CMIC - Processing Group - Energy in Comminution Comminution Technology Appraisal Study Persio Rosario, PhD Director - Comminution 00/2015 2 Presentation outline Introduction Objective Boundary Limits Execution Plan Phase 1 Phase 2 Progress of Work Phase 1 00/2015 3 Introduction CIMC identified the issue: energy in ore comminution Intends to allocate funding to efforts to reduce energy requirements and there is a need to determine where to focus the efforts The appraisal study was defined and Hatch came onboard For over 50 years Hatch have worked alongside clients to develop and implement innovations in the mining and metals industries Hatch brings a wealth of skills to support the process of innovation on projects: idea generation techniques; feasibility evaluation and testing The global nature and diversity of Hatch's business allows crossregional and cross-business sector transfers of novel ideas 00/2015 4 Objective The overall objective of this long-term program is to reduce the energy required for comminution by greater than 50% Assessment of the value of existing and emerging technologies to reduce the energy required for industrial ore comminution What are the engineering limitations of existing “more efficient” technologies? What is the potential value of extending existing technologies into newer applications? What are prospects of non-conventional approaches? Are there notable alternative technologies “under the radar screen” that should be considered? The assessment will result in a report identifying the approaches and technologies to be considered in a multi-year development plan (short-term, long-term, academic and/or industrial testing…) 00/2015 5 Boundary Limits This study is on the process technologies of comminution Out of scope: methods which reduce the size of feed to the comminution plant methods which reduce the volume of feed to the mill like pre-concentration recovery of energy from process streams in the mill Intelligent blasting, ore sorting, energy recovery are being studied by other CMIC groups 00/2015 6 Execution Plan Phase 1 Literature review: investigation of technical publications and patents Compilation of a list containing all potential technologies, including: Contact and interview: consultants/experts, academia, suppliers… (Global – Hatch’s group extensive network worldwide) extension of existing technologies into newer applications non-conventional comminution approaches notable alternative technologies “under the radar screen” 00/2015 7 Execution Plan Phase 1 Details to be included in the list: maturity level of development possible % reduction in energy requirement applicable size range, e.g. from 50mm to 1mm feasibility perception towards industrial application inhibiting factors and possible ways to mitigate them Develop basis for ranking all listed technologies (analysis matrix) 00/2015 8 Execution Plan Phase 1 Present findings to CIMC processing group, including: the complete matrix with resulting ranking detailed information on the top 5 technologies Together with CIMC processing group select the best 2 or 3 cases for further investigation 00/2015 9 Execution Plan Phase 2 Deeper investigation on top 2 or 3 selected technologies Together with CIMC processing group select the best technology for the development plan and funding Completion of final report which includes a development plan (short-term, long-term, academic and industrial batch/pilot testing) 00/2015 10 Execution Plan – Work Progress Phase 1 Literature review: investigation of technical publications and patents Compilation of a list containing all potential technologies, including: Contact and interview: consultants/experts, academia, suppliers… (Global – Hatch’s group extensive network worldwide) extension of existing technologies into newer applications non-conventional comminution approaches notable alternative technologies “under the radar screen” 00/2015 11 Execution Plan – Work Progress Phase 1 Literature review: investigation of technical publications and patents 33 Journal papers 135 Conference papers 24 Patents 00/2015 12 Execution Plan – Work Progress Phase 1 Literature review: investigation of technical publications and patents 00/2015 13 Execution Plan – Work Progress Phase 1 Literature review: investigation of technical publications and patents Compilation of a list containing all potential technologies, including: Contact and interview: consultants/experts, academia, suppliers… (Global – Hatch’s group extensive network worldwide) extension of existing technologies into newer applications non-conventional comminution approaches notable alternative technologies “under the radar screen” 00/2015 14 Execution Plan – Work Progress Phase 1 Contact More than 30 names suggested 00/2015 15 Execution Plan – Work Progress Phase 1 Interviews Elaboration and refinement of a questionnaire 00/2015 16 Execution Plan – Work Progress Phase 1 Literature review: investigation of technical publications and patents Compilation of a list containing all potential technologies, including: Contact and interview: consultants/experts, academia, suppliers… (Global – Hatch’s group extensive network worldwide) extension of existing technologies into newer applications non-conventional comminution approaches notable alternative technologies “under the radar screen” 00/2015 17 Execution Plan – Work Progress Phase 1 – List of Technologies 00/2015 18 Execution Plan – Work Progress Phase 1 – List of Technologies 00/2015 19 Execution Plan – Work Progress Phase 1 – List of Technologies 00/2015 20 Execution Plan – Work Progress Phase 1 – List of Technologies 00/2015 21 Execution Plan – Work Progress Phase 1 Details to be included in the list: maturity level of development possible % reduction in energy requirement applicable size range, e.g. from 50mm to 1mm feasibility perception towards industrial application inhibiting factors and possible ways to mitigate them Develop basis for ranking all listed technologies (analysis matrix) 00/2015 22 Execution Plan – Work Progress Phase 1 Develop basis for ranking all listed technologies (analysis matrix) 00/2015 23 Execution Plan – Current stage Phase 1 Present findings to CIMC processing group, including: the complete matrix with resulting ranking detailed information on the top 5 technologies Together with CIMC processing group select the best 2 or 3 cases for further investigation 00/2015 24 Execution Plan – Work Progress Phase 1 Ranking 00/2015 25 Execution Plan – Technology High Voltage Pulse treatment - Selfrag 00/2015 26 Execution Plan – Technology HPGR in close circuit with air classifiers 00/2015 27 Execution Plan – Technology HPGR-Stirred Media Mill Circuit (HPGR in series) 00/2015 28 Execution Plan – Technology Conjugate Anvil-Hammer Mill (CAHM) 00/2015 29 Execution Plan – Technology Multishaft Mill 00/2015 30 Acknowledgements CMIC Processing Group and all participants and Hatch 00/2015 31 Thank you for your attention! Questions? 00/2015
© Copyright 2026 Paperzz