2016-2025 CRTPO TRANSPORTATION IMPROVEMENT PROGRAM APPROVED BY CRTPO: August 19, 2015 DRAFT TIP Project Description NON-HIGHWAY PROJECTS Preliminary Construction Date Programmed Amount (2016-2025) Division Needs 2016 $0.4 STP-DA Division Needs 2016 $0.1 Municipality Mode Funding Category STI Tier Iredell County Area Transit System Transit STP-DA Iredell County Area Transit System Transit TIP ID Preliminary Right-of-Way Date Iredell County Projects ICATS Bus Replacements Purchase two replacement buses per year over four years (eight buses total) for the Iredell County Transit System (ICATS). ICATS Facility Feasibility Study Preliminary Engineering/Feasibility Study for a ICATS Office Expansion and Renovation. Bellingham Park Greenway Extension Construct an extension of the greenway from Bellingham Park to Johnson Dairy Road along the Dye Creek. EB-5787 Mooresville Bicycle & Pedestrian STP-DA Division Needs 2018 2019 $0.5 Shelton Avenue Multi-Use Path Construct multi-use path along Shelton Avenue between Garner Bagnal Boulevard and Amity Hill Road. EB-5788 Statesville Bicycle & Pedestrian STP-DA Division Needs 2019 2021 $0.6 Mecklenburg County Projects Matheson Avenue Bicycle Lane Conversion Convert Matheson Avenue to include bicycle lanes along each side of the street from N.Tryon Street to The Plaza/Parkwood Avenue. EB-5710 Charlotte Bicycle & Pedestrian STI Division Needs 2018 $0.5 Norfolk Southern Bulk Transfer Facility Construct a new bulk transfer facility for Norfolk Southern on the site of the old Charlotte Intermodal Facility. P-5702 Charlotte Rail STI Division Needs 2020 $0.5 CATS Farebox Replacement Purchase new fareboxes for the CATS fleet. Charlotte Area Transit System Transit STP-DA Division Needs 2016 $3.5 South Prong Rocky River Greenway Construct greenway on new alignment along the South Prong Rocky River from South Street in Davidson to Main Street in Cornelius. EB-5775 Cornelius Bicycle & Pedestrian STP-DA Division Needs 2017 $0.7 NC 115 Bicycle and Pedestrian Construct bicycle and sidewalk improvements along NC 115 from Smith Road to Potts Street. Improvements EB-5776 Cornelius Bicycle & Pedestrian STP-DA Division Needs 2018 $0.2 McDowell Creek Tributary Greenway Construct greenway on new alignment along the McDowell Creek Tributary from Catawba Avenue to Washam-Potts Road. EB-5777 Cornelius Bicycle & Pedestrian STP-DA Division Needs 2019 2020 $1.4 Pleasant Plains Road Bicycle Lanes Construct bicycle lanes along Pleasant Plains Road between Trade Street and McKee Road. EB-5779 Matthews Bicycle & Pedestrian STP-DA Division Needs 2019 2020 $0.2 Mallard Creek Greenway Connector Construct a greenway connecting the existing Mallard Creek Greenway with a CATS Park and Ride Lot in Charlotte. EB-5780 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2016 2017 $0.1 Stewart Creek Greenway Construct greenway on new alignment along Stewart Creek from State Street to Rozelles Ferry Road in Charlotte. EB-5781 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2018 $0.4 McAlpine Creek Greenway Construct greenway on new alignment along McAlpine Creek from Green Rea Road to Johnston Road in Charlotte. EB-5782 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2021 $1.1 Sam Newell Road Multi-Use Path Construct multi-use path along Sam Newell Road between Rice Road and Crown Point Elementary School in Matthews. EB-5783 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2018 $0.3 Irvins Creek Greenway Construct greenway on new alignment along Irvins Creek from Idlewild Road to Lakeview Circle in Charlotte. EB-5784 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2020 $0.9 McDowell Creek Greenway Construct greenway on new alignment along McDowell Creek from NC 73 to the Torrence Creek Greenway in Huntersville. EB-5785 Mecklenburg County Bicycle & Pedestrian STP-DA Division Needs 2021 $1.6 Page 1 of 2 2016 2017 2016-2025 CRTPO TRANSPORTATION IMPROVEMENT PROGRAM APPROVED BY CRTPO: August 19, 2015 DRAFT TIP Project Description Little Sugar Creek Greenway Extension Construct an extension of the Little Sugar Creek Greenway between Ramblewood Lane in Charlotte and Cadillac Street in Pineville. This section of the greenway would traverse under I-485. NON-HIGHWAY PROJECTS Preliminary Construction Date Programmed Amount (2016-2025) Division Needs 2020 $2.2 TIP ID Municipality Mode Funding Category STI Tier EB-5786 Mecklenburg County Bicycle & Pedestrian STP-DA Preliminary Right-of-Way Date Union County Projects US 74 Multi-Use Path Construct a multi-use path along the southern edge of US 74 through Indian Trail. From the Western limit of Indian Trail to Sardis Church Road. EB-5723 Indian Trail Bicycle & Pedestrian STI Division Needs 2021 $1.1 US 74 Multi-Use Path Construct a multi-use path along the southern edge of US 74 through Indian Trail. From the Western limit of Indian Trail to Sardis Church Road. EB-5723 Indian Trail Bicycle & Pedestrian STP-DA Division Needs 2020 $0.9 S. Fork Crooked Creek Greenway Construct a greenway along the South Fork Crooked Creek from Indian Trail-Fairview Road to US 74. EB-5778 Indian Trail Bicycle & Pedestrian STP-DA Division Needs 2021 $1.0 P-5704 Indian Trail Rail STI Regional Impact 2018 $5.5 EB-5789 Wesley Chapel Bicycle & Pedestrian STP-DA Division Needs 2018 $0.1 10,000-foot Rail Siding on CSX Creates a passing siding in the middle of a 30-mile segment of single track. MILEPOST 311.8 TO RR Line MILEPOST 316.9. Weddington Road Sidewalk Construct a sidewalk along Weddington Road between Waxhaw-Indian Trail Road and Lester Davis Road. Project should be coordinated with U-3467. Page 2 of 2 2020
© Copyright 2026 Paperzz