For Lease Up to ±85,000 RSF Class A Office Building First Base Building 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com BullStreet Development, South Carolina For more information: Roger Winn +1 803.744.9843 [email protected] Paul Hartley, SIOR Paul Paschal +1 803.744.9824 +1 803.744.9886 807 Gervais Street, Suite 301 [email protected] [email protected] The information contained herein has been given to us by the owner of the property or other sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. All information should be verified prior to purchase or lease. Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com For Lease First Base Building BullStreet Development, SC Bull Street: “Live, Work, Play” • One of a kind opportunity to locate into Columbia’s newest and most desirable Class A office building in the new 180 acre BullStreet mixed-use development • Up to ±85,000/RSF of Class A office space • The building will be constructed simultaneously with the new, world-class Spirit Communications Park. The park, which will be open year round, is the new City–owned multi-use entertainment venue of Columbia’s new professional minor league baseball team. • Delivery: April 1, 2016 • Rental Rate: Upon Request 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 2 For Lease First Base Building BullStreet Development, SC 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 3 For Lease First Base Building BullStreet Development, SC 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 4 For Lease First Base Building Floor Plan: 2nd Floor This side of building is situated along the first baseline of the Spirit Communications Baseball Field 1 10 11 12 13 14 2 15 16 3 17 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 18 THE C THE CENTER FOR CONNECTIVE ARCHITECTURE P 9 P 191 Peachtree Street NE Suite 2400 Atlanta, GA 30303-1770 (404) 237-2000 coopercarry.com NEW YORK - A4.02 WASHINGTON N ATLANTA - 2 1 © 2014 COOPER CARRY A7 A8 N A6 N 8 P 7 A10 A11 A12 A13 A14 The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. --- 2 SCOPE D The Const incomplete the Projec Work, and of the Proj with any an inform the information errors are scope sha quality of t A16 A4.11 --- B1 M M A15 SCOPE DOCUMENTS M BullStreet Development, SC --- L No. Date L ISSUANCES Drawing Issue Description No. 2' - 0" 7' - 4" L B2 - - A5 --- 2' - 0" A6 J B3 J A4 3 A4.11 7' - 4" A3 3' - 4" A2 --- K A1 K K 8' - 0" --- J J 7' - 4" 31 SF B4 2' - 0" B4 E B5 8' - 0" B5 M W 179 SF 140 SF H 2' - 0" H H UP 91 SF 7' - 4" T 64 SF B6 1 2' - 0" G 7' - 4" G G 3' - 4" B6 UP 1 A4.11 2' - 0" F F 8' - 0" A4.11 E 8' - 8" E E 3' - 4" F 7' - 4" 2ND FLOOR MIXED USE 34194 GSF B7 B7 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 0" 3' - 8" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 4" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 8" 3' - 0" 5' - 0" 5' - 0" 5' - 0" 5' - 0" 3' - 0" 3' - 8" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 4" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 4" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 4" 7' - 4" 2' - 0" 8' - 0" 2' - 0" 7' - 4" 3' - 8" 11' - 4" 1' - 8" BU BULL STREET FIRST BASE BUILDING C C COLUMBIA, SOUTH CAROLINA ♦ HUGHES DEVELOPMENT CORPORATION C PROJECT NUMBER: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING SHEET NUMBER: A2.02A - FLOOR PLAN LEVEL 2 - SOUTH M:\2014\20140355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt 1/19/2015 7:18:34 PM D D D 3' - 4" FLOO B B FLOOR PLAN LAVEL 2 - NORTH ROGER B SCALE: 1/8" = 1'-0" Principal-in-Charge Project No. Approver 01/12/15 Project Manager Date 8 9 10 11 12 13 14 15 2 4 8 Project Arch 16 ROGER Project Architect 2 4 8 16 Author 1 2 3 Staff Architect 4 A2.02B 5 Drawing No. 7 Project Man ROGER Checker A A2.02B FLOOR PLAN LEVEL 2 - NORTH FLOOR PLAN LEVEL 2 - SOUTH SCALE: 1/8" = 1'-0" 20140355 A 1 A2.02A A 1 Principal-in- ROGER Designer 16 17 18 NOT ISSUED FOR CONSTRUCTION 6 7 8 9 10 11 12 13 14 15 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 16 17 5 18 Staff Archite For Lease First Base Building Floor Plan: 3rd Floor BullStreet Development, SC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 THE CENTER FOR CONNECTIVE ARCHITECTURE 191 Peachtree Street NE Suite 2400 Atlanta, GA 30303-1770 (404) 237-2000 coopercarry.com P P This side of building is situated along the first baseline of the Spirit Communications Baseball Field ATLANTA NEW YORK WASHINGTON N N © 2014 COOPER CARRY - A7 A8 A10 A11 A12 A13 A14 M 2 A15 A16 - A4.11 M 2 1 A6 The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. - A4.02 SCOPE DOCUMENTS --- - ISSUANCES Drawing Issue Description No. B1 Date L L --- --- K K B2 3rd Floor Balcony --- - J J --- B3 H H B4 J 31 SF B5 E 91 SF M W 179 SF 140 SF G G T 64 SF - 1 --- A4.11 F F B6 BULL STREET FIRST BASE BUILDING COLUMBIA, SOUTH CAROLINA ♦ HUGHES DEVELOPMENT CORPORATION C C PROJECT NUMBER: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING SHEET NUMBER: A2.03A - FLOOR PLAN LEVEL 3 - SOUTH M:\2014\20140355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt 1/19/2015 7:18:39 PM D B7 D E E 3RD FLOOR OFFICE 24508 GSF B B FLOOR PLAN LEVEL 3 - SOUTH Designer 20140355 Principal-in-Charge Project No. Approver 01/12/15 Project Manager Date 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com Checker A A2.03A 1 2 FLOOR PLAN LEVEL 3 - SOUTH SCALE: 1/8" = 1'-0" 2 4 8 Project Architect 16 Author A 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Staff Architect A2.03A 6 Drawing No. NOT ISSUED FOR CONSTRUCTION For Lease First Base Building BullStreet Development, SC 1 2 3 4 Floor Plan: 4th Floor 5 6 7 8 9 10 11 12 13 14 15 16 17 18 THE CEN P N N P This side of building is situated along the first baseline of the Spirit Communications Baseball Field - A4.02 A6 A7 A8 A10 A11 A12 A13 A14 2 A16 --M M A4.11 A15 SCOPE DOCU The Constructio incomplete or n the Project. Th Work, and shal of the Project, w with any and al inform the Own information pro errors are disco scope shall be quality of the Pr - 2 1 --- B1 No. - L L --- K K B2 --- - J J --- B3 J 31 SF W 235 SF H H B4 E 91 SF B5 M 234 SF T G B6 G 64 SF - F E E 4TH FLOOR OFFICE 24212 GSF 45' - 3 1/16" F 59' - 5 1/16" --- BUL D D B7 C F 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com B B C R: 20140355 PROJECT NAME: BULL STREET FIRST BASE BUILDING A2.04 - FLOOR PLAN LEVEL 4 355\d-7 drawings\d-7-1 revit\users\20140355 cbobach.rvt :43 PM CO 7 ROGER MI Principal-in-Char ROGER MI Project Manager ROGER MI Project Architect 2 4 8 16 ROGER MI For Lease First Base Building BullStreet Development, SC Property Features • Up to ±85,000/RSF of Class A office space located on 3 floors • Centrally located in the heart of the new BullStreet mixed-use development • Building constructed with unparalleled views of the baseball park • Restaurant and retail space on first floor • 80 dedicated parking spaces beneath the building with abundant adjacent street and structured parking available Property Amenities • Unmatched working environment providing desirable “live, work, play” atmosphere with multiple retail and entertainment options within a short walking distance • Building situated on the 1st base line, overlooking Spirit Communications Park. Planned uses for the Park, include Minor League Professional baseball games, concerts, and community outings. Spirit Communications Park will have a capacity of approximately 8,500 for baseball and 14,000 for concerts • Within 3 Years of initial groundbreaking, BullStreet anticipates offering over 50 retail shops, 20 restaurants, 1 dine-in movie theater, a hotel, and multiple residential properties • Park Operator has indicated that building tenants will have access to meeting space, dining space, catering service, etc. 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 8 For Lease First Base Building BullStreet Development, SC GR EGG ST R EET CA L H OU N ST R EET COL ON IAL DRI VE T H OMS ON ST R EET ↓ N 200’ 300’ 400’ ELM WO OD AVEN UE Site P I C K E NS STR E E T BU LL ST R EET 500’ 807 Gervais Street, Suite 301 Columbia, South Carolina 29201 +1 803.254.0100 www.naiavant.com 9
© Copyright 2026 Paperzz