FILE REFERENCE: XXXX/YYYY/ZZ NET PERSONNEL AND OPERATING COSTS PROJECT NUMBER PROJECT TITLE LOCATION & STATE PROJECT SPONSOR: Insert Here Endorsement The parties endorse the Net Personnel and Operating Costs for this project. Project Representative NAME Regional Representative NAME Sponsor Representative NAME POSITION POSITION POSITION DATE DATE DATE Version 5 Date 4 Dec 2007 Page 1 This template is to be used as a guide as part of the Commissioning Handover Takeover process, it is not exhaustive and individual project requirements need to be included. Background 1. Provide a short description of the project scope. Key Stakeholders 2. IAD Representative Project Manager / Contract Administrator Regional Representative CMC Representative User Representative Builder/Contractor: Representative Other Representative Name: Position: Name: Position: Name: Position: Name: Position: Name: Position: Name: Position: Name: Position: What is the indicative cost impacts resulting from the planned/designed works? Costs to show the additional costs incurred to operate and maintain the new works and the reductions estimated from demolition/mothball of existing structures. Existing Structures – Demolished or Mothballed 3. EMS Structure Name Future (Demolish or ID Mothball) New Structures Created 4. DEMS Structure Name (tentative) ID Utilities 5. Item Additional Costs Electricity Version 5 Date 4 Dec 2007 Unit Year Decommissioned Year Commissioned Rate QTY Cost Page 2 Water Gas Waste Deducted Costs (negative values) Electricity Water Gas Waste Net Cost PA Electricity Water Gas Waste Total Comments 6. Issues arising from cost assessment, ie potential improvements in design CMS 7. Item Additional Costs PBM OF FP&E GEWM EngOps Management of the Services Fee Deducted Costs (negative values) PBM OF FP&E GEWM EngOps Management of the Services Fee Net Cost PA PBM OF FP&E GEWM EngOps Management of the Services Fee Total Unit Rate QTY Cost $ $ $ Comments 8. Issues arising from cost assessment, ie potential improvements in design Version 5 Date 4 Dec 2007 Page 3 GSS 9. Item Additional Costs Catering Security Grounds Maintenance Other Deducted Costs (negative values) Catering Security Grounds Maintenance Other Net Cost PA Catering Security Grounds Maintenance Other Total Unit Rate QTY Cost $ $ $ Comments 10. Issues arising from cost assessment, ie potential improvements in design Other (can include average life cycle cost for FACOPS over say 5-10 years) 11. Item Additional Costs Infrastructure Appraisal Other Deducted Costs (negative values) Other Net Cost PA Total Version 5 Date 4 Dec 2007 Unit Rate QTY Cost $ $ $ Page 4 Final Quotes Utilities, CMS, GSS Template Project Name 1. What is the final cost impacts resulting from the planned/designed works? Costs to show the additional costs incurred to operate and maintain the new works and the reductions from demolition/mothball of existing structures. Existing Structures – Demolished or Mothballed 2. DEMS Structure Name ID New Structures Created 3. DEMS Structure Name (tentative) ID Future (Demolish or Mothball) Year Commissioned Utilities (may be supplied by Design Consultants or Others) 4. Item Unit Rate QTY Additional Costs Electricity Water Gas Waste Deducted Costs (negative values) Electricity Water Gas Waste Net Cost PA Electricity Water Gas Waste Total Version 5 Date 4 Dec 2007 Year Decommissioned Cost $ $ $ Page 5 CMS 5. Item Unit Rate QTY Cost During DLP Additional Costs PBM OF FP&E GEWM EngOps Management of the Services Fee Deducted Costs (negative values) PBM OF FP&E GEWM EngOps Management of the Services Fee Net Cost PA PBM OF FP&E GEWM EngOps Management of the Services Fee Total Cost Post DLP $ $ $ GSS 6. Item Additional Costs Catering Security Grounds Maintenance Other Deducted Costs (negative values) Catering Security Grounds Maintenance Other Net Cost PA Catering Security Grounds Maintenance Other Total Unit Rate QTY Cost $ $ $ Other (can include average life cycle cost for FACOPS over say 5-10 years) Version 5 Date 4 Dec 2007 Page 6 7. Item Additional Costs Infrastructure Appraisal Other Deducted Costs (negative values) Other Net Cost PA Total Unit Rate QTY Cost $ $ $ OPERATIONS AND MAINTENANCE ESTIMATES TEMPLATE SHOULD INCLUDE ESTIMATE FOR ON-GOING Australian Building Greenhouse Rating Scheme (ABGR) PERFORMANCE VALIDATION FOR OFFICE ACCOMMODATION. Version 5 Date 4 Dec 2007 Page 7
© Copyright 2026 Paperzz