LOST CABIN GAS PLANT CO2 MADDEN AREA Madden Wind River Basin Madden Unit BIGHORN 4-36 BIGHORN 10-5 BIGHORN 9-4 BIGHORN 8-35 BIGHORN 5-6 BIGHORN 2-3 BIGHORN 7-34 Lost Cabin Gas Plant BIGHORN 1-5 •Acreage: 79,500 •“Gas-in-Place”: 3.5 – 5.5 TCFG MADDEN FIELD STRATIGRAPHIC SECTION Fremont and Natrona Counties, Wyoming LOST CABIN MBR. LYSITE MEMBER WIND RIVER FORMATION TERTIARY INDIAN MEADOWS FORMATION SHOTGUN MEMBER WALTMAN SHALE MEMBER -----------A----------LOWER MEMBER -----------B--------------------1.1------------------------TOP-------------------------BASE-------------------------BLUE------------- 3000’ Madden Deep Unit starts in Top of Lower For Union 6000’ FORT UNION FORMATION Approximate Top of Geologic Lance 9000’ 11,000’ LANCE FORMATION Contractual Lance Top (Base Waltman plus 5,500’) 13,000’ MEETEETSEE FORMATION TEAPOT 15,000’ CRETACEOUS MESAVERDE FORMATION BADWATER FALES MEMBER POISON CREEK SUSSEX EQUIV SUSSEX “B” 1st SHANNON 2nd SHANNON 3rd SHANNON 17,000’ “CODY” 18,000’ NIOBRARA FORMATION FRONTIER FORMATION 21,000’ MOWRY FORMATION MUDDY FORMATION P 20,000’ IP PHOSPHORIA FORMATION 23,000’ TENSLEEP FORMATION MISS LIMESTONE KARST MADISON FORMATION C 24,000’ GALLATIN FORMATION PC DOLOMITE 25,000’ PRE-CAMBRIAN BIGHORN WELL DRILLING HISTORY BH 1-5 1983-85 Drilled/Tested BH 2-3 1987-88 Drilled/Tested BH 4-36 1995-97 Drilled/Tested BH 5-6 1999-2000 Drilled/Tested BH 7-34 2000-01 Drilled/Tested BH 8-35 2001-02 Drilled/Tested BH 9-4 2002-03 Drilled/Tested BH 10-5 2006- Spudded in July DEVELOPMENT AND EXPANSION OF LOST CABIN GAS PLANT TRAIN I DEBOTTLENECK 1988-90 Conceptual design work 1993 Construction started 1994 WOGCC Hearing 1995 Online 1997 WOGCC Hearing 1998 TRAIN II TRAIN III 50 MM/D Increases Capacity 15 MM/D 1998 Construction started 1999 Online 2000 WOGCC Hearing 2000 Construction started 2002 Online 65 MM/D 180 MM/D CHEMICAL COMPOSITION OF GAS PROCESSED AT LCGP Methane COS 12% CO2 H2S 20% 1% 67% LCGP PROCESSING SUMMARIZATION CARBON DIOXIDE VENT 50 MMscf/d INLET GAS 310 MMscfd INLET AREA COOLED GAS AIR SALES GAS 200 MMscfd PROCESS AREA H2S Recycle SULFUR SULFUR RECOVERY RECOVERY UNIT UNIT ACID GAS 58 MMscfd PRODUCED WATER 5100 bbls/d SULFUR TO SALES 1460 LT/d VENT TAIL GAS GAS TAIL UNIT UNIT INCINERATOR INCINERATOR DISPOSITION OF VARIOUS COMPONENTS COMPONENT TRAIN I TRAIN II TRAIN III TOTAL INLET GAS 65MMscfd 65MMscfd 180MMscfd 310 MMscfd CARBON DIOXIDE 10 MMscfd 10 MMscfd 30 MMscfd 50 MMscfd CARBON DIOXIDE 2.5 MMscfd 2.5 MMscfd 6.8 MMscfd 11.8 MMscfd 20% of Inlet CO2 Slips process Sales & Incinerator SALES GAS 42 MMscfd 42 MMscfd 116 MMscfd 200MMscfd Various customers (CIG, KM, LC) 310 LT 310 LT 840 LT 1460 LT ACID GAS 12.4 MMscfd 12.4 MMscfd 33.5 MMscfd 58.3 MMscfd SRU PRODUCED WATER 1200 bbls/d 1200 bbls/d 2700 bbls/d 5100 bbls/d Surface Discharge SULFUR COMMENTS 80% of Inlet CO2 is Vented (Fertilizer) AVERAGE CO2 VENT STACK COMPOSITION Train I Train II Train III CO2, mol % 98.318 98.447 98.273 CH4, mol % 1.472 1.389 1.550 C2H6, mol% 0.016 0.015 0.027 N2, mol % 0.103 0.057 0.052 COS, mol% 0.091 0.092 0.098 H2S, ppm 5.000 4.000 8.000
© Copyright 2026 Paperzz