Hope United Methodist Church - Invitation to Submit Bids - July 2013 An Invitation for Bids for ADA Compliance Projects at Hope United Methodist Church 31 Main Street Belchertown, Massachusetts July 2013 Projects described herein are funded in part by public funds made available through the Belchertown Community Preservation Committee and approved by a vote of the Town Meeting on May 13th, 2013 Page 1 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 Section 1 - General Information 1-1 The Hope United Methodist Church of Belchertown, MA, acting through its Board of Trustees; hereinafter referred to as the "Owner", is requesting bids from qualified contractors to provide construction services on one or more of the projects described in this document and associated plans and drawings. 1-2 The Owner is soliciting bids for five separate projects and may elect to award contracts for any combination of these projects which it determines to be most advantageous to the church, which also meets the grant conditions of the Community Preservation Act and is compliant with the guidelines of the American Disabilities Act. [ADA] 1-3 Mandatory Pre-bid Meeting and Site Visit - ALL prospective bidders must attend a mandatory pre-bid meeting and site visit with the Owner at 31 Main St., Belchertown, MA on Wednesday, July 24th at 3 to 5 pm. Contractors will be required to sign in and include a complete mailing address and preferred e-mail address. Important handout(s) containing supplemental information may be given to contractors upon signing in and follow-up communications will only be sent to those contractors. 1-4 Other site visits by contractors can be arranged by contacting the Owner's representative, Duane Stinchfield at [email protected] however, such visits will NOT satisfy the requirement for attendance at the mandatory pre-bid meeting. The Contractor must send a representative to this meeting; or will not be allowed to submit a bid. 1-5 Interested parties may use the attached form [pp 7 - 9 of this document] to submit bids for any of the listed projects described herein. All bid forms, accompanied by required documentation and bid deposit, must be submitted in a sealed package or envelope no later than noon on August 7th, 2013 to: The Board of Trustees - PROJECT BID Hope United Methodist Church 31 Main Street Belchertown, MA 01007 1-6 Questions pertaining to these projects and the bid process must be sent to the attention of Duane Stinchfield via e-mail to [email protected] with a written copy sent to the address above. Page 2 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 1-7 Bids will be opened and reviewed by the owner at 1 pm on August 7th, 2013. list of all bids received will be made available to all interested parties. 1-8 Upon verification of bidders' qualifications and references; the owner will announce its decision to award contracts within ten calendar days of the bid opening. 1-9 Specifications, schematic and structural drawings showing details of the projects described below can be found on the owner's website http://hopebelchertown.org/?page_id=491 . In the SECTION titled "Projects" all drawings and documents may be downloaded and printed for contractor bidding. 1-10 Contractors are NOT to contact the Architect or Structural Engineer directly. ALL communications must be done via e-mail through the Owner's representative; Duane Stinchfield at [email protected] and with a hardcopy also sent to the Owner's address at Hope United Methodist Church - Attn: Trustees, 31 Main St., Belchertown, MA 01007. 1-11 All work of the contractor(s) must be done in compliance with ADA guidelines and standards, local and state building codes and proper permit(s) must be obtained from the Town of Belchertown. 1-12 Contractors are required to produce proof of insurance for Contractor Liability and Workers Compensation. 1-13 The Contractor will be required to maintain a clean and safe work area at all times. Appropriate barriers to protect children and adults passing nearby will be required. Hard hat areas will be clearly marked. 1-14 The Contractor will provide their own dumpster and will cleanup and remove all debris at the end of each work day. 1-15 Working on a Sunday will NOT be permitted. Page 3 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 Section 2 - Description of Projects Project 1 - [Concrete work for an ADA Ramp] 1-1 Remove and dispose of an old wood handicap access ramp and construct a new concrete handicap access ramp with required railings. The dimensions of this ramp can be found at the Owners website on a PDF drawing titled "Handicap Access Ramp" and also on AutoCAD drawing ". . . S0 - PHASE 1 CONSTRUCTION". 1-2 Concrete mix shall be 3000 p.s.i. or other as specified by the Owner's structural engineer. The ramp shall have a non-slip broom finish. Hand rails shall be smooth welded pipe rails finished with epoxy paint. Railings must be consistent with ADA Guidelines http://simplifiedsafety.com/safety-railing/ada-handrail/?/solutions/ada/ . Shop Drawings of hand rails shall be provided by the contractor and subject to approval by the Owner. 1-3 Four steel 6" steel pipes filled with concrete shall be installed as protective bollards and each will be covered with a PVC type sleeve.. 1-4 The contractor shall be responsible for all pavement saw cuts and asphalt restoration adjacent to the new ramp structure. Project 2 - [New 1 story Construction] 2-1 Construction of a small single story structural addition to the existing connector between the main church building and the education wing. This new addition shall include a [unisex] handicap accessible bathroom. All concrete, plumbing, electrical and carpentry work included. It is known that the pitch from the bathroom location to the street sewer connection is a slight upgrade. This project should factor in a waste pump system. The structural details of this project are on drawing ". . . S0- PHASE 1 CONSTRUCTION". 2-2 All fixtures, hardware and finish materials shall be as specified below (or equivalent as determined by the Owner). 1. Roof Materials shall be equivalent to the existing asphalt materials on adjoining church structures. 2. Exterior siding shall be vinyl; same as adjoining exterior walls. 3. A combination light and exhaust fan, appropriately sized, shall be installed in the ceiling and ducted to the outside. Page 4 of 9 4. 5. 6. 7. 8. 9. Hope United Methodist Church - Invitation to Submit Bids - July 2013 Bathroom floor shall be ceramic tile with six inch vinyl base cove. Walls and ceiling shall be primed and painted moisture proof & mold resistant sheetrock. Safety grab rails shall be stainless steel located on each wall and both sides of the toilet. Toilet and sink fixtures shall be ADA compliant of a type approved by the Owner. Bathroom door shall be 36" solid core six panel. The will be a 1500 watt baseboard electric heater with a wall mounted timer / temp control unit. 10. It is known that the pitch from the bathroom location to the street sewer connection is a slight upgrade. Consequently, this project should factor in a waste pump system. Project 3 - [New Elevator installation] 3-1 This will be a design / build project involving the removal of the existing elevator and modification to the shaft to accommodate a new, larger ADA compliant elevator with three stops [same as existing elevator]. The contractor will be required to submit detailed shop drawings to the Owner's representative for review with the structural engineer. 3-2 The three existing doors and frames shall be removed and replaced with wider door openings [minimum 36"] and doors will include a viewing glass to determine the elevator position and who is inside. 3-3 Cost of all materials, labor, permits, review and certification by the Owner's structural engineer, and the final inspection by the State Elevator Inspection Division shall be included in the Contractor's bid. Project 4 - [Interior remodeling for an ADA bathroom] 4-1 Construction of a new ADA compliant bathroom on the ground floor of the main church building. The bathroom will be constructed in an existing 8' X 14' storage closet. The Contractor will construct a new wall [8' w X 8' h] to partition the closet. All plumbing and electrical will be run in the new wall for the sink / vanity installation. The existing 33" door will be replaced with a new 36" door. 4-2 All fixtures, hardware and finish materials shall be as specified below (or 'equivalent' as determined by the Owner). 1. A combination light and exhaust fan, appropriately sized, shall be installed in the ceiling and ducted above the drop ceiling to the outside. The switch for this device shall be inside the bathroom. Page 5 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 2. Bathroom floor shall be ceramic tile with six inch vinyl base cove and rubber transition threshold at the door opening. 3. Walls and shall be primed and painted moisture proof & mold resistant sheetrock. 4. Ceiling shall be a drop ceiling with moisture resistant insulated ceiling tiles. 5. A mirror with side light shall be installed above the sink / vanity. 6. Safety grab rails shall be stainless steel, located on each wall and both sides of the toilet. 7. Toilet and sink fixtures shall be ADA compliant of a type approved by the Owner. 8. Bathroom door shall be 36" solid core six panel with a occupied indicator built in. 9. The will be a 1200 watt baseboard electric heater with a wall mounted timer / temp control unit. Project 5 - [New 2 story Construction] 5-1 This is a new two story addition connecting the main church with the education wing. This project involves removing and disposal of the existing steel frame fire exit stair structure. The project includes new foundation work, structural wood framing, roofing same as adjoining buildings, siding to match adjoining buildings, all electrical, plumbing and interior finishes, and custom double pane windows per Architects plan. NOTE: This project also incorporates all the concrete ramp work described in Project 1 on page 4 of this document. 5-2 This new construction will require preservation of the existing single story connector during construction so as to allow continuous and safe free flow of people in and out and between the main church building and the education wing. The details of this project are shown on the AutoCAD drawings and PDFs included on the Owner's website . 5-3 This project incorporates the same single [unisex] handicap accessible bathroom as described in Project 2. [Same specifications apply]. 5-4 All interior railings shall be oak hardwood, stained and 3 coats of polyurethane finish. 5-5 All steps shall have non-slip rubber stair treads. 5-6 All walls shall be primed sheetrock with two coats of semi-gloss enamel paint. 5-7 All flooring shall be direct cement down commercial grade carpet. 5-8 This project requires a full three story fire wall as shown on the structural plans. 5-9 This project intentionally excludes the full service elevator shown on the Architect's plan. Page 6 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 REQUIRED BID FORM 3 pages - [separate form required for each project bid] This form must be used to submit a qualified bid on each project described in the documents advertised by the "Owner" Hope United Methodist Church, 31 Main St., Belchertown, MA. No other form will be accepted and non-compliant bid submissions will be rejected. This BID is being submitted by ___________________________________ [hereinafter called the "Bidder"] which Bidder is a legal entity in the Commonwealth of Massachusetts as: Check appropriate class below. [ ] a corporation, organized and certified in the Commonwealth of Massachusetts or another state _______________________ . [ ] a legal partnership [ ] a joint venture [ ] a limited liability company [ ] an individual doing business as _________________________________ The Bidder has participated in the Mandatory Pre-bid meeting and Site Visit with the Owner at 31 Main St., Belchertown, MA on Wednesday, July 24th at 3 to 5 pm. The Bidder submits this BID pursuant to the provisions of the Invitation to Bid document advertised by the Owner in the _____________ newspaper on the dates of _____ and _____. The Bidder has examined the Plans, Specifications and related documents of the proposed work, and being familiar with all of the conditions surrounding the construction of the project(s) selected, including the availability of labor and materials; hereby proposes to provide all necessary personnel and supervision, materials, equipment, and all other things necessary to complete the project within the time set forth below. The prices quoted herein are to cover all expenses incurred whether directly or indirectly related to the actual construction. The Bidder hereby agrees to commence work on Project _______________________________ on or before ______________ and to complete said work on or before ___________________ . The Bidder agrees to perform all of the work for the above named project as described in the Owner's Plans & Specifications for the SUM of: _______________________________________________________ dollars [$ _______ . ___ ] Amount is to be shown in words and figures. In case of a discrepancy, the amount shown in words shall govern. Page 7 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 The Bidder agrees that this BID may not be withdrawn for a period of 45 calendar days. The Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. Within 10 days of receipt of the written acceptance of this bid, the Bidder agrees to execute a contract for services with the Owner. A bid security in the amount of five percent (5%) of the total bid amount is enclosed herewith. The bid security is a certified check made payable to the "Hope United Methodist Church"; which bid security may become the property of the Owner in the event the Bidder is notified of a bid acceptance, but then refuses to execute a contract for services. The undersigned bidder offers the following information as evidence of its qualifications to perform the work as bid according to the plans and specification. 1. Have been in business under the present name for ____ years _____ months. 2. The names and addresses of all principals of the partnership, LLC, Corp. or joint venture. __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ 3. List of References for Previous Projects: Name / phone # / project title, location & date. __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ __________________________________________________________________________ attach additional pages as needed Page 8 of 9 Hope United Methodist Church - Invitation to Submit Bids - July 2013 Bidder's Assurances - page 3 of bid form. The undersigned Bidder hereby certifies that it will comply with all appropriate state and federal laws pertaining to Equal Employment Opportunities, Fair Wages, Worker's Compensation, and Occupational Safety. Pursuant to M.G.L. CH. 62C, Sec. 49A, the undersigned Bidder certifies under penalty of perjury that it is in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, withholding and remitting child support. The undersigned Bidder hereby certifies that all employees to be employed on the Owner's property [the work site] will have successfully completed a course in construction safety and health as required by the U.S. Occupational Safety & Health Administration. The undersigned Bidder certifies under penalties of perjury that this Bid is in all respects bona fide, fair and made without collusion or fraud with any other person, joint venture, corporation or other business or legal entity which sells materials, equipment or supplies used in or for, or engages in the performance of, the same or similar construction, installation, reconstruction, demolition, maintenance or repair work or any part thereof. The undersigned Bidder further certifies under penalty of perjury that the said undersigned is not presently barred from doing construction work in the Commonwealth of Massachusetts under the provisions of M.G.L., Chapter 152 [worker's compensation] or any other applicable debarment provisions of any other Chapter of M.G.L. or any rule or regulation promulgated and is not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency. Date: ________________ By: ________________________________________________ (signature) __________________________________________________ (name typed or printed) SEAL of Corporation __________________________________________________ (company name and Fed. I.D #) __________________________________________________ (full business address) ______________________________________________________________________ (telephone number and e-mail address) Page 9 of 9
© Copyright 2026 Paperzz