C
C
PROJECT NUMBER: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING
SHEET NUMBER: A2.03A - FLOOR PLAN LEVEL 3 - SOUTH
M:\2014\20140355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt
1/19/2015 7:18:39 PM
D
B7
D
E
E
3RD FLOOR OFFICE
24508 GSF
B
B
FLOOR PLAN LEVEL 3 - SOUTH
Designer
20140355
Principal-in-Charge
Project No.
Approver
01/12/15
Project Manager
Date
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
Checker
A
A2.03A
1
2
FLOOR PLAN LEVEL 3 - SOUTH
SCALE: 1/8" = 1'-0"
2
4
8
Project Architect
16
Author
A
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Staff Architect
A2.03A
6
Drawing No.
NOT ISSUED FOR CONSTRUCTION
For Lease
First Base Building
BullStreet Development, SC
1
2
3
4
Floor Plan: 4th Floor
5
6
7
8
9
10
11
12
13
14
15
16
17
18
THE CEN
P
N
N
P
This side of building is situated along the first baseline of the
Spirit Communications Baseball Field
-
A4.02
A6
A7
A8
A10
A11
A12
A13
A14
2
A16
--M
M
A4.11
A15
SCOPE DOCU
The Constructio
incomplete or n
the Project. Th
Work, and shal
of the Project, w
with any and al
inform the Own
information pro
errors are disco
scope shall be
quality of the Pr
-
2
1
---
B1
No.
-
L
L
---
K
K
B2
---
-
J
J
---
B3
J
31 SF
W
235 SF
H
H
B4
E
91 SF
B5
M
234 SF
T
G
B6
G
64 SF
-
F
E
E
4TH FLOOR OFFICE
24212 GSF
45' - 3 1/16"
F
59' - 5 1/16"
---
BUL
D
D
B7
C
F
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
B
B
C
R: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING
A2.04 - FLOOR PLAN LEVEL 4
355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt
:43 PM
CO
7
ROGER MI
Principal-in-Char
ROGER MI
Project Manager
ROGER MI
Project Architect
2
4
8
16
ROGER MI
For Lease
First Base Building
BullStreet Development, SC
Property Features
• Up to ±85,000/RSF of Class A office space located on 3 floors
• Centrally located in the heart of the new BullStreet mixed-use
development
• Building constructed with unparalleled views of the baseball
park
• Restaurant and retail space on first floor
• 80 dedicated parking spaces beneath the building with
abundant adjacent street and structured parking available
Property Amenities
• Unmatched working environment providing desirable “live,
work, play” atmosphere with multiple retail and entertainment
options within a short walking distance
• Building situated on the 1st base line, overlooking Spirit
Communications Park. Planned uses for the Park, include
Minor League Professional baseball games, concerts, and
community outings. Spirit Communications Park will have a
capacity of approximately 8,500 for baseball and 14,000 for
concerts
• Within 3 Years of initial groundbreaking, BullStreet anticipates
offering over 50 retail shops, 20 restaurants, 1 dine-in movie
theater, a hotel, and multiple residential properties
• Park Operator has indicated that building tenants will have
access to meeting space, dining space, catering service, etc.
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
8
For Lease
First Base Building
BullStreet Development, SC
GR EGG ST R EET
CA L H OU N ST R EET
COL
ON
IAL
DRI
VE
T H OMS ON ST R EET
↓
N
200’
300’
400’
ELM WO OD AVEN UE
Site
P I C K E NS STR E E T
BU LL ST R EET
500’
807 Gervais Street, Suite 301
Columbia, South Carolina 29201
+1 803.254.0100
www.naiavant.com
9