CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 E-Auction Catalogue E-Auction conducted by A H Bilimoria & Co. SALE OF MISC ITEMS OF TATA STEEL PROCESSING AND DISTRIBUTION LIMITED, ON ‘’AS IS WHERE IS AND NO COMPLAINT BASIS’’ Catalogue Serial Number: Materials : Seller: E-Auctionwebsite: TSPDL/AHB/JANUARY/19/16-17, Rev-02 MISC ITEMS At TSPDL Tata Steel Processing And Distribution Limited www.ahbilimoria.com E-Auction Date & Time: 27th JANUARY, 2017at 11.00AM Inspection Date & Time: 25th JANUARY, 2017 :At 10.30 AM ---------------- For inspection of materials the interested customers should report at POWER HOUSE GATE # 3 GATE, Jugsali Police Station, Jamshedpur-831001 BY 10.00 A.M. Date of Security Money Deposit 25th JANUARY, 2017 Till 05.00 PM. Contact Details: For Post E-Auction @ A H Bilimoria& Company E-Auction Room 033-2229-4833/6577 Inspection & Helpdesk Mr. A Dey- 09831132642, Mr. BimalBhardwaj- 09431373386, 08051121855 Sale Confirmation Letter Mr. A Das - 033-2229-4833 / 6577 / 2760, 30290771 Disablement Mr. A Mazumdar- 09883421336 Customer Complaint Mr. A K Sil – 09830074122, Mr. D Pyne – 09830438481 For any unresolved issues Mr. BimalBhardwaj- Email_ [email protected], [email protected] Escalation for unresolved issues Mr. A K Sil – 09830074122, [email protected], [email protected]. For Commercial Issue : Tata Steel Processing And Distribution Limited :Contact Person Mr. Manish Kumar. Contact number: 7070896835 For Delivery related Issued @ Tata Steel Processing And Distribution Limited:Contact Person 1. For CR Plant ( Inside the Tata Steel Works )- Mr. Kaushik Das ; E-Mail- [email protected] Number :- 07070197264 2. For HR Plant ( TSPDL- Bara),- Mr. PrabhatRanjan Das ; [email protected] Contact Number :- 08235671157/ Sujay Kumar Singh ([email protected]) Contact Number :9430715740 3. For Demag Mr.D Saha ([email protected]) ,Contact Number 09234569958 Page 1 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 A. MATERIAL DETAILS: Quantity offered is based on eye estimation. Delivery will be made for the estimated quantity or actual ground stock, whichever is lower. Estimation error may arise. After inspection, no complaint of whatsoever nature on estimated /offered quantity shall be entertained under any circumstances. Bidders are advised to make their own judgement on offered quantity before bidding. B. INFORMATION AND INSTRUCTION 1. EMD can be adjusted in the final installment/lot. 2. Customers have to ensure regular lifting as and when material availability communicated by TSPDL in writing. 3. Only for HDPE, LDPE, Dust & Mucks at CR Plant TSPDL, if full truckload is not available, customer will be given an incentive of Rs. 500 per truck if the customer places the truck within 02 days of intimation by TSPDL/AHB in writing. 4. The offered quantity (in the auction) can be increase if mutual agreement happens between TSPDL and customer. 5. For Demag plant any scrap dispatch from Demag unit; vehicle has to tare weight at our BARA plant and then place to Demag unit. After loading vehicle has to report once again at Bara for final weight and then invoicing at Bara. This is to be followed strictly otherwise, billing cannot be done. 6. Presence of supervisor during loading is required. LOCATION MATERIAL DESCRIPTION LOT NO QTY. (STOCK + ARISING) 100.00 UOM E.D VAT TCS LOADING MT 12.50 % 5% 1% SELF TSPDL-CRJAN-01 CR PLANT, INSIDE OF TATA STEEL WORKS Folded GP Sheets (Packaging sheet of raw material coils of CR & GP). (Arising for the months of feb’17 to apr’2017) TSPDL-CRJAN-02 CR PLANT, INSIDE OF TATA STEEL WORKS CR (rejected) End Cuts of SJCR Plant (Thickness: 0.4-3.2mm, Width: 150-1540mm, length: 50-4000mm) (Arising for the months of feb’17 to apr’2017) 200 MT Nil 5% 1% Self TSPDL-CRJAN-03 CR PLANT, INSIDE OF TATA STEEL WORKS Empty Oil Drums including condemned of capacity 210 Ltr. (Arising for the months of feb’17 to apr’2017) 100 Nos 12.50 % 5% 1% SELF Page 2 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDL-CRJAN-04 CR PLANT, INSIDE OF TATA STEEL WORKS TSPDL-CRJAN-05 CR PLANT, INSIDE OF TATA STEEL WORKS TSPDL-CRJAN-06 CR PLANT, INSIDE OF TATA STEEL WORKS TSPDL-CRJAN-07 CR PLANT, INSIDE OF TATA STEEL WORKS TSPDL-CRJAN-08 CR PLANT, INSIDE OF TATA STEEL WORKS Oil Drums of capacity 210 Ltr. With residual unusable RP oil, Gear oil, Transformer oil and water in as is where is basis;separation of oil &water is not allowed. Only PC & MOEF Certified customer required to bid. (Arising for the months of feb’17 to apr’2017) Rejected and used GC Sheet (Roofing Sheets may be of full length or cut sheet and may include some quantity as old and rusted with holes punched in the sheet for fixing purpose originally. (Arising for the months of feb’17 to apr’2017) Rejected and Used wire rope slings of various diameters (Gas Cut) ((Arising for the months of feb’17 to apr’2017) 10500 (50pcs) Ltr 12.50 % 5% 1% SELF 30 MT 12.50 % 5% 1% SELF 3 MT 12.50 % 5% 1% SELF Dust and Mucks a. Scrap wood pieces of various types. b. Scrap Cardboard papers. c. Scrap woolen carpets (may be with RP oil in it) d. Scrap Mat Carpets (May be with RP oil) e. Small HDPE, LDPE and VCI laminated HDPE pieces. f. Small plastic ID and OD protectors g. Oil and grease dipped Jute and Banyan cloths h. Dust generated in sweeping of the floor of CR unit. i. Rejected wooden pallets/gutkas. (Arising for the months of feb’17 to apr’2017) Rejected and used FRP Sheet (Roofing Sheets may be of full-length, cut sheet and may include some olddamaged pieces). (Arising for the months of feb’17 to apr’2017) 200 MT 12.50 % 5% 1% SELF 5 MT 12.50 % 5% 1% SELF Page 3 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDL-CRJAN-09 CR PLANT, INSIDE OF TATA STEEL WORKS Rejected Eco-ventilator set (Used Eco ventilator removed from roof shed) (Arising for the months of feb’17 to apr’2017) 50 Nos 12.50 % 5% 1% SELF TSPDL-CRJAN-10 CR PLANT, INSIDE OF TATA STEEL WORKS Rejected and used Steel Rolls (Solid and Hollow discarded from Machines) ((Arising for the months of feb’17 to apr’2017) 3 MT 12.50 % 5% 1% SELF TSPDL-CRJAN-11 CR PLANT, INSIDE OF TATA STEEL WORKS Rejected and used Nitrile rubber Stripper Ring discarded from machines (STOCK BASIS). 1.5 MT 12.50 % 5% 1% SELF TSPDL-CRJAN-12 CR PLANT, INSIDE OF TATA STEEL WORKS Rejected and used Conveyor belts discarded from machines (STOCK BASIS) 05 MT 12.50 % 5% 1% SELF TSPDL-HRJAN-13 HR PLANT- BARA 10.00 MT Nil 5% 1% SELF TSPDL-HRJAN-14 HR PLANT- BARA Miscellaneous melting structural like cut pieces of Steel angle, Channel, Beam, Pipe,which are less than one feet & damaged structural steel of any length. (Arising for the months of feb’17 to apr’2017) Melting Scrap, which are rejected from any fabrication material,may include some old and rusted material. (Arising for the months of feb’17 to apr’2017) 20.00 MT Nil 5% 1% SELF TSPDL-HRJAN-15 HR PLANT- BARA Light Melting Scrap consisting of CR cut sheet, GP cut sheet, Coil ID protectors, and OD Protector may include some old and rusted material. (Arising for the months of feb’17 to apr’2017) 5.00 MT Nil 5% 1% SELF ( Cancel) Cancel) Page 4 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDL-HRJAN-16 HR PLANT- BARA Rejected and Used wire rope slings of various diameters (Gas Cut) (Arising for the months of feb’17 to apr’2017) 1.00 MT Nil 5% 1% SELF TSPDL-HRJAN-17 HR PLANT- BARA Scrap wood consisting of various type of rejected wood in the form of flat pcs or box) (Arising for the months of feb’17 to apr’2017) 10.00 MT Nil 14 % 1% SELF TSPDL-HRJAN-18 HR PLANT- BARA Strap end Cuts which also include some old and rusted material,Bundling is allowed for the lot (Arising for the months of feb’17 to apr’2017) Rejected and used GC Sheet (Roofing Sheets may be of full length or cut sheet and may include some quantity as old and rusted. (Arising for the months of feb’17 to apr’2017) 15.00 MT Nil 5% 1% SELF TSPDL-HRJAN-19 HR PLANT- BARA 5.00 MT Nil 5% 1% SELF TSPDL-HRJAN-20 HR PLANT- BARA Rejected and used FRP Sheet (Roofing Sheets may be of full-length, cut sheet and may include some olddamaged pieces). (Arising for the months of feb’17 to apr’2017) 1.00 MT Nil 5% 1% SELF TSPDL-HRJAN-21 HR PLANT- BARA Rejected HDPE (Arising for the months of feb’17 to apr’2017) 8 MT Nil 5% 1% SELF TSPDL-HRJAN-22 HR PLANT- BARA Rejected LDPE (Arising for the months of feb’17 to apr’2017) 2 MT Nil 5% 1% SELF Page 5 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDL-HRJAN-23 60 Nos Nil 5% 1% SELF 2000 10 pc Liter 12.50 % 5% 1% SELF 2.00 MT Nil 5% 1% SELF HR PLANT- BARA Oil Drums of capacity 200 Liter With residual unusable( RP oil, Gear oil, Transformer oil )and water in as is where is basis; separation of oil &water is not allowed. Only PC & MOEF Certified customer required to bid. Arising for the months of feb’17 to apr’2017) Shear blades discarded from machine. (Arising for the months of feb’17 to apr’2017) 3.00 MT Nil 5% 1% SELF HR PLANT- BARA Slitting cutter discarded from machine. (Arising for the months of feb’17 to apr’2017) HR PLANT- BARA TSPDL-HRJAN-24 HR PLANT- BARA TSPDL-HRJAN-25 TSPDL-HRJAN-26 Empty Oil Drum of capacity 200 Ltr. (Arising for the months of feb’17 to apr’2017) TSPDL-HRJAN-27 HR PLANT- BARA Rejected HR End Cuts Sheets (Arising for the months of feb’17 to apr’2017) 45.00 MT Nil 5% 1% FREE LOADING TSPDL-HRJAN-28 HR PLANT- BARA Rejected HR Slit Coils (Arising for the months of feb’17 to apr’2017) 60.00 MT Nil 5% 1% FREE LOADING TSPDL-HRJAN-29 HR PLANT- BARA Rejected HR Side Trim (Arising for the months of feb’17 to apr’2017) 30.00 MT Nil 5% 1% FREE LOADING Page 6 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDL-HRJAN-30 HR PLANT- BARA Rejected Stripper Rings discarded from machine. (Arising for the months of feb’17 to apr’2017) 1.00 MT Nil 5% 1% SELF TSPDL-HRJAN-31 HR PLANT- BARA Rejected and Unusable Roll discarded from machine. excluding Rubber rolls. (Arising for the months of feb’17 to apr’2017) 3.00 MT Nil 5% 1% SELF TSPDLDEMAGJAN-32 DEMAG PLANT Scrap wood consisting of various type of rejected wood in the form of flat pcs or box) (Arising for the months of feb’17 to apr’2017) 1.00 MT Nil 14 % 1% SELF TSPDLDEMAGJAN-33 DEMAG PLANT 12600 (60 pc) Ltr. Nil 5% 1% SELF TSPDLDEMAGJAN-34 DEMAG PLANT Oil Drums of capacity 210Ltr. With residual unusable RP oil, Gear oil, Transformer oil and water in as is where is basis; separation of oil &water is not allowed. Only PC & MOEF Certified customer required to bid. (Arising for the months of feb’17 to apr’2017) Rejected and cut pieces annealed wire (Arising for the months of feb’17 to apr’2017) 1.50 MT Nil 5% 1% SELF TSPDLDEMAGJAN-35 DEMAG PLANT 4.50 MT Nil 5% 1% SELF Strap end Cuts which also include some old and rusted material,Bundling is allowed for the lot (Arising for the months of feb’17 to apr’2017) Page 7 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 TSPDLDEMAGJAN-36 DEMAG PLANT Miscellaneous melting structural like Angle, Channel, Small or residual pcs of plate and Rejected pipes) (Arising for the months of feb’17 to apr’2017) 5.00 MT Nil 5% 1% SELF TSPDLDEMAGJAN-37 DEMAG PLANT Rubber scrap which include Stripper rings and insulated rubber pipes) (STOCK BASIS) 500 KG Nil 5% 1% SELF TSPDLDEMAGJAN-38 DEMAG PLANT Mixed Non- ferrous scrap which include Paper and HDPE polyethene) (STOCK BASIS) 500 KG Nil 5% 1% SELF TSPDLDEMAGJAN-39 DEMAG PLANT Rejected HDPE(STOCK BASIS) 500 KG Nil 5% 1% SELF TSPDLDEMAGJAN-40 DEMAG PLANT Wire rope HS steel SLINGS. (STOCK BASIS) 500 KG Nil 5% 1% SELF 1. Payment and Lifting Schedule: Successful customers have to strictly adhere to the payment schedule mentioned below; no deviation in payment terms against arising lots will be permitted. Page 8 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 Lifting Schedule (working days from the next day of DO release) Lot No. For All Material EMD (10 % of Total Lot Value ) 02 Working days from Date of Lot Confirmation Balance Payment Schedule for Arising Quantity FEB’17 to APR’17should be deposited by as per schedule. For Stock +Arising of FEB’ 17 - Payment to be made within the two days from the EMD. For arising of MAR’17 – Payment to be made by 27th FEB’17. For arising of APR’17 – Payment to be made by 27th MAR’17. Lifting Schedule CUSTOMERS HAVE TO LIFT THE MATERIAL WHENEVER STOCK INCREASES FROM ONE VEHICLE QTYFOR EVERY ITEMS. For CR • CUSTOMERS HAVE TO LIFT AS PER DETAILS MENTIONED IN ITEM DESCRIPTION. For Stock Qty Lifting should be completed within 10 Working Days From the Date of SO 1. Suitable extension of due date for payment and lifting will be accorded in case of any eventualities like Strike/ Bandh/ Special restriction on vehicular movement imposed by the local Administration etc. 2. Requirements of participation: 2.1 Registration: Before participation in the E-Auction, a prospective bidder shall be required to get registered with A H Bilimoria& Co. For details visit www.ahbilimoria.com. 2.2 Documentation: The following documents need to be submitted by the bidder interested in participating in the E-Auction to A H Bilimoria& Co. prior to the Date of the E-Auction. PAN Card, TIN No, Registration Form Letter of Interest duly signed and stamped by bidder. Each page of the Terms & Conditions to be signed and stamped by the buyer and to be submitted to A H Bilimoria& Co. Bidders are requested to submit copies of their SOI's before participating in the E-Auction. 2.3 Security Deposit: Non-Interest bearing security deposit of Rs.50,000/- (Rupees Fifty Thousand only) in favour of “A H Bilimoria& Co.” payable at Kolkata/Jamshedpur. 2.4 Modes of Security Deposit: PO / DD / CHQ or through NEFT in favour of "A. H. BILIMORIA & COMPANY" to be deposited with HDFC Bank A/c. No. 06932560001205, IFSC Code: HDFC0000693, Branch name: 31, Chowringhee Road, Kolkata – 700016. 3. Inspection Rules & Policy: All interested parties should reach at GOPAL MAIDAN, Opp. Novelty Restaurant, Bistupur Police Station, Jamshedpur-831001, by 10:00 AM (or as announced) on the date of inspection. Page 9 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 Only registered customers/bidders/representatives of firms shall be allowed for inspection of material, subject to fulfilling their safety requirement of the steel works. Taking photographs of the material is strictly prohibited. Customers are advised to ensure that they inspect the materials on offer on the scheduled date as mentioned in the catalogue, before Participating in the E-Auction. It is retreated that all materials are offer / sold by Tata Steel Processing And Distribution Limited on“AS-IS-WHERE-IS” and “NOCOMPLAINTS” basis, and no complaint what so ever shall be entertained regarding the quality of materials after the sale. (All are required to bring safety Goggles, Safety Helmet, leg guards, & Safety Shoes. Without the safety equipment’s no one will be allowed to inspect the material inside the works) “Tata Steel Processing And Distribution Limited would not accept any claim from any customer for non-inspection of materials.” Interested bidders have to come with safety shoes, safety jackets, safety goggles, safety laggards& safety helmets at the time of inspection. All interested parties have to arrange for their own safety shoes, safety jackets, safety helmets and safety goggles as per Tata Steel Processing And Distribution Limited standards. No person will be allowed to enter the works without these. Compliance to Tata Steel Processing And Distribution Limited safety norms is a must. No complaints during lifting, in what-so-ever manner, will be entertained if customers fail to inspect the materials during scheduled inspection dates. No ''people movement'' shall be allowed within the danger zone, at the time of loading/delivery of materials from the yards. Tata Steel Processing And Distribution Limited will not be responsible for any delays arising out of non-compliance to Tata Steel Processing And Distribution Limited norms. 4. Bidding modalities: 3.1 Price Bid Basis: In Indian rupees as per unit of measurement as given in Material List. Price to be quoted is basic, ex- location exclusive of excise duty (In case of consignment agency sale price to be quoted ex location inclusive of excise duty), Sales tax and any other statutory levies. 3.2 Bid Increment : Rs.100/- ( Rupees Hundred only ) / (or as specified) 3.3 Type of E-Auction: English No Ties 3.4 Bid Validity: Bid shall be valid for 15(Fifteen)working days excluding Sundays and holidays counted from the next day of E-Auction process in case of E-Auction against a catalogue which is completed on the same day. And if it is continuing on any other day the counting of days for lot confirmation shall be from the next day of completion of entire E-Auction process. 4. Taxes & duties: 4.1 VAT / Sales Tax : As applicable 4.2 Excise Duty : As applicable 4.3 TCS : As applicable. In case of availing of concessional rate of TCS proper certificate issued by appropriate Income Tax authority are to be issued in favour of the Principal Company along with payment. Self certification of Form no 27C is not acceptable. Form 27C will also have to be certified by appropriate Income tax authorities. 4.4 CST: The differential CST of 3% has to be made separately and deposited along with EMD. The same will be refunded after receiving complete endorsed C form. CST 3% security deposit is to be made available at AHB’s Kolkata / Jamshedpur office on or before the due date of balance payment. Mode of payment of CST security deposit are: By way of PO/DD or through NEFT in favour of ‘’ TATA STEEL PROCESSING AND DISTRIBUTION LIMITED. to be deposited with HDFC BANK A/C No-00870310000919, IFSC Code: HDFC0000087, Branch name: MITHILA MOTORS, NEAR RAM MANDIR, BISTUPUR, JSR-831001. Page 10 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 4.5 Any change in Excise duty, taxes and levies applicable at the time of lifting shall be applicable. 5. Payment terms & conditions : 5.1 Payments: PAYMENT FACILITY BY RTGS / NEFT ONLY Account no. : 0870310000919, Beneficiary name: TATA STEEL PROCESSING AND DISTRIBUTION LIMITED. Bank Name: HDFC BANK LTD., IFSC Code: HDFC0000087, Branch Name: Mithila Motors, Near Ram Mandir, Bistupur, Jsr-831001. All payment related confirmation and details should be addressed to Mr. Sanjay Kumar ([email protected]), All blocked SO communication should be addressed to Mr. BiplabDutta ([email protected]), Mr. Barun Mukherjee ([email protected])Mr. Sanjay Kumar ([email protected]), Ramesh Sharma ([email protected]). Material availability communication should be addressed to Mr.Kaushik Das (Jsr) ([email protected]), PrabhatRanjan Das ([email protected]),D Saha ([email protected]) Any other queries Communication should be addressed to Mr. Manish Kumar ([email protected]), Mr. Sidhartha Dash ([email protected]). 5.2 5.3 5.4 5.5 5.6 5.7 EMD:10% of the total material value to be paid within 02 (Two) working days from the date of lot confirmation. EMDwill be adjusted in the final installment. EMD payment is to be made within the time limit as given in letter of confirmation. No extension will be provided for the same. Balance Payment Time: (As per payment schedule) Delayed Payment Charges (DPC): Installment payments with DPC @ five (05) paise per Rs. 100 per day will be accepted up to 4 (Four) working days from due date of installment payment as mentioned in the confirmation letter. This is not applicable for EMD payment. Only Sundays are excluded for counting purpose for payment schedule. In the event of Non-Receipt of Payment within the stipulated period of Payment, the Sale Offer for the approved Lot shall stand withdrawn automatically. Buyers have to send the payment deposit slip (UTR No /Scan Copy of NEFT/RTGS Transaction Slip) against Lot No. immediately after the payment to AHB at email id: [email protected], [email protected],[email protected],[email protected] 6. Lifting terms & conditions: 6.1 DOs will be handed over to authorized representatives of bidders on receipt of payment.Lifting date is calculated from the next day of DO Release date. 6.2 Loading Charges: Self, Loading Time: - 8.00 AM to 5.00 PM. Presence of Supervisor is necessary while loading of Scrap. 6.3 Please note Loading shall be given strictly as per the statutory norms & safety norms of TSPDL. Winning bidder must have registration with PF, ESI, LABOURLICENSE. Party to ensure that the workers engaged by them are covered under PF, ESI/Group Insurance & document should be submitted for applying for gate pass. 6.4 Loading shall be given strictly as per the statutory norms & safety norms of Tata Steel Processing And Distribution Limited Ltd.Winning bidder need to provide the Authorization letter for the transporter. Page 11 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 6.5 Lifting with Ground Rent: Lifting along with ground rent will be allowed up to 4 (four) working days from the last date of lifting period. In case the lifting is not complete, and no request is made by the customer within the period of four days, the company reserves the right to close the lot, and refund the balance to the party after deducting for any shortfall in lifting as per norms laid down in the catalogue. Ground Rent will be calculated on balance unlifted quantity @ 05 paisa (inclusive of service tax) per Rs.100/- per day 6.6 Additional lifting days for advance payment of installment - if the installment payment is made in advance, then additional lifting days (equivalent to the number of days payment made in advance) would be given, this would not be applicable for emd payment. 6.7 Customer has to place only the vehicle, which is less than 10 year old from HSM gate. 6.8 Pick & choose not allowed for any of the lots. 6.9 Lot transfer will not be allowed& no stock transfer will be done. 6.10 Use of hydra cranes by customers in any premises/location /stockyards of tata steel processing and distribution limited and its vendors/ consignment agents' premises is banned. 6.11For lifting of materials from CR Mill, Trucks entering through HSM Gate, Vehicles whose age do not exceed 10 years are to be deployed. 7. Penalties: 7.1 The following penalties shall be applicable in the eventuality of a buyer defaulting in making the payment of EMD (wherever applicable) or any installment/s, as per the stipulated schedule for each lot, in a financial year: In the first instance, a penalty of Rs. 50,000/- (Rupees Fifty Thousand only) shall be recovered from the customer. In the second instance, a penalty of Rs.100,000/- (Rupees One Lakh only) shall be recovered from the customer. In the third, and any subsequent instance, a penalty of Rs.150,000/-(Rupees One Lakh Fifty thousand only) shall be recovered and the customer shall be debarred from participating in any E-Auction for a period of three months from the date of debarment. In the event of any default, the customer’s user id will be disabled and the customer will be blocked from participating in any E-Auction of TSPDL with immediate effect. The defaulting customer shall be allowed 06 (six) working days to deposit the penalty as mentioned above. In case the penalty is not received within the stipulated period, the customer’s security deposit shall be forfeited, and the defaulting customer shall be debarred from participating in any EAuction of TATA STEEL PROCESSING AND DISTRIBUTION LIMITED. 7.2 If after making payment of EMD (wherever applicable), the installment payment/s are not made by the customer as per the stipulated schedule for each lot, the entire EMD amount against such lot shall be forfeited. 7.3 In case of non- lifting of full lot quantity against DO after making full payment. 1st Instance: - A penalty equivalent to 20% of the material value for the un-lifted quantity against each lot will be recovered from the customer + EMD will be forfeited + Debarment of customer from any auction of TATA STEEL PROCESSING AND DISTRIBUTION LIMITED for a period of 3 months. 2nd Instance :- :- A penalty equivalent to 20% of the material value for the un-lifted quantity against each lot will be recovered from the customer + EMD will be forfeited + Debarment of customer from any auction of TATA STEEL PROCESSING AND DISTRIBUTION LIMITED for a period of 6 months. Page 12 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 3rd Instance: - :- A penalty equivalent to 20% of the material value for the un-lifted quantity against each lot will be recovered from the customer + EMD will be forfeited + Debarment of customer from any auction of TATA STEEL PROCESSING AND DISTRIBUTION LIMITED permanently. 7.4 Penalty for dishonour of cheques: In case of dishonor of a payment instrument deposited by a customer for any reason whatsoever, the following shall be recovered from the customer: Rs.1000/- (service tax inclusive) in form of Demand Draft towards bankers charges per instrument. Delayed payment charges @ 5 paise per Rs.100/- per day for the period of delay beyond the due date. Penalty @ 1% ( Inclusive of service tax) of the dishonoured amount, subject to a maximum of Rs.25000/- ( Rupees Twenty Five Thousand Only) per dishonoured instrument In case of non- compliance by the bidder the penalties as given in clause no. 7.1 shall be applicable. 7.5 Penalty for dishonor of cheques submitted for CST payment : In case of dishonor of a payment instrument deposited by a customer for any reason whatsoever, the following shall be recovered from the customer:Rs.1000/- (Rupees one thousand in form of Demand Draft) towards bankers charges per instrument. DEFAULTS WOULD BE COUNTED AGAINST TATA STEEL PROCESSING AND DISTRIBUTION LIMITED AND NOT AGAINST A PARTICULAR EAUCTIONEER 8. Lot Closure Norms:For Lot Closure, the tolerance would be ± 10% of the original quantity. 9. Refund : For refund against ‘’C’’ Forms & Short Quantity please contact please contact Mr. Chintamani ( TSPDL ) (09234550337 ) Bidders have to mention their contact address, contact person, telephone number and email ID. 10. Complaints: Complaints, if any, with regard to any transaction shall have to be lodged by the buyer within three calendar months from the date of last invoice. No complaint shall be entertained thereafter, under any circumstances. 11. Jurisdiction: Any dispute arising out of any contract shall be decided in Jamshedpur by the courts in Jamshedpur and by no other courts. The courts in Jamshedpur shall have exclusive jurisdiction to adjudicate upon any such dispute. 12. General terms & conditions: 12.1Any dispute on condition of material shall not be entertained at any point after confirmation of lot. 12.2All materials are offered/sold on “As is Where is Basis” and “No Complaint Basis”. 12.3Payment and invoicing has to done in the name of the H1 bidder, subject to the prices being approved. 12.4Material purchased should be the only material being lifted from the designated location. Tata Steel Processing And Distribution Limited to check any vehicle at any moment of has the right time. If material lifted differs from the material that is purchased by the buyer, and then the buyer/authorized Page 13 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 representative will be permanently debarred and penal action against the buyer/ authorized representative as deemed fit shall be taken by Tata Steel Processing And Distribution Limited Ltd. 12.5If the safety compliance is not followed then Tata Steel Processing And Distribution Limited can penalize the buyer/authorized representative as deemed fit. 12.6These terms and conditions as stated above supersede the relevant terms & conditions that are given in Tata Steel Processing And Distribution Limited Secondary General Terms and Conditions. The terms & conditions not covered above will be as per Tata Steel Processing And Distribution Limited’s 12.7Quantity offered is based on eye estimation. Delivery will be made for the estimated quantity or actual ground stock, whichever is lower. Estimation error may arise. After inspection, no complaint of whatsoever nature on estimated /offered quantity shall be entertained under any circumstances. Bidders are advised to make their own judgement on offered quantity before bidding. 12.8Presence of supervisor during loading is required. 12.9Customers have to lift whenever stock increase from one vehicle qty. some material in cr need lifting daily irrespective of stock quantity 12.10The quantity of offered quantity can be increase if mutual agreement happens between TSPDL and Customer. 12.11Please note Loading shall be given strictly as per the statutory norms & safety norms of TSPDL. Winning bidder must have registration with PF, ESI, LABOUR LICENSE. Party to ensure that the workers engaged by them are covered under PF, ESI/Group Insurance & document should be submitted for applying for gate pass. 12.12Loading Time: - 8.00 AM to 5.00 PM 12.13 EMD WILL BE ADJUSTED IN THE FINAL INSTALLMENT. CUSTOMERS HAVE TO LIFT WHENEVER STOCK INCREASE FROM ONE VEHICLE QTY. 12.14 Successful customers have to strictly adhere to the payment schedule mentioned below, no deviation in payment terms against arising lots will be permitted. 13. Lot Photograph:Photographs of lots are at best indicative only and do not necessarily reflect the actual condition of lots. All bidders are advised to physically inspect the offered lots before participating in the E-Auctions. Tata Steel Processing And Distribution Limited or AHB shall not be responsible or liable for any error of judgment or bids put by bidders acting on the basis of these photographs. 14. Documents for verification regarding entry of vehicles inside Tata Steel Processing And Distribution Limited works : a. 15.06.2014, Eye Test certificate production is mandatory for all Truck Drivers. If the age of the driver is less than 45 years frequency of production of such certificate is once a year and if the age of the driver is more than 45 years the frequency of production of such certificate will be at an interval of every 6 months. Page 14 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 15 Compliance to safety norms 15.1 Authorized persons (of the customer) involved in lifting of the materials will be allowed only with Personal Protective Equipments (PPE) i.e., Safety Shoes, Safety Helmet, Safety Goggles, Fluorescent Jacket and Hand Gloves. No "people movement" shall be allowed at the time of loading/delivery of materials from the yards" Tata Steel Processing And Distribution Limited will not be responsible for any delays arising out of Non- Compliance to the Safety Norms. 15.2 Documents for verification regarding entry of vehicles inside Tata Steel Processing And Distribution Limited works : All customers to note that presentation of following set of documents to TATA STEEL PROCESSING AND DISTRIBUTION LIMITED authorities is COMPULSORY at the time of reporting of vehicles at TATA STEEL PROCESSING AND DISTRIBUTION LIMITEDdesignated Gate for entry of Customer trucks/vehicles. a. Driving License of driver. b. Registration Card. c. Commercial Certificate. d. Fitness Certificate of Vehicle, e. Re-registration for vehicles older than 15 years f. Insurance The checklist form will be filled in at TATA STEEL PROCESSING AND DISTRIBUTION LIMITED designated Gate for entry of Customer trucks/vehicles before entry of vehicle. 15.3 The drivers of the vehicle must have the eye test certificate.The frequency of the testing would be as below: 15.3.1. If the age of the person is less than 45 years - Once in a year 15.3.2 If the age of the person is 45 years or more, the testing is required to be done once in every 6 months 15.4Requirements: a) Buzzer with Turning Indicator:- 1st June ,b) SUPD &RUPD :- With Immediate effect Page 15 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 Page 16 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 16.TRUCK DAIGRAM: Sl No. Safety Parameters to be checked Page 17 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 1 Three Piece Mirror( Truck, Trailer & Dumper)-Helper side 2 Single Mirror- Driver side 3 Rear View Mirror (Tata Ace, 207, Jeep etc.) 4 Service Brake 5 Parking Brake 6 Seat Belt 7 Head Light 8 Parking Light 9 Blinker 10 Horn 11 Reverse Alarm 12 Wiper 13 Windshield Glass 14 Air Pressure Min. 7 Kg/Cm^2 15 Run Under Protection Guard as per TATA STEEL PROCESSING AND DISTRIBUTION LIMITED standard 16 Side under Protection Guard as per TATA STEEL PROCESSING AND DISTRIBUTION LIMITED standard 17 Tyre Condition (Tread Depth, Cut Mark etc.) 18 Any Oil Leakage from the vehicle 19 Physical condition of Dallah 20 Availability of scotch block 21 Buzzer with side indicator 22 Driver's eye examination report Legal Documents to be checked: Sl No. 1 RC Book 2 Insurance 3 Pollution 4 Driving licence 5 Fitness for more than 15 years old vehicle 6 NOC for outside vehicles Documents to be Checked Page 18 of 19 CATALOUGE SERIAL NO: TSPDL/AHB/JANUARY/19/16-17, Rev-02 January 25, 2017 17. Charge of Sales Tax (VAT / CST) and issue of Statutory Forms 17.1 The applicability of Sales tax (VAT/ CST) is determined on the basis of the destination state where the goods are being shipped to.(For instance goods shipped to within Jharkhand would attract VAT even though the SOLD-TO customer is registered outside Jharkhand. Similarly in case of goods being shipped to outside Jharkhand, CST would be chargeable even if the SOLD-TO customer is from within the state of Jharkhand) 17.2 C Form against concessional inter-state sales would be issued only by the SOLD-TO customer. Under no circumstances, the Form issued by SHIP-TO customer would be accepted. 17.3 E1 form would be issued only to the SOLD-TO customer against submission of C Form by the same. Under no circumstances, the Form would be issued to SHIP-TO customer. 17.4 JVAT404 Form for local sales tax (VAT) would be issuedonly to the SOLD-TO customer, subject to VAT being charged on the Tax Invoice. Under no circumstances, the Form would be issued to SHIP-TO customer. 17.5 Timelines for submission of Forms / request for issue of Forms ( Pt. 17.2-17.4, ) would be as below: 17.6 Submission of C Form: All C Forms against concessional inter-state sales must be submitted by the customers (complete in all aspects) and received at AHB’s office at Kolkata for every quarter by the last day ofthe subsequent quarter (except for the E1 customers wherein it has to be Submitted within 60 days from the end of the quarter, so that E1 form can be issued well in time). In case of non-receipt of C form as aforesaid; Debit Notes for the differential tax would be raised in the following month, after the end of succeeding respective quarter. 17.7 Request for issue of E1 Form: Customers eligible for issue of E1 Forms, are required to provide monthly E1 transaction details in the specified format, on or before the 5th working day of the subsequent month.Requisite documents along with the enclosures should be submitted within 60 days of the end of the quarter. This shall be entertained subject to receipt of C Forms along with correct endorsement as mentioned above.Any requests / applications / details / documents (as mentioned above), received beyond the above timelines shall not be accepted or processed under any circumstances. 17.8 Application for JVAT404: All applications for JVAT404 from eligible customers need to be received at AHB’s Jamshedpur office within 2 months from the end of the financial year. Any application received beyond this point shall not be entertained under any circumstances. For ODR items Customer / Authorized Lifter has to do Route Mapping in consultation with Tata Steel Processing And Distribution Limited. Post Ro. SPECIAL TERMS AND CONDITIONS FOR INTERNET E-AUCTION Bandwidth problems, connectivity problems with the local isp (internet service provider), slowness to access pages for downloading etc. are beyond the control of tspdl and a h bilimoria & company. Hence no responsibility lies with tspdl or a h bilimoria & company for the above problems faced, if any, by the bidders before/during the e-auction any bid placed using the bidder's username and password is unconditionally binding on the bidder to whom such username and password had been allotted and he shall be solely responsible for maintaining the confidentiality of the same and fully responsible for all activities that occur under their username and password.hence the user is advised to check the username and password before the e-auction in order to familiarise himself with the same and is advised not to reveal it to anyone else so as to prevent misuse of the same. the bids made by the bidders against their username and password shall be irrevocable.the bidders are advised to register and pre-qualify for bidding well in advance and place their bids early in order to take care of any unforeseen technical difficulty that might surface in the internet operations. Page 19 of 19
© Copyright 2026 Paperzz