FUSETRA Kick-off Meeting Context and Administrative information Munich, 11/12/2009 Eric LECOMTE Project Officer Directorate H: Transport, Unit H3:Aeronautics Directorate-General for Research European Commission DG RTD-H.3 Aeronautics - 1 Table of Contents 1. 2. 3. 4. 5. EU institutions FP 7 – Air Transport Theme, budgets, calls GA – Grant Agreement – content, tips Return of Experience Deliverables - tips DG RTD-H.3 Aeronautics - 2 Europe in 2009 - 27 countries (yellow-brown) ~500 M inhabitants ~30% of worldwide GDP DG RTD-H.3 Aeronautics - 3 The European Union European Commission Budget 2009 134 billions € Proposes, Executes (E.G. FP7) President Barroso Treaties FP7 Adoption Scheme Council of the European Union European Parliament Decides is Consulted, Co-decides Heads of Member States Presidency changes every 6 months Co-decision procedure 736 representatives elected directly by citizens Court of Auditors Committee of the Regions Advises Advises DG RTD-H.3 Aeronautics - 4 Table of Contents 1. 2. 3. 4. 5. EU institutions FP 7 – Air Transport Theme, budgets, calls GA – Grant Agreement – content, tips Return of Experience Deliverables - tips DG RTD-H.3 Aeronautics - 5 7th Framework Program Objectives The EU strategy w.r.t. Research was defined in Lisbon (2000) “to make the EU the most dynamic and competitive knowledge-based economy in the world capable of sustainable economic growth with more and better jobs and greater social cohesion, and respect for the environment by 2010". => European Research Area (ERA) DG RTD-H.3 Aeronautics - 6 FP7 – Air Transport ACARE High level targets ACARE Goals (SRA 2002, 2004) (2020 vs. 2000) FP7 - Aeronautics Air Transport (2007–2013) Ultra Green 50% cut in perceived noise 80% cut in NOx emissions 50% cut in CO2 emissions 7.1.1 Greening of Air Transport Time Efficient 99% of flights within 15’ of timetable Handling 3 x more flights / y (16m) 7.1.2 Increasing Time Efficiency Customer oriented 80% cut in accidents 7.1.3 Ensuring Customer Satisfaction and Safety Cost Efficient Reducing travel charges Halve time-to-market 7.1.4 Improving Cost Efficiency Ultra Secure Zero successful hijack 7.1.5 Protection of Aircraft and Passenger 7.1.6 Pioneering the Air Transport of the Future 7.1.7 Cross-cutting Activities DG RTD-H.3 Aeronautics - 7 DG Research, Directorate Transport ‘Aeronautics’ Unit Aircraft Drag reduction, noise, avionics, etc. Air Traffic Management Engine 4D trajectory, time efficiency, etc. SFC, emissions, noise, etc. Helicopters Payload increase, cabin noise, etc. ~130 projects for FP6, among which 16 IPs (2002-2006) Overall budget ~785 M€ over 5 years DG RTD-H.3 Aeronautics - 8 FP7 - Aeronautics and Air Transport • Closed Calls •2007 217 M€ •2008 200 M€ • Open Call : 2010, 101 M€ (deadline 14/01/2010) •WP for CSA and CP-FP Level 1 (Max Funding limit 5 M€) •Focused mainly on Greening and Cost efficiency • Future Annual Calls •2011 130 M€ (estimated) •2012 160 M€ (estimated) •2013 140 M€ (estimated) • Total FP7 EC funding for levels 1 & 2 : 950 M€ (7 years) • CleanSKY JTI (Level 3) : 800 M€ (+ 800M€ by industry, 7 years) • SESAR JU (Single European Sky ATM Research, 8 years) : 700M€ ( + 700M€ Eurocontrol + 700M€ industry) DG RTD-H.3 Aeronautics - 9 Table of Contents 1. 2. 3. 4. 5. EU institutions FP 7 – Air Transport Theme, budgets, calls GA – Grant Agreement – content, tips Return of Experience Deliverables - tips DG RTD-H.3 Aeronautics - 10 3. Grant Agreement (GA) - structure Form C – Model of Financial Statement Form B – Request for Accession of a new Beneficiary to the GA Form A – Accession to the GA Annex II - General Conditions Common to all projects Annex I - Description of Work The Grant Agreement - Core The Model Grant Agreement can be downloaded from CORDIS web site DG RTD-H.3 Aeronautics - 11 Reference Documents 1 - Grant Agreement (GA) - Core part - Annex I (Description of work) - Annex II (General Conditions – available on CORDIS) - Other specific Annexes (adapted to each GA) 2 - Guidance Notes (available on CORDIS http://cordis.europa.eu/home_fr.html) - Financial - Audit certification - For Reporting - For Reviews (involving external experts) - IPRs - Check list for Consortium Agreement DG RTD-H.3 Aeronautics - 12 Grant Agreement - Core Part Article 3 – Duration and start date of the project Commencement date: 1-12-2009 Duration: 36 months Article 4 – Reporting & language of reports: The project is divided into reporting periods : - P1: from month 1 to month 18 - P2: from month 19 to the last month of the project Article 5 – EC contribution: 397,772 € max Article 6 – Prefinancing: 318,218 € (80%) Guarantee fund: 19,888.60 € (5%) To be paid within 45 days after GA entry into force DG RTD-H.3 Aeronautics - 13 Annex II General Conditions: II.14 Eligibility of costs Costs incurred for the implementation of the project a) must be actual; b) must be incurred by the beneficiary; c) must be incurred during the duration of the project, with the exception of costs incurred in relation to final reports and reports corresponding which may be incurred during the period of up to 60 days after the end of the project or the date of termination whichever is earlier; d) must be determined in accordance with the usual accounting and management principles and practices of the beneficiary. e) must be used for the sole purpose of achieving the objectives of the project f) must be recorded in the accounts of the beneficiary DG RTD-H.3 Aeronautics - 14 Annex II General Conditions: II.15 Direct Costs Eligible costs which can be directly attributed to the project (personnel costs: actual hours worked directly to carry out work under the project, rates according to normal practice of the beneficiary) Annex II General Conditions: II.15 Indirect Costs Eligible costs which cannot be identified as being directly attributed to the project but incurred in direct relationship with the eligible costs attributed to the project Models - analytical accounting system: actual indirect costs - flat rate of 20% - Non-profit public bodies, secondary and higher education establishments, research organisations and SMEs may opt for a flat rate of 60% - NB : indirect cost on subcontracting is NOT eligible DG RTD-H.3 Aeronautics - 15 Annex II General Conditions: II.16 Types of Costs - RTD Activities (50% or 75%*) (* for non-profit public bodies, secondary and higher education establishments, research organisations and SMEs) - Demonstration (max 50%) - Coordinating and Support actions (100%) - Other activities (100%) Management Training (excluding salary of those being trained) Coordination (except of research and technological development activities) Networking Dissemination Must be foreseen in the DOW DG RTD-H.3 Aeronautics - 16 Annex II General Conditions: II.16 Management − maintenance of the consortium agreement, if it is obligatory, − the overall legal, ethical, financial and administrative management including, for each of the beneficiaries, the obtaining of the certificates on the financial statements and on the methodology and costs relating to financial audits and technical reviews, − implementation of competitive calls by the consortium for the participation of new beneficiaries, where required by Annex I of this grant agreement, − any other management activities foreseen by the annexes, except coordination of research and technological development activities. DG RTD-H.3 Aeronautics - 17 Annex II General Conditions: II.4 Certificate on Financial Statements - If EC contribution <375.000€: no certificate (not even at the end) formerly Audit Certificate Annex II General Conditions: II.7 Sub-contracting - Identify in Annex 1 the foreseen subcontracting and associated costs - When not identified previously, submit a request to the EC and keep an updated overall view IPR Issues - A Consortium decision - Should be defined in the Consortium Agreement - You can release everything if you want with the agreement of EC www.ipr-helpdesk.org DG RTD-H.3 Aeronautics - 18 Annex II General Conditions: II.4 Certificate on the Methodology - The Commission may, at its sole discretion, accept at the request of a beneficiary, that it submits a certificate on the methodology for the calculation of costs, which it used to prepare its claims with regard to both personnel and indirect costs, and the related control systems. - must be prepared and certified by an external auditor according to Annex VII of the Grant Agreement - covers both personnel and indirect costs - allows to declare average personnel costs DG RTD-H.3 Aeronautics - 19 Annex II General Conditions: II.23 Technical Audits and Reviews The Commission may initiate a technical audit or review at any time during the Implementation of the project and up to up to five years after the end of the project. DG RTD-H.3 Aeronautics - 20 Annex II General Conditions: II.30 Dissemination - Is described in the DOW - Must serve the project (not a specific contribution from a single laboratory) - Publications (external to the dissemination policy): - Ask permission to partners (45 days prior notice) - Add acknowledgement to EC FP7 + contract number DG RTD-H.3 Aeronautics - 21 Table of Contents 1. 2. 3. 4. 5. EU institutions FP 7 – Air Transport Theme, budgets, calls GA – Grant Agreement – content, tips Return of Experience Deliverables - tips DG RTD-H.3 Aeronautics - 22 4. Return of Experience : Most Common mistakes and causes of delays - The dates of the reporting period are not correct - The person who signed is not the authorized one - The signed documents are copies, not originals - The 'cost model' is wrong - There must be a cost claim, even for 0 € The process goes at the pace of the slowest , please help your coordinator to meet target dates for reporting ! DG RTD-H.3 Aeronautics - 23 Table of Contents 1. 2. 3. 4. 5. EU institutions FP 7 – Air Transport Theme, budgets, calls GA – Grant Agreement – content, tips Return of Experience Deliverables DG RTD-H.3 Aeronautics - 24 Contractual reports • Progress report giving an overview of all achievements of the reporting period, including • Main features as results, graphics, pictures and reference list of related deliverables technical reports • Status of the project activities (achieved or delivered vs. scheduled ) • Efforts spent (man power, main costs, travel) (achieved vs. scheduled) • Financial Reporting giving partners’ details on spending of resources • Man power used against planned resources on task level • Explanation and justification of all cost categories (hardware, computing, consumables, travel, subcontracting, etc.) • Financial figures should be in line with costs claimed on Form C • Delivery of progress reports • A draft progress report should delivered to the EC, reviewers and partners 10 days before the review meeting • Final version within 60 days after the reporting period DG RTD-H.3 Aeronautics - 25 Technical Deliverables Technical Reports will be the only trace of your work in the future (people leave, reports stay) Ensure the perenniality of the ensemble of the The Quality reports, constitute a Library for the project of the − A way to monitor the progress – Shipment to Technical EC and status update every 6 months (? -TBC) Reporting is Very − Proof to the partners and the Commission that Important high quality work has been performed with transparency − By default, these reports are confidential and the Commission does not disseminate them DG RTD-H.3 Aeronautics - 26 Deliverables - Tips - Structure: An introduction, a conclusion, and a core text, a table of contents, abbreviations list - Complete and self-explanatory, otherwise useless - Add pictures, illustrations ( a picture of a set-up or a computational grid can tell more than pages of text ) - Design a common title page with the title of the deliverable, the name and contact detail of the author, an index for the version, - The work package leaders (or other persons interested in the report) should check the quality of the deliverables in their tasks (organize an internal review process for the reports) - Filename the deliverable FUSETRA-D1.1-…-v01.pdf and not 28/02/2009-FUSETRA-V01.zip DG RTD-H.3 Aeronautics - 27 Good luck for the FUSETRA collaboration! DG RTD-H.3 Aeronautics - 28 Aeronautics and Air Transport Research Contacts: Eric LECOMTE European Commission DG Research-H.3 Aeronautics Rue du Champ de Mars (CDMA 4/177) B - 1049 Brussels Tel.: +32 2 29 84693/ 98543; Fax: +32 2 29 66757 E-mail: [email protected] Information on FP7 Cooperation: http://cordis.europa.eu/fp7/cooperation/home_en.html Specific information on Calls and Experts of F.P.7: http://cordis.europa.eu/fp7/dc/index.cfm http://cordis.europa.eu/emmfp7 Information on Commission Aeronautics Research: http://ec.europa.eu/research/transport/transport_modes/aeronautics_en.cfm DG RTD-H.3 Aeronautics - 29
© Copyright 2025 Paperzz