Embedded Battery Energy Storage System (BESS) Preliminary Enquiry Application This document provides details of the minimum information required to be submitted to CitiPower or Powercor for a preliminary enquiry under chapter 5 of the NER to register a Battery Energy Storage System (BESS) with a capacity greater than 5 MW. The response provided by CitiPower/Powercor will generally not involve a detailed design or technical analysis of this application. Please include details of on site generation as part of the BESS, if applicable. Please fill out this form in black pen and tick the boxes where appropriate. Attach all available documents where requested. If there is insufficient space provided, an attached note may be referred to in the relevant section. Locked Bag 14090, Melbourne, 8001 or via Email to [email protected] SECTION 1: OVERVIEW OF PROPOSED EMBEDDED BESS Submission date Project name Proposed date of construction Proposed in service date Connection Voltage Export Peak Capacity MW Import Peak Capacity MW Location address Existing site on supply No Yes NMI if Yes Number of Phases SECTION 2: PROJECT OBJECTIVES List the objectives of the proposed project 1 2 3 Embedded Battery Energy Storage System - Preliminary Enquiry Application Version 1 – May 2017 Page 1 of 4 WARNING: PRINTED COPIES OF THIS DOCUMENT MAY NOT BE THE LATEST. THE MOST UP-TO-DATE VERSION IS LOCATED ON THE WEBSITE. SECTION 3: APPLICANT DETAILS Applicant Company Name ABN Contact Name Postal Address Telephone Mobile Email Consultant Company Name ABN Contact Name Postal Address Telephone Mobile Email SECTION 4: EMBEDDED BESS DETAILS Please provide the following details below: Intended energy charging source, battery storage details (proposed and existing), invertor specifications, Site generation details if applicable. Intended Energy Charging Source: Charging Source: Battery Storage Type Proposed DC Battery: Size MW Capacity (kWhrs) Type & Model Inverter Make & Model Inverter Voltage Output Capacity kW No of Phases Battery Volt Level Battery Storage Type Existing (if applicable) DC Battery Voltage Inverter Size DC Capacity kW Capacity (MWhrs) AC No of Phases Embedded Battery Energy Storage System - Preliminary Enquiry Application Version 1 – May 2017 Type & Model Output Voltage Level Voltage Level Page 2 of 4 WARNING: PRINTED COPIES OF THIS DOCUMENT MAY NOT BE THE LATEST. THE MOST UP-TO-DATE VERSION IS LOCATED ON THE WEBSITE. Existing on site Generator type (if applicable) Rotating Synchronous Asynchronous (induction) Wind Farm Induction Double Fed Induction Generator Non Rotating DC PV DC Fuel Cell Voltage DC AC Inverter Capacity kW DC FCCG Other Voltage Level No of Phases Voltage Level Proposed on site Generator type (if applicable) Rotating Synchronous Asynchronous (induction) Wind Farm Induction Double Fed Induction Generator Non Rotating DC PV DC Fuel Cell Voltage DC AC Inverter Capacity kW DC FCCG Other Voltage Level No of Phases Voltage Level SECTION 5: EMBEDDED BESS (INCLUDING GENERATION) INTENDED OPERATION Standby Grid connected Non Export Export Max export MW MWh exported per month Charge Rate Discharge Rate Operating Scenario (attach further detail as required) SECTION 6: SUPPORTING INFORMATION TO BE PROVIDED Single Line Diagram Embedded BESS (including on site generation) interface point to the network Disconnection devices, generating equipment, protection devices, metering If upgrade to an existing installation show clearly the existing and new equipment Location map Site location of plant and equipment Proposed connection configuration Harmonics Harmonic content as applicable Plant details and harmonic contents Embedded Battery Energy Storage System - Preliminary Enquiry Application Version 1 – May 2017 Page 3 of 4 WARNING: PRINTED COPIES OF THIS DOCUMENT MAY NOT BE THE LATEST. THE MOST UP-TO-DATE VERSION IS LOCATED ON THE WEBSITE. Fault Level Fault level contribution as per AS 3851-1991 Details of system earthing arrangements Additional Information Grid Interactive Inverter Details Hybrid Inverter details if applicable Energy management system details Applicant Name Applicant Signature Date PRIVACY STATEMENT: The personal information you provide in this form will be collected by CitiPower/Powercor for the purpose of assessing pre approval for connection of your proposed Embedded Generator to the electricity grid. This information will be used and disclosed by CitiPower/Powercor in accordance with its privacy policy. You can find more information on the privacy policy on our website. Embedded Battery Energy Storage System - Preliminary Enquiry Application Version 1 – May 2017 Page 4 of 4 WARNING: PRINTED COPIES OF THIS DOCUMENT MAY NOT BE THE LATEST. THE MOST UP-TO-DATE VERSION IS LOCATED ON THE WEBSITE.
© Copyright 2026 Paperzz