0 1 5 Planning (10) 10 15 20 2 Purchase (10) 3 Http://www.prosjektledelse.ntnu.no 25 Construction (10) 30 4 Purchase We Each have of the acan project activities start with 2 weeks has three a duration after activities: planning of 10 planning, weeks. starts. This purchase means and that construction. if we add the durations, the total duration of the project We can also assume that purchase should becomes 30 weeks. finish two weeks after planning has We can also assume, for this example, that finished. the activities can overlap with each other. We have now introduced two types of links between purchase and planning. Prosjektstyring Planning (10) SS2 FF2 Purchase (10) SS2 FF2 Construction (10) We the same between have shown, with an (startto tofinish) start) We assume also introduced anrelationship FFSS (finish purchase andwhen construction. Construction dependency and a lag time that of 2purchase weeks, we said can when purchase has on that start thefinish start point for purchase is going linkedhas should two weeks afterbeen planning for twostart weeks, and construction to the of planning with lagmust time finished. This means that theafinish of of finish 2 weeks aftertopurchase has 2planning weeks. is linked the end of thefinished. We now have twowith similar links purchase activity a lag of 2between weeks. purchase and construction and between planning and purchase. Http://www.prosjektledelse.ntnu.no Prosjektstyring 0 10 Planning (10) 2 SS2 FF2 12 Purchase (10) 4 SS2 FF2 14 Construction (10) Construction We Planning The After have earliest twoset starts weeks, finish up can in thebegin purchase week isactivities found two zero. starts. by weeks in This adding anWe is AON later, also have so network an the earliest earliest and start start calculated time date of value point for for to2the the duration for construction duration activity. purchase. of of theisthe project. activity. week 4. Planning has a duration of 10 weeks, which gives us an earliest finish of 10. 0 + 10 = 10 Purchase: 2 + 10 = 12 Construction: 4 + 10 = 14 Http://www.prosjektledelse.ntnu.no Prosjektstyring 0 10 Planning (10) 0 2 SS2 FF2 10 12 Purchase (10) 2 4 SS2 FF2 12 14 Construction (10) 4 14 Planning: We To By Purchase: find allowing can the alsolatest calculate overlap startbetween the point, latest the the times duration activities, for thethe of we have activities. activities reducedisthe subtracted. project’s duration 12 - 10 = 02 10 from 30 to 14 weeks. We start with the project’s finish time and Construction: assume that the earliest finish is equal to 14 - 10 = 4 the latest finish. Http://www.prosjektledelse.ntnu.no Prosjektstyring 0 1 2 1 (2) 2 4 3 4 5 6 7 8 9 Planning (8) (2) 5 8 10 11 12 (2) 7 Weeks 13 14 3 Purchase (6) Construction (8) 6 9 (2) 10 will fully accomplished intwo Nowcan We Planning When Again, we purchase there draw have has isabe astart aprecedence has precedence 2-week been part with finish going network network duration part on for for with of the2 week 10. canCPM-AOA see that the purchase the information weeks. weeks, construction form of After the a We usual start starting these from part two of from the construction weeks AOA the network. time have network. can activity here, and that into the remaining Wil willisthe elapsed, begin. purchase divide issplit finished. start the part activities of purchase three begins. part finish whichpart lasts fora 2finish parts:isathe start part,part, a middle and weeks. part. Http://www.prosjektledelse.ntnu.no Prosjektstyring
© Copyright 2025 Paperzz