Issue date: 01/02/15 Contractor SWMS Review Review date: 01/02/18 Use this form to record the review of SWMS provided by LAA Contractors engaged under Contract No. 1500755. Project Title Contractor Company Job description SECTION A – Use this section to review Contractor SWMS only 1. Work Description and/or Title 2. The contractors letterhead that shows the name and registered office address of the contractor 3. Date SWMS developed recorded 4. Signed and dated by a senior management representative of the contractor, and the author 5. Are the names and positions of those who developed the SWMS listed? 6. Was it developed in consultation with employees or their representatives? 7. Does it include a clear description of the work to be undertaken? 8. Is the task sequence broken into the step-by-step process actually involved in the work? 9. Does it include reference to the requirements specific to Contract No 1500755 including: - Preparatory work; confirmation of access points and ceiling height - Pre-inspection risk assessment - Removal of soft clothing / furnishings below manhole access to ceiling cavity - Close doors and windows adjacent to manhole Satisfactory ? (/ / NA) Comments Electrical safety: - Disconnection of main power to house including reference to solar power where present - Advise to home owner that power is to remain disconnected for duration of inspection - Arrangements for lockout/tagout on mains switch board - Heating/cooling systems and fans exhausting into ceiling cavity are disabled - Plastic 200um thick drop sheet placed under manhole - Appropriate PPE including minimum P2 half face mask with cartridge and disposable overalls rated 5, category 3 - Room is cleared of persons other than LAA prior to accessing manhole - Decontamination point set up Custodian: WHS Manger Approved by: Place Services Number: SMS-06-FM-A760860 UNCONTROLLED COPY WHEN PRINTED © SHFA Version: 1.0 1 of 3 Issue date: 01/02/15 Contractor SWMS Review SECTION A – Use this section to review Contractor SWMS only - Review date: 01/02/18 Satisfactory ? (/ / NA) Comments Risk management controls for working at heights 10. Do the potential hazards for each step appear to be clearly described? (see Section B) 11. Has the risk associated with each hazard been assessed & ranked? 12. The person responsible for implementing the controls is named specifically? 13. Are all precautions to be taken to protect health and safety (workers, visitors, public etc.) listed? 14. Have appropriate sections of legislation, codes of practice and Australian Standards been referenced? Minimum: WHS Act 2011, WHS Regulations 2011, SafeWork NSW Managing the risk of falls at workplaces, SafeWork codes of practice How to safely remove asbestos; How to manage and control asbestos in the workplace; AS/NZS 1716, ISO 13982-1; 15. Are all health and safety instructions to be given to persons involved with the work included? 16. Are all plant and equipment that will be used for the work listed? 17. Have inspection and maintenance checks required for the plant and equipment been listed? 18. Are the details / conditions of any permits and/or licences required for the work stated? ie NSW OHS General Induction Card (White Card) and LAA license card 19. Are the training courses and qualifications required to do the job safely included? 20. Has responsibility for controls been identified? - supervise the work - inspect and approve work area conditions, work methods, protective measures, plant, equipment and power tools for use 21. Does it include the names of those who will be, or have been, trained for the work activities described in the SWMS, and the names and qualifications of the people responsible for training them 22. Is the SWMS signed by all workers who will be performing that task? 23. Is it site specific rather than generic? 24. Is there a step prior to commencing any tasks that a prework brief will be carried out with all staff and how often this will occur? Custodian: WHS Manger Approved by: Place Services Number: SMS-06-FM-A760860 UNCONTROLLED COPY WHEN PRINTED © SHFA Version: 1.0 2 of 3 Issue date: 01/02/15 Contractor SWMS Review Review date: 01/02/18 SECTION B – Contractor SWMS Hazard Identification and Control Checklist Use this table to list hazards that may be associated with the job (tick box). Check whether they have been identified and adequately addressed by the contractor SWMS. Hazard Adequately addressed Yes No Adequately addressed Yes No Hazard Biological /food handling Cold/ Hot Conditions Yes No Noise Yes No Communication Yes No Radiation Yes No Contaminated soil/ Dust Yes No Plant and Equipment Yes No Essential Services/Structures Yes No Slips trips and falls Yes No Electrical Yes No Security/ Access/ Yes No Environmental/ Heritage Yes No Yes No Hazardous Chemicals Yes No Service provisions (lighting/water) Traffic Management Yes No Hazardous Materials Yes No Waste materials Yes No Hazardous Manual Tasks Yes No Work Environment Yes No Isolated work Yes No Workplace design/layout Yes No Lighting Yes No Psychological (stress, fatigue, workplace , violence) Yes No Other Yes No Other Yes No Public area SECTION C – Reviewer Recommendation Name Reviewer details Position Signature Date of review Recommendation: Custodian: WHS Manger Approved by: Place Services Number: SMS-06-FM-A760860 Allow Works to Commence Or UNCONTROLLED COPY WHEN PRINTED Amendments required © SHFA Version: 1.0 3 of 3
© Copyright 2026 Paperzz