t Adopted Transit Improvement Plan 2016 December 2015 To request accommodations for persons with disabilities or to receive information in alternative formats, please call 1-888-889-6368, TTY Relay 711 or e-mail [email protected] Contents Transit Improvement Plan Overview ......................................................................................................................... 1 Financial Plan ........................................................................................................................................................... 1 Project Budgeting ..................................................................................................................................................... 1 Transit Modes .............................................................................................................................................................. 3 Projects 1 ...................................................................................................................................................................... 4 Lifetime Budget Changes from 2015 to 2016 ............................................................................................................ 5 Project Summary and Detail Pages ........................................................................................................................... 5 System Expansion – Link Light Rail .......................................................................................................................... 7 System Expansion – Sounder Commuter Rail ........................................................................................................ 26 System Expansion – Regional Express ................................................................................................................... 44 System Expansion – Other ...................................................................................................................................... 56 Enhancement Projects ............................................................................................................................................ 68 Rehabilitation & Replacement Projects ................................................................................................................. 101 Administrative Projects .......................................................................................................................................... 117 Reserves .................................................................................................................................................................. 125 Appendices .............................................................................................................................................................. 126 Appendix A – Sound Transit 2 Cost Estimates .................................................................................................... 126 Appendix B – Sound Move Lifetime Budgets ....................................................................................................... 128 Appendix C – Sound Transit Project Phases ....................................................................................................... 129 Appendix D – Subarea Allocations ....................................................................................................................... 130 Appendix E – Reconciliation of the Proposed 2016 TIP to Adopted 2016 TIP ..................................................... 135 Appendix F – Glossary ......................................................................................................................................... 137 1 Index of Project Details follows on next page. Alphabetical Index of Project Details by Mode LINK LIGHT RAIL Beacon Avenue Paving ............................................................................................................................................................. 106 Central Link Card Readers .......................................................................................................................................................... 94 Central Link HVAC – Instrument House and UPS Room ............................................................................................................ 84 Central Link HVAC for Traction Power ........................................................................................................................................ 93 Central Link Overhead Catenary System Tie Switch ................................................................................................................... 95 Downtown Redmond Link Extension ........................................................................................................................................... 14 East Link Extension ..................................................................................................................................................................... 24 Enhancements to Tacoma Link Expansion ................................................................................................................................. 12 Federal Way Link Extension ........................................................................................................................................................ 13 First Hill Streetcar ........................................................................................................................................................................ 18 Initial Segment ............................................................................................................................................................................. 22 Link CCTV System Upgrade ........................................................................................................................................................ 87 Link Operations & Maintenance Satellite Facility ......................................................................................................................... 16 Link Remote Switch Heaters ........................................................................................................................................................ 79 Link Station Braided Tile Replacement ...................................................................................................................................... 108 LRV On Board Energy Storage .................................................................................................................................................... 81 LRV Overhaul ............................................................................................................................................................................ 109 Lynnwood Link Extension ............................................................................................................................................................ 17 Noise Abatement ......................................................................................................................................................................... 82 Non-revenue Support Vehicles .................................................................................................................................................... 98 Northgate Link Extension ............................................................................................................................................................. 20 Northgate Link Extension Project Reserve .................................................................................................................................. 25 South 200th Link Extension ......................................................................................................................................................... 23 Signage Improvements ................................................................................................................................................................ 78 ST2 Light Rail Vehicle Expansion ................................................................................................................................................ 19 Tacoma Link Announcement/Sign System ................................................................................................................................ 107 Tacoma Link Light Rail Vehicle Overhaul .................................................................................................................................. 104 Tacoma Link Expansion ............................................................................................................................................................... 15 Tacoma Link Fare Collection ....................................................................................................................................................... 83 University Link Extension ............................................................................................................................................................. 21 SOUNDER COMMUTER RAIL D St – M St Track & Signal .......................................................................................................................................................... 39 Kent Station Parking Lot Paving .................................................................................................................................................. 91 Kent Station Platform Lighting ..................................................................................................................................................... 90 Lakewood Station Improvements ................................................................................................................................................. 33 M St – Lakewood Track & Signal ................................................................................................................................................. 38 Mukilteo Station, S Platform ......................................................................................................................................................... 40 Passenger Information System .................................................................................................................................................... 41 Point Defiance Bypass ................................................................................................................................................................. 34 Positive Train Control ................................................................................................................................................................... 80 Puyallup Station Improvements ................................................................................................................................................... 32 Puyallup Station LED Lighting ..................................................................................................................................................... 88 Sounder South Expanded Service ............................................................................................................................................... 35 Sounder ST2 Fleet Expansion ..................................................................................................................................................... 43 Sounder Vehicle Overhaul Program .......................................................................................................................................... 110 Sounder Yard & Shops Facility .................................................................................................................................................... 30 Sounder Yard Expansion ............................................................................................................................................................. 37 Station Midlife Refurbishment Program ..................................................................................................................................... 113 Sumner Station Improvements .................................................................................................................................................... 31 Sumner Station LED Lighting ....................................................................................................................................................... 89 Tacoma Trestle Track & Signal .................................................................................................................................................... 36 Tukwila Station ............................................................................................................................................................................. 42 REGIONAL EXPRESS 85th Corridor, Kirkland ................................................................................................................................................................. 51 Bothell Transit Related Improvements ......................................................................................................................................... 49 Bus Maintenance Facility ............................................................................................................................................................. 73 Federal Way Post Tension Cable Repair ................................................................................................................................... 112 Federal Way Transit Center ......................................................................................................................................................... 53 I-90 Two-Way Transit & HOV Operations, Stage 3 ..................................................................................................................... 54 Kirkland Transit Center/3rd ........................................................................................................................................................... 52 Pierce Transit Radio System Upgrade ......................................................................................................................................... 96 ST Express Bus Base .................................................................................................................................................................. 48 ST Express Fleet Expansion ........................................................................................................................................................ 55 ST Express Fleet Replacement ................................................................................................................................................. 114 ST Express Mid-Day Bus Storage ............................................................................................................................................... 50 ST Express Mobile Communications ........................................................................................................................................... 97 OTHER Administrative Capital ................................................................................................................................................................ 122 Agency Administration Operating .............................................................................................................................................. 120 Bike Locker Program ................................................................................................................................................................... 86 Central & East HCT Study ........................................................................................................................................................... 61 Downtown Seattle Transit Tunnel Mitigation ............................................................................................................................... 74 Environmental Mitigation, Monitoring & Maintenance ................................................................................................................ 121 Fare Administration ...................................................................................................................................................................... 67 Fare Collection ............................................................................................................................................................................. 65 HCT Corridor Planning Studies .................................................................................................................................................... 62 Information Technology Program ............................................................................................................................................... 123 IT Link Light Rail ........................................................................................................................................................................ 105 IT Transit Systems ..................................................................................................................................................................... 116 Operations & Maintenance Facility LRV Vehicle Lift .................................................................................................................... 75 OMF LRV Wash Heater System .................................................................................................................................................. 92 Regional Parking Pilot Project ..................................................................................................................................................... 77 Research & Technology ............................................................................................................................................................... 66 Security Enhancements ................................................................................................................................................................ 85 Small Works Program ................................................................................................................................................................. 115 South Corridor Alternatives Planning ........................................................................................................................................... 59 ST3 Planning ............................................................................................................................................................................... 60 STart ............................................................................................................................................................................................ 63 STart Operations & Maintenance.................................................................................................................................................. 64 Surplus Property Disposition ...................................................................................................................................................... 124 Tacoma Dome Station ............................................................................................................................................................... 111 Transit Oriented Development Planning .................................................................................................................................... 100 Transit Oriented Development Property Disposition .................................................................................................................... 99 Union Station Garden Level Remodel ......................................................................................................................................... 76 Marilyn Strickland, Tacoma Mayor and Sound Transit Board Vice Chair, speaks to the need for transit improvements. Ahmad Fazel, Executive Director of Sound Transit’s Design, Engineering and Construction Management Department and Tracy Reed, Rail Activation Manager, at the Capitol Hill Station. Sound Transit employees tour the Angle Lake Station site. The station is located 1.6 miles south of the Link SeaTac/Airport station. Transit Improvement Plan Overview The Adopted 2016 Transit Improvement Plan (TIP) provides a long-term forecast of project and transit mode costs, plus reserves set aside for potential future expenditures.The Sound Transit Board adopts the TIP and the annual budget to authorize spending for the budget year, as well as lifetime project budgets. agency programs against the financial plan ensures a balance of revenues and expenditures, as well as affordability of the overall program. Sensitivity analysis, using the financial plan, gauges the impact of potential changes in the economy as well as changes in project schedule and scope on overall program affordability. Transit Modes Project Budgeting The TIP includes annual forecasts for six years of operating expenses for each of the agency’s transit modes. The expense forecasts are developed in a detailed long-term operating and maintenance plan and reflect service plans contained in the 2016 Service Implementation Plan (SIP). Project Prioritization Process During the development of the budget, the agency follows an objective process to vet all proposed new projects and increases to existing projects that are not part of the Sound Move or ST2 programs. Projects are scored using objective criteria including: safety, sustainability, regulatory, financial, impact on asset “State of Good Repair,” system enhancements, security, and impact on ridership. The goal is to identify high-value, high-priority projects and pair them with available resources. Projects The TIP includes project scope, schedule, budget, and risk information for all active projects. Budget information is presented at the phase-level including life-to-date costs, annual spending forecasts for the upcoming six years, summarized costs for years beyond this six-year period, and the total authorized lifetime budget. Only board-approved budget amounts are included. Where a baseline budget has not been approved, the total budget only includes the authorized phases. The baseline budget reflects the estimated costs for the entire project and is used to measure actual project budget performance. For most projects, Phase Gate status is also provided. For ST2 projects only, cost estimate information is shown in the Projects section and in Appendix A. Lifetime budgets for active Sound Move projects are shown in Appendix B. Budget Approval and Phase Gate Process Prior to 2010, the Sound Transit Board approved project lifetime budgets at the outset of a capital project. Since 2010, our approach to project budgeting has been modified to provide greater Board oversight and control. As projects reach key milestones, requests for budget approval to complete the next project phase are presented for Board approval. Phase Gate, our project management oversight process, confirms that the project is ready to move forward to the next phase and triggers the request to the Board for additional budget. There are exceptions to having projects pass through each gate in sequence, such as procurements and alternative contracting methods, as in design-bid-build. Reserves The TIP includes reserves that are set aside for both planned and unplanned expenditures. Reserves are not considered appropriations, and Board authorization is required to use reserved funds. Typical budget requests include funding for: Financial Plan In addition to the TIP that is published annually, Sound Transit maintains a long-term agency financial plan – a model of forecasted cash flows through 2040. A review of Project development through preliminary engineering and environmental investigation. Final design and right-of-way acquisition. Baseline or total expected project budget. TRANSIT IMPROVEMENT PLAN SUMMARY (in millions) Life to Date 2016 2017 2018 2019 2020 2021 Future Total $0 $263 $276 $283 $291 $299 $352 $0 $1,763 6,322 947 1,614 1,417 1,085 909 715 1,008 14,016 318 69 14 9 9 3 3 8 433 $6,641 $1,279 $1,904 $1,708 $1,385 $1,211 $1,069 $1,015 $16,213 Transit Modes Projects Reserves Total Adopted 2016 Transit Improvement Plan 1 of 140 The initial project development budget includes alternatives analysis to shape the scope of the project and selection of a preferred alternative, compliance with environmental requirements which may include an Environmental Impact Statement, development of operations and maintenance plans, and preliminary engineering for the preferred alternative. A final design and right-of-way budget includes funding for all design work – civil, structural, electrical and HVAC, systems and architectural through to construction procurement documentation, as well as purchase or lease of all property needed to build the project. A baseline budget is established during final design when sufficient information is available to establish a project’s cost through construction. Project spending is benchmarked against the baseline through completion of the project. Projects are fully funded when the Board approves the baseline. Cost Estimates Each ST2 capital project has a cost estimate that originated from the 2008 voter-approved plan. Original ST2 cost estimates, 2015 cost estimates, and 2016 cost estimates for ST2 projects appear in Appendix A. Our cost estimates are maintained on a current year, constant dollar basis. For instance, in the 2016 TIP, full project cost estimates are presented in constant 2015 dollars. However, the Board approves budgets in year-ofexpenditure dollars to take into account the fact that project spending occurs over several years and so must be adjusted for inflation. Sparks fly as crews work on the Angle Lake light rail station. . 2 of 140 Adopted 2016 Transit Improvement Plan Transit Modes The Adopted 2016 TIP contains forecasted expenses to operate and maintain the regional transit system from 2016 – 2021. Operating expenses include the costs of third-party operators for light rail, commuter rail, and bus services, as well as Sound Transit’s direct costs for providing those services. In 2016, service levels provided by three of Sound Transit’s four modes will be increasing. In the fourth quarter of 2016, an additional round trip for Sounder commuter rail service is planned. An additional 19,750 service hours (annualized 32,000 hours in future years) will be phased in for ST Express service to help mitigate East Link Extension construction congestion and address capacity and schedule issues on many routes. As a part of the annual budget, the Sound Transit Board approves spending for each of these modal services for the following fiscal year. The agency also maintains a Service Implementation Plan (SIP) that includes service level and expenditure forecasts for a six-year period. The 2016 SIP provides the service plan on which the Adopted 2016 Budget is based. Reviewed and recommended by the Operations and Administration Committee, the Board adopts the 2016 SIP at the same time as adopting the budget for 2016. The TIP only includes summary spending information for the sixyear period described in the SIP. The SIP may be read at www.soundtransit.org. In March 2016, Link expansion north to the University of Washington will open, followed later in the year by the addition of light rail service south to Angle Lake Station at South 200th Street in SeaTac. In 2021, light rail service north to Northgate will begin. Additional extensions of light rail service are planned for 2023 north to Lynnwood, south to Kent/Des Moines in the vicinity of Highline Community College, and east to Overlake in Redmond. There are no changes planned for Tacoma Link light rail service through 2020; however, fare collection is proposed to begin in late 2016. The extension of Tacoma Link service approved by voters in ST2 is moving through the planning process, and is projected to open in late 2021. TRANSIT MODES SUMMARY (in millions) Link Light Rail Tacoma Link Light Rail Sounder Commuter Rail ST Express Bus Total Adopted 2016 Transit Improvement Plan 2016 2017 2018 2019 2020 2021 Total $88 $92 $95 $98 $104 $144 $623 5 5 5 6 6 12 39 46 49 52 54 56 59 315 124 130 130 133 132 137 786 $263 $276 $283 $291 $299 $352 $1,763 3 of 140 Projects The Adopted 2016 TIP contains all board-authorized budgets for active projects. The majority of Sound Transit’s projects support the planning, design, and construction of light rail, commuter rail, and express bus transit infrastructure as described in the Sound Move and ST2 plans. The TIP uses project categories, which align with common industry practice and provides transparency into the agency’s investment in expanding service versus investment in existing assets. Projects are also reported by program. PROJECTS SUMMARY BY PROJECT TYPE (in millions) Life to Date 2016 2017 2018 2019 2020 2021 Future Total System Expansion Link $5,085 $600 $1,246 $1,260 $987 $827 $614 $839 $11,458 Sounder 570 140 129 13 0 0 0 0 852 Regional Express 132 85 75 21 9 0 0 0 322 49 19 34 14 9 4 4 31 164 5,836 844 1,483 1,308 1,005 832 618 869 12,795 74 26 34 1 1 1 1 0 139 Rehabilitation & Replacement 132 13 28 36 5 2 24 3 242 Administrative 280 64 70 72 73 75 72 134 840 $6,322 $947 $1,614 $1,417 $1,085 $909 $715 $1,008 $14,016 Other Subtotal Enhancement Total PROJECTS SUMMARY BY PROGRAM (in millions) Life to Date 2016 2017 2018 2019 2020 2021 Future Total $5,100 $609 $1,254 $1,260 $987 $827 $614 $839 $11,491 Sounder 616 155 145 16 0 0 0 0 932 Regional Express 266 88 105 52 11 0 21 0 545 Link Other Total 340 94 110 89 86 81 79 168 1,048 $6,322 $947 $1,614 $1,417 $1,085 $909 $715 $1,008 $14,016 The Projects section of the TIP document displays project lifetime budgets primarily in terms of cash flow – what year dollars will be spent and on which phase of a project. The total budget to complete a project is not necessarily included in the TIP because the agency’s Phase Gate process requires most project budgets be approved by the Board in phases, rather than all at once. There are a number of terms that require definition in order to clearly understand the tables in this section. Life to Date – Sum of all project expenditures prior to the budget year. Annual Cash Flow – Annual projected expenditures are shown for six years beginning with the budget year. Future – Refers to the sum of projected expenditures for years seven and beyond. Total – The total Board-approved budget for a project. It may be just preliminary engineering, final design, and right-of way, or it could be the budget for the entire project budget. Each of the project detail pages include the type and amount of the Board-approved lifetime budget. Lifetime budget is stated in year-of-expenditure dollars (YOE$). Appendix B contains a summary of lifetime budgets for active Sound Move projects. Cost Estimates – Most comparable to a baseline budget—cost estimates are for the entire project scope. Cost estimates are periodically updated as new information becomes available. Estimates are also adjusted each year for inflation and stated in constant-year dollars. For ST2 projects only, project detail pages in the following subsections show project cost estimates. Cost estimates for 2008 (the year ST2 was adopted by voters), 2015, and 2016 are stated in constant-2015 dollars. A summary of ST2 cost estimates is provided in Appendix A. 4 of 140 Adopted 2016 Transit Improvement Plan Lifetime Budget Changes from 2015 to 2016 The table below is a reconciliation of changes in lifetime budget from the Adopted 2015 TIP to the Adopted 2016 TIP by project type. A breakdown of the lifetime budget changes by project is included at the beginning of the relevant subsections ahead. SUMMARY OF PROJECT LIFETIME BUDGET CHANGES FROM 2015 TO 2016 (in millions) 2015 Lifetime Total Closed Projects New Projects Budget Transfers Increase/ Decrease Transfer from Cost Estimate 2016 Lifetime Total System Expansion Link Light Rail $7,762 ($267) $764 $0 ($226) $3,425 $11,458 Sounder Commuter Rail 767 (7) 0 0 86 5 852 Regional Express 402 (106) 26 0 0 0 322 Other 164 (5) 0 0 5 0 164 9,095 (385) 790 0 (134) 3,430 12,795 Enhancement 123 0 9 0 6 0 139 Rehabilitation & Replacement 240 0 1 0 1 0 242 Administrative 840 0 0 0 0 0 840 $10,297 ($385) $800 $0 ($127) $3,430 $14,016 Subtotal Total Project Summaries and Detail Pages In the Projects section, details pertaining to each project are provided as well as summaries of each program. Summary Tables Summary tables for all budgets approved by the Board include three views: Projects by budget approval phase. Two exceptions are programs, which are comprised of a number of projects, and reserves. Subarea by allocation to Sound Transit’s five geographic subareas. Project phase, by the agency’s work breakdown structure phases that group costs relative to activities and deliverables such as final design, construction, and startup and testing. Project Detail Each active project has a full page that covers scope, lifetime budget and cashflow detail, phase gate status, and schedule and budget risk information. For ST2 projects, cost estimate updates are included. The following is an explanation of terms used in the project pages. Capital Budget (in YOE dollars) Phase Gate Passed The most recent gate passed indicates a project’s progress. Certain Sound Move projects pre-date implementation of our Phase Gate process and are not required to pass through gates that they would have if the process had been in place at that time. Pending – Projects that will pass through Gate 1 before the end of the coming year Gate 1 – Enter Project Development Gate 5 – Establish Baseline Gate 2 – Identify Alternatives Gate 6 – Proceed to Construction Gate 3 – Identify Preferred Alternative Gate 7 – Transition to Operations Gate 4 – Enter Final Design Gate 8 – Close Out Project None – Projects that advanced through project development prior to implementation of Phase Gate (includes some Sound Move projects). N/A – Projects not subject to the Phase Gate process, e.g., procurements, installation of equipment, etc. Adopted 2016 Transit Improvement Plan 5 of 140 Baseline Baseline budget is the lifetime budget for the entire project in year of expenditure dollars. The baseline budget is established once the project scope and schedule are defined. 2015 TIP Project lifetime budget authorized by the Board in 2015 or prior. 2016 TIP Project lifetime budget authorized by the Board in 2016 or prior. ST2 Project Cost Estimate (in 2015 dollars) This section of the project page is for ST2 projects only and provides a history of funded cost estimate updates in constant dollars. Cost estimates provided include the original 2008 estimate, prior year estimate, and budget year estimate. Budget Risk Assessment Estimate Type Basis of current budget estimate used for a project: Initial Estimate – Sound Move or ST2 program plans Planning – preliminary conceptual estimate developed for specific sites based on limited project information Conceptual Engineering Scoping – itemized right-of-way and construction costs on an estimated unit price basis PE/ED – preliminary engineering/environmental design Final Design Construction – full design drawings, specifications, and known unit prices Fixed Contribution – contractual amount of funds Sound Transit is to contribute to a project implemented by another transit agency or governmental entity. This may not reflect a project’s total cost estimate. Budget Risk Level Overall risk level for each project is classified as low, medium, or high, depending on the presence of uncertainties that could impact the scope or budget. Schedule Risk Assessment Schedule Risk Level Overall risk level for each project is classified as low, medium, or high depending on the presence of risk factors that could impact the completion schedule for budgeted phases. If the project has a baseline budget, then risk is assessed at the level of the entire project through to putting the asset into service. 2015 Budget Schedule The year anticipated for completion of the budgeted phases of the project at the time the 2015 TIP is published. 2016 Budget Schedule The year anticipated for completion of the budgeted phases of the project at the time the 2016 TIP is published. Project Risk Assessment Explanation of the budget or schedule risk for the budgeted phases of the project. 6 of 140 Adopted 2016 Transit Improvement Plan System Expansion – Link As a relatively young transit system, the majority of Sound Transit’s project budget is focused on building light rail to connect the region. Both Sound Move and ST2 programs funded light rail facilities and tracks – in tunnels, at grade, and elevated. By 2023, these two programs will extend light rail north to Lynnwood, south to Federal Way, and east to the Overlake area of Redmond. Highlights Complete University Link and South 200th Street Link extensions and begin passenger service along these two new light rail extension segments. Begin construction on East Link Extension segments in south Bellevue, downtown Bellevue-Spring District, and Bel-Red area, with tunneling in Bellevue. Complete preliminary engineering for a 7.8-miles light rail extension from South 200th Street to Federal Way Transit Center and begin final design for just the first 2.4-mile segment to Kent/Des Moines Road. Continue with final design and construction for Northgate Link Extension. Begin final design for Lynnwood Link Extension. Complete preliminary engineering of the preferred alternative to expand Tacoma Link. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project Overlake Village Bridge Reason Closed Project Tacoma Link Expansion Transfer from Cost Estimate Transfer from Cost Estimate Decrease Link Operations & Maintenance Facility Northgate Link Extension Lynnwood Link Extension Airport Link Federal Way Transit Extension East Link Transfer from Cost Estimate Closed Project Increase Transfer from Cost Estimate Adopted 2016 Transit Improvement Plan Budget Type Explanation Preliminary Engineering Scope and budget incorporated into East Link Extension. Project closed. Final Design Begin final design, right of way activities and vehicle procurement. Resolution No. R2015-33. Final Design Commence final design and early right of way activities. Resolution No. R2015-34. Baseline Transfer budget for vehicle purchases to new project - Resolution No. R2015-23 and increase baseline to accommodate transit-oriented development at U District Station - Resolution No. R2015-25. Final Design Commence final design and early right of way activities. Resolution No. R2015-30. Baseline Project completed and to be closed in 2016. Preliminary Engineering Budget added to include preliminary engineering from Kent/Des Moines to Federal Way Transit Center. Resolution No. R2016-04. Baseline Project baseline budget established. Resolution No. R2015-04. Change ($5,186) $25,216 $96,800 ($231,645) $423,742 ($261,650) $5,913 $2,878,803 7 of 140 Project ST2 LRV Fleet Expansion Reason New Project Downtown Redmond Link Extension New Project Enhancements to Tacoma New Project Link Expansion Total Budget Type Baseline Explanation Project created to purchase light right vehicles for Northgate, Lynnwood and East Link extensions. Resolution No. R2015-24. Preliminary Engineering Preliminary engineering and environmental reviews to extend light rail from Overlake Transit Center to Redmond Terminal Station. Resolution No. R2016-04. Baseline Process grant reciepts for City of Tacoma for transit access and station area improvements near the Tacoma Link Expansion project. Resolution No. R2015-36. Change $733,006 $28,617 $2,000 $3,695,616 TACOMA LINK LIGHT RAIL CAPITAL PROJECTS 8 of 140 Adopted 2016 Transit Improvement Plan LINK LIGHT RAIL CAPITAL PROJECTS Adopted 2016 Transit Improvement Plan 9 of 140 10 of 140 Adopted 2016 Transit Improvement Plan Downtown Redmond Link Extension 4X630 Northgate Link Extension University Link Extension Initial Segment South 200th Link Extension East Link Extension 4X100 4X200 4X300 4X420 4X600 4X199 7,452 137 0 0 $595,689 0 $5,085,189 Total 442,324 4,975,724 0 203,268 23,010 0 40,561 164,837 10,511 405,778 283,451 2,068,518 1,463,828 620,769 1,102 132,279 70,366 127,671 51,784 49,853 89,480 30,745 6,951 4,120 25,694 0 25,194 500 2016 19,985 19,985 0 Life to Date Subtotal Northgate Link Extension Project Reserve Subtotal ST2 Light Rail Vehicle Fleet Expansion 400032 Reserve First Hill Streetcar 400007 Baseline Subtotal Link Operations & Maintenance Satellite Facility Lynnwood Link Extension 400009 4X115 Tacoma Link Expansion 400008 Final Design & ROW Federal Way Link Extension 4X445 Subtotal Enhancements to Tacoma Link Expansion 400034 Project Number and Name Preliminary Engineering System Expansion LINK $1,230,401 0 0 1,046,421 510,425 76,779 23,250 66,207 304,310 65,342 107 178,868 125,482 43,532 9,854 5,111 15,120 3,611 1,500 2017 90,786 9,498 2,393 0 9,377 0 0 2018 $1,250,151 0 0 1,147,474 638,433 0 0 184,822 295,451 28,728 40 102,677 (in thousands) 0 1,775 0 0 0 0 2019 $987,126 0 0 940,872 641,488 0 0 589 190,120 108,636 40 46,254 44,479 2016 TIP Cashflow by Budget Approval $827,406 0 0 789,326 576,900 0 0 0 76,929 135,457 40 38,080 36,306 0 1,775 0 0 0 0 2020 $614,192 0 0 584,303 383,807 0 0 0 37,142 163,314 40 29,889 28,116 0 1,774 0 0 0 0 2021 $838,834 50,000 50,000 747,263 317,051 0 0 0 210,198 219,916 97 41,571 40,542 0 1,030 0 0 0 0 Future $11,457,606 50,000 50,000 10,673,708 3,677,150 383,241 2,091,768 1,756,007 1,899,756 733,006 132,780 654,491 487,861 133,628 33,002 79,407 28,617 48,790 2,000 Total Adopted 2016 Transit Improvement Plan 11 of 140 Total 619,600 40-Row Acquisition+Permits Total 218,585 35-Third Party 90-Contingency 0 $599,809 $5,085,189 3,009 9,737 58,715 213,924 145,326 12,697 78,856 23,864 2016 53,682 0 21,677 230,990 70-Vehicles 80-System Testing+Startup 232,303 55-Construction Services 2,716,790 482,993 50-Construction 198,031 30-Final Design+Specifications Life to Date 364,220 20-Prelim Engineering/Env Review Phase # and Description 10-Agency Administration $1,245,521 11,354 570,649 103,270 474,752 2017 85,496 (in thousands) $1,259,528 2,393 661,001 5,558 535,565 2018 55,011 $1,245,521 0 3,239 66,458 75,690 744,970 178,393 17,142 77,975 17,985 2017 63,669 (in thousands) $1,259,528 0 0 29,198 82,723 913,145 84,421 19,122 57,834 6,604 2018 66,481 2016 TIP Cashflow by Phase $599,809 232,385 $5,085,189 417,090 4 - East King 59,142 250,179 7,952 845,642 3 - South King 2016 50,150 6,951 3,780,643 2 - North King 5 - Pierce Life to Date 34,863 Subarea 1 - Snohomish System Expansion LINK 2016 TIP Cashflow by Subarea $987,126 0 1,216 106,082 84,177 715,143 309 10,136 25,460 203 2019 44,400 $987,126 1,775 686,525 14,123 247,382 2019 37,322 $827,406 0 5,067 133,310 69,080 527,377 22,203 8,031 21,644 208 2020 40,487 $827,406 1,775 634,394 17,609 137,550 2020 36,078 $614,192 0 5,274 161,040 53,130 332,354 0 7,431 16,788 213 2021 37,962 $614,192 1,774 454,995 21,231 101,244 2021 34,949 $838,834 72,200 1,373 215,061 54,221 336,036 25,730 14,199 17,108 249 Future 102,659 $838,834 1,030 414,111 28,589 346,579 Future 48,526 $11,457,606 72,200 40,855 951,876 710,039 6,499,739 1,075,983 307,342 778,657 247,357 Total 773,559 $11,457,606 35,002 4,071,150 1,095,165 5,873,894 Total 382,395 System Expansion LINK 400034 Enhancements to Tacoma Link Expansion Managed by: FIT Scope: Engineering and streetscape design for transit access improvements and station area enhancements around the Tacoma Link Expansion project. This project is also focused on job access needs and identify barriers that currently limit the Tacoma Hilltop residents from participation in existing workforce training and apprenticeship programs. The City of Tacoma and Sound Transit received a $2,000,000 grant from the Federal Transit Administration for this project. Sound Transit is the designated recipient and needs to administer the grant while the City of Tacoma will execute the scope and provide the $500,000 in local matching funds. The scope of this project is independent of the Tacoma Link Expansion project Changes in lifetime budget since 2015: Resolution R2015-36 established this project during the 2016 budget development process. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $2,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase 20-Prelim Engineering/Env Review Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 500 1,500 0 0 0 0 0 2,000 0 500 1,500 0 0 0 0 0 2,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 500 1,500 0 0 0 0 0 2,000 0 500 1,500 0 0 0 0 0 2,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment Although the risk is low in both schedule and budget, this project will be managed by a third party and Sound Transit will submit costs for reimbursement. In situations such as this, the risk of not recovering funds due to ineligibility or a delay in schedule always exists. 12 of 140 Adopted 2016 Transit Improvement Plan 2017 System Expansion LINK 4X445 Federal Way Link Extension Managed by: PEPD Scope: Federal Way Link Extension project adds approximately 7.8 miles of light rail from S. 200th Street in the city of SeaTac to the Federal Way Transit Center. Alternatives analysis and environmental scoping were completed in 2013 and a draft environmental impact statement was published in April 2015. Completion of preliminary engineering and publication of a Final Environmental Impact Statement is anticipated in late 2016. The project will transition to final design in 2017. Currently, the agency's Financial Plan includes construction for the initial 2.4-mile segment to Kent/Des Moines only. The Board has approved additional budget (Resolution R2016-04) to complete preliminary engineering from Kent/Des Moines through to Federal Way Transit Center. Changes in lifetime budget since 2015: With Resolution R2016-04, the Board approved an additional $5.9 million to include preliminary engineering from Kent/Des Moines Station to Federal Way Transit Center, plus additional third-party coordination and right-of-way activities to the project scope. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 3-Identify Preferred Alternative Baseline: $0 2008 Cost Estimate: $492,281 2015 TIP: $42,877 2015 Cost Estimate: $437,636 2016 TIP: $48,790 2016 Cost Estimate: $437,636 TIP Cashflow (in thousands) Subarea South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 19,985 25,194 3,611 0 0 0 0 0 48,790 19,985 25,194 3,611 0 0 0 0 0 48,790 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 3,288 4,369 1,728 0 0 0 0 0 9,385 20-Prelim Engineering/Env Review 16,162 15,660 1,507 0 0 0 0 0 33,329 35-Third Party 195 2,254 0 0 0 0 0 0 2,449 40-Row Acquisition+Permits 340 2,911 376 0 0 0 0 0 3,627 19,985 25,194 3,611 0 0 0 0 0 48,790 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning High Schedule Risk Level: High 2015 Budget Schedule: 2016 2016 Budget Schedule: 2017 Project Risk Assessment Project is entering environmental review and beginning preliminary engineering work. Uncertainties exist in design, environmental, third party, and jurisdictional requirements that could present budget and schedule risks. Adopted 2016 Transit Improvement Plan 13 of 140 System Expansion 4X630 LINK Managed by: PEPD Downtown Redmond Link Extension Scope: Downtown Redmond Link Extension includes environmental reviews and preliminary engineering only to establish route and station locations for a 3.7 mile extension of light rail from Overlake Transit Center to Redmond Terminal Station. Changes in lifetime budget since 2015: This new project was establish by Resolution R2016-04. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) Pending Baseline: $0 2008 Cost Estimate: 2015 TIP: $0 2015 Cost Estimate: $21,997 $0 2016 TIP: $28,617 2016 Cost Estimate: $18,195 TIP Cashflow (in thousands) Subarea East King Total Phase Life to Date 2016 2017 2018 0 4,120 15,120 9,377 2019 2020 28,617 0 4,120 15,120 9,377 28,617 2016 2017 2018 0 815 2,745 1,746 5,306 20-Prelim Engineering/Env Review 0 2,805 10,550 6,406 19,761 35-Third Party 0 450 1,125 925 2,500 40-Row Acquisition+Permits 0 50 700 300 1,050 4,120 15,120 9,377 28,617 Estimate Type: Budget Risk Level: 2021 Future Total Life to Date Budget Risk Assessment 2020 Future 10-Agency Administration Total 2019 2021 Total Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: 2018 Project Risk Assessment Project is beginning preliminary engineering work. Uncertainties exist in design, environmental, third party, and jurisdictional requirements that could present budget and schedule risks. 14 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 400008 Tacoma Link Expansion Managed by: DECM Scope: In cooperation with the city of Tacoma and Pierce Transit, design and construction of the selected expansion of Tacoma Link from north downtown Tacoma to the Stadium District and Hilltop. Lifetime budget increased per Resolution R2015-33 by $25,216,229 for the commencement of final design, right of way activities and vehicle procurement. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 4-Enter Final Design Baseline: $0 2008 Cost Estimate: $100,162 2015 TIP: $33,002 2015 Cost Estimate: $135,876 2016 TIP: $33,002 2016 Cost Estimate: $135,876 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 6,951 7,452 9,854 2,393 1,775 1,775 1,774 1,030 33,002 6,951 7,452 9,854 2,393 1,775 1,775 1,774 1,030 33,002 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,940 1,332 1,629 1,279 1,175 1,175 1,174 898 10,600 20-Prelim Engineering/Env Review 4,987 260 599 0 0 0 0 26 5,872 0 2,450 6,125 550 550 550 550 55 10,830 Pierce Total Phase 30-Final Design+Specifications 35-Third Party 40-Row Acquisition+Permits 70-Vehicles Total 0 125 125 50 50 50 50 50 500 24 2,285 377 514 0 0 0 0 3,200 0 1,000 1,000 0 0 0 0 0 2,000 6,951 7,452 9,854 2,393 1,775 1,775 1,774 1,030 33,002 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment PE/ED High Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2018 Project Risk Assessment The choice to extend the length of the preferred alternative chosen may exceed budget. Project requires continued coordination with community stakeholders and contribution from public/private partners. Adopted 2016 Transit Improvement Plan 15 of 140 System Expansion LINK 400009 Link Operations & Maintenance Satellite Facility Managed by: DECM Scope: Development, design, and construction of a light rail operations and maintenance facility in support of link system expansion. Resolution R2015-34 approved in Dec 2015 increased lifetime budget to $133,628,000 for the commencement of final design and early ROW activities. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 4-Enter Final Design Baseline: $0 2008 Cost Estimate: $298,615 2015 TIP: $133,628 2015 Cost Estimate: $251,589 2016 TIP: $133,628 2016 Cost Estimate: $251,589 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 6,456 10,469 9,142 1,995 0 0 0 0 28,062 North King 5,134 8,326 7,270 1,586 0 0 0 0 22,316 South King 5,903 9,572 8,358 1,824 0 0 0 0 25,657 13,251 21,487 18,762 4,094 0 0 0 0 57,594 30,745 49,853 43,532 9,498 0 0 0 0 133,628 East King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,274 1,963 0 0 0 0 0 0 3,237 20-Prelim Engineering/Env Review 6,305 3,886 0 0 0 0 0 0 10,191 35-Third Party 40-Row Acquisition+Permits 55-Construction Services Total 0 1,060 590 0 0 0 0 0 1,650 23,166 42,644 42,642 9,498 0 0 0 0 117,950 0 300 300 0 0 0 0 0 600 30,745 49,853 43,532 9,498 0 0 0 0 133,628 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Final Design High Schedule Risk Level: High 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Design challenges and coordination efforts with third parties, stakeholders, and jurisdictions have the potential to impact both the budget and the schedule for completing design activities. This could result in potential schedule delays affecting the opening of the facility in 2020 and adding costs to the project. 16 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 4X115 Lynnwood Link Extension Managed by: DECM Scope: Lynnwood Link Extension will extend light rail approximately 8.5 miles from Northgate through Shoreline and Mountlake Terrace to Lynnwood. In November 2015 Resolution R2015-30 increased the lifetime budget by $423,742,313 to commence final design and right of way activities. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 4-Enter Final Design Baseline: $0 2008 Cost Estimate: $1,668,579 2015 TIP: $487,861 2015 Cost Estimate: $1,421,593 2016 TIP: $487,861 2016 Cost Estimate: $1,421,593 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 28,274 38,420 68,513 49,569 24,286 19,823 15,351 22,136 266,372 23,510 31,946 56,969 41,217 20,194 16,483 12,765 18,406 221,489 51,784 70,366 125,482 90,786 44,479 36,306 28,116 40,542 487,861 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 7,345 6,532 9,553 12,017 9,985 10,115 10,350 22,409 88,305 20-Prelim Engineering/Env Review 37,997 412 3,590 0 0 0 0 0 42,000 0 20,900 37,050 29,722 4,228 5,284 5,284 8,984 111,453 Snohomish North King Total Phase 30-Final Design+Specifications 35-Third Party 40-Row Acquisition+Permits 55-Construction Services Total 352 2,318 3,000 3,000 2,000 2,000 2,000 2,729 17,400 6,090 32,953 61,889 22,847 0 0 0 0 123,779 0 7,250 10,400 23,201 28,267 18,906 10,481 6,419 104,925 51,784 70,366 125,482 90,786 44,479 36,306 28,116 40,542 487,861 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment PE/ED Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2018 Project Risk Assessment Budget Risk: Working with Final Designer, GC/CM contractor, and Construction Management Consultant in 2016 to develop updated construction cost estimates. Schedule Risk: Coordination efforts with multiple third parties, stakeholders, and jurisdictions, and complying with the requirements of the Federal Transit Administration’s (FTA) New Starts process has the potential to impact the schedule for completion of Final Design. Adopted 2016 Transit Improvement Plan 17 of 140 System Expansion LINK 400007 First Hill Streetcar Managed by: PEPD Scope: Provide funding for planning, design and construction of a street car providing connections between Capitol Hill and International District/Chinatown stations via the First Hill neighborhood. Substantial completion of the system was accomplished in 2014, with revenue operations commencing in 2015. Balance of activity supports work items related to the completion of the project. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 5-Establish Baseline Baseline: $132,780 2008 Cost Estimate: $138,141 2015 TIP: $132,780 2015 Cost Estimate: $136,590 2016 TIP: $132,780 2016 Cost Estimate: $136,590 TIP Cashflow (in thousands) Subarea North King Total Phase 10-Agency Administration 35-Third Party Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 132,279 137 107 40 40 40 40 97 132,780 132,279 137 107 40 40 40 40 97 132,780 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 218 137 107 40 40 40 40 97 719 132,061 0 0 0 0 0 0 0 132,061 132,279 137 107 40 40 40 40 97 132,780 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2025 Project Risk Assessment The project is in revenue service and overall budget and schedule risk is low. 18 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 400032 ST2 Light Rail Vehicle Fleet Expansion Managed by: DECM Scope: To provide project management, design, manufacturing, delivery, assembly inspection and testing in the support of a procurement of 122 low floor light rail vehicles (LRVs) to meet fleet requirements to support revenue service of all the ST2 light rail expansion projects; and centralize procurement of the LRVs for Northgate Link Extension, Lynnwood Link Extension and East Link Extension into one project. New project created by adoption of the Sound Transit Board in September 2015 (R2015-24, adopted 9/24/15) with a baseline project budget of $733 million. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $733,006 2008 Cost Estimate: N/A 2015 TIP: $733,006 2015 Cost Estimate: N/A 2016 TIP: $733,006 2016 Cost Estimate: $733,006 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 132 1,261 7,841 3,447 13,036 16,255 19,598 26,390 87,961 North King 330 3,153 19,603 8,618 32,591 40,637 48,994 65,975 219,902 South King 143 1,366 8,495 3,735 14,123 17,609 21,231 28,589 95,291 East King 496 4,730 29,404 12,928 48,886 60,956 73,491 98,962 329,853 1,102 10,511 65,342 28,728 108,636 135,457 163,314 219,916 733,006 Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 16 936 536 380 479 435 446 1,521 4,748 55-Construction Services 1,086 989 1,217 1,850 2,075 1,712 1,828 3,334 14,090 0 8,587 63,590 26,498 106,082 133,310 161,040 215,061 714,168 1,102 10,511 65,342 28,728 108,636 135,457 163,314 219,916 733,006 70-Vehicles Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2024 2016 Budget Schedule: 2024 Project Risk Assessment The project is in the initial stages of development and identified risks include establishing a set of specifications that assure the new LRV(s) are system compatible and are interchangeable with the existing fleet. Adopted 2016 Transit Improvement Plan 19 of 140 System Expansion LINK 4X100 Northgate Link Extension Managed by: DECM Scope: The Northgate Link Extension extends light rail 4.3-miles from the University of Washington Station north under the campus via twin bored tunnels to an underground U-District Station along Brooklyn Avenue NE between NE 43rd and NE 45th Streets, and underground Roosevelt Station along 12th Avenue NE between NE 65th Street and NE 67th Street, and continuing to an elevated station in Northgate along 1st Avenue NE spanning NE 103rd Street. The Northgate Link Extension is scheduled to be completed in September 2021 and will provide an interim terminus for Link at Northgate until the Lynnwood Link Extension is in service, currently anticipated in 2023. The budget was amended by two resolutions of the Sound Transit Board for a net reduction of $231.6 million to the project baseline budget; in September 2015 to transfer budget for Vehicles to the new ST2 LRV Fleet Expansion project (Resolution R2015-23), and in October 2015 to increase the baseline budget for changes to the U District Station to accommodate transit-oriented development (Resolution R2015-25). Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $1,899,756 2008 Cost Estimate: $1,734,306 2015 TIP: $1,899,756 2015 Cost Estimate: $1,904,550 2016 TIP: $1,899,756 2016 Cost Estimate: $1,904,550 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 620,769 164,837 304,310 295,451 190,120 76,929 37,142 210,198 1,899,756 620,769 164,837 304,310 295,451 190,120 76,929 37,142 210,198 1,899,756 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 35,406 13,057 16,168 15,518 13,605 10,259 8,291 35,576 147,879 20-Prelim Engineering/Env Review 15,077 0 0 0 0 0 0 0 15,077 30-Final Design+Specifications 93,213 12,203 4,603 4,869 4,511 2,960 2,091 4,716 129,167 North King Total Phase 35-Third Party 40-Row Acquisition+Permits 50-Construction 55-Construction Services 5,057 1,710 1,752 1,273 737 350 224 696 11,800 91,852 2,173 4,996 2,240 309 0 0 25,730 127,300 350,623 117,565 258,374 257,898 159,237 50,553 12,528 108,314 1,315,093 29,542 18,128 18,417 13,653 10,504 7,739 8,734 11,593 118,310 70-Vehicles 0 0 0 0 0 0 0 0 0 80-System Testing+Startup 0 0 0 0 1,216 5,067 5,274 1,373 12,930 90-Contingency 0 0 0 0 0 0 0 22,200 22,200 620,769 164,837 304,310 295,451 190,120 76,929 37,142 210,198 1,899,756 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2021 2016 Budget Schedule: 2021 Project Risk Assessment Risks associated with underground conditions, limited site access, deep stations and groundborne noise and vibration have the potential to impact costs and schedule. TBM progress continues to be slower than planned, which has the potential for delaying critical path work. 20 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 4X200 University Link Extension Managed by: DECM Scope: University Link Extension is a 3.15-mile light rail extension located entirely underground extending east from the Downtown Seattle Transit Tunnel, under I-5 to an underground Capitol Hill Station that will serve the First Hill/Capitol Hill urban center. The tunnel route crosses under the Lake Washington Ship Canal to an interim terminus in an underground University of Washington Station near Husky Stadium. University Link Extension is expected to generate high ridership by connecting the three major population and employment centers of Downtown Seattle, Capitol Hill, and the University District when it opens in 2016. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $1,756,007 2008 Cost Estimate: N/A 2015 TIP: $1,756,007 2015 Cost Estimate: N/A 2016 TIP: $1,756,007 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,463,828 40,561 66,207 184,822 589 0 0 0 1,756,007 1,463,828 40,561 66,207 184,822 589 0 0 0 1,756,007 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 74,594 7,438 12,970 18,053 500 0 0 0 113,554 20-Prelim Engineering/Env Review 24,261 0 0 0 0 0 0 0 24,261 30-Final Design+Specifications 84,741 1,659 3,082 826 0 0 0 0 90,308 35-Third Party 10,988 600 1,020 6,038 0 0 0 0 18,646 40-Row Acquisition+Permits 125,599 10 145 26,578 0 0 0 0 152,332 50-Construction 956,828 24,650 36,936 130,281 89 0 0 0 1,148,783 55-Construction Services 83,007 3,296 8,164 347 0 0 0 0 94,814 70-Vehicles 99,191 150 1,868 2,700 0 0 0 0 103,909 4,619 2,759 2,022 0 0 0 0 0 9,400 1,463,828 40,561 66,207 184,822 589 0 0 0 1,756,007 80-System Testing+Startup Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Budget and schedule risks significantly decreased after the completion of tunneling work in 2013. Some low-level risk associated with tighter constraints and coordination between Civil station contractors and Systems contractor. Some additional risk had surfaced regarding the LRV retrofit project; although those risks were captured in that project. Execution of an early revenue service start date could be affected by coordination of contractors and work necessary for completion. Adopted 2016 Transit Improvement Plan 21 of 140 System Expansion LINK 4X300 Initial Segment Managed by: DECM Scope: The 13.9-mile Initial Segment of the Link light rail system connecting South 154th Street in Tukwila with downtown Seattle opened for service in July 2009. All work completed in 2015 and the project is expected to close out in 2016; budget cash flow in 2017 reflects surplus budget. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $2,070,000 2008 Cost Estimate: N/A 2015 TIP: $2,091,768 2015 Cost Estimate: N/A 2016 TIP: $2,091,768 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,532,358 0 17,223 0 0 0 0 0 1,549,582 536,160 0 6,026 0 0 0 0 0 542,186 2,068,518 0 23,250 0 0 0 0 0 2,091,768 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 186,785 0 77 0 0 0 0 0 186,862 20-Prelim Engineering/Env Review 33,268 0 0 0 0 0 0 0 33,268 143,997 0 0 0 0 0 0 0 143,997 61,101 0 0 0 0 0 0 0 61,101 30-Final Design+Specifications 35-Third Party 40-Row Acquisition+Permits 205,046 0 0 0 0 0 0 0 205,046 1,187,370 0 23,171 0 0 0 0 0 1,210,541 55-Construction Services 102,528 0 1 0 0 0 0 0 102,529 70-Vehicles 131,799 0 0 0 0 0 0 0 131,799 16,625 0 0 0 0 0 0 0 16,625 2,068,518 0 23,250 0 0 0 0 0 2,091,768 50-Construction 80-System Testing+Startup Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2009 2016 Budget Schedule: 2009 Project Risk Assessment N/A 22 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 4X420 South 200th Link Extension Managed by: DECM Scope: The South 200th Link Extension will extend light rail approximately 1.6 miles south from Sea-Tac/Airport Station to Angle Lake Station at South 200th Street. The design features an elevated light rail guide way, an elevated station, and detached park-and-ride facility at South 200th. The project is being delivered through a design-build (DB) delivery strategy and is expected to begin revenue service operation in 2016. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $383,241 2008 Cost Estimate: $404,745 2015 TIP: $383,241 2015 Cost Estimate: $385,788 2016 TIP: $383,241 2016 Cost Estimate: $385,788 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 283,451 23,010 76,779 0 0 0 0 0 383,241 283,451 23,010 76,779 0 0 0 0 0 383,241 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 12,215 2,349 2,200 0 0 0 0 0 16,764 20-Prelim Engineering/Env Review 5,698 0 0 0 0 0 0 0 5,698 30-Final Design+Specifications 8,727 0 1,174 0 0 0 0 0 9,902 South King Total Phase 35-Third Party 40-Row Acquisition+Permits 50-Construction 55-Construction Services 80-System Testing+Startup Total 3,358 607 3,120 0 0 0 0 0 7,085 37,773 300 5,476 0 0 0 0 0 43,549 204,069 15,965 60,988 0 0 0 0 0 281,022 11,177 3,539 2,605 0 0 0 0 0 17,322 433 250 1,217 0 0 0 0 0 1,900 283,451 23,010 76,779 0 0 0 0 0 383,241 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Project being delivered through alternative design-build delivery strategy. The project approaches revenue service in 2016, the schedule and budget risks are low. In 2016, construction work will conclude and close coordination of system testing between University Link and South 200th may be required between both projects. Adopted 2016 Transit Improvement Plan 23 of 140 System Expansion LINK 4X600 East Link Extension Managed by: DECM Scope: East Link extends light rail 14 miles to East King County from downtown Seattle serving Mercer Island via I-90, Bellevue and the Overlake area of Redmond, with ten new light rail stations. Revenue service to the Overlake Transit Center is forecasted for mid-2023. Resolution R2015-04 established the baseline budget for the project. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $3,677,150 2008 Cost Estimate: $3,311,457 2015 TIP: $3,677,150 2015 Cost Estimate: $3,134,891 2016 TIP: $3,677,150 2016 Cost Estimate: $3,134,891 TIP Cashflow (in thousands) Subarea North King East King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,435 1,220 3,063 3,831 3,849 3,461 2,303 1,902 22,063 403,343 202,048 507,363 634,603 637,639 573,439 381,504 315,149 3,655,087 405,778 203,268 510,425 638,433 641,488 576,900 383,807 317,051 3,677,150 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 41,140 14,755 15,957 17,450 18,617 18,463 17,661 42,157 186,200 20-Prelim Engineering/Env Review 54,276 340 240 198 203 208 213 222 55,900 152,314 41,643 25,941 21,867 16,172 12,849 8,862 3,352 283,000 5,473 3,572 6,410 7,836 7,349 5,631 5,157 10,724 52,150 129,710 62,000 61,792 22,445 0 22,203 0 0 298,150 17,901 55,744 365,501 524,966 555,816 476,824 319,827 227,721 2,544,300 30-Final Design+Specifications 35-Third Party 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total 4,964 25,214 34,586 43,672 43,331 40,722 32,087 32,875 257,450 405,778 203,268 510,425 638,433 641,488 576,900 383,807 317,051 3,677,150 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction High Schedule Risk Level: Medium 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment The project presents technical and third party approval challenges, and requires close coordination with stakeholders and other governmental jurisdictions. Timely decision-making, maintaining the schedule for completing Final Design, and Construction contracts procurement will be necessary in 2016. Project costs are heavily influenced by the competitiveness in the construction market. 24 of 140 Adopted 2016 Transit Improvement Plan System Expansion LINK 4X199 Northgate Link Extension Project Reserve Managed by: DECM Scope: Project reserve created for the Northgate Link Extension that, if required, can be directed to mitigate budget risks associated with project construction. Funding for the reserve originated from unused funds in the project reserve that was set up for the Initial Segment. The project reserve cannot be used for additional scope and approval for its use requires super-majority approval by the Board. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) None Baseline: $50,000 2008 Cost Estimate: N/A 2015 TIP: $50,000 2015 Cost Estimate: N/A 2016 TIP: $50,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 90-Contingency Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 0 0 0 0 0 0 50,000 50,000 0 0 0 0 0 0 0 50,000 50,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 0 0 0 0 0 0 50,000 50,000 0 0 0 0 0 0 0 50,000 50,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2021 2016 Budget Schedule: 2021 Project Risk Assessment Reflects overall Northgate Link Extension project risk. Adopted 2016 Transit Improvement Plan 25 of 140 System Expansion – Sounder Sounder commuter rail provides rail service between Everett and Seattle from the north and Lakewood to Seattle from the south. Projects are now focused on rail station improvements among its 12 commuter rail stations, track and signal improvements in Tacoma, and the improvement of track and signals between Lakewood and Nisqually. Highlights Continue construction on track and signal improvements from Tacoma to Nisqually along Sound Transit owned right-ofway for Point Defiance Bypass. Increase capacity at the layover facility in Lakewood to accommodate up to seven train sets. Conduct preliminary planning and due diligence for development of a commuter rail base to support operations and maintainance of the Sounder fleet. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project Permitting & Mitigation Puyallup Station Improvements Sounder Yard & Shops Facility Tacoma Trestle Track & Signal Total 26 of 140 Reason Budget Type Closed Baseline Transfer from Cost Preliminary Engineering Estimate Transfer from Cost Preliminary Engineering Estimate Increase Baseline Explanation Project closed in 2015. Project anticipates making a strategic property acquisition. Aquire property prior to project baseline. Change ($6,516) $4,867 Project was baselined. Resolution No. R201509. $85,955 $560 $84,867 Adopted 2016 Transit Improvement Plan SOUNDER COMMUTER RAIL CAPITAL PROJECTS Adopted 2016 Transit Improvement Plan 27 of 140 28 of 140 Adopted 2016 Transit Improvement Plan Puyallup Station Improvements Sumner Station Improvements Lakewood Station Improvements 300017 300018 300019 Sounder South Expanded Service 3X510 Tacoma Trestle Track & Signal Sounder Yard Expansion M St-Lakewood Track & Signal D St-M St Track & Signal Mukilteo Station, S Platform Passenger Information System Tukwila Station Sounder ST2 Fleet Expansion 300021 300026 3X130 3X135 3X206 3X216 3X236 7X755 Baseline Point Defiance Bypass 300027 Final Design & ROW Sounder Yard & Shops Facility 300004 Preliminary Engineering Project Number and Name SOUNDER System Expansion 353,461 $570,209 Total 40,548 36,908 6,441 14,395 152,934 80,431 2,004 19,799 208,344 194,146 14,198 8,403 Subtotal Subtotal Subtotal 262 4,463 1,681 1,997 Life to Date $140,089 71,265 8,982 727 0 2,819 460 5 11,405 46,866 56,782 4,300 52,482 12,042 138 1,173 5,945 4,786 2016 $128,995 62,468 0 8,333 0 1,099 4,868 217 7,141 40,810 64,842 3,522 61,320 1,686 3 836 789 58 2017 13,034 0 0 0 0 0 0 0 13,034 0 0 0 0 0 0 0 0 2018 $13,034 (in thousands) $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2019 2016 TIP Cashflow by Budget Approval $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2020 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2021 $14 14 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 Future $852,340 500,241 49,530 45,969 6,455 18,313 158,262 80,654 20,550 120,509 329,968 201,968 128,000 22,131 404 6,472 8,414 6,841 Total Adopted 2016 Transit Improvement Plan 29 of 140 Total Total 35,064 30-Final Design+Specifications 80-System Testing+Startup 70-Vehicles $570,209 1,046 58,452 9,561 169,688 50-Construction 55-Construction Services 259,809 40-Row Acquisition+Permits 865 14,434 20-Prelim Engineering/Env Review 35-Third Party 21,249 42 Life to Date 10-Agency Administration 02-Operation+Maintenance-Agency Phase # and Description $570,209 514,157 39,863 3 - South King 5 - Pierce 16,189 Life to Date 1 - Snohomish Subarea SOUNDER System Expansion 2016 2017 $128,995 115,798 12,089 1,107 $13,034 13,034 0 0 2018 $140,089 0 8,832 11,550 94,700 9,754 759 4,699 5,227 4,568 0 2016 $128,995 64 0 4,607 107,178 6,103 943 2,516 2,858 4,726 0 2017 (in thousands) $13,034 0 0 1,053 10,767 267 54 771 0 122 0 2018 2016 TIP Cashflow by Phase $140,089 129,825 6,726 3,537 (in thousands) 2016 TIP Cashflow by Subarea $0 0 0 0 0 0 0 0 0 0 0 2019 $0 0 0 0 2019 $0 0 0 0 0 0 0 0 0 0 0 2020 $0 0 0 0 2020 $0 0 0 0 0 0 0 0 0 0 0 2021 $0 0 0 0 2021 $14 0 0 0 11 0 0 0 0 3 0 Future $14 6 4 3 Future Total $852,340 1,110 67,284 26,770 382,343 275,932 2,621 43,049 22,519 30,669 42 Total $852,340 772,821 58,682 20,836 System Expansion SOUNDER 300004 Sounder Yard & Shops Facility Managed by: PEPD Scope: Sound Transit is evaluating operations and maintenance cost efficiencies associated with the development of commuter rail operations and maintenance facilities to support existing and future service levels. Funding has been approved for completing site selection, preliminary engineering (30% design), and environmental determination. Detailed project oversight requires a step by step involvement of the Board before moving from one project phase to another. Changes in lifetime budget since 2015: Increased by $560 thousand for property acquisition. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 2-Identify Alternatives Baseline: $0 2008 Cost Estimate: $171,727 2015 TIP: $6,281 2015 Cost Estimate: $149,559 2016 TIP: $6,841 2016 Cost Estimate: $149,559 TIP Cashflow (in thousands) Subarea Life to Date Snohomish Pierce Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 40-Row Acquisition+Permits Total 2016 2017 2018 2019 2020 2021 Future Total 300 718 9 0 0 0 0 0 1,026 1,698 4,068 49 0 0 0 0 0 5,815 1,997 4,786 58 0 0 0 0 0 6,841 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 369 491 0 0 0 0 0 0 860 1,591 3,481 44 0 0 0 0 0 5,116 37 814 14 0 0 0 0 0 865 1,997 4,786 58 0 0 0 0 0 6,841 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment PE/ED High Schedule Risk Level: High 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Uncertainties exist in siting, design, environmental, third party and jurisdictional requirements that present budget and schedule risks. 30 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 300018 Sumner Station Improvements Managed by: PEPD Scope: The Sumner Station Access Improvement Project is evaluating potential capital improvements to facilitate access to Sumner Station for pedestrians, bicyclists, and drivers. Improvements include additional parking facilities, pedestrian access improvements, bicycle route improvements, and secure bicycle storage. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 3-Identify Preferred Alternative Baseline: $0 2008 Cost Estimate: $48,603 2015 TIP: $6,472 2015 Cost Estimate: $44,113 2016 TIP: $6,472 2016 Cost Estimate: $44,113 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 4,463 1,173 836 0 0 0 0 0 6,472 4,463 1,173 836 0 0 0 0 0 6,472 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 353 266 143 0 0 0 0 0 762 20-Prelim Engineering/Env Review 1,305 737 643 0 0 0 0 0 2,685 40-Row Acquisition+Permits 2,708 170 34 0 0 0 0 0 2,912 97 0 16 0 0 0 0 0 113 4,463 1,173 836 0 0 0 0 0 6,472 Pierce Total Phase 10-Agency Administration 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment PE/ED Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Uncertainties exist in siting, design, environmental, third party and jurisdictional requirements that present budget and schedule risks. Adopted 2016 Transit Improvement Plan 31 of 140 System Expansion SOUNDER 300017 Puyallup Station Improvements Managed by: PEPD Scope: The Puyallup Station Access Improvement Project is evaluating potential capital improvements to facilitate access to Puyallup Station for pedestrians, bicyclists, and drivers. Improvements include additional parking facilities, pedestrian access improvements, bicycle route improvements, and secure bicycle storage. Changes in lifetime budget since 2015: Increase project budget $4.8 million for property acquisition. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 3-Identify Preferred Alternative Baseline: $0 2008 Cost Estimate: $68,525 2015 TIP: $3,547 2015 Cost Estimate: $57,977 2016 TIP: $8,414 2016 Cost Estimate: $57,977 TIP Cashflow (in thousands) Subarea Pierce Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 40-Row Acquisition+Permits Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,681 5,945 789 0 0 0 0 0 8,414 1,681 5,945 789 0 0 0 0 0 8,414 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 352 264 141 0 0 0 0 0 757 1,301 737 643 0 0 0 0 0 2,680 28 4,944 6 0 0 0 0 0 4,977 1,681 5,945 789 0 0 0 0 0 8,414 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment PE/ED Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Uncertainties exist in siting, design, environmental, third party and jurisdictional requirements that present budget and schedule risks. 32 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 300019 Lakewood Station Improvements Managed by: PEPD Scope: Construction of a pedestrian bridge in the city of Lakewood connecting the community to the northwest of Lakewood Station with the station. This work is partly funded by a capped contribution from Sound Transit. Additional access improvements contemplated in ST2 and reflected in the ST2 cost estimate were evaluated through the Station Access and Demand Study project and may be proposed in the future. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) Pending Baseline: $0 2008 Cost Estimate: $44,466 2015 TIP: $404 2015 Cost Estimate: $37,798 2016 TIP: $404 2016 Cost Estimate: $37,798 TIP Cashflow (in thousands) Subarea Pierce Total Phase 10-Agency Administration 35-Third Party Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 262 138 3 0 0 0 0 0 404 262 138 3 0 0 0 0 0 404 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 24 13 3 0 0 0 0 0 40 238 125 0 0 0 0 0 0 363 262 138 3 0 0 0 0 0 404 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 33 of 140 System Expansion SOUNDER 300027 Point Defiance Bypass Managed by: DECM Scope: Sound Transit will administer the construction of the Point Defiance Bypass Project which will construct a new second track adjacent to Sound Transit’s existing main line between South Tacoma (South 66th Street Bridge) and Lakewood (Bridgeport Way) and install new rails, ties, and ballast on Sound Transit’s existing track between Lakewood and Nisqually. Improvements will be made at the connection to BNSF’s main line near Nisqually and safety improvements will be made at some existing at-grade crossings within the project corridor. The project started in 2014 with $6.4 million lifetime budget which is used for the procurement of a construction services contract, right-of-way acquisition, and associated staff costs to administer the same in support of the construction of a second track between South Tacoma and Lakewood. These costs are reimbursable through the Federal High Speed Rail grant administered by the Washington State Department of Transportation (WSDOT). Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 5-Establish Baseline Baseline: $128,000 2008 Cost Estimate: N/A 2015 TIP: $128,000 2015 Cost Estimate: N/A 2016 TIP: $128,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase 02-Operation+MaintenanceAgency 10-Agency Administration 30-Final Design+Specifications 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 14,198 52,482 61,320 0 0 0 0 0 128,000 14,198 52,482 61,320 0 0 0 0 0 128,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 42 0 0 0 0 0 0 0 42 1,038 1,235 545 0 0 0 0 0 2,818 103 0 97 0 0 0 0 0 200 49 10 941 0 0 0 0 0 1,000 12,020 43,437 58,883 0 0 0 0 0 114,340 947 7,800 853 0 0 0 0 0 9,600 14,198 52,482 61,320 0 0 0 0 0 128,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: High 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment Due to grant requirements and expiration of grant fund eligibility, the project is on a very tight schedule to maximize reimbursement opportunities. 34 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 3X510 Sounder South Expanded Service Managed by: DECM Scope: Purchase of four additional commuter rail easements between Seattle and Lakewood from Burlington Northern Santa Fe (BNSF) Railroad. BNSF is responsible for track and signal improvements; Sound Transit maintains responsibility for environmental permitting and mitigation. The fourth easement payment was made in 2015. Sound Transit is working with BNSF and federal and local environmental regulatory agencies on environmental impacts and mitigation. A fish passage culvert will be designed by ST and construction will be performed by King County. Construction to be complete by April 2018. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 4-Enter Final Design Baseline: $0 2008 Cost Estimate: $196,715 2015 TIP: $201,968 2015 Cost Estimate: $253,762 2016 TIP: $201,968 2016 Cost Estimate: $253,762 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 194,146 4,300 3,522 0 0 0 0 0 201,968 194,146 4,300 3,522 0 0 0 0 0 201,968 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,078 300 872 0 0 0 0 0 2,250 482 0 225 0 0 0 0 0 707 30-Final Design+Specifications 0 700 0 0 0 0 0 0 700 35-Third Party 0 140 160 0 0 0 0 0 300 185,182 160 1,143 0 0 0 0 0 186,485 7,405 2,800 1,022 0 0 0 0 0 11,226 0 200 100 0 0 0 0 0 300 194,146 4,300 3,522 0 0 0 0 0 201,968 Pierce Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Final Design Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 2016 Budget Schedule: 2018 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 35 of 140 System Expansion SOUNDER 300021 Tacoma Trestle Track & Signal Managed by: DECM Scope: Design and construct additional track, bridge and platforms along an approximately 0.65 mile section of track between the existing Tacoma Dome Station and the vicinity of M Street in Tacoma. Project baseline was established in 2015 per Resolution No. R2015-09. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 5-Establish Baseline Baseline: $120,509 2008 Cost Estimate: $75,114 2015 TIP: $120,509 2015 Cost Estimate: $63,529 2016 TIP: $120,509 2016 Cost Estimate: $63,529 TIP Cashflow (in thousands) Subarea Pierce Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 19,799 46,866 40,810 13,034 0 0 0 0 120,509 19,799 46,866 40,810 13,034 0 0 0 0 120,509 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,898 1,195 871 122 0 0 0 0 4,086 20-Prelim Engineering/Env Review 4,005 82 410 0 0 0 0 0 4,497 30-Final Design+Specifications 7,842 3,649 1,219 771 0 0 0 0 13,481 22 454 547 54 0 0 0 0 1,077 35-Third Party 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total 5,874 2,365 1,555 267 0 0 0 0 10,061 44 36,721 34,109 10,767 0 0 0 0 81,641 113 2,400 2,100 1,053 0 0 0 0 5,666 19,799 46,866 40,810 13,034 0 0 0 0 120,509 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction High Schedule Risk Level: High 2015 Budget Schedule: 2017 2016 Budget Schedule: 2018 Project Risk Assessment The schedule has been accelerated in order to meet a Fall 2017 completion date which allows for maximum use of expiring grant revenues. Several challenges to the construction of the project are recognized and may result in potential lost of grant revenues supporting the project. 36 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 300026 Sounder Yard Expansion Managed by: DECM Scope: Increase track capacity at the layover facility in Lakewood to store up to seven train sets. The project will also complete drainage improvements and increase electrical power to accommodate additional wayside power and yard lighting. The increase in capacity is needed for the additional ST2 Sounder South service that begins in 2016 before the Sounder Yard & Shops Facility project is complete. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 5-Establish Baseline Baseline: $20,550 2008 Cost Estimate: N/A 2015 TIP: $20,550 2015 Cost Estimate: $21,092 2016 TIP: $20,550 2016 Cost Estimate: $21,092 TIP Cashflow (in thousands) Subarea South King Pierce Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,054 5,999 3,756 0 0 0 0 0 10,809 950 5,406 3,385 0 0 0 0 0 9,741 2,004 11,405 7,141 0 0 0 0 0 20,550 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 486 425 289 0 0 0 0 0 1,200 1,215 40 895 0 0 0 0 0 2,150 184 20 196 0 0 0 0 0 400 50-Construction 75 10,070 5,255 0 0 0 0 0 15,400 55-Construction Services 44 850 506 0 0 0 0 0 1,400 2,004 11,405 7,141 0 0 0 0 0 20,550 Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 40-Row Acquisition+Permits Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Medium 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment Availability of materials requiring long lead time could potentially create delays in construction. Adopted 2016 Transit Improvement Plan 37 of 140 System Expansion SOUNDER 3X130 M St-Lakewood Track & Signal Managed by: DECM Scope: Reconstruction of approximately seven miles of rail track between M Street in Tacoma and Lakewood was completed in 2010. Remaining project elements include restoration of the South 66th Street Bridge and installation of the Centralized Train Control system. Commuter rail service began in 2012 following the completion of the D Street to M Street Track and Signal project (Project 3x135). Project will be completed in 2016. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $78,630 2008 Cost Estimate: N/A 2015 TIP: $80,654 2015 Cost Estimate: N/A 2016 TIP: $80,654 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 80,431 5 217 0 0 0 0 0 80,654 80,431 5 217 0 0 0 0 0 80,654 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 3,652 0 113 0 0 0 0 0 3,765 20-Prelim Engineering/Env Review 1,496 0 0 0 0 0 0 0 1,496 30-Final Design+Specifications 2,982 0 3 0 0 0 0 0 2,985 40-Row Acquisition+Permits 12,769 5 41 0 0 0 0 0 12,815 50-Construction 50,579 0 60 0 0 0 0 0 50,639 8,953 0 0 0 0 0 0 0 8,953 80,431 5 217 0 0 0 0 0 80,654 70-Vehicles Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2010 2016 Budget Schedule: 2016 Project Risk Assessment N/A 38 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 3X135 D St-M St Track & Signal Managed by: DECM Scope: Design and construct a 1.4 mile rail conneciton between Tacoma Dome Station and Sound Transit owned right-of-way at the Lakewood Subdivision Line. Construction included; rail work, an overpass at Pacific Avenue, roadway improvements, utility relocations and centralized traffic control for the rail line. The project completed construction and began Sounder service between Lakewood and Tacoma in October 2012. Follow-on work continues and is anticipated to be completed by the end of 2016. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $161,581 2008 Cost Estimate: N/A 2015 TIP: $158,262 2015 Cost Estimate: N/A 2016 TIP: $158,262 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 152,934 460 4,868 0 0 0 0 0 158,262 152,934 460 4,868 0 0 0 0 0 158,262 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 8,829 95 682 0 0 0 0 0 9,606 20-Prelim Engineering/Env Review 1,733 0 0 0 0 0 0 0 1,733 17,308 200 604 0 0 0 0 0 18,112 605 5 236 0 0 0 0 0 846 30-Final Design+Specifications 35-Third Party 40-Row Acquisition+Permits 42,137 10 1,482 0 0 0 0 0 43,629 50-Construction 67,150 100 1,249 0 0 0 0 0 68,499 55-Construction Services 5,173 50 550 0 0 0 0 0 5,773 70-Vehicles 8,953 0 0 0 0 0 0 0 8,953 80-System Testing+Startup 1,046 0 64 0 0 0 0 0 1,110 152,934 460 4,868 0 0 0 0 0 158,262 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment Continued coordination with local jurisdictions may result in additional requirements. Adopted 2016 Transit Improvement Plan 39 of 140 System Expansion SOUNDER 3X206 Mukilteo Station, S Platform Managed by: DECM Scope: The Mukilteo Station South Platform project includes the second platform, stair, and elevator towers for both platforms and the pedestrian bridge connecting them. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $18,313 2008 Cost Estimate: N/A 2015 TIP: $18,313 2015 Cost Estimate: N/A 2016 TIP: $18,313 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 14,395 2,819 1,099 0 0 0 0 0 18,313 14,395 2,819 1,099 0 0 0 0 0 18,313 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,252 130 158 0 0 0 0 0 1,540 30-Final Design+Specifications 2,240 100 307 0 0 0 0 0 2,647 Snohomish Total Phase 35-Third Party 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total 0 35 0 0 0 0 0 0 35 478 1,250 50 0 0 0 0 0 1,778 8,751 1,054 559 0 0 0 0 0 10,363 1,674 250 26 0 0 0 0 0 1,950 14,395 2,819 1,099 0 0 0 0 0 18,313 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Medium 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment Schedule delays have pushed the project completion into 2016 as the certificate of occupancy issuance was delayed. 40 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 3X216 Passenger Information System Managed by: FIT Scope: Upgrade of station communications and all closed circuit television (CCTV) and passenger information systems for commuter rail stations. The system includes communications between stations and the Union Station centralized security and operations control center for CCTV cameras; audible rail announcement capabilities; variable message signs; customer emergency stations; and onboard, automated vehicle location. Project was completed in 2015 and will be closed in 2016 any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) None Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $6,455 2015 Cost Estimate: N/A 2016 TIP: $6,455 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 1,494 0 0 0 0 0 0 3 1,497 South King 1,900 0 0 0 0 0 0 4 1,904 Pierce 3,047 0 0 0 0 0 0 6 3,053 6,441 0 0 0 0 0 0 14 6,455 Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 207 0 0 0 0 0 0 3 210 20-Prelim Engineering/Env Review 204 0 0 0 0 0 0 0 204 6,030 0 0 0 0 0 0 11 6,040 6,441 0 0 0 0 0 0 14 6,455 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 41 of 140 System Expansion SOUNDER 3X236 Tukwila Station Managed by: DECM Scope: Construction of a new permanent commuter rail station to replace the existing temporary Tukwila Sounder Station on Sound Transit owned property at Longacres Way in Tukwila. The project includes two 600-foot-long platforms with shelters, ADA compliant ramps, stairs, ticket vending machines, improvements to the underpass connecting the two platforms, a bus transit area with shelters, 390 car parking stalls, 68 bicycle parking spaces, and underground water quality and stormwater detention facilities. Project is expected to continue well into 2016 to complete follow-on work including potential platform crack repairs, removal of soil stockpile, and possible lighting enhancements. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $45,969 2008 Cost Estimate: $40,943 2015 TIP: $45,969 2015 Cost Estimate: $48,360 2016 TIP: $45,969 2016 Cost Estimate: $48,360 TIP Cashflow (in thousands) Subarea South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 36,908 727 8,333 0 0 0 0 0 45,969 36,908 727 8,333 0 0 0 0 0 45,969 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,710 155 908 0 0 0 0 0 2,773 20-Prelim Engineering/Env Review 1,101 0 0 0 0 0 0 0 1,101 30-Final Design+Specifications 4,589 50 286 0 0 0 0 0 4,924 40-Row Acquisition+Permits 10,362 5 642 0 0 0 0 0 11,009 50-Construction 17,537 517 6,026 0 0 0 0 0 24,081 1,609 0 472 0 0 0 0 0 2,081 36,908 727 8,333 0 0 0 0 0 45,969 55-Construction Services Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Final Design Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment N/A. 42 of 140 Adopted 2016 Transit Improvement Plan System Expansion SOUNDER 7X755 Sounder ST2 Fleet Expansion Managed by: Operations Scope: Fleet expansion to add train sets to support additional trips between Seattle and Lakewood. The number of coaches and cab cars that will be procured will be refined based on ridership trends and forecasts. In 2012, three locomotives were ordered and received from Motive Power, Inc. Nine cabs were ordered in 2013 from Bombardier and will be received in 2015 through 2016. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: $36,854 2015 TIP: $49,530 2015 Cost Estimate: $30,438 2016 TIP: $49,530 2016 Cost Estimate: $30,438 TIP Cashflow (in thousands) Subarea Pierce Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 40,548 8,982 0 0 0 0 0 0 49,530 40,548 8,982 0 0 0 0 0 0 49,530 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 2 0 0 0 0 0 0 0 2 20-Prelim Engineering/Env Review 0 150 0 0 0 0 0 0 150 40,546 8,832 0 0 0 0 0 0 49,378 40,548 8,982 0 0 0 0 0 0 49,530 70-Vehicles Total Budget Risk Assessment Schedule Risk Assessment Estimate Type: Scoping Schedule Risk Level: Medium Budget Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Time between the contract for purchase and delivery can be affected by manufacturing delays or unforeseen challenges. Adopted 2016 Transit Improvement Plan 43 of 140 System Expansion – Regional Express Projects in support of ST Express bus services are mostly completed and the focus is now on the expansion of high occupancy vehicle (HOV) lanes on I-90 to make way for the construction of light rail from downtown Seattle to Bellevue. Highlights Purchase 27 new buses to support increased bus service fulfilling the commitment made to the public in the ST2 plan. Conduct preliminary planning and due diligence for development of a bus base to support operations and maintainance of the ST Express bus fleet. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project Reason ST Express Fleet Expansion New Project Budget Type Explanation Baseline Expand fleet by 27 buses to accommodate additional service hours. Closed Project Baseline Project completed. Rainier Avenue Arterial Improvements Strander Boulevard Closed Project Baseline Extension Moutlake Terrace Freeway Closed Project Baseline Station S Everett Freeway Station Closed Project Baseline Issaquah Transit Center/SR900 Total 44 of 140 Closed Project Baseline Change $26,185 ($15,348) Project completed. ($4,073) Project completed. ($29,260) Project completed. ($28,358) Project completed. ($28,962) ($79,816) Adopted 2016 Transit Improvement Plan REGIONAL EXPRESS CAPITAL PROJECTS Adopted 2016 Transit Improvement Plan 45 of 140 46 of 140 Adopted 2016 Transit Improvement Plan ST Express Bus Base Kirkland Transit Center/3rd Federal Way Transit Center I-90 Two-Way Transit & HOV Operations, Stage 3 5X142 5X321 5X387 700720 ST Express Fleet Expansion 0 $131,781 Total 0 130,641 74,179 37,929 10,808 5,418 2,306 4 4 1,136 1,136 Life to Date Subtotal Subtotal 85th Corridor, Kirkland 5X141 Operating ST Express Mid-Day Bus Storage Subtotal Bothell Transit Related Improvements Subtotal 500020 Baseline 500030 Final Design & ROW 500005 Preliminary Engineering Project Number and Name REGIONAL EXPRESS System Expansion $85,060 9,061 9,061 75,413 75,368 0 45 0 0 0 0 587 587 2016 $74,684 17,124 17,124 48,439 45,813 1,525 106 172 822 5,036 5,036 4,085 4,085 2017 0 0 21,424 21,424 0 0 0 0 0 0 0 0 2018 $21,424 (in thousands) $8,864 0 0 8,864 8,864 0 0 0 0 0 0 0 0 2019 2016 TIP Cashflow by Budget Approval $0 0 0 0 0 0 0 0 0 0 0 0 0 2020 $0 0 0 0 0 0 0 0 0 0 0 0 0 2021 $0 0 0 0 0 0 0 0 0 0 0 0 0 Future $321,813 26,185 26,185 284,781 225,648 39,455 10,959 5,590 3,128 5,040 5,040 5,808 5,808 Total Adopted 2016 Transit Improvement Plan 47 of 140 Total 6,407 20-Prelim Engineering/Env Review 0 90-Contingency $131,781 0 238 89,594 7,608 0 70-Vehicles 55-Construction Services 50-Construction 40-Row Acquisition+Permits 35-Third Party 22,106 5,827 30-Final Design+Specifications Life to Date 10-Agency Administration $131,781 Phase # and Description Total 90,938 4 - East King 2,579 38,061 3 - South King 5 - Pierce 203 Life to Date 1 - Snohomish Subarea REGIONAL EXPRESS System Expansion 2016 2017 $74,684 2,522 65,425 3,866 2,872 $21,424 0 21,424 0 0 2018 $85,060 0 9,061 0 75,190 10 0 80 505 215 2016 $74,684 100 17,124 32 44,463 197 5,000 3,297 3,460 1,012 2017 (in thousands) $21,424 0 0 0 18,730 0 0 923 0 1,770 2018 2016 TIP Cashflow by Phase $85,060 521 82,246 1,056 1,238 (in thousands) 2016 TIP Cashflow by Subarea $8,864 0 0 0 8,864 0 0 0 0 0 2019 $8,864 0 8,864 0 0 2019 $0 0 0 0 0 0 0 0 0 0 2020 $0 0 0 0 0 2020 $0 0 0 0 0 0 0 0 0 0 2021 $0 0 0 0 0 2021 $0 0 0 0 0 0 0 0 0 0 Future $0 0 0 0 0 Future Total $321,813 100 26,185 270 236,842 7,814 5,000 26,406 10,372 8,824 Total $321,813 5,622 268,896 42,982 4,313 System Expansion REGIONAL EXPRESS 500005 ST Express Bus Base Managed by: PEPD Scope: Sound Transit is evaluating constructing an ST Express Bus Base for operating and maintaining the ST Express bus fleet. The Board has approved initial project development activities including confirmation of fleet operating assumptions, development of facilities and site programming evaluations and review of alternative project delivery methods. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: $196,007 2015 TIP: $5,808 2015 Cost Estimate: $189,577 2016 TIP: $5,808 2016 Cost Estimate: $189,577 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 203 105 731 0 0 0 0 0 1,040 South King 132 68 474 0 0 0 0 0 674 East King 528 273 1,900 0 0 0 0 0 2,701 Pierce 273 141 980 0 0 0 0 0 1,394 1,136 587 4,085 0 0 0 0 0 5,808 Life to Date 2016 2017 2018 2019 2020 2021 Future Total Total Phase 10-Agency Administration 335 72 437 0 0 0 0 0 844 20-Prelim Engineering/Env Review 798 505 3,460 0 0 0 0 0 4,763 40-Row Acquisition+Permits Total 3 10 188 0 0 0 0 0 201 1,136 587 4,085 0 0 0 0 0 5,808 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2016 Project Risk Assessment Uncertainties exist in siting, design, environmental, third party and jurisdictional requirements that present budget and schedule risks. 48 of 140 Adopted 2016 Transit Improvement Plan System Expansion REGIONAL EXPRESS 500030 Bothell Transit Related Improvements Managed by: PEPD Scope: Capital contribution to transit center/park-and-ride project near SR 527/Bothell Way NE and NE 185th Street in the downtown Bothell area. Sound Transit and the city of Bothell would enter into an memorandum of understanding to confirm the responsibilities of each party, the project capital component(s) to receive funding, and the financial participation schedule. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: $6,129 2015 TIP: $5,040 2015 Cost Estimate: N/A 2016 TIP: $5,040 2016 Cost Estimate: $6,112 TIP Cashflow (in thousands) Subarea East King Total Phase 10-Agency Administration 35-Third Party Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 4 0 5,036 0 0 0 0 0 5,040 4 0 5,036 0 0 0 0 0 5,040 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 4 0 36 0 0 0 0 0 40 0 0 5,000 0 0 0 0 0 5,000 4 0 5,036 0 0 0 0 0 5,040 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2018 Project Risk Assessment The execution of the grant matching contribution is reliant on the city of Bothell receiving the grant award. As such the actual payment may be carried over year to year until such time the grant is received. Adopted 2016 Transit Improvement Plan 49 of 140 System Expansion REGIONAL EXPRESS 500020 ST Express Mid-Day Bus Storage Managed by: DECM Scope: Replace temporary bus storage at the Link Operations Maintenance Facility employee parking area with permanent storage with capacity for 30, forty-five foot buses. The project is complete, any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $3,128 2015 Cost Estimate: $3,336 2016 TIP: $3,128 2016 Cost Estimate: $3,336 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,306 0 822 0 0 0 0 0 3,128 2,306 0 822 0 0 0 0 0 3,128 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 226 0 127 0 0 0 0 0 353 20-Prelim Engineering/Env Review 229 0 0 0 0 0 0 0 229 30-Final Design+Specifications 418 0 37 0 0 0 0 0 455 Pierce Total Phase 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total 1 0 9 0 0 0 0 0 10 1,193 0 618 0 0 0 0 0 1,811 238 0 32 0 0 0 0 0 270 2,306 0 822 0 0 0 0 0 3,128 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A 50 of 140 Adopted 2016 Transit Improvement Plan System Expansion REGIONAL EXPRESS 5X141 85th Corridor, Kirkland Managed by: DECM Scope: Street widening, traffic signal and bus shelter installations, and sidewalk improvements at various intersections in the city of Kirkland to enhance reliability and connections to transit. This project is being led by the city of Kirkland; transit elements are funded by capped contribution from Sound Transit. Project is complete and will be closed in 2016. Any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 5-Establish Baseline Baseline: $6,015 2008 Cost Estimate: N/A 2015 TIP: $5,590 2015 Cost Estimate: N/A 2016 TIP: $5,590 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea East King Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 30-Final Design+Specifications 40-Row Acquisition+Permits 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 5,418 0 172 0 0 0 0 0 5,590 5,418 0 172 0 0 0 0 0 5,590 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 447 0 14 0 0 0 0 0 460 1,124 0 0 0 0 0 0 0 1,124 554 0 0 0 0 0 0 0 554 876 0 0 0 0 0 0 0 876 2,417 0 158 0 0 0 0 0 2,575 5,418 0 172 0 0 0 0 0 5,590 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 51 of 140 System Expansion REGIONAL EXPRESS 5X142 Kirkland Transit Center/3rd Managed by: DECM Scope: Design and construct, and place into service, a new regional transit center in Kirkland on Third Street, south of Central Way to accommodate existing and anticipated bus service by King County Metro and ST Express routes. The project also includes a capped contribution for intersection improvements near the transit center to enhance bus service speed and reliability. This project was completed in 2015 and will be closed in 2016. Any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $13,300 2008 Cost Estimate: N/A 2015 TIP: $10,959 2015 Cost Estimate: N/A 2016 TIP: $10,959 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10,808 45 106 0 0 0 0 0 10,959 10,808 45 106 0 0 0 0 0 10,959 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 947 5 1 0 0 0 0 0 953 20-Prelim Engineering/Env Review 1,154 0 0 0 0 0 0 0 1,154 30-Final Design+Specifications 1,574 0 0 0 0 0 0 0 1,574 East King Total Phase 10-Agency Administration 40-Row Acquisition+Permits 187 0 0 0 0 0 0 0 187 50-Construction 6,946 40 5 0 0 0 0 0 6,991 90-Contingency 0 0 100 0 0 0 0 0 100 10,808 45 106 0 0 0 0 0 10,959 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A 52 of 140 Adopted 2016 Transit Improvement Plan System Expansion REGIONAL EXPRESS 5X321 Federal Way Transit Center Managed by: DECM Scope: Construct a new transit center and five level 1,200 stall parking structure in Federal Way. Connect I-5 high occupancy vehicle (HOV) lanes to the transit center via South 317th Street. Project is complete and pending closeout. Any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 7-Transition to Operations Baseline: $39,455 2008 Cost Estimate: N/A 2015 TIP: $39,455 2015 Cost Estimate: N/A 2016 TIP: $39,455 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 37,929 0 1,525 0 0 0 0 0 39,455 37,929 0 1,525 0 0 0 0 0 39,455 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 2,396 0 130 0 0 0 0 0 2,526 20-Prelim Engineering/Env Review 1,553 0 0 0 0 0 0 0 1,553 30-Final Design+Specifications 1,701 0 0 0 0 0 0 0 1,701 40-Row Acquisition+Permits 6,541 0 0 0 0 0 0 0 6,541 25,739 0 1,395 0 0 0 0 0 27,134 37,929 0 1,525 0 0 0 0 0 39,455 South King Total Phase 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2006 2016 Budget Schedule: 2006 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 53 of 140 System Expansion REGIONAL EXPRESS 5X387 I-90 Two-Way Transit & HOV Operations, Stage 3 Managed by: DECM Scope: Stage 3 of the I-90 Two-way Transit and HOV Operations project will provide reliable two-way transit and HOV operations eastbound and westbound on I-90 between 80th Avenue SE on Mercer Island and Rainier Avenue/I-5 in Seattle. This stage will also include the installation of screening on the shared pathway on the I-90 floating bridge. Upon completion of the Stage 3 project, the center roadway will be closed to allow the construction of East Link to proceed. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $225,648 2008 Cost Estimate: N/A 2015 TIP: $225,648 2015 Cost Estimate: N/A 2016 TIP: $225,648 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 74,179 75,368 45,813 21,424 8,864 0 0 0 225,648 74,179 75,368 45,813 21,424 8,864 0 0 0 225,648 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,472 138 267 1,770 0 0 0 0 3,648 20-Prelim Engineering/Env Review 1,549 0 0 0 0 0 0 0 1,549 East King Total Phase 30-Final Design+Specifications 17,858 80 3,260 923 0 0 0 0 22,121 50-Construction 53,300 75,150 42,286 18,730 8,864 0 0 0 198,330 74,179 75,368 45,813 21,424 8,864 0 0 0 225,648 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction High Schedule Risk Level: Medium 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment Fire Life Safety in a tunnel retrofit does create risk in cost and in schedule. Commissioning of the fire life safety equipment and system will require a multi-phase detailed plan through commissioning. Other construction risks are known and suitable contingencies and project schedule float included in the baseline budget. 54 of 140 Adopted 2016 Transit Improvement Plan System Expansion REGIONAL EXPRESS 700720 ST Express Fleet Expansion Managed by: Operations Scope: Procure and accept 11 Compressed Natural Gas (CNG) buses and 16 double deck diesel buses to support the increase in peak hour bus service with an additional 19,750 hours in 2016, equivalent to 32,000 hours of annualized peak hours. The added service hours will include 29,000 hours for the peak service period and the balance for non-peak hour support. The existing fleet is fully utilized during peak hour service, requiring the additional buses. Changes in lifetime budget since 2015: New Project with lifetime budget of $26,184,555 Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) None Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $26,185 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 0 1,133 2,140 0 0 0 0 0 3,273 South King 0 988 1,867 0 0 0 0 0 2,854 East King 0 6,560 12,398 0 0 0 0 0 18,958 Pierce Total Phase 70-Vehicles Total 0 381 719 0 0 0 0 0 1,100 0 9,061 17,124 0 0 0 0 0 26,185 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 9,061 17,124 0 0 0 0 0 26,185 0 9,061 17,124 0 0 0 0 0 26,185 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: 2017 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 55 of 140 System Expansion – Other Sound Transit is working to finalize the next transit expansion plan —Sound Transit 3 (ST3). The scope of the plan, including specific projects, will be selected by the Board in June 2016. Highlights Research and Technology project will continue to build and deploy passenger oriented technologies that enhance rider experience. ST3 Planning will produce a high-capacity transit system plan to expand regional transit beyond the Sound Move and ST2 programs. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project Research & Technology Reason Budget Type Cost Increase Program ST3 Planning Transfer Preliminary Engineering Central & East HCT Study Transfer Preliminary Engineering Transfer Preliminary Engineering HCT Corridor Planning Studies Ballard to Downtown HCT Closed Project Preliminary Engineering Lynnwood to Everett HCT Closed Project Preliminary Engineering Study South King County HCT Closed Project Preliminary Engineering Study South Corridor Alternative Transfer Plannning Total 56 of 140 Preliminary Engineering Explanation Expand use of technology to provide customers with rider alerts, interactive signage, and personalized on-demand information and Americans with Disabilities rider support. Share data with more transit providers. Surplus funds transferred from the HCT Corridor Planning Studies, South King County HCT Corridor Study and Lynnwood to Everett HCT Surplus funds transferred to the ST3 Planning project for long range planning needs. Surplus funds transferred to the ST3 project for long range planning needs. Surplus funds transferred to the ST3 Planning project for long range planning needs. Project closed. Surplus funds transferred to the ST3 project for long range planning needs. Project closed. Surplus funds transferred to the ST3 Planning project for long range planning needs. Project closed. Surplus funds transferred to the ST3 project for long range planning needs. Project closed. Change $5,344 $3,723 ($2,373) ($500) ($1,167) ($1,670) ($2,374) ($850) $133 Adopted 2016 Transit Improvement Plan Adopted 2016 Transit Improvement Plan 57 of 140 Central & East HCT Study 809103 Subtotal Fare Collection Research & Technology Fare Administration 5X410 600016 5,009 $18,546 16,647 $49,143 Subtotal Total 2,727 1,494 7,717 788 250 748 8,020 250 748 1,254 1,254 15,325 15,325 65 12,033 2,087 0 11,968 0 2016 16,424 65 12,232 2,040 Life to Date 910 Subtotal STart Operations & Maintenance 3X212 Program 600668 Operating 6X668 STart HCT Corridor Planning Studies 809102 Baseline ST3 Planning 809100 Subtotal South Corridor Alternatives Planning 4X446 Preliminary Engineering Project Number and Name System Expansion OTHER $33,714 3,217 600 2,033 584 210 210 1,691 1,691 28,596 0 0 28,448 148 2017 0 0 0 0 0 2018 $13,873 7,484 5,673 1,414 398 145 145 6,244 6,244 (in thousands) $9,485 2,651 371 1,821 460 144 144 6,690 6,690 0 0 0 0 0 2019 2016 TIP Cashflow by Budget Approval $4,371 2,538 190 1,911 437 145 145 1,688 1,688 0 0 0 0 0 2020 $3,996 2,819 1,200 1,036 583 150 150 1,026 1,026 0 0 0 0 0 2021 $30,601 12,116 7,173 1,342 3,601 3,137 3,137 15,349 15,349 0 0 0 0 0 Future $163,729 52,482 17,611 20,000 14,870 4,927 4,927 49,267 49,267 57,053 2,152 65 52,648 2,188 Total 58 of 140 Adopted 2016 Transit Improvement Plan 61-Art 50-Construction 40-Row Acquisition+Permits 26-Research+Technology Total 20-Prelim Engineering/Env Review 10-Agency Administration $49,143 14,799 7,498 1 2,633 16,241 4,121 850 0 01-Operation+Maintenance 02-Operation+Maintenance-Agency Life to Date Phase # and Description $18,546 890 735 200 3,525 11,053 1,985 158 0 2016 $18,546 415 667 569 $49,143 6,317 5 - Pierce Total 7,809 4 - East King 16,189 5,933 3 - South King 385 322 2016 20,924 4,804 2 - North King 6 - Systemwide 3,356 Life to Date 1 - Snohomish Subarea System Expansion OTHER $13,873 7,087 615 2,611 1,351 1,495 714 2018 $33,714 1,316 584 99 2,233 25,983 3,384 115 0 2017 $13,873 5,858 398 0 6,604 483 484 47 0 2018 (in thousands) 2016 TIP Cashflow by Phase $33,714 31,081 512 790 570 445 316 2017 (in thousands) 2016 TIP Cashflow by Subarea $9,485 6,290 460 0 1,970 222 501 43 0 2019 $9,485 2,192 671 2,794 1,457 1,599 772 2019 $4,371 1,278 437 0 1,911 190 514 41 0 2020 $4,371 2,101 302 758 504 429 277 2020 $3,996 604 583 0 1,836 400 529 43 0 2021 $3,996 2,236 312 495 433 275 245 2021 $30,601 13,702 2,841 0 8,036 479 3,124 2,419 0 Future $30,601 8,515 2,732 7,624 4,794 4,326 2,611 Future Total $163,729 44,737 13,537 300 31,747 55,051 14,642 3,715 0 Total $163,729 90,225 11,875 23,599 15,611 13,807 8,612 System Expansion OTHER 4X446 South Corridor Alternatives Planning Managed by: PEPD Scope: Identification and evaluation of high-capacity transit (HCT) alternatives for the corridor between Federal Way and Tacoma. It also includes an examination of potential projects for Pierce and South King subareas to enhance transit use and operational efficiencies. This is one of the HCT Corridor Planning studies that will serve as a resource for the Board and public during the update of the Long-Range Plan. Project is complete any remaining funds are considered surplus and will be transferred to ST3 Planning upon project closure. Changes in lifetime budget since 2015: Project budget was reduced and transferred to ST3 Planning to recognize a project surplus. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: $82,921 2015 TIP: $3,038 2015 Cost Estimate: $3,077 2016 TIP: $2,188 2016 Cost Estimate: $3,077 TIP Cashflow (in thousands) Subarea Pierce Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,040 0 148 0 0 0 0 0 2,188 2,040 0 148 0 0 0 0 0 2,188 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 195 0 26 0 0 0 0 0 221 1,844 0 122 0 0 0 0 0 1,967 2,040 0 148 0 0 0 0 0 2,188 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 59 of 140 System Expansion OTHER 809100 ST3 Planning Managed by: PEPD Scope: Provide funding for the study of future regional transit system expansion beyond the Sound Move and ST2 programs. The ST3 plan includes funding for studying public transit expansion options in nine corridors. These studies were split into their own projects reducing the scope to long-range planning beyond the Sound Move and ST2 programs. The project is currently in the ST3 project identification phase. Changes in lifetime budget since 2015: Project budget increased by $3.7 million to reflect transfer of surplus budget from multiple corridor planning studies projects. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: $67,204 2015 TIP: $48,925 2015 Cost Estimate: $47,399 2016 TIP: $52,648 2016 Cost Estimate: $50,325 TIP Cashflow (in thousands) Subarea Systemwide Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 12,232 11,968 28,448 0 0 0 0 0 52,648 12,232 11,968 28,448 0 0 0 0 0 52,648 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 1,672 1,278 2,888 0 0 0 0 0 5,838 20-Prelim Engineering/Env Review 10,559 10,490 25,461 0 0 0 0 0 46,510 40-Row Acquisition+Permits Total 1 200 99 0 0 0 0 0 300 12,232 11,968 28,448 0 0 0 0 0 52,648 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2018 2016 Budget Schedule: 2018 Project Risk Assessment N/A 60 of 140 Adopted 2016 Transit Improvement Plan System Expansion OTHER 809102 HCT Corridor Planning Studies Managed by: PEPD Scope: ST2 includes funding for identifying and evaluating potential high-capacity transit improvements beyond those identified in ST2. These studies have been budgeted separately under other projects. The remaining budget will fund additional ST3 corridor planning work as requested by the Sound Transit Board of Directors during the ST3 planning process as related to the High-Capacity Transit corridor studies. Changes in lifetime budget since 2015: Project budget decreased by $500 thousand reflecting the transfer of remaining funds to ST3 Planning project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $565 2015 Cost Estimate: $554 2016 TIP: $65 2016 Cost Estimate: $54 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 65 0 0 0 0 0 0 0 65 65 0 0 0 0 0 0 0 65 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 65 0 0 0 0 0 0 0 65 20-Prelim Engineering/Env Review 0 0 0 0 0 0 0 0 0 65 0 0 0 0 0 0 0 65 Systemwide Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 61 of 140 System Expansion OTHER 809103 Central & East HCT Study Managed by: PEPD Scope: Identify and evaluate alternative high-capacity transit (HCT) modes, routes, and potential station areas along high-capacity transit corridors. Changes in lifetime budget since 2015: Project budget decreased by $2.4 million reflecting the transfer of funds to ST3 Planning. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $4,525 2015 Cost Estimate: $4,736 2016 TIP: $2,152 2016 Cost Estimate: $2,112 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total North King 1,043 33 0 0 0 0 0 0 1,076 East King 1,043 33 0 0 0 0 0 0 1,076 2,087 65 0 0 0 0 0 0 2,152 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 142 22 0 0 0 0 0 0 164 1,944 43 0 0 0 0 0 0 1,988 2,087 65 0 0 0 0 0 0 2,152 Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment N/A 62 of 140 Adopted 2016 Transit Improvement Plan System Expansion OTHER 6X668 STart Managed by: DECM Scope: The Sound Transit Art Program (STart) incorporates art into Sound Transit facilities. The artwork is intended to reflect the communities served and contribute to a positive experience for customers. The Board supports a public art budget of one percent of construction costs excluding tunneling for all Sound Move and ST2 projects. In 2010, Resolution No. R2010-21 consolidated the Sound Move and ST2 Art programs and established an Art Policy. Ten percent of the total Art program funding is earmarked for the maintenance of the art collection (see project 600668). Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $49,267 2015 Cost Estimate: $49,267 2016 TIP: $49,267 2016 Cost Estimate: $49,267 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 Snohomish 1,502 123 166 North King 3,586 293 396 South King 2,896 237 320 East King 6,237 510 Pierce 1,103 90 15,325 Total Phase 10-Agency Administration 61-Art Total 2018 2019 2020 2021 Future Total 612 656 165 101 1,504 4,828 1,461 1,565 395 240 3,592 11,529 1,180 1,264 319 194 2,901 9,312 688 2,541 2,723 687 418 6,247 20,052 122 450 482 122 74 1,105 3,547 1,254 1,691 6,244 6,690 1,688 1,026 15,349 49,267 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 526 364 375 386 400 410 422 1,647 4,530 14,799 890 1,316 5,858 6,290 1,278 604 13,702 44,737 15,325 1,254 1,691 6,244 6,690 1,688 1,026 15,349 49,267 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 63 of 140 System Expansion OTHER 600668 STart Operations & Maintenance Managed by: DECM Scope: Maintain Sound Transit art installations, including documentation, monitoring, cleaning, repair and occasional replacement. As part of the Sound Transit Art program (STart), the lifetime budget is set at ten percent of the total STart program. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $4,927 2015 Cost Estimate: $4,927 2016 TIP: $4,927 2016 Cost Estimate: $4,927 TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 73 25 21 14 14 14 15 307 483 North King 175 59 49 34 34 34 35 734 1,153 South King 141 47 40 27 27 27 28 593 931 East King 304 102 85 59 58 59 61 1,277 2,005 54 18 15 10 10 10 11 226 355 748 250 210 145 144 145 150 3,137 4,927 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 02-Operation+MaintenanceAgency 574 158 115 47 43 41 43 2,419 3,439 10-Agency Administration 174 92 95 98 101 104 107 717 1,488 748 250 210 145 144 145 150 3,137 4,927 Pierce Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment N/A 64 of 140 Adopted 2016 Transit Improvement Plan System Expansion OTHER 3X212 Fare Collection Managed by: FIT Scope: Maintain and upgrade as required, Agency fare collection systems which includes: Ticket Vending Machines (TVMs), One Regional Card for All (ORCA) system, secure payment requirements, and electronic citations for fare validation and enforcement. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $14,870 2015 Cost Estimate: N/A 2016 TIP: $14,870 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 Snohomish 1,781 175 South King 2,895 284 130 88 211 144 225 22 16 3,120 307 8,020 788 Life to Date 10-Agency Administration 20-Prelim Engineering/Env Review East King Pierce Total Phase 50-Construction Total 2020 2021 Future Total 102 97 166 158 129 799 3,301 210 1,300 5,368 11 13 12 16 101 416 227 155 584 398 179 170 227 1,401 5,785 460 437 583 3,601 14,870 2016 2017 2018 2019 2020 2021 Future Total 372 53 0 0 0 0 0 759 1,184 150 0 0 0 0 0 0 0 150 7,498 735 584 398 460 437 583 2,841 13,537 8,020 788 584 398 460 437 583 3,601 14,870 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction High Schedule Risk Level: Medium 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment The current budget and schedule is based on early planning estimates for rehabilitation and replacement for these assets. The costs are at high risk until more detailed assessment of the condition of the fielded assets and associated repair and replacement costs are developed. Adopted 2016 Transit Improvement Plan 65 of 140 System Expansion OTHER 5X410 Research & Technology Managed by: FIT Scope: Assess and implement new transit technologies to improve the agency's operational effectiveness, efficiency and customer experience. This program focuses on system wide security and safety technology, real-time service information and passenger communications, and deploying applications to manage operations better. Changes in lifetime budget since 2015: Increased lifetime budget by $5.3 million to expand new features and functions in application development to include sharing transit data on to a wider audience of transit providers, interface of useful customer data to web platforms, rider alerts, interactive signage and fare payment expansion. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $14,656 2015 Cost Estimate: N/A 2016 TIP: $20,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 7,717 2,727 2,033 1,414 1,821 1,911 1,036 1,342 20,000 7,717 2,727 2,033 1,414 1,821 1,911 1,036 1,342 20,000 Total Life to Date 2016 2017 2018 2019 2020 2021 Future 02-Operation+Maintenance-Agency 276 0 0 0 0 0 0 0 276 10-Agency Administration 975 176 0 0 0 0 0 0 1,151 20-Prelim Engineering/Env Review 946 71 0 0 0 0 0 0 1,017 5,520 2,479 2,033 1,414 1,821 1,911 1,036 1,342 17,556 7,717 2,727 2,033 1,414 1,821 1,911 1,036 1,342 20,000 Phase 26-Research+Technology Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Medium Schedule Risk Level: High 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment Elements of this program are in various stages of design and include new technologies that require custom software development which creates budget and schedule risk while a project goes from an idea or concept to a fully scoped project. Extensive coordination with external agencies adds level of schedule risk. 66 of 140 Adopted 2016 Transit Improvement Plan System Expansion OTHER 600016 Fare Administration Managed by: FIT Scope: Create and install fare system enhancements to the existing regional smart card system (ORCA) and fare collection systems. Beginning in 2015 this project includes the planning, development and implementation of a new fare collection system. The program also manages fares and pricing for Sound Transit. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $17,611 2015 Cost Estimate: N/A 2016 TIP: $17,611 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Phase 10-Agency Administration Life to Date 2016 2017 2018 2019 2020 2021 Future Total 910 1,494 600 5,673 371 190 1,200 7,173 17,611 910 1,494 600 5,673 371 190 1,200 7,173 17,611 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 0 0 0 0 0 0 0 0 20-Prelim Engineering/Env Review 797 448 400 483 222 190 400 479 3,420 26-Research+Technology 113 1,046 200 5,190 149 0 800 6,694 14,191 910 1,494 600 5,673 371 190 1,200 7,173 17,611 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 67 of 140 Enhancement Although the majority of Sound Transit’s projects are related to expanding the regional transit system, work is planned and ongoing to improve operating efficiency and effectiveness, improve the rider experience, increase system functionality, or reduce operating costs. Highlights Install more energy efficient LED lighting at Kent, Sumner, and Puyallup Sounder stations. Begin operation of Positive Train Control (PTC) to increase operational safety of commuter rail. Design and install a second light rail vehicle lift at the Link Operations & Maintenance Facility. Upgrade the Link Closed Circuit Television System (CCTV) to be compatible with technology installed for the University Link and South 200th Link extensions. Install heating systems in washers for light rail vehicles, in order to allow for all-weather operation and reduce hazards to operators in freezing weather conditions. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands Project LINK Central Link HVAC Instrument House and UPS Room SOUNDER Kent Station Parking Lot Paving Kent Station Platform Lighting Puyallup Station LED Lighting Sumner Station LED Lighting OTHER Downtown Seattle Transit Tunnel Mitigation Reason Explanation Change Cost Increase Baseline Acquire right-of-way for the project. $661 New Project Operating Add 39 parking spaces including 2 ADA spaces. $700 New Project Operating $236 New Project Operating New Project Operating Install energy efficient lighting to reduce costs and energy use. Install energy efficient lighting to reduce costs and energy use. Install energy efficient lighting to reduce costs and energy use. New Project Preliminary Engineering Street improvements in downtown Seattle to accommodate an increase in bus traffic due to light rail's increasing use of the tunnel. Preliminary Engineering Installation of a second lift to support light rail vehicle maintenance. Program Project decreased by $494 thousand and transferred to Transit Oriented Development (TOD) disposition. Operations & Maintenance New Project Facility LRV Vehicle Lift Transit Oriented Transfer Development Planning 68 of 140 Budget Type $178 $134 $2,334 $4,898 ($494) Adopted 2016 Transit Improvement Plan Project Transit-Oriented Development Property Disposition Reason Budget Type Cost Increase Program Link CCTV System Upgrade New Project Baseline OMF LRV Wash Heater System Baseline New Project Total Adopted 2016 Transit Improvement Plan Explanation The number of surplus properties are increasing as ST2 projects are completed. Increase includes $494 thousand transfer from TOD Planning Project. Upgrade existing systems to be compatible with newer equipment for U Link and S 200th Link extensions. Resolution No. R2015-19. Enable the washbay facility to be used in freezing temperatures. Resolution No. R201506. Change $6,014 $700 $300 $15,661 69 of 140 70 of 140 Adopted 2016 Transit Improvement Plan Operations & Maintenance Facility LRV Vehicle Lift Union Station Garden Level Remodel Regional Parking Pilot Project Signage Improvements Link Remote Switch Heaters 700730 700736 700784 700793 700798 Noise Abatement Tacoma Link Fare Collection Central Link HVAC - Instrument House and UPS Room Security Enhancements Bike Locker Program 4X340 600029 700774 7X743 7X753 Link CCTV System Upgrade Puyallup Station LED Lighting Sumner Station LED Lighting Kent Station Platform Lighting Kent Station Parking Lot Paving OMF LRV Wash Heater System Central Link HVAC for Traction Power Central Link Card Readers Central Link Overhead Catenary System Tie Switch Pierce Transit Radio System Upgrade 600033 700724 700725 700726 700727 700733 700773 700775 700777 700790 Operating LRV On Board Energy Storage 4X210 Subtotal Positive Train Control 300011 Subtotal Downtown Seattle Transit Tunnel Mitigation 700723 Baseline Bus Maintenance Facility 5X261 Preliminary Engineering Project Number and Name ALL MODES Enhancement 562 5 44 1,013 105 0 0 0 0 0 49,170 1,154 2,445 379 64 8,986 1,488 34,654 9,253 0 89 195 23 189 0 8,757 Life to Date 438 150 379 0 195 700 236 134 178 700 9,605 161 0 853 392 26 93 8,081 8,293 200 843 280 1,360 2,475 1,728 1,407 2016 0 2,845 0 266 0 0 0 0 0 0 14,466 39 0 0 58 3,987 63 10,319 14,709 0 0 0 0 2,234 606 11,869 2017 (in thousands) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2018 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2019 2016 TIP Cashflow by Budget Approval 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2020 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2021 0 0 0 0 0 0 0 0 0 0 53 0 53 0 0 0 0 0 0 0 0 0 0 0 0 0 Future 1,000 3,000 423 1,278 300 700 236 134 178 700 73,295 1,355 2,498 1,232 514 13,000 1,643 53,054 32,255 200 931 475 1,383 4,898 2,334 22,033 Total Adopted 2016 Transit Improvement Plan 71 of 140 $74,046 1,146 Total Transit Oriented Development Planning 8X100 420 2,016 3,582 Transit-Oriented Development Property Disposition 12,041 10,311 Life to Date Subtotal Non-revenue Support Vehicles 804100 Subtotal ST Express Mobile Communications 700781 Program 7X745 Project Number and Name ALL MODES Enhancement $26,494 5,267 0 4,261 1,006 3,329 220 2016 $33,765 1,479 0 1,315 163 3,111 0 2017 (in thousands) $1,463 1,463 0 1,291 172 0 0 2018 $1,406 1,406 0 1,273 133 0 0 2019 2016 TIP Cashflow by Budget Approval $644 644 0 644 0 0 0 2020 $717 717 0 673 44 0 0 2021 $388 335 0 143 192 0 0 Future Total $138,921 14,891 1,146 11,615 2,130 18,480 10,531 72 of 140 Adopted 2016 Transit Improvement Plan 1,503 20-Prelim Engineering/Env Review 1,774 90-Contingency $74,046 0 86 5,167 70-Vehicles 80-System Testing+Startup 2,795 55-Construction Services 56,002 40-Row Acquisition+Permits 50-Construction 2,510 35-Third Party 704 3,503 30-Final Design+Specifications Life to Date 10-Agency Administration $74,046 195 Phase # and Description 6 - Systemwide Total 8,911 4 - East King Total 7,434 3 - South King 36,472 15,340 2 - North King 5 - Pierce 5,694 Life to Date 1 - Snohomish Subarea ALL MODES Enhancement 2017 $33,765 0 12,248 5,627 4,460 8,822 2,609 $1,463 0 0 0 58 1,405 0 2018 2016 $26,494 77 500 1,098 504 15,285 3,109 3,118 994 381 1,427 $33,765 1,725 903 163 4,298 22,503 1,019 973 117 87 1,977 2017 (in thousands) $1,463 0 0 172 0 100 891 0 0 100 200 2018 2016 TIP Cashflow by Phase $26,494 280 8,747 771 3,409 12,445 842 2016 (in thousands) 2016 TIP Cashflow by Subarea $1,406 0 0 133 0 80 893 0 0 100 200 2019 $1,406 0 0 0 45 1,361 0 2019 $644 0 0 0 0 29 314 0 0 100 200 2020 $644 0 0 0 0 644 0 2020 $717 0 0 44 0 0 366 0 0 107 200 2021 $717 0 0 0 15 702 0 2021 $388 0 0 192 0 53 69 0 0 0 74 Future $388 0 0 0 64 324 0 Future Total $138,921 1,802 1,490 6,970 7,598 94,053 8,435 6,601 1,815 2,379 7,780 Total $138,921 475 57,467 15,309 15,484 41,042 9,145 Enhancement REGIONAL EXPRESS 5X261 Bus Maintenance Facility Managed by: Operations Scope: Fund expansion of Sound Transit's fleet maintenance capacity through contributions to facilities managed by third party service providers. Changes in lifetime since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) None Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $22,033 2015 Cost Estimate: N/A 2016 TIP: $22,033 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 1,384 222 1,875 0 0 0 0 0 3,481 South King 972 156 1,317 0 0 0 0 0 2,446 East King 4,151 667 5,626 0 0 0 0 0 10,444 Pierce 2,251 362 3,050 0 0 0 0 0 5,662 8,757 1,407 11,869 0 0 0 0 0 22,033 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 24 25 477 0 0 0 0 0 527 20-Prelim Engineering/Env Review 8 0 0 0 0 0 0 0 8 Total Phase 40-Row Acquisition+Permits 50-Construction Total 59 0 0 0 0 0 0 0 59 8,665 1,382 11,392 0 0 0 0 0 21,439 8,757 1,407 11,869 0 0 0 0 0 22,033 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment The schedule is flexible as it is predicated on partners to submit projects for participation. The schedules dates can change if no projects are planned. Adopted 2016 Transit Improvement Plan 73 of 140 Enhancement OTHER 700723 Downtown Seattle Transit Tunnel Mitigation Managed by: Operations Scope: This project reflects the Sound Transit contribution to a partnership for a series of mitigation improvements, including street improvements in downtown Seattle to improve bus operations as buses transition from the Downtown Seattle Transit Tunnel (DSTT) to surface streets to accommodate increased light rail activity in the tunnel. Changes in lifetime budget since 2015: New Project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $2,334 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 35-Third Party Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 1,728 606 0 0 0 0 0 2,334 0 1,728 606 0 0 0 0 0 2,334 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 1,728 606 0 0 0 0 0 2,334 0 1,728 606 0 0 0 0 0 2,334 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment N/A 74 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 700730 Operations & Maintenance Facility LRV Vehicle Lift Managed by: DECM Scope: Design, procure and install a second lift in the Link Operations and Maintenance Facility (OMF). The installation of a second lift in support of operations is required to accommodate scheduled and unscheduled light rail vehicle (LRV) maintenance needs and capacity. Changes in lifetime budget since 2015: New Project Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) Pending Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $4,898 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 162 2,112 1,906 0 0 0 0 0 4,179 28 363 328 0 0 0 0 0 719 189 2,475 2,234 0 0 0 0 0 4,898 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 53 175 71 0 0 0 0 0 299 20-Prelim Engineering/Env Review 136 64 0 0 0 0 0 0 200 30-Final Design+Specifications 0 900 0 0 0 0 0 0 900 50-Construction 0 1,204 2,032 0 0 0 0 0 3,236 55-Construction Services Total 0 131 132 0 0 0 0 0 263 189 2,475 2,234 0 0 0 0 0 4,898 Budget Risk Assessment Estimate Type: Schedule Risk Assessment Conceptual Engineering Budget Risk Level: Medium Schedule Risk Level: High 2015 Budget Schedule: 2016 Budget Schedule: 2017 Project Risk Assessment Constructability of project given the constraints of having to install the lift in an on-going working environment, creates challenges in both schedule and cost. Adopted 2016 Transit Improvement Plan 75 of 140 Enhancement OTHER 700736 Union Station Garden Level Remodel Managed by: Operations Scope: Renovate Union Station's Garden Level: convert cubicle space from 8X8 to 6X8 configuration, add 7 enclosed offices, relocate 3 offices, create a new mailroom, install new carpet, purchase and install 132 cubicles, and install new data cabling to support additional staff and consultants. Change in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,383 2015 Cost Estimate: N/A 2016 TIP: $1,383 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 23 1,360 0 0 0 0 0 0 1,383 23 1,360 0 0 0 0 0 0 1,383 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 3 0 0 0 0 0 0 0 3 20-Prelim Engineering/Env Review 0 10 0 0 0 0 0 0 10 21 0 0 0 0 0 0 0 21 0 1,350 0 0 0 0 0 0 1,350 23 1,360 0 0 0 0 0 0 1,383 30-Final Design+Specifications 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment 76 of 140 Adopted 2016 Transit Improvement Plan Enhancement OTHER 700784 Regional Parking Pilot Project Managed by: Operations Scope: Conduct test and evaluate parking management strategies under the system implementation of customer parking permits to include: vanpool customer parking, community outreach activities and real time parking availability monitoring. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $475 2015 Cost Estimate: N/A 2016 TIP: $475 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Phase 20-Prelim Engineering/Env Review 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 195 280 0 0 0 0 0 0 475 195 280 0 0 0 0 0 0 475 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 95 107 0 0 0 0 0 0 202 100 173 0 0 0 0 0 0 273 195 280 0 0 0 0 0 0 475 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 77 of 140 Enhancement LINK 700793 Signage Improvements Managed by: Operations Scope: Sound Transit is modifying and updating signage at existing Link and Sounder stations and ticket vending machine (TVM) locations to improve wayfinding and reflect system expansion. Work includes design, fabrication, and installation of new signage elements. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $931 2015 Cost Estimate: N/A 2016 TIP: $931 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 0 3 0 0 0 0 0 0 3 North King 42 403 0 0 0 0 0 0 445 South King 45 432 0 0 0 0 0 0 478 0 1 0 0 0 0 0 0 1 East King Pierce 0 4 0 0 0 0 0 0 5 89 843 0 0 0 0 0 0 931 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 36 40 0 0 0 0 0 0 76 30-Final Design+Specifications 50 44 0 0 0 0 0 0 94 3 725 0 0 0 0 0 0 728 0 33 0 0 0 0 0 0 33 89 843 0 0 0 0 0 0 931 Total Phase 50-Construction 55-Construction Services Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment N/A 78 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 700798 Link Remote Switch Heaters Managed by: Operations Scope: Install remote switch heaters at Rainier Beach Station and Stadium Station interlockings to enhance the capabilities of providing all-weather service. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $200 2015 Cost Estimate: N/A 2016 TIP: $200 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 200 0 0 0 0 0 0 200 0 200 0 0 0 0 0 0 200 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 0 35 0 0 0 0 0 0 35 50-Construction 0 165 0 0 0 0 0 0 165 0 200 0 0 0 0 0 0 200 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2017 Project Risk Assessment Remote switch heaters will be installed by Sound Transit maintenance staff. Risk of other work receiving the resource allocaitons resulting in delays to the project schedule. Adopted 2016 Transit Improvement Plan 79 of 140 Enhancement SOUNDER 300011 Positive Train Control Managed by: DECM Scope: Integrate command, control, communications, and information systems for controlling passenger train movements with safety, security, precision, and efficiency. These systems will improve railroad safety by significantly reducing the probability of collisions between trains, casualties to railway workers and damage to their equipment, and over speed accidents. Federal regulations had previously mandated that PTC be operational on all passenger rail systems by the end of December 2015, but this was recently extended by three years. The project was originally scheduled to be completed in 2015, however due to third party delays, it will now likely complete in third quarter of 2016. Budget displayed in 2017 is considered surplus at this time. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $53,054 2008 Cost Estimate: N/A 2015 TIP: $53,054 2015 Cost Estimate: N/A 2016 TIP: $53,054 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Snohomish South King Pierce Total Phase 10-Agency Administration 30-Final Design+Specifications 35-Third Party 50-Construction 55-Construction Services 80-System Testing+Startup 90-Contingency Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,460 574 733 0 0 0 0 0 3,767 1,525 356 454 0 0 0 0 0 2,334 30,669 7,152 9,133 0 0 0 0 0 46,953 34,654 8,081 10,319 0 0 0 0 0 53,054 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,212 151 876 0 0 0 0 0 2,238 226 0 52 0 0 0 0 0 279 2,510 1,390 367 0 0 0 0 0 4,267 29,912 5,750 3,333 0 0 0 0 0 38,995 707 290 3,064 0 0 0 0 0 4,062 86 500 903 0 0 0 0 0 1,490 0 0 1,725 0 0 0 0 0 1,725 34,654 8,081 10,319 0 0 0 0 0 53,054 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Medium 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment Limited availability of contractor technical staff and high demand for their services. Availability of Federal Railroad Administration staff for final certification. 80 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 4X210 LRV On Board Energy Storage Managed by: DECM Scope: Design, procure, and install energy storage units on up to five light rail vehicles to capture and store energy generated by vehicle braking for reuse to improve vehicle operational efficiencies, lower energy consumption, and reduce operating costs. The project is partially funded by a Transit Investment for Greenhouse Gas and Energy Reduction (TIGGER) grant awarded to Sound Transit in 2011. Work was completed in June 2014 however, the project will not close until contract warranty support is closed out in 2016. Budget cash flow in 2017 reflects projected surplus budget. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $1,643 2008 Cost Estimate: N/A 2015 TIP: $1,643 2015 Cost Estimate: N/A 2016 TIP: $1,643 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 10-Agency Administration 30-Final Design+Specifications 70-Vehicles Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,488 93 63 0 0 0 0 0 1,643 1,488 93 63 0 0 0 0 0 1,643 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 7 0 53 0 0 0 0 0 60 0 0 10 0 0 0 0 0 10 1,481 93 0 0 0 0 0 0 1,573 1,488 93 63 0 0 0 0 0 1,643 Budget Risk Assessment Estimate Type: Schedule Risk Assessment Construction Budget Risk Level: Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment Project pending final payment of warranty coverage in 2016. Adopted 2016 Transit Improvement Plan 81 of 140 Enhancement LINK 4X340 Noise Abatement Managed by: DECM Scope: Design and construct a noise wall along the Link elevated guideway in Tukwila. Funding for the completion of the Residential Sound Insulation Program (RSIP) for residences impacted by noise from operations of Central Link in the Rainier Valley is included in this project. Construction of the noise wall was completed in 2013. The project is expected to close in 2016. Budget cash flow in 2017 reflects projected surplus budget. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $13,000 2008 Cost Estimate: N/A 2015 TIP: $13,000 2015 Cost Estimate: N/A 2016 TIP: $13,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total North King 6,136 18 2,723 0 0 0 0 0 8,876 South King 2,850 8 1,265 0 0 0 0 0 4,124 8,986 26 3,987 0 0 0 0 0 13,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,022 10 168 0 0 0 0 0 1,200 5 0 55 0 0 0 0 0 60 Total Phase 10-Agency Administration 30-Final Design+Specifications 40-Row Acquisition+Permits 50-Construction 55-Construction Services Total 16 1 83 0 0 0 0 0 100 5,856 15 2,579 0 0 0 0 0 8,450 2,088 0 1,102 0 0 0 0 0 3,190 8,986 26 3,987 0 0 0 0 0 13,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment N/A 82 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 600029 Tacoma Link Fare Collection Managed by: FIT Scope: Install and commission eight ticket vending machines at Tacoma Link stations, establish a spare parts inventory, set up fare collection and fare enforcement support, and conduct public outreach. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $514 2015 Cost Estimate: N/A 2016 TIP: $514 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 64 392 58 0 0 0 0 0 514 64 392 58 0 0 0 0 0 514 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 50-Construction 64 325 58 0 0 0 0 0 447 90-Contingency 0 67 0 0 0 0 0 0 67 64 392 58 0 0 0 0 0 514 Pierce Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate Low Schedule Risk Level: Medium 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment Key project risks include a further deferment of implementation. Additionally, fare system contractor timelines for software development and ability to reach intergovernmental agreements for fare enforcement may cause a delay once implementation is approved. Adopted 2016 Transit Improvement Plan 83 of 140 Enhancement LINK 700774 Central Link HVAC - Instrument House and UPS Room Managed by: DECM Scope: Install HVAC system in the uninterruptible power supply (UPS) rooms and signal houses. This project consists of installing AC units in ten instrument houses along the Central Link corridor. AC units are needed to keep equipment inside the bungalows from overheating during periods of hot weather. This project is necessary to ensure the continued integrity of the signal equipment throughout the system. This is the current design standard for Link light rail. Changes in lifetime budget since 2015: Increased lifetime budget $661 thousand due to complications and procurement of real property at various sites. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $571 2015 Cost Estimate: N/A 2016 TIP: $1,232 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 254 570 0 0 0 0 0 0 824 125 282 0 0 0 0 0 0 408 379 853 0 0 0 0 0 0 1,232 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 140 310 0 0 0 0 0 0 450 30-Final Design+Specifications 116 0 0 0 0 0 0 0 116 2 43 0 0 0 0 0 0 46 121 500 0 0 0 0 0 0 621 379 853 0 0 0 0 0 0 1,232 40-Row Acquisition+Permits 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment Project delays associated with small right-of-way needs to allow for the proper installation of equipment. 84 of 140 Adopted 2016 Transit Improvement Plan Enhancement OTHER 7X743 Security Enhancements Managed by: FIT Scope: Install 95 analog cameras and 8 digital video recorders with a central monitoring application. Upgrade networked video recorders with six times the amount of video storage and high quality digital video capabilities. Upgrade 62 cameras to either a megapixel IP camera or a higher quality encoded video camera which allows such features as video analytics, high definition viewing, and a streamlined video administration and video sharing capability. Project is complete. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $2,498 2015 Cost Estimate: N/A 2016 TIP: $2,498 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 20-Prelim Engineering/Env Review 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,445 0 0 0 0 0 0 53 2,498 2,445 0 0 0 0 0 0 53 2,498 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 162 0 0 0 0 0 0 0 162 2,283 0 0 0 0 0 0 53 2,336 2,445 0 0 0 0 0 0 53 2,498 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 85 of 140 Enhancement OTHER 7X753 Bike Locker Program Managed by: DECM Scope: Install new bicycle parking at various Sounder commuter rail, ST Express bus, and Link light rail stations. In addition, project-funded design and construction of a bicycle plaza adjacent to the light rail Columbia City station. In King County, Sound Transit will add bicycle parking spaces at six light rail and commuter rail stations (Tukwila Station, Kent Station, Auburn Station, Columbia City Station, Othello Station, and Rainier Beach Station). In Pierce County, Sound Transit will expand secured bicycle parking at Puyallup and Sumner Stations. The project will also add benches, lighting, signage, and other pedestrian and bicycle amenities at the commuter rail stations. Anticipated completion of this project is 2016. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,355 2015 Cost Estimate: N/A 2016 TIP: $1,355 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 35 5 1 0 0 0 0 0 41 North King 569 80 19 0 0 0 0 0 668 South King 320 45 11 0 0 0 0 0 375 17 2 1 0 0 0 0 0 20 East King Pierce 213 30 7 0 0 0 0 0 251 1,154 161 39 0 0 0 0 0 1,355 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 283 61 39 0 0 0 0 0 383 30-Final Design+Specifications 98 0 0 0 0 0 0 0 98 40-Row Acquisition+Permits 13 0 0 0 0 0 0 0 13 760 101 0 0 0 0 0 0 861 1,154 161 39 0 0 0 0 0 1,355 Total Phase 10-Agency Administration 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment N/A 86 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 600033 Link CCTV System Upgrade Managed by: FIT Scope: Upgrade existing Link light rail Closed-Circuit Television (CCTV) NiceVision system at 16 stations and Link Operations and Maintenance Facility (OMF). This upgrade will be compatible with the new equipment for University Link and South 200th Link extensions. Changes in lifetime budget since 2015: New project established per Resolution No. R2015-19. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $700 2015 Cost Estimate: N/A 2016 TIP: $700 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 468 0 0 0 0 0 0 468 0 232 0 0 0 0 0 0 232 0 700 0 0 0 0 0 0 700 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 700 0 0 0 0 0 0 700 0 700 0 0 0 0 0 0 700 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: 2016 Project Risk Assessment Adopted 2016 Transit Improvement Plan 87 of 140 Enhancement SOUNDER 700724 Puyallup Station LED Lighting Managed by: Operations Scope: Install energy efficient lighting at Puyallup Station. Work will result in receiving a utility incentive based upon the energy reduction achieved and will reduce energy consumption on a ongoing basis. Changes in lifetime budget since 2015: New project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $178 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 178 0 0 0 0 0 0 178 0 178 0 0 0 0 0 0 178 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 20-Prelim Engineering/Env Review 0 19 0 0 0 0 0 0 19 50-Construction 0 159 0 0 0 0 0 0 159 0 178 0 0 0 0 0 0 178 Pierce Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment N/A 88 of 140 Adopted 2016 Transit Improvement Plan 2016 Enhancement SOUNDER 700725 Sumner Station LED Lighting Managed by: Operations Scope: Install energy efficient lighting at Sumner Station. Work will result in receiving a utility incentive based upon the energy reduction achieved and will reduce energy consumption on a ongoing basis. Changes in lifetime budget since 2015: New project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $134 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 134 0 0 0 0 0 0 134 0 134 0 0 0 0 0 0 134 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 20-Prelim Engineering/Env Review 0 15 0 0 0 0 0 0 15 50-Construction 0 120 0 0 0 0 0 0 120 0 134 0 0 0 0 0 0 134 Pierce Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: 2016 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 89 of 140 Enhancement SOUNDER 700726 Kent Station Platform Lighting Managed by: Operations Scope: Install energy efficient lighting at Kent Station. In late 2012 lighting was upgraded in the Kent Garage, this project will extend the upgrades to the platform, surface lots, pedestrian bridge, and bus loop areas. Work will result in receiving a utility incentive based upon the energy reduction achieved and will reduce energy consumption on an ongoing basis. Changes in lifetime budget since 2015: New project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $236 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 236 0 0 0 0 0 0 236 0 236 0 0 0 0 0 0 236 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 20-Prelim Engineering/Env Review 0 26 0 0 0 0 0 0 26 50-Construction 0 210 0 0 0 0 0 0 210 0 236 0 0 0 0 0 0 236 South King Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment N/A 90 of 140 Adopted 2016 Transit Improvement Plan 2016 Enhancement SOUNDER 700727 Kent Station Parking Lot Paving Managed by: Operations Scope: Design and install paved and landscaped commuter parking to an additional 36 standard spaces, 1 compact space and 2 Americans with Disabilities Act (ADA) spaces. Changes in lifetime budget since 2015: New project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $700 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 700 0 0 0 0 0 0 700 0 700 0 0 0 0 0 0 700 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 20-Prelim Engineering/Env Review 0 140 0 0 0 0 0 0 140 50-Construction 0 560 0 0 0 0 0 0 560 0 700 0 0 0 0 0 0 700 South King Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: 2016 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 91 of 140 Enhancement OTHER 700733 OMF LRV Wash Heater System Managed by: Operations Scope: Install a heating system within the OMF LRV washbay facility that includes overhead radiant heaters, water line heat tracing, and a small unit heater. The installation of the system will allow for all-weather operation and reduce the risk to operators of working in icy conditions when weather is below freezing. Changes to lifetime budget since 2015: New project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 1-Enter Project Development Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $300 2015 Cost Estimate: N/A 2016 TIP: $300 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total North King 70 130 0 0 0 0 0 0 201 South King 35 64 0 0 0 0 0 0 99 105 195 0 0 0 0 0 0 300 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 105 30 0 0 0 0 0 0 135 0 165 0 0 0 0 0 0 165 105 195 0 0 0 0 0 0 300 Total Phase 10-Agency Administration 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment N/A 92 of 140 Adopted 2016 Transit Improvement Plan 2016 Enhancement LINK 700773 Central Link HVAC for Traction Power Managed by: DECM Scope: Install air conditioning required in the Traction Power Substation to protect and enhance the useful life of temperature sensitive equipment. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,278 2015 Cost Estimate: N/A 2016 TIP: $1,278 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 677 0 178 0 0 0 0 0 855 335 0 88 0 0 0 0 0 423 1,013 0 266 0 0 0 0 0 1,278 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 198 0 0 0 0 0 0 0 198 30-Final Design+Specifications 188 0 0 0 0 0 0 0 188 50-Construction 626 0 266 0 0 0 0 0 892 1,013 0 266 0 0 0 0 0 1,278 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 93 of 140 Enhancement LINK 700775 Central Link Card Readers Managed by: DECM Scope: Install card readers on all doors at Central Link stations' public areas. Card readers are required to ensure secure premises, eliminate the need to issue keys to a large number of staff and ensure consistency in key control. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $423 2015 Cost Estimate: N/A 2016 TIP: $423 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase 10-Agency Administration Life to Date 2016 2017 2018 2019 2020 2021 Future Total 30 253 0 0 0 0 0 0 283 15 125 0 0 0 0 0 0 140 44 379 0 0 0 0 0 0 423 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 44 20 0 0 0 0 0 0 64 30-Final Design+Specifications 0 50 0 0 0 0 0 0 50 50-Construction 0 249 0 0 0 0 0 0 249 55-Construction Services 0 50 0 0 0 0 0 0 50 0 10 0 0 0 0 0 0 10 44 379 0 0 0 0 0 0 423 90-Contingency Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2017 Project Risk Assessment N/A. 94 of 140 Adopted 2016 Transit Improvement Plan Enhancement LINK 700777 Central Link Overhead Catenary System Tie Switch Managed by: Operations Scope: Install the mechanical means to electrically bridge the Overhead Catenary System (OCS) section insulators at approximately 34 various locations throughout the Link alignment to allow inspection and maintenance of traction power substations without interrupting Link service. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $3,000 2015 Cost Estimate: N/A 2016 TIP: $3,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase 10-Agency Administration 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 3 100 1,903 0 0 0 0 0 2,007 2 50 942 0 0 0 0 0 993 5 150 2,845 0 0 0 0 0 3,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 25 0 0 0 0 0 0 25 5 125 2,845 0 0 0 0 0 2,975 5 150 2,845 0 0 0 0 0 3,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Medium 2015 Budget Schedule: 2015 2016 Budget Schedule: 2017 Project Risk Assessment Project is intended to be completed by Link Maintenance staff. There is a risk to schedule when competing projects use limited resources initially allocated to this project. Adopted 2016 Transit Improvement Plan 95 of 140 Enhancement REGIONAL EXPRESS 700790 Pierce Transit Radio System Upgrade Managed by: Operations Scope: Replace all ST owned mobile radios currently installed in Pierce Transit-operated buses and necessary radio infrastructure components to be compliant with F.C.C. 6.25 MHZ narrow band, digital technology effective December 31, 2016. The project will cover 118 radios for installation on ST Express buses, plus 13 mobile/portable radios assigned to supervisors/mechanics. The project is completed and will close in 2016. any remaining funds are considered surplus. Change since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,000 2015 Cost Estimate: N/A 2016 TIP: $1,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 562 438 0 0 0 0 0 0 1,000 562 438 0 0 0 0 0 0 1,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 562 438 0 0 0 0 0 0 1,000 562 438 0 0 0 0 0 0 1,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2015 Project Risk Assessment N/A 96 of 140 Adopted 2016 Transit Improvement Plan Enhancement REGIONAL EXPRESS 7X745 ST Express Mobile Communications Managed by: Operations Scope: As part of the operation of the ST Express bus fleet, mobile communications are necessary to ensure driver and passenger safety, to enhance the customer service information, and to improve the information available to the service planning function. The existing mobile communications systems are aging and in need of upgrades. In addition, this investment allows the ST Express bus fleet to be compatible with partner communication systems. A signed project participation agreement with Pierce Transit was executed in 2007. This project is in service. It was tested and accepted in 2010. Agreements for ST project participation with King County Metro and Community Transit projects were approved by the Board in 2008. These projects were completed in 2014, any remaining funds in this project are considered surplus. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $10,531 2015 Cost Estimate: N/A 2016 TIP: $10,531 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 1,815 39 0 0 0 0 0 0 1,853 South King 1,041 22 0 0 0 0 0 0 1,064 East King 4,743 101 0 0 0 0 0 0 4,844 Pierce 2,712 58 0 0 0 0 0 0 2,770 10,311 220 0 0 0 0 0 0 10,531 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 50-Construction 7,044 220 0 0 0 0 0 0 7,264 70-Vehicles 3,267 0 0 0 0 0 0 0 3,267 10,311 220 0 0 0 0 0 0 10,531 Total Phase Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 97 of 140 Enhancement LINK 700781 Non-revenue Support Vehicles Managed by: Operations Scope: Purchase and replace maintenance vehicles to improve maintenance efficiencies for the Link light rail system. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $2,130 2015 Cost Estimate: N/A 2016 TIP: $2,130 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total North King 279 669 109 115 88 0 29 128 1,416 South King 141 337 55 58 45 0 15 64 713 420 1,006 163 172 133 0 44 192 2,130 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 420 1,006 163 172 133 0 44 192 2,130 420 1,006 163 172 133 0 44 192 2,130 Total Phase 70-Vehicles Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2019 2016 Budget Schedule: 2019 Project Risk Assessment N/A 98 of 140 Adopted 2016 Transit Improvement Plan Enhancement OTHER 804100 Transit-Oriented Development Property Disposition Managed by: PEPD Scope: Dispose of properties that have been declared surplus and are suitable for transit oriented development based on size and proximity to ST transit services; consistent with Sound Transit's Transit Oriented Development Policy. Changes in lifetime budget since 2015: Project budget increased by $5.6 million: $5.1 million to add TOD eligible properties acquired through ST 2 phase and $494 thousand from the transfer of remaining funds from TOD Planning project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $5,601 2015 Cost Estimate: N/A 2016 TIP: $11,615 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review 40-Row Acquisition+Permits 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2,016 4,261 1,315 1,291 1,273 644 673 143 11,615 2,016 4,261 1,315 1,291 1,273 644 673 143 11,615 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 331 546 293 200 200 200 200 74 2,044 0 0 87 100 100 100 107 0 494 1,684 3,065 936 891 893 314 366 69 8,217 1 650 0 100 80 29 0 0 860 2,016 4,261 1,315 1,291 1,273 644 673 143 11,615 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2020 2016 Budget Schedule: 2023 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 99 of 140 Enhancement OTHER 8X100 Transit Oriented Development Planning Managed by: PEPD Scope: Provide planning and technical assistance to local jurisdictions and Sound Transit project teams to help identify and shape transit oriented development and joint development opportunities. Changes in lifetime budget since 2015: Project budget is decreased by $494 thousand. Project is completed and remaining funds are transferred to TOD Property Disposition project. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,640 2015 Cost Estimate: N/A 2016 TIP: $1,146 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 10-Agency Administration 20-Prelim Engineering/Env Review Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,146 0 0 0 0 0 0 0 1,146 1,146 0 0 0 0 0 0 0 1,146 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 43 0 0 0 0 0 0 0 43 1,103 0 0 0 0 0 0 0 1,103 1,146 0 0 0 0 0 0 0 1,146 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 2016 Budget Schedule: 2017 Project Risk Assessment N/A 100 of 140 Adopted 2016 Transit Improvement Plan Rehabilitation & Replacement Rehabilitation & Replacement projects extend the life of existing system assets and replace those at the end of their useful life. As the transit system ages, investment in maintaining our assets in a state of good repair will rise. Highlights Replace deficient braided tile at Link stations to improve wayfinding and meet ADA standards. Overhaul three Sounder locomotives to maintain them in good repair. Upgrade CCTV and Public Announcement systems at Sounder stations and ST Express transit centers. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project LINK Link Station Braided Tile Replacement Tacoma Link Light Rail Vehicle Overhaul OTHER Small Works Program Reason Budget Type New Project Operating New Project Remove and replace braided wayfinding tile at five link stations. Preliminary Engineering Overhaul traction motors and trucks for all three Tacoma Link light rail vehicles. Cost Increase Program Total Adopted 2016 Transit Improvement Plan Explanation Extend the program another year and provide an earmark for safety projects that need immediate action. Change $435 $731 $1,179 $2,345 101 of 140 102 of 140 Adopted 2016 Transit Improvement Plan Sounder Vehicle Overhaul Program Tacoma Dome Station Federal Way Post Tension Cable Repair 700770 7X356 7X768 0 2,838 $131,535 IT Transit Systems 870101 Total Small Works Program 7X740 694 115,013 118,546 ST Express Fleet Replacement 7X701 11,281 4 0 10,064 1,213 0 1,550 342 1,208 157 157 0 Life to Date Subtotal Station Midlife Refurbishment Program 700771 Program LRV Overhaul 700769 Subtotal Link Station Braided Tile Replacement 700728 Operating Tacoma Link Announcement/Sign System 7X758 Subtotal Beacon Avenue Paving 4X360 Subtotal IT Link Light Rail 870100 Baseline Tacoma Link Light Rail Vehicle Overhaul 700718 Preliminary Engineering Project Number and Name ALL MODES Rehabilitation & Replacement $13,290 2,845 515 856 824 650 10,044 521 0 5,301 3,787 435 29 29 0 372 0 372 2016 $28,018 20,469 776 656 18,932 106 6,159 0 414 5,745 0 0 792 0 792 599 240 359 2017 31,710 480 614 30,615 0 3,191 0 0 3,191 0 0 0 0 0 673 673 0 2018 $35,574 (in thousands) $4,963 4,057 550 979 2,528 0 0 0 0 0 0 0 0 0 0 906 906 0 2019 2016 TIP Cashflow by Budget Approval $1,791 1,335 343 992 0 0 0 0 0 0 0 0 0 0 0 456 456 0 2020 $23,690 23,203 840 1,006 21,357 0 0 0 0 0 0 0 0 0 0 488 488 0 2021 $3,417 2,401 2,401 0 0 0 0 0 0 0 0 0 0 0 0 1,016 1,016 0 Future $242,278 204,566 5,905 7,942 189,269 1,450 30,675 525 414 24,301 5,000 435 2,371 371 2,000 4,666 3,935 731 Total Adopted 2016 Transit Improvement Plan 103 of 140 35,312 5 - Pierce 70-Vehicles 55-Construction Services 50-Construction $131,535 120,350 166 10,233 0 97 35-Third Party 24 30-Final Design+Specifications 506 10-Agency Administration 20-Prelim Engineering/Env Review 157 Life to Date $131,535 09-Admin Capital Phase # and Description Total 53,445 4 - East King Total 18,225 3 - South King 0 2,562 2 - North King 6 - Systemwide 21,990 Life to Date 1 - Snohomish Subarea ALL MODES Rehabilitation & Replacement 2017 $28,018 776 7,984 8,833 5,154 1,068 4,204 2018 $35,574 480 9,367 14,200 5,031 591 5,905 $13,290 10,120 0 2,719 150 91 42 168 0 2016 $28,018 23,020 64 4,669 0 159 34 72 0 2017 (in thousands) $35,574 33,671 0 1,768 0 101 23 11 0 2018 2016 TIP Cashflow by Phase $13,290 515 2,957 542 5,198 3,097 983 2016 (in thousands) 2016 TIP Cashflow by Subarea $4,963 2,528 0 2,435 0 0 0 0 0 2019 $4,963 550 1,037 1,349 637 818 572 2019 $1,791 0 0 1,791 0 0 0 0 0 2020 $1,791 343 377 188 267 486 129 2020 2021 $23,690 21,357 0 2,334 0 0 0 0 0 2021 $23,690 840 5,999 10,015 2,434 512 3,890 $3,417 0 0 3,324 0 0 0 0 93 Future $3,417 2,401 0 0 263 752 0 Future Total $242,278 211,046 230 29,272 150 449 123 758 250 Total $242,278 5,905 63,032 88,573 37,209 9,886 37,673 Rehabilitation & Replacement 700718 LINK Tacoma Link Light Rail Vehicle Overhaul Managed by: Operations Scope: Maintain, preserve, and extend the life of Tacoma Link light rail vehicles. This program overhauls the traction motors and trucks for the Tacoma Link fleet comprised of three light rail vehicles. Changes in lifetime budget since 2015: New project Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) Pending Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $731 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 372 359 0 0 0 0 0 731 0 372 359 0 0 0 0 0 731 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 0 20 21 0 0 0 0 0 41 20-Prelim Engineering/Env Review 0 19 6 0 0 0 0 0 25 0 333 332 0 0 0 0 0 665 0 372 359 0 0 0 0 0 731 Pierce Total Phase 70-Vehicles Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment N/A 104 of 140 Adopted 2016 Transit Improvement Plan 2017 Rehabilitation & Replacement OTHER 870100 IT Link Light Rail Managed by: FIT Scope: Maintain the lifecycle maintenance of the IT infrastructure behind the Link light rail (LLR) SCADA system to mitigate equipment failure of an operationally-critical system. This project will provide for lifecycle maintenance of SCADA systems including, but not limited to, servers, SANs, networking equipment, Video Messaging Systems/backend and other computer-based infrastructure. This will also entail enhancements and maintenance for IT SCADA security. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) None Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $3,935 2015 Cost Estimate: N/A 2016 TIP: $3,935 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total North King 117 0 178 499 671 338 361 752 2,915 South King 41 0 62 174 235 118 126 263 1,020 157 0 240 673 906 456 488 1,016 3,935 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 157 0 0 0 0 0 0 93 250 0 0 240 673 906 456 488 923 3,685 157 0 240 673 906 456 488 1,016 3,935 Total Phase 09-Admin Capital 50-Construction Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Medium Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment Potential for risk of increased cost as system expands and integration and support require more resources to meet system compliance standards. Adopted 2016 Transit Improvement Plan 105 of 140 Rehabilitation & Replacement LINK 4X360 Beacon Avenue Paving Managed by: DECM Scope: As agreed with the city of Seattle, perform roadway improvements on Beacon Avenue between South McClellen Street and South Landers Street to mitigate construction impacts by construction of the Initial Segment. All work is complete and the project is expected to close out in 2016; budget cash flow in 2017 reflects surplus budget. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) 6-Proceed to Construction Baseline: $2,000 2008 Cost Estimate: N/A 2015 TIP: $2,000 2015 Cost Estimate: N/A 2016 TIP: $2,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,208 0 792 0 0 0 0 0 2,000 1,208 0 792 0 0 0 0 0 2,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 109 0 41 0 0 0 0 0 150 79 0 46 0 0 0 0 0 125 50-Construction 855 0 640 0 0 0 0 0 1,495 55-Construction Services 166 0 64 0 0 0 0 0 230 1,208 0 792 0 0 0 0 0 2,000 North King Total Phase 10-Agency Administration 30-Final Design+Specifications Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2014 2016 Budget Schedule: 2016 Project Risk Assessment N/A 106 of 140 Adopted 2016 Transit Improvement Plan Rehabilitation & Replacement LINK 7X758 Tacoma Link Announcement/Sign System Managed by: Operations Scope: Procure and install a new communications system for Tacoma Link. System replacement is required due to the limited availability of replacement parts and technical support for the existing technology. Project is complete and will be closed in 2016. Any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $371 2015 Cost Estimate: N/A 2016 TIP: $371 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase 10-Agency Administration 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 342 29 0 0 0 0 0 0 371 342 29 0 0 0 0 0 0 371 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 2 19 0 0 0 0 0 0 21 340 10 0 0 0 0 0 0 350 342 29 0 0 0 0 0 0 371 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 107 of 140 Rehabilitation & Replacement LINK 700728 Link Station Braided Tile Replacement Managed by: Operations Scope: Demolition and reinstallation of braided wayfinding tile at five Link light rail stations. Changes in lifetime budget since 2015 - New project Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $0 2015 Cost Estimate: N/A 2016 TIP: $435 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 435 0 0 0 0 0 0 435 0 435 0 0 0 0 0 0 435 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 0 22 0 0 0 0 0 0 22 50-Construction 0 413 0 0 0 0 0 0 413 0 435 0 0 0 0 0 0 435 Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate Low Schedule Risk Level: Low 2015 Budget Schedule: 2016 Budget Schedule: Project Risk Assessment N/A 108 of 140 Adopted 2016 Transit Improvement Plan 2016 Rehabilitation & Replacement LINK 700769 LRV Overhaul Managed by: DECM Scope: Complete repairs of the gear units and traction motors on light rail vehicles (LRVs), and purchase materials, equipment, services, and labor necessary to complete repairs. Work is projected to complete in 2016. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $5,000 2015 Cost Estimate: N/A 2016 TIP: $5,000 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King South King Total Phase 70-Vehicles Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 812 2,533 0 0 0 0 0 0 3,345 402 1,253 0 0 0 0 0 0 1,655 1,213 3,787 0 0 0 0 0 0 5,000 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 1,213 3,787 0 0 0 0 0 0 5,000 1,213 3,787 0 0 0 0 0 0 5,000 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate High Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2016 Project Risk Assessment Budget risk remains high given no agreement regarding the warranty coverage on repairs has been reached between manufacturer, supplier and Sound Transit. Adopted 2016 Transit Improvement Plan 109 of 140 Rehabilitation & Replacement SOUNDER 700770 Sounder Vehicle Overhaul Program Managed by: Operations Scope: Maintain, preserve, and extend the life of Sounder locomotives and cab car fleet. This program overhauls 11 locomotives of the Sounder fleet while upgrading technolgies and emisison efficiencies, truck overhauls of cab cars and HVAC upgrades to the same. Change in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $24,301 2015 Cost Estimate: N/A 2016 TIP: $24,301 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 1,379 726 787 437 0 0 0 0 3,329 South King 5,274 2,778 3,010 1,672 0 0 0 0 12,734 Pierce 3,412 1,797 1,948 1,082 0 0 0 0 8,238 10,064 5,301 5,745 3,191 0 0 0 0 24,301 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 0 11 11 11 0 0 0 0 32 20-Prelim Engineering/Env Review 0 23 28 23 0 0 0 0 74 Total Phase 30-Final Design+Specifications 50-Construction 70-Vehicles Total 0 91 113 101 0 0 0 0 305 6,130 0 1,838 0 0 0 0 0 7,968 3,935 5,176 3,756 3,056 0 0 0 0 15,923 10,064 5,301 5,745 3,191 0 0 0 0 24,301 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Initial Estimate Low Schedule Risk Level: Low 2015 Budget Schedule: 2018 2016 Budget Schedule: 2018 Project Risk Assessment N/A 110 of 140 Adopted 2016 Transit Improvement Plan Rehabilitation & Replacement OTHER 7X356 Tacoma Dome Station Managed by: Operations Scope: Provide financial support to address major maintenance requirement at Tacoma Dome Station per agreement with Pierce Transit. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $414 2015 Cost Estimate: N/A 2016 TIP: $414 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Pierce Total Phase 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 0 414 0 0 0 0 0 414 0 0 414 0 0 0 0 0 414 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 0 414 0 0 0 0 0 414 0 0 414 0 0 0 0 0 414 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Fixed Contribution Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2018 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 111 of 140 Rehabilitation & Replacement REGIONAL EXPRESS 7X768 Federal Way Post Tension Cable Repair Managed by: DECM Scope: Repair post tension cables that provide structural reinforcement of the Federal Way parking garage. Grease has been leaking out of the post tension cable grout pockets indicating water penetration. The budget funds complete remediation. At a minimum, removal of failed grout pockets and replacement of the grease-filled caps is required; however, more extensive remediation may be needed. The project was determined unnecessary and will be closed in 2016. Any remaining funds are considered surplus. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $525 2015 Cost Estimate: N/A 2016 TIP: $525 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea South King Total Phase 10-Agency Administration 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 4 521 0 0 0 0 0 0 525 4 521 0 0 0 0 0 0 525 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 4 96 0 0 0 0 0 0 100 0 425 0 0 0 0 0 0 425 4 521 0 0 0 0 0 0 525 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2015 2016 Budget Schedule: 2015 Project Risk Assessment N/A 112 of 140 Adopted 2016 Transit Improvement Plan Rehabilitation & Replacement SOUNDER 700771 Station Midlife Refurbishment Program Managed by: Operations Scope: Provide rehabilitation and mid-life maintenance for Sound Transit facilities that have been in service for fifteen years or longer. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,450 2015 Cost Estimate: N/A 2016 TIP: $1,450 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea South King Pierce Total Phase 10-Agency Administration 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 463 434 70 0 0 0 0 0 967 231 216 35 0 0 0 0 0 483 694 650 106 0 0 0 0 0 1,450 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 8 0 0 0 0 0 0 0 8 687 650 106 0 0 0 0 0 1,442 694 650 106 0 0 0 0 0 1,450 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Medium 2015 Budget Schedule: 2016 2016 Budget Schedule: 2017 Project Risk Assessment Undefined scope of work at the various station locations could affect both the budget and schedule. Adopted 2016 Transit Improvement Plan 113 of 140 Rehabilitation & Replacement REGIONAL EXPRESS 7X701 ST Express Fleet Replacement Managed by: Operations Scope: Funds the bus fleet replacement program for ST Express. Current Assumptions: FTA guidelines indicate that buses are to be replaced no earlier than either 12 years of service or 500,000 miles. Due to the unique service characteristics of the ST Express fleet, Sound Transit buses typically reach 500,000 miles after only 10 years of operations. Replacement decisions are informed by specific fleet performance in consultation with our operating partner agencies. During the period from 20132021 more than 185 buses will be replaced. The current fleet size is 280. Changes in lifetime since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $189,269 2015 Cost Estimate: N/A 2016 TIP: $189,269 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 20,242 145 3,332 5,388 445 0 3,759 0 33,311 South King 11,616 83 1,912 3,092 255 0 2,157 0 19,116 East King 52,906 379 8,709 14,083 1,163 0 9,824 0 87,064 Pierce Total Phase 50-Construction 70-Vehicles Total 30,248 217 4,979 8,052 665 0 5,617 0 49,778 115,013 824 18,932 30,615 2,528 0 21,357 0 189,269 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 47 0 0 0 0 0 0 0 47 114,966 824 18,932 30,615 2,528 0 21,357 0 189,222 115,013 824 18,932 30,615 2,528 0 21,357 0 189,269 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Medium Schedule Risk Level: Low 2015 Budget Schedule: 2020 2016 Budget Schedule: 2021 Project Risk Assessment Budget risk is a concern as the cost estimates and vehicle types are annually reviewed as replacements are identified and the agency adopts onboard technologies to be included in future replacements. 114 of 140 Adopted 2016 Transit Improvement Plan Rehabilitation & Replacement OTHER 7X740 Small Works Program Managed by: Operations Scope: Projects completed under the small works program include modification/repairs of operating facilities and systems with an estimated total cost of less than $200,000 per project. The budget for this program is based on number of sites maintained, age of facilities, and amount of use. Changes in lifetime budget since 2015: Project budget increased by $1.2 million - $979 thousand to extend the program another year and $200 thousand earmarked for potential safety related projects. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $6,763 2015 Cost Estimate: N/A 2016 TIP: $7,942 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 369 111 85 80 127 129 131 0 1,032 North King 426 128 98 92 147 149 151 0 1,191 South King 426 128 98 92 147 149 151 0 1,191 East King 539 163 125 117 186 188 191 0 1,509 1,079 325 249 233 372 377 382 0 3,018 2,838 856 656 614 979 992 1,006 0 7,942 Pierce Total Phase Life to Date 2016 2017 2018 2019 2020 2021 Future Total 10-Agency Administration 385 0 0 0 0 0 0 0 385 20-Prelim Engineering/Env Review 24 0 0 0 0 0 0 0 24 30-Final Design+Specifications 19 0 0 0 0 0 0 0 19 35-Third Party 50-Construction 70-Vehicles Total 0 150 0 0 0 0 0 0 150 2,175 706 656 614 979 992 1,006 0 7,129 236 0 0 0 0 0 0 0 236 2,838 856 656 614 979 992 1,006 0 7,942 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Scoping Low Schedule Risk Level: Low 2015 Budget Schedule: 2020 2016 Budget Schedule: 2021 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 115 of 140 Rehabilitation & Replacement OTHER 870101 IT Transit Systems Managed by: FIT Scope: Maintain, upgrade and replace multiple computer and technology-based systems at Sounder stations and ST Express transit centers to keep them safe, secure, and functional for our customers. Systems maintained include: Sounder Stations & Transit Centers - Closed circuit television (CCTV) access control and customer emergency stations. Sounder - Passenger information systems, automated passenger counters and variable message signage. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $5,905 2015 Cost Estimate: N/A 2016 TIP: $5,905 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Phase 50-Construction Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 515 776 480 550 343 840 2,401 5,905 0 515 776 480 550 343 840 2,401 5,905 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 515 776 480 550 343 840 2,401 5,905 0 515 776 480 550 343 840 2,401 5,905 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Medium Schedule Risk Level: Medium 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment Information technology is ever changing and could adversely affect both the cost of the equipment and the availability of the equipment and technology. 116 of 140 Adopted 2016 Transit Improvement Plan Administrative Administrative projects are not specific to any transit mode or capital program. However, these projects fund disposition of surplus real estate, procurement of administrative equipment, facilities, and technology, as well as administrative support critical to the successful operation of the agency. Administrative costs that support projects are charged to construction in progress and capitalized with the resulting assets. Highlights Replace eight non-revenue vehicles used by administrative staff. Replace asphalt shingles on the Union Station administration building. Continue landscape and wetland hydrology mitigation and maintenance activities at selected Sound Transit properties. Procure and implement the eBid system to improve vendor solicitation process. Investigate the potential of a business intelligence system to enhance usability of agency and industry data. Lifetime Budget Changes The table below explains the changes in individual project lifetime budgets since the publication of the Adopted 2015 TIP. BUDGET CHANGES (in thousands) Project Reason Budget Type Explanation OTHER Administrative Capital Increase Operating Purchase furniture for additional work space needed to accommodate consultants and employees. Total Adopted 2016 Transit Improvement Plan Change $150 $150 117 of 140 118 of 140 Adopted 2016 Transit Improvement Plan 18,123 189 $280,346 Surplus Property Disposition 804500 5,677 11,982 Total Information Technology Program 803800 274 262,223 262,223 Life to Date Subtotal Administrative Capital 802000 Subtotal Environmental Mitigation, Monitoring & Maintenance Agency Administration Operating 600025 Program 0X002 Operating Project Number and Name ALL MODES Administrative $63,679 3,575 120 2,164 1,097 194 60,104 60,104 2016 $69,577 5,297 113 2,305 2,726 153 64,281 64,281 2017 3,370 285 2,068 856 160 68,629 68,629 2018 $71,999 (in thousands) $73,257 2,836 0 2,172 551 113 70,421 70,421 2019 2016 TIP Cashflow by Budget Approval $74,632 2,941 0 2,296 645 0 71,691 71,691 2020 $72,015 2,741 0 2,071 670 0 69,274 69,274 2021 $134,263 8,968 0 7,177 1,261 529 125,296 125,296 Future $839,768 47,850 708 32,235 13,484 1,423 791,918 791,918 Total Adopted 2016 Transit Improvement Plan 119 of 140 40 5 - Pierce $280,346 0 189 40-Row Acquisition+Permits 90-Contingency 490 262,845 16,821 0 Life to Date $280,346 20-Prelim Engineering/Env Review 10-Agency Administration 09-Admin Capital 02-Operation+Maintenance-Agency Phase # and Description Total 16 4 - East King Total 170 3 - South King 279,882 189 2 - North King 6 - Systemwide 48 Life to Date 1 - Snohomish Subarea ALL MODES Administrative $69,577 69,311 22 9 95 113 27 2017 $71,999 71,554 24 9 99 285 28 2018 $63,679 50 120 194 60,464 2,702 149 2016 $69,577 50 113 263 64,402 4,749 0 2017 (in thousands) $71,999 50 285 270 68,750 2,643 0 2018 2016 TIP Cashflow by Phase $63,679 63,365 28 11 120 120 34 2016 (in thousands) 2016 TIP Cashflow by Subarea $73,257 50 0 223 70,421 2,563 0 2019 $73,257 73,144 17 7 70 0 20 2019 $74,632 50 0 100 71,691 2,537 254 2020 $74,632 74,632 0 0 0 0 0 2020 $72,015 50 0 110 69,274 2,581 0 2021 $72,015 72,015 0 0 0 0 0 2021 $134,263 97 0 838 125,296 7,936 96 Future $134,263 133,734 78 31 328 0 93 Future $839,768 397 708 2,488 793,143 42,532 500 Total $839,768 837,637 209 83 882 708 249 Total Administrative OTHER 0X002 Agency Administration Operating Managed by: FIT Scope: Funds administrative overhead expenses that are charged to capital projects and overhead expenses that are not allocated to either projects or transit operations. Overhead expenses allocated to projects are included in the capitalized cost of the resulting assets. Unallocated overhead expenses are included in general and administrative expenses for the agency. The agency uses a cost allocation plan approved by the Federal Transit Administration. Use of this approved model makes the majority of indirect project expenses eligible for federal grant funding. The project timeline coincides with that of the ST2 program: 2010 - 2023. Changes in lifetime since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $791,918 2015 Cost Estimate: N/A 2016 TIP: $791,918 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Phase 10-Agency Administration Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 262,223 60,104 64,281 68,629 70,421 71,691 69,274 125,296 791,918 262,223 60,104 64,281 68,629 70,421 71,691 69,274 125,296 791,918 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 262,223 60,104 64,281 68,629 70,421 71,691 69,274 125,296 791,918 262,223 60,104 64,281 68,629 70,421 71,691 69,274 125,296 791,918 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment N/A 120 of 140 Adopted 2016 Transit Improvement Plan Administrative OTHER 600025 Environmental Mitigation, Monitoring & Maintenance Managed by: PEPD Scope: Monitor and maintain post-construction environmental mitigation including wetland hydrology, plant establishment, and other site features. Duration depends upon permit conditions and may be 10 years and/or may last for the life of the property. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $1,423 2015 Cost Estimate: N/A 2016 TIP: $1,423 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total Snohomish 48 34 27 28 20 0 0 93 249 South King 170 120 95 99 70 0 0 328 882 East King 16 11 9 9 7 0 0 31 83 Pierce 40 28 22 24 17 0 0 78 209 274 194 153 160 113 0 0 529 1,423 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 274 194 153 160 113 0 0 529 1,423 274 194 153 160 113 0 0 529 1,423 Total Phase 20-Prelim Engineering/Env Review Total Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Construction Low Schedule Risk Level: Low 2015 Budget Schedule: 2030 2016 Budget Schedule: 2030 Project Risk Assessment N/A Adopted 2016 Transit Improvement Plan 121 of 140 Administrative OTHER 802000 Administrative Capital Managed by: FIT Scope: Funds capital expenditures for administrative assets that support agency staff, including administrative facilities, non-revenue administrative fleet, office equipment, space planning, and furnishings. Changes in lifetime budget since 2015: Increase of $150,000 in lifetime budget for furniture in support of Agency's need for additional work space. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $13,334 2015 Cost Estimate: N/A 2016 TIP: $13,484 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Systemwide Total Phase 09-Admin Capital 90-Contingency Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 5,677 1,097 2,726 856 551 645 670 1,261 13,484 5,677 1,097 2,726 856 551 645 670 1,261 13,484 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 5,677 1,047 2,676 806 501 595 620 1,164 13,087 0 50 50 50 50 50 50 97 397 5,677 1,097 2,726 856 551 645 670 1,261 13,484 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment N/A 122 of 140 Adopted 2016 Transit Improvement Plan Administrative OTHER 803800 Information Technology Program Managed by: FIT Scope: Support agencywide hardware and software infrastructure, develop and implement technology solutions to improve administrative efficiency through 2023. Changes in lifetime budget since 2015: None. Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $32,235 2015 Cost Estimate: N/A 2016 TIP: $32,235 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea Life to Date 2016 2017 2018 2019 2020 2021 Future Total 11,982 2,164 2,305 2,068 2,172 2,296 2,071 7,177 32,235 11,982 2,164 2,305 2,068 2,172 2,296 2,071 7,177 32,235 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 0 149 0 0 0 254 0 96 500 11,144 1,654 2,074 1,837 2,062 1,942 1,961 6,772 29,445 10-Agency Administration 622 360 121 121 0 0 0 0 1,225 20-Prelim Engineering/Env Review 216 0 110 110 110 100 110 309 1,065 11,982 2,164 2,305 2,068 2,172 2,296 2,071 7,177 32,235 Systemwide Total Phase 02-Operation+MaintenanceAgency 09-Admin Capital Total Budget Risk Assessment Estimate Type: Schedule Risk Assessment Conceptual Engineering Budget Risk Level: High Schedule Risk Level: High 2015 Budget Schedule: 2023 2016 Budget Schedule: 2023 Project Risk Assessment Future year forecasts reflect initial planning estimates so costs are subject to change. Schedules are dependent on staff capacity and the specific application or approach selected. Adopted 2016 Transit Improvement Plan 123 of 140 Administrative OTHER 804500 Surplus Property Disposition Managed by: DECM Scope: Prepare surplus properties for sale that due to their size or location do not lend themselves to Transit-Oriented Development (TOD) opportunities. Surplus properties represent remnant properties that may have been used during construction or were acquired and no longer needed for transit use. Changes in lifetime budget since 2015: None Board Approved Capital Budget (in thousands of YOE dollars) Phase Gate Passed: ST2 Total Project Cost Estimate (in thousands of 2015 dollars) N/A Baseline: $0 2008 Cost Estimate: N/A 2015 TIP: $708 2015 Cost Estimate: N/A 2016 TIP: $708 2016 Cost Estimate: N/A TIP Cashflow (in thousands) Subarea North King Total Phase 40-Row Acquisition+Permits Total Life to Date 2016 2017 2018 2019 2020 2021 Future Total 189 120 113 285 0 0 0 0 708 189 120 113 285 0 0 0 0 708 Life to Date 2016 2017 2018 2019 2020 2021 Future Total 189 120 113 285 0 0 0 0 708 189 120 113 285 0 0 0 0 708 Budget Risk Assessment Estimate Type: Budget Risk Level: Schedule Risk Assessment Planning Low Schedule Risk Level: Low 2015 Budget Schedule: 2017 2016 Budget Schedule: 2017 Project Risk Assessment N/A 124 of 140 Adopted 2016 Transit Improvement Plan Reserves The 2016 TIP includes life to date contributions to the agency’s various reserves as well as expected future contributions through 2023, which corresponds with the expected completion of ST2. Emergency/Loss Systemwide Contingency While the agency maintains a comprehensive insurance program, the policies do contain retentions (deductibles), which the agency would have to cover in the event of an insurable loss. In such instances, the Board could authorize the use of the emergency/loss fund on a case-by-case basis. The systemwide contingency was established as part of the Sound Move program and was supplemented in the ST2 plan. This fund is for use by the Board to deal with any unforeseen events. Capital Replacement Insurance Systemwide The agency maintains a minimum $300.0 million reserve for unanticipated expenditures necessary to keep the system in good working condition. In addition, the agency maintains a forecast of the funds necessary to repair and replace existing assets to keep the regional transit system in a state of good repair, consistent with industry standards. These forecasts are included in the agency’s long-term financial plan as a financial commitment. When such investments are required, they are added to the budget and TIP in the Repair & Replacement project category. The insurance systemwide reserve is forecasted to be funded beginning in 2016 when major new construction gets underway. It will be available to partially pay for builders’ risk insurance in conjunction with funds provided by building contractors. Operations & Maintenance Sound Transit’s financial policies require the agency to maintain an operation and maintenance reserve equal to two months of department operating expenses, including costs allocated to transit modes and projects. AGENCY RESERVE SUMMARY (in millions) Life to Date 2016 2017 2018 2019 2020 2021 Future Total $12 $3 $3 $3 $3 $3 $3 $8 $38 Insurance Systemwide 0 6 6 6 6 0 0 0 23 Operations & Maintenance 0 60 0 0 0 0 0 0 60 Systemwide Contingency 0 0 5 0 0 0 0 0 5 306 0 0 0 0 0 0 0 306 $318 $69 $14 $9 $9 $3 $3 $8 $433 Emergency Loss Capital Replacement Total Adopted 2016 Transit Improvement Plan 125 of 140 Appendix A – Sound Transit 2 Cost Estimates The agency maintains cost estimates for all of its projects that are funded in the agency’s financial plan. These estimates are updated as new engineering, right-of-way, public outreach, and other project information are developed. Project cost estimates are updated prior to seeking Board authorization of budgets for preliminary engineering, final design, and right-of-way acquisition, and baseline budget, which includes total project costs and construction. ST2 cost estimates were initially developed and reported in 2007 constant-year dollars. To enable comparisons between cost estimates, the figures in this appendix have been updated to 2015 constant-year dollars based on the agency’s August 2015 inflation forecasts. The table on the next page includes the following information: 2008 cost estimates from the initial ST2 plan approved by voters in November 2008. 2015 cost estimates match the adopted 2015 TIP. 2016 cost estimates include all ST2 projects currently funded in the agency’s financial plan. The changes to the cost estimates between 2015 and 2016 include: The transfer of cost estimates from HCT Corridor Planning Studies and Central and East HCT Study to ST3 Planning to provide additional funding for long-range planning. The closure of projects Ballard to Downtown Seattle HCT Planning Study, Lynnwood to Everett HCT Study and the South King County HCT Study. These projects were removed from the cost estimates. The Sound Transit Board authorized the creation of the Downtown Redmond Link Extension project to complete the preliminary engineering from Overlake to Redmond Transit Center. The Angle Lake light rail station opens in 2016. 126 of 140 Adopted 2016 Transit Improvement Plan ST2 COST ESTIMATES (in thousands/constant 2015 dollars) 2008 Estimate Inc / (Dec) 2015 Estimate Inc / (Dec) 2016 Estimate Link Light Rail East Link Downtown Redmond Link Extension $3,311,457 ($176,566) $3,134,891 21,997 (21,997) 0 $3,134,891 18,195 18,195 Northgate Link Extension 1,734,306 170,244 1,904,550 1,904,550 Lynnwood Link Extension 1,421,593 1,668,579 (246,986) 1,421,593 First Hill Link Connector 138,141 (1,552) 136,590 136,590 South 200th Street Link Extension 404,745 (18,957) 385,788 385,788 South Corridor HCT - S200th to KDM Rd 492,218 (54,582) 437,636 437,636 South Corridor HCT - KDM Rd to S 272nd St 535,365 (535,365) 0 0 HCC to Tacoma Dome - P/E & ROW 47,267 (47,267) 0 0 South Corridor Alternatives Analysis 82,921 (79,843) 3,077 3,077 Tacoma Link Expansion 100,162 35,714 135,876 135,876 Link Maintenance & Storage 298,615 (47,026) 251,589 251,589 Link Fleet Expansion Subtotal Link Light Rail 583,579 (255,326) 328,253 9,419,351 (1,279,507) 8,139,844 328,253 18,195 8,158,039 Sounder Commuter Rail Station Access & Demand Study 148,901 (87,676) 61,226 61,226 Sumner Station Improvements 48,630 (4,518) 44,113 44,113 Puyallup Station Improvements 68,525 (10,548) 57,977 57,977 Lakewood Station Improvements 44,466 (6,668) 37,798 37,798 171,727 (22,168) 149,559 149,559 Sounder Yard & Shop Facility Sounder Yard Expansion 0 21,092 21,092 21,092 Tukwila Permanent Station 40,943 7,417 48,360 48,360 Edmonds Permanent Station 27,168 (27,168) 196,715 Sounder South Expanded Service 0 0 57,047 253,762 253,762 Sounder ST2 Fleet Expansion 36,854 (6,416) 30,438 30,438 Tacoma Trestle Track & Signal 75,114 (11,585) 63,529 63,529 Tacoma Track & Signal 30,574 (306) 30,268 30,268 Platform Extensions - South King / Pierce 61,318 (61,318) 0 0 Eastside Rail Partnership 57,584 (57,582) 1 1,008,520 (210,397) 798,123 196,007 (6,429) 189,577 Subtotal Sounder Commuter Rail 1 0 798,123 Regional Express ST Express Bus Base Mid-Day Bus Storage 189,577 0 3,336 3,336 3,336 ST Express Fleet Expansion 41,041 4,179 45,220 45,220 ST Express Capital Reserve Program 28,164 (28,164) I-90 Contribution 55,033 Burien - Parking Garage / Transit Center 16,357 Bothell - Parking Garage / Transit Center 6,129 Subtotal Regional Express 0 0 55,033 55,033 (645) 15,712 15,712 (18) 6,112 342,732 (27,743) 314,989 0 314,989 64,099 (16,700) 47,399 2,926 50,325 0 6,112 Other ST3 Planning HCT Corridor Planning Studies 0 554 554 (500) 54 Central and East HCT Study 0 4,538 4,538 (2,426) 2,112 ST Art Program Subtotal Other TOTAL ST2 Capital Estimate 0 27,306 27,306 64,099 15,698 79,797 0 79,797 $9,332,753 $18,195 $9,350,948 $10,834,702 ($1,501,949) 27,306 Note: The cost estimates included in the table above reflect the amount included in the agency's long-term Financial Plan. Projects proposed to proceed with only limited engineering activity are funded only to the extend that activtiy requires. Projects proposed to be suspended or deleted have no funding in the current Long-term Financial Plan. Adopted 2016 Transit Improvement Plan 127 of 140 Appendix B – Sound Move Lifetime Budgets The agency has two voter-approved system expansion programs, Sound Transit 2 (ST2) approved in 2008 and the earlier Sound Move program approved in 1996. Appendix A reflects the cost estimates in constant-year dollars for all projects funded under the ST2 program. This appendix displays adopted lifetime budgets in year-of-expenditure dollars for active Sound Move system expansion projects. Regional Express Lifetime budgets for Sound Move projects were adopted as total project budgets/baseline budgets, since these projects pre-date the agency’s Phase Gate process. As with the ST2 projects in Appendix A, Sound Move lifetime budgets are shown for 2008, 2015, and 2016. Rainier Avenue Arterial improvements project was closed in 2015. Strander Boulevard Extension project was closed in 2015. Mountlake Terrace Freeway Station project was closed in 2015. S. Everett Freeway Station project was closed in 2015. Issaquah transit Center/SR900 project was closed in 2015. The I-90 Two-Way Transit and HOV Operations, Stage 3 project was baselined in 2014. This project is funded by Sound Move & ST2, Regional Express Reserve, and agency financial capacity. The changes between 2015 and 2016 include: Link Light Rail Airport Link project was closed in 2015. Sounder Commuter Rail Permitting and Environmental Mitigation was closed in 2015. ADOPTED LIFETIME BUDGETS FOR ACTIVE SOUND MOVE PROJECTS Year of Expenditure (YOE) Dollars (in thousands) 2008 Link Light Rail University Link Initial Segment Inc/(Dec) 2015 Inc/(Dec) 2016 Subtotal Link Light Rail $1,614,007 2,070,000 3,684,007 $142,000 21,768 163,768 $1,756,007 2,091,768 3,847,775 - $1,756,007 2,091,768 3,847,775 Sounder Commuter Rail M Street to Lakewood Track and Signal D Street to M Street Track and Signal Mukilteo Station, South Platform Tukwila Station (see Notes) Subtotal Sounder Commuter Rail 73,601 76,025 9,371 158,997 7,053 82,237 8,942 98,232 80,654 158,262 18,313 257,229 - 80,654 158,262 18,313 257,229 Regional Express I-90 2-Way Transit & HOV Op, Stage 3 (see note) 85th Corridor, Kirkland Kirkland Transit Center Federal Way Transit Center Subtotal Regional Express STart Program Total Active Sound Move Projects 1,722 6,015 13,300 39,455 60,492 18,100 $3,921,596 223,926 225,648 (425) 5,590 (2,341) 10,959 39,455 221,160 281,652 16,100 34,200 $499,260 $4,420,856 225,648 5,590 10,959 39,455 281,652 34,200 - $ 4,420,856 Notes: Numbers may not add due to rounding. Tukwila Station is a project recognized in ST2, but Sound Move did fund the project through Final Design. I-90 2-Way Transit and HOV Op, Stage 3 is recognized in Sound Move, but ST2 contributed $45 million of planned funding. Additionally, to fully fund the project agency financial capcity was used $89.3 million and the balance of the REX program reserve $27.2 million. 128 of 140 Adopted 2016 Transit Improvement Plan Appendix C – Sound Transit Project Phases Projects are typically planned and executed in phases. Project teams track and report on project costs relative to the activities and deliverables in each. Project phases include: 01 – Operations+Maintenance Costs to operate and maintain capital assets where the budget to do so is part of an established lifetime budget. Currently used to maintain Sound Transit’s public art assets. 02 – Operations+Maintenance-Agency Costs that cannot be capitalized. Currently used for Research and Technology project costs incurred prior to the establishment of project scope. 09 – Administrative Capital Design, development and implementation or procurement of Agency assets such as non-revenue vehicle fleet, IT systems, furniture, and equipment. 10 – Agency Administration Administrative expenditures occur throughout the life of the project and include costs for direct labor by Sound Transit staff (staff dedicated to specific projects) and other direct charges to the project necessary for project execution. 20 – Preliminary Engineering & Environmental Review Professional services to complete the preliminary engineering and environmental assessments and evaluations. Preliminary engineering identifies project requirements and defines the project work scope. This includes preliminary design studies, permitting requirements, data collection, public involvement, legal and technical documentation, cost estimates, and assessment of alternatives. The environmental review includes achievement of all necessary environmental permits. 26 – Research & Technology Implementation of new transit technologies focused on systemwide safety, security and communications with passengers. 30 – Final Design & Specification Final design includes professional consultant activities to complete design and full construction plans and specifications, legal and technical documentation, environmental clearance, constructability review, value engineering, data collection, advertising, assessment of alternatives related to project design, and bid reviews. 35 – Third Parties rather than the lead agency, it includes Sound Transit’s funding obligation to the lead agency. 40 – Right-of-Way (ROW) Acquisition & Permits ROW includes the cost to purchase or lease real property required for construction and construction staging, easements, rights-of-way, and any residential or commercial relocations. This phase includes budget for negotiating the purchase price, relocation costs, surveys, appraisals, environmental audits, permits, legal costs, maps, charts, and all permits not included under the general construction contracts. 50 – Construction Construction covers project construction contracts, professional and technical assistance, advertising, legal and technical documentation, inspection, testing, and permitting. In addition, the construction budget includes service startup, commissioning of all systems, and training. 55 – Construction Services Construction Services includes construction management and other professional services in support of the Agency’s management of construction activities. 61 – Art Procurement and installation of public art at stations and along guideways. 70 – Vehicles Procurement, manufacture, delivery, testing, and commissioning of revenue vehicles, spare parts, and warranty support. Also includes procurement of nonrevenue vehicles. 80 – Startup and Testing Includes tests of new systems, new schedules, and various specific equipment. This phase includes the training of personnel before the completion of the project to identify issues and correct them to enable a smooth transition to operations and the close out of the project. 90 – Contingency Contingency provides a funding source to address general project risks, such as market fluctuations and changes in regulatory requirements. It also covers unforeseen expenses and cost estimate variances. Third party expenditures occur through the life of the project and include agreements with other governmental units to reimburse their costs for review of alternatives, design review, and construction monitoring and inspection. In certain cases, when Sound Transit is a funding partner Adopted 2016 Transit Improvement Plan 129 of 140 Appendix D – Subarea Allocations The Central Puget Sound Regional Transit Authority (Sound Transit) has implemented an accounting and reporting system consistent with the financial policies approved in the ST2 voter-approved program. Annually, Sound Transit (the agency) prepares a Schedule of Sources and Uses of Funds by Subarea (the schedule) that is based on the agency’s audited financial statements and the agency’s long-term Financial Plan. The schedule reports actual tax revenues received by subarea and an allocation to each subarea of other sources and uses earned. This system is integrated into the agency’s system of internal control over financial reporting, ensuring the integrity of the information reported and providing management, the Board, and the Citizen Oversight Panel required information to monitor progress against Sound Transit’s subarea commitments to its voters. Annually, the agency’s financial statement auditors perform agreed upon procedures which look at the allocation of sources and uses of funds presented. These procedures were developed by management, reviewed by the Citizen Oversight Panel, and approved by the Audit and Reporting Committee of the Board. All results from independent examinations are presented to the Board. This appendix provides the drivers that will be used to allocate sources and uses to subareas in 2015 as well as new projects for 2016. Any additional projects are added at the end of the year when subarea allocations are calculated. Revenues and Financing Sources SOURCES Description Driver Bond Proceeds Financial Plan Capital Grants Project Costs or Board Designation Interest Earnings Financial Plan Motor Vehicle Excise Tax Zip Code Location Operating Grants Operating Uses by Mode Other Revenue Location/Modal Operating Use Drivers (see Operating Uses section below) Passenger Fares (see next section) Rental Car Tax Department of Revenue Location Code/County Level Sales & Use Tax Department of Revenue Location Code PASSENGER FARES Description Driver Central Link Light Rail Fares Station Boardings Sounder Fares Station Boardings ST Express Fares Route Boardings/Platform Hours Tacoma Link Light Rail Fares Station Boardings 130 of 140 Adopted 2016 Transit Improvement Plan Operating Uses LINK LIGHT RAIL SERVICES OPERATING USES Description Driver Central Link Operations Track Miles/Boardings Tacoma Link Operations Location SOUNDER COMMUTER RAIL SERVICES OPERATING USES Description Driver BNSF North Line Track Miles BNSF South Line Track Miles All Other Sounder Operations Vehicle Miles ST EXPRESS SERVICES OPERATING USES Description Driver Bus Operations Platform Hours DSTT Operations Location OTHER USES Description Driver Art Maintenance Location Other Expenses Location or Board Designation Capital Project Uses (Outlays) System Expansion – Link Light Rail Projects Driver East Link Extension ST2 Adopted Financial Plan Location Downtown Redmond Link Extension Location Federal Way Link Extension Location First Hill Link Streetcar Location Initial Segment 2009 Sound Move Reported Rules Link Operations & Maintenance Satellite Facility ST2 Adopted Financial Plan Lynnwood Link Extension ST2 Adopted Financial Plan Northgate Link Extension Location S. 200th Link Extension Location Tacoma Link Expansion Location University Link Extension Location ST2 LRV Fleet Expansion ST2 Adopted Financial Plan Enhancements to Tacoma Link Expansion Location Adopted 2016 Transit Improvement Plan 131 of 140 System Expansion – Sounder Commuter Rail Projects Driver D St-M St Track & Signal Location Lakewood Station Improvements Location M St.-Lakewood Track & Signal Location Mukilteo Station, South Platform Location Passenger Information System/CCTV Location Point Defiance Bypass Location Puyallup Station Improvements Location Sounder South Expanded Service ST2 Adopted Financial Plan Sounder ST2 Fleet Expansion ST2 Adopted Financial Plan Sounder Yard & Shops Facility ST2 Adopted Financial Plan Sounder Yard Expansion Track Miles Sumner Station Improvements Location Tacoma Trestle Track & Signal Location Tukwila Station Location System Expansion – ST Express Projects Driver 85th Corridor, Kirkland Location Bothell Transit Related Improvements Location Federal Way Transit Center Location I-90 Two-Way Transit & HOV Operations, Stage 3 Location Kirkland Transit Center/3rd Location ST Express Bus Base ST2 Adopted Financial Plan ST Express Mid-Day Bus Storage Location System Expansion – Other Driver Central & East HCT Study Financial Policies Fare Administration Financial Policies Fare Collection Location HCT Corridor Planning Studies Financial Policies Research and Technology Financial Policies South Corridor Alternatives Planning Location ST3 Planning Financial Policies STart Location Enhancement Projects Driver Bike Locker Program Location Bus Maintenance Facility Platform Hours 132 of 140 Adopted 2016 Transit Improvement Plan Enhancement Projects Driver Central Link Card Readers Boardings/Track Miles Central Link HVAC – Instrument House & UPS Room Boardings/Track Miles Central Link HVAC for Traction Power Boardings/Track Miles Central Link Overhead Catenary System Tie Switch Boardings/Track Miles Downtown Seattle Transit Tunnel Mitigation Location Kent Station Parking Lot Paving Location Kent Station Platform Lighting Location Link CCTV System Upgrade Boardings/Track Miles LRV On Board Energy Storage Location Noise Abatement Location Non Revenue Support Vehicles Boarding/ Track Miles OMF LRV Wash Heater System Boardings/Track Miles Operations & Maintenance LRV Vehicle Lift Boardings/Track Miles Pierce Transit Radio System Upgrade Platform Hours Positive Train Control Location Puyallup Station LED Lighting Location Regional Parking Pilot Project Financial Policies Remote Switch Heaters Location Security Enhancements Location Signage Improvements Location ST Express Mobile Communications Platform Hours Sumner Station LED Lighting Location Tacoma Link Fare Collection Location TOD Planning Location TOD Property Disposition Location Union Station Remodel – Renovation of Garden Level Remodel Location Rehabilitation & Replacement Projects Driver Beacon Avenue Paving Location Federal Way: Post Tension Cable Repair Location IT Link Light Rail Financial Policies IT Transit Systems Financial Policies Link Station Braided Tile Replacement Location LRV Overhaul Track Miles/Boardings Small Works Program Location Sounder Vehicle Overhaul Program Vehicle Miles ST Express Fleet Replacement Platform Hours Adopted 2016 Transit Improvement Plan 133 of 140 Station Midlife Refurbishment Program Location Tacoma Dome Station Location Tacoma Link LRV Overhaul Location Tacoma Link LRV Communications Upgrade Location Administrative Projects Driver Administrative Capital Financial Policies Environmental Mitigation, Monitoring and Maintenance Modal Operating Expense Rules Information Technology Program Financial Policies Surplus Property Disposition Location Systemwide Uses Description Driver Agency Administration Financial Policies Debt Service Description Driver Debt Service Financial Plan 134 of 140 Adopted 2016 Transit Improvement Plan Appendix E – Reconciliation of the Proposed 2016 TIP to Adopted 2016 TIP There are three circumstances when the project lifetime budget would change from the Proposed TIP to the Adopted TIP: The TIP contains Board-approved lifetime budget for active projects by phase and year of expenditure forecast. The Proposed TIP, and any amendments to it before the Board adopts the Budget and TIP, is approved by the annual budget resolution. Additional changes to the Proposed TIP arise from budget amendments approved as separate Board actions, in the time between publication of the Proposed and Adopted TIP, or from non-material error corrections. The 2016 TIP was adopted by Resolution No. R2015-36 on December 17, 2015. The TIP also includes summary level six year forecasts for Transit Mode expenses contained in the 2016 Service Implementation Plan (SIP). 1. 1. Amendments adopted by the annual budget resolution. 2. Amendments adopted between publication of the proposed and adopted TIP. 3. Non-material error corrections. Amendments adopted by the annual budget resolution Board committees reviewed and recommended for approval to the Board, amendments to project lifetime budgets published in the proposed TIP. These amendments were adopted by the annual budget resolution (Resolution No. R2015-36, Attachment C) and are shown below. Project Lifetime Budget as reported in Proposed TIP ($000) Revised Lifetime Budget ($000) Change to Project Budget ($000) Comments SYSTEM EXPANSION - LINK 0 2,000 2,000 New Project: Engineering and streetscape design for transit access improvements and station area enhancements around the Tacoma Link Expansion project. ST is grant recipient and administrator. 0 26,185 26,185 Budget to fund expansion of ST Express bus fleet by 27 buses to support added peak service hours. 4X446 - S CORRIDOR ALTERNATIVES PLAN 3,038 2,188 (850) Projected to close in 2015 with project savings. 809100 - ST3 PLANNING 51,851 52,648 797 Transfer project savings from corridor projects to ST3 Planning. 809103 - CENTRAL & EAST HCT STUDY 2,099 2,152 53 Increase lifetime budget to fund additional 2016 project deliverables. 0 731 731 New Project: The project provides necessary maintenance to the Tacoma Link LRV fleet to extend the useful life of the vehicles and maintain them in a good state of repair. 1,334 2,334 1,000 13,334 13,484 150 400034 - ENHANCEMENTS TO TLE SYSTEM EXPANSION - REGIONAL EXPRESS 700720 - ST EXPRESS FLEET EXPANSION SYSTEM EXPANSION - OTHER REHABILITATION & REPLACEMENT 700718 - TACOMA LINK LRV OVERHAUL ENHANCEMENT 700723 - DSTT MITIGATION Project Budget Amendment: Amendment would fund additional planning work related to surface street improvements. ADMINISTRATIVE 802000 - ADMINISTRATIVE CAPITAL Procurement of furniture for space to be used by final design consultants for Lynnwood Link Extension, Link OMSF and Tacoma Link Expansion projects. Note: There may be insignificant variances due to rounding. Adopted 2016 Transit Improvement Plan 135 of 140 2. Amendments adopted between the publication of the proposed and adopted TIP Other budget amendments adopted by the Board subsequent to publication of the Proposed 2016 TIP and prior to publication of the Adopted 2016 TIP are shown below: Project Lifetime Budget Revised Change to Project as reported in Lifetime Budget ($000) Proposed TIP Budget ($000) ($000) Comments SYSTEM EXPANSION - LINK 400008 - TACOMA LINK EXPANSION 7,786 33,002 25,216 Project commenced final design per Resolution R2015-33 in December 2015. 400009 - LINK O&M SATELLITE FACILITY 36,828 133,628 96,800 Project commenced final design per Resolution R2015-34 in December 2015. 400032 - ST2 LRV FLEET EXPANSION 0 733,006 733,006 New Project: This project was established in September 2015 by Resolution R2015-24 to purchase Light Rail Vehicles (LRVs) for Northgate Link Extension, East Link Extension and Lynnwood Link Extension. 461600 - DOWNTOWN REDMOND LINK EXTENSION 0 28,617 28,617 Project was established per Resolution 2016-05 in February 2016. 4X100 - NORTHGATE LINK EXTENSION 2,131,400 1,899,756 (231,645) The lifetime budget was amended in September 2015 and October 2015 by Resolutions: R2015-23 to transfer budget for Vehicles to the new ST2 LRV Fleet Expansion project; and R2015-25 to increase the baseline budget for changes to the U District Station to accommodate transit-oriented development. 4X115 - LYNNWOOD LINK EXTENSION 64,119 487,861 423,742 Project commenced final design per Resolution R2015-30 in December 2015. 4X445 - FEDERAL WAY LINK EXTENSION 42,877 48,790 5,913 Expands the scope of the project to include PE from the Kent/Des Moines Station to the Federal Way Transit Center per Resolution R2016-04 in February 2016. Note: There may be insignificant variances due to rounding. 3. Non-material error corrections. Resolution No. R2015-36, section 5, authorizes the CEO to correct the budget for “non-material errors” to be consistent with Board actions. There were no corrections for 2016. 136 of 140 Adopted 2016 Transit Improvement Plan Appendix F – Glossary A-87 – A federal government Office of Management and Budget circular that establishes principles and standards for determining costs for Federal awards carried out through grants, cost reimbursement contracts, and other agreements with State and local governments. The A-87 Revised (effective June 9, 2004) rescinds and supersedes Circular A-87 (issued May 4, 1995). ADA (Americans with Disabilities Act) – Federal law passed in 1990 that prohibits discrimination in services, facilities, and employment against individuals with disabilities. Adopted Budget – The Board-approved budget and capital plan for Sound Transit for the current fiscal year. Average Weekday Boardings – Number of one-way passenger movements (trips) between two points on a single vehicle on all routes on an average weekday. Baseline – A plan, design, specification, contract, or other approved document or configurations against which actual performance is measured. Baseline can also refer to a schedule or budget used for management control and reporting purposes. BNSF – Burlington Northern Santa Fe Railway - The railroad company that contractually operates Sounder, Sound Transit’s commuter rail service. Board – The Sound Transit Board of Directors, made up of 18 members: 17 elected officials from local jurisdictions within the Sound Transit district and the Secretary of the Washington State Department of Transportation. CEO – Chief Executive Officer of Sound Transit who reports directly to the Board of Directors. COLA (Cost-of-Living Adjustment) – Refers to the annual percentage increase applied to an employee’s salary for inflationary factors. Commuter Rail – Railway for urban passenger train service consisting of local short distance travel operating between a central city and adjacent suburbs. Complaints per 100,000 Boardings – The performance metric (calculated for each mode) that measures the number of service complaints per 100,000 passenger boardings. Calculation = ((Service Complaints Received/ Modal Passenger Boardings) * 100,000) Contingency – A budgetary reserve put aside for emergencies or unforeseen expenses. COP (Citizen Oversight Panel) – An independent panel of 15 volunteers appointed by the Board of Directors representing each of Sound Transit’s five subareas. Its mission is to monitor the agency’s commitment to the public, reviewing projects, budgets, and performance, and reporting its findings and recommendations for improvement to the Board. Cost per Boarding – Calculated for each mode, this metric represents the fully allocated cost of providing service to a passenger. Calculation = (Modal Operating Expenses/Modal Passenger Boardings) Boarding – The number of one-way passenger trips between two points on a single vehicle. Also synonymous with unlinked passenger trip, rider, or passenger. Cost per Platform Hour – Calculated for each mode, this metric measures the fully allocated cost of providing one hour of service, inclusive of revenue and non-revenue time. Capital Asset – Individual assets costing $5,000 or more and having useful lives greater than one year. Also, significant alterations, renovations, or structural changes that increase the usefulness of a Sound Transit owned asset, enhance its efficiency, or prolong its useful life by more than one year. Calculation = (Modal Operating Expenses/Modal Platform Hours) Capital Outlay – An expense that results in the acquisition of or addition to fixed assets. Capital Projects – Projects that purchase or construct capital assets. Catenary – Suspended overhead wire that carries high voltage for electrically-powered transit vehicles (such as light rail) from a central power source. CCTV (Closed Circuit Television) – Cameras installed aboard transit vehicles and at passenger stations for security purposes. CEA – Communications & External Affairs department. Adopted 2016 Transit Improvement Plan Cost per Revenue Vehicle Hour – Calculated for each mode, this metric represents the fully allocated cost of providing one revenue vehicle hour of service. Calculation = (Modal Operating Expense/Modal Revenue Vehicle Hours) CPI (Cost Performance Index) – A measure of the value of the work completed compared to the actual cost or progress made on the project. Deadhead – The amount of non-revenue service time or miles when a bus or train is not carrying revenue passengers, usually a trip from, to, or between lines, yards, or garages. Debt Service – The payment of interest and the repayment of principal on long-term borrowed funds according to a predetermined schedule. 137 of 140 DECM – Design, Engineering & Construction Management department DB (Design-build) – A procurement method used to minimize design and construction risks while reducing the project delivery schedule by overlapping the design phase and construction phase of a project. Using DB, the owner contracts with a single entity for all engineering, design, and construction services for a transit facility/system. Department – Highest organizational unit of Sound Transit, consisting of Communications & External Affairs; Design, Engineering & Construction Management; Executive; Finance & Information Technology; Legal; Operations; and Planning, Environment & Project Development. Depreciation – A method by which the costs of property and equipment are systematically and rationally allocated over their useful life. Division – Organizational sub-unit within departments. DSTT – Downtown Seattle Transit Tunnel EIS (Environmental Impact Statement) – A study of the impacts of a major project on the environment and surrounding areas, required for any capital construction project for which federal funds are used. Expense – A decrease in net current assets. Expenses include salaries and benefits, administrative expenses, debt service, and those current operating costs that require the use of current assets. Farebox Recovery – Calculated for each mode collecting fares, this metric represents the percentage of operating cost of each mode that is paid by transit riders. Calculation = (Modal Operating Expenses/Modal Passenger Fare Revenue) FCC – Federal Communications Commission Fiscal Year – A 12-month period to which the annual operating budget applies and at the end of which a government determines its financial position and results of its operations. Sound Transit’s fiscal year is concurrent with the calendar year. FIT – Finance & Information Technology department FTA (Federal Transit Administration) – The federal agency responsible for the administration of federal transit programs, including the allocation of grant funds. FTA is a part of the U.S. Department of Transportation. FTE (Full Time Equivalent) – The fractional equivalent of one full-time employee working a 40-hour work week for one calendar year. FY – Fiscal Year 138 of 140 GCCM (General Contractor/Construction Manager) – A procurement method used to reduce construction risk. Using GCCM, the owner has access to construction expertise and experience prior to completion of design. Services offered by a GCCM contractor include assistance with decisionmaking, constructability reviews, value engineering, budget control, cost estimating, and schedule control. GFOA (Government Finance Officers Association) – An organization whose purpose is to enhance and promote the professional management of governments for the public’s benefit by identifying and developing financial policies and practices and promoting them through education, training, and leadership. GIS – Geographic Information Services HCT (High Capacity Transit) – Public transportation within an urbanized region operating principally on exclusive rights of way, including interim express services and high occupancy vehicle lanes, which taken as a whole, provides a substantially higher level of passenger capacity, speed, and service frequency than traditional public transportation systems operating principally in general purpose roadways. HOV (High-Occupancy Vehicle) – A vehicle containing two or more passengers. Occupancy designations are used on designated auto traffic lanes to encourage car-pooling, ride sharing, or the use of public transportation. IT – Information Technology KCM (King County Metro) – The public transit division of King County Department of Transportation, responsible for providing bus, trolley bus, light rail, water taxi, paratransit, and vanpool services in a service area of about 2,000 square miles. Sound Transit contracts a portion of its express bus service as well as all of its light rail service with KCM. Light Rail – Service using trains powered with overhead catenary power, operating on tracks embedded in city streets or along a separate right-of-way. Passengers are picked up and discharged at fixed locations (stations) located along the tracks. LRV (Light Rail Vehicle) – A vehicle with overhead catenary power operating on tracks. It may be connected to other vehicles and operated as a train. MMIS (Maintenance Management Information System) – The Maintenance Management Information System is an online system that helps gather and analyze data about an organization’s maintenance operations with the intention of helping management make informed decisions and staff do their jobs more effectively. Mode – A system for carrying transit passengers described by specific right-of-way, technology, and operational features. Sound Transit modes are light rail, commuter rail, and regional express bus. Adopted 2016 Transit Improvement Plan MVET (Motor Vehicle Excise Tax) – Also called the “car tab” tax; this is a tax on vehicles based on the depreciated value of the vehicle using the Manufacturer's Suggested Retail Price (MSRP) as the initial vehicle value. The tax on commercial trucks and trailers is based on the depreciated value using the latest purchase price and year as the initial vehicle value. Sound Transit currently assesses a 0.3 percent MVET within its taxing district. NRV (Non-Revenue Vehicles) – Agency fleet consisting of cars, trucks, vans, SUVs, specialty vehicles, and equipment used for administrative purposes. O&M – Operations and Maintenance OMF – Operations Maintenance Facility On-Time Performance – A performance ratio that measures how often a transit service is on time (i.e., at a designated pick-up spot within a predetermined timeframe). The timeframe differs based on mode and frequency of service. Calculation = ((# Scheduled Trips – # Trips Early or Late)/Total # of Scheduled Trips) ORCA (One Regional Card for All) – A stored-value smart card used for payment of public transit fares in the Central Puget Sound region. Paratransit – The comparable transportation service required by the ADA for individuals with disabilities who are unable to use fixed-route (bus and rail) service. The vehicles used do not operate over a fixed route or on a fixed schedule. PE/ED – Preliminary Engineering and Environmental Documentation PEPD – Planning, Environment & Project Development department Percentage of Scheduled Trips Operated – A performance ratio that measures the number of times a Sound Transit vehicle or mode of service completes its scheduled route/trip Phase Gate – Phase Gate is a project management process designed around a series of eight defined gates. Gates represent key transition and/or decision points in a project’s progression through planning and environmental review, design, construction, and transition to operations. PLA (Project Labor Agreement) – PLAs are collective bargaining agreements between building trade unions and contractors. They govern terms and conditions of employment for all craft workers – union and nonunion – on a construction project. Adopted 2016 Transit Improvement Plan Platform Hours (also called Service Hours) – For any mode, the total time the operator operates the vehicle, including revenue service (scheduled route, special event, and layover time) and non-revenue service (pullout and pullin times from first/last stop to garage). Platform Miles (also called Service Miles) – For any mode, the total miles traveled by a vehicle from pullout of garage/yard to return to garage/yard at end of revenue service, including any layover time and time when not carrying passengers. Preventable Accidents per 100,000 Revenue Miles – For any mode, the number of preventable accidents reported per 100,000 miles of actual revenue vehicle mileage. A preventable accident is one in which the driver failed to do everything that reasonably could have been done to avoid the crash. Calculation = (Preventable Accidents / Actual Revenue Mileage) * 100,000 Proposed Budget – The recommended and unapproved Sound Transit budget submitted by the CEO to the Board. Purchased Transportation – Transportation service provided to a public transit agency from a public or private transportation provider, based on a written contract. Revenue Vehicle Hours – The number of hours that a vehicle is in revenue service and there is a reasonable expectation of carrying passengers (includes layover time, but not deadhead). Revenue Vehicle Miles – The number of miles that a vehicle is in revenue service and there is a reasonable expectation of carrying passengers (includes layover time, but not deadhead). Revenues – Increases in proprietary fund type net total assets from other than expense refunds and capital contributions. ROW (Right-of-Way) – A right-of-way is a right to make a way over a piece of land, usually to and from another piece of land. A right of way is a type of easement granted or reserved over the land for transportation purposes. Also used to describe the land on which a railroad line, road, or utility is built. Sales Tax – A 0.9 percent tax levied on sales of eligible items within the boundaries of the Sound Transit District and collected by the State for the benefit of Sound Transit. SCADA (Supervisory Control and Data Acquisition) – A centralized system to control signals, systems, and substations on Sound Transit’s light rail system. The system also provides real-time location data to a control center. 139 of 140 Service Hours (also called Platform Hours) – For any mode, the total time the operator operates the vehicle, including revenue service (scheduled route, special event, and layover time) and non-revenue service (pullout and pullin times from first/last stop to garage). Service Miles (also called Platform Miles) – For any mode, the total miles traveled by a vehicle from pullout of garage/yard to return to garage/yard at end of revenue service, including any layover time and time when not carrying passengers. SIP (Service Implementation Plan) – This document is produced annually by the Service Planning division and approved by the Board. It details the development of each mode of service, describes any service changes planned for the year, and contains preliminary service proposals and financial projections for the following five years. Smart Card – A small card, usually plastic, with an imbedded computer chip good for one or more trips that is usually altered by a fare collection machine removing some or all of the stored value as each trip is taken. SODO – The general area south of downtown Seattle; also, the name of one of Sound Transit’s light rail stations located in that neighborhood. Sound Move – Voter-approved plan (1996) to build a highcapacity public transit system. Sound Transit – The Central Puget Sound Regional Transit Authority SPI (Schedule Performance Index) – A measure of schedule efficiency on a project. It is the ratio of earned value (EV) to planned value (PV). SR – State Route ST2 (Sound Transit 2) – Voter-approved (2008) second phase of Sound Transit’s plan for mass transit expansion. ST3 (Sound Transit 3) – The third phase of Sound Transit’s plan for mass transit expansion. STart (Sound Transit Art Program) – Program whose purpose is to incorporate public art into Sound Transit systems and facilities that will reflect the communities served and enhance the customer experience. STU (Sound Transit University Program) – Refers to a range of training courses, both on-site and off-site, offered for Sound Transit employees to improve professional and technical skills. TCO (Total Cost of Ownership) – A financial estimate intended to help buyers and owners determine the direct and indirect costs of a product or system. TGT (Technology Governance Team) – Team of Sound Transit employees who provide leadership and direction for the Information Technology (IT) division to ensure reliable, consistent, cost-effective, and accountable services. TIFIA (Transportation Infrastructure Financing and Innovation Act) – A direct loan, loan guarantee, and standby line of credit program allowing the USDOT to provide credit assistance of up to 33 percent of the construction costs of a regionally or nationally significant surface transportation project. Loans are made at U.S. Treasury rates and may be repaid over as long as 35 years after substantial completion of the project. TIP (Transit Improvement Plan) – This document provides projected capital and operating expenditures for the construction and operation of the Sound Transit regional transit system in the central Puget Sound. The TIP contains information on scope and budget as well as changes in budget and schedule for all active phases of both capital and operating programs. TOD (Transit-Oriented Development) – The development of residential, commercial, and retail uses within walking distance of a transit station or stop. TPSS (Traction Power Sub Station) – A wayside unit that converts electric power from the form provided by the public utility to an appropriate voltage, current type, and frequency to supply traction power to the motor of the light rail vehicle through the overhead catenary. TVM (Ticket Vending Machine) – Automated equipment located at customer facilities that enable the purchase of fare media for access to the Sound Transit transportation system. UPS – Uninterrupted Power Supply UW – University of Washington Variance – The difference between planned costs and actual costs. WSDOT – Washington State Department of Transportation YOE (Year of Expenditure) – refers to the representation of a project’s cost inclusive of an annual inflationary factor calculation. Subarea – Five subareas of the Sound Transit District defined for planning and budgeting purposes consisting of Snohomish County, North King County, East King County, South King County, and Pierce County. System Plan – (see Sound Move). 140 of 140 Adopted 2016 Transit Improvement Plan Union Station 401 S. Jackson St. Seattle, WA 98104 1-888-889-6368 TTY Relay: 711 [email protected] soundtransit.org
© Copyright 2026 Paperzz