TARIFF INSTRUCTIONS ON LARA 1) Lara system work D&D calculation this way: Import Demurrage: From the day discharged (IDF) till Laden out gate (IFC), minus free days Import Detention: From laden out gate (IFC) till empty return (MEA etc), minus free days Export Detention: From the day empty out depot (MOS) till Laden in gate (XRX), minus free days Export Demurrage: From laden in gate (XRX) till vessel sailed date (XOF), minus free days Import Merged Detention/Demurrage: From Discharge date (IDF) till empty return depot (MEA etc), minus free days Export Merged Detention/Demurrage: From empty out depot (MOS) till ship sailed date (XOF), minus free days It is always important to know that just ensure chargeable days to minus off given free days, and not to add one (or more) day which will impact in calculations. For further questions on this, kindly check with ANL RO Logistic ([email protected]). 2) Any given free days waiver which affect on 2nd tier or more, the initial calculation will start on that particular tier. Example: free 7 days, 8-14 days USD20 14-30 days USD40 31 days onwards USD80 If a 25 free days is given to this particular shipment, the charges will start at 2nd tier which is USD40, NOT USD20. This is "VATOS with grid not changed" - this will be the default waiver setting. Any waiver not specifies "VATOS with grid change" it will automatic be categories as "Not changed". "VATOS with grid change" = on above example it will start with USD20 which is on the first tier. Please ensure such to be remark in D&D waiver application platform: CDVA or message upon confirmation via mail (all waiver should apply through CDVA unless on exception case) TRANSHIPMENT ON HOLD CHARGES With immediate effect, on hold detention charges will be applicable for ALL transhipment ports. Upon request by shipper/consignee, detention tariff will apply for shipment on hold for more than 10 days tranship status: - USD 10 per teus per day to be charge on requestor a/c. - if request from POL, detention must be on prepaid basis - if request from consignee, POD office will have to collect from consignee upon confirmation by T/S port of period being hold ANL Logistics Dept should be informed of the hold request. Location China, Yantian (Guangdong) Status / Type Free days Thereafter 20' Import (Yantian Int Container Terminals Ltd (YICT)) Export General 10 days 11 onwards RMB 86.00 Reefer 3 days 4 onwards RMB 195.00 General 7 days 8 onwards RMB 86.00 (Yantian Int Container Terminals Ltd (YICT)) Reefer 3 days 4 onwards RMB 195.00 Terminal Charges Cost per day 40' RMB 173.00 (40') RMB 194.00 (45') RMB 391.00 (40') RMB 439.00 (45') Reefer Charges Reefer power / Monitoring is inclusive in the storage Remark Status Type Free Days Import General Merged 7 days cost which is under Customer account after freedays. Calendar High cube 7 days Merged Calendar RMB 173.00 (40') RMB 194.00 (45') Reefer RMB 391.00 (40') RMB 439.00 (45') Merged Special Equipment Export RF(20') 4 days Calendar RF(40') 4 days Calendar 7 days Calendar 7 days Calendar Highcube Merged General 10 days 11 onwards RMB 69.00 Export RMB 137.00(40') Reefer monitoring RMB 206.00 / 20' / day RMB161.00(45') Reefer monitoring RMB 257.00 / 40' / day Import 7 days Calendar Merged 4 days Calendar Special Equipment Merged 7 days Calendar Reefer Import / FOR GENERAL & REEFER: Reefer / DG 3 days 4 onwards RMB 82.00 RMB 164.00(40') RMB245.00(45') (Guangdong Reefer 3 days DG 3 days RMB160.00(40')/RMB180.00(45') RMB240.00(40')/RMB300.00(45') RMB160.00(40')/RMB180.00(45') RMB240.00(40')/RMB300.00(45') RMB240.00(40')/RMB270.00(45') RMB400.00(40')/RMB500.00(45') Import 7 days 8-21 Days 22 Days onwards RMB80.00 RMB120.00 RMB160.00(40')/RMB180.00(45') RMB240.00(40')/RMB300.00(45') Export 3 days 3 days 4-17 Days 18 Days onwards 4-17 Days 18 Days onwards RMB80.00 RMB120.00 RMB120.00 RMB200.00 RMB160.00(40')/RMB180.00(45') RMB240.00(40')/RMB300.00(45') RMB240.00(40')/RMB270.00(45') RMB400.00(40')/RMB500.00(45') CNY CNY CNY 240.00 480.00 640.00 Calendar CNY 303.00 455.00 909.00 190.00 380.00 570.00 240.00 480.00 640.00 606.00 909.00 1818.00 285.00 570.00 970.00 CNY CNY CNY CNY CNY CNY CNY Calendar Calendar 260.00 520.00 800.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar High cube 7 days Merged Calendar 220.00 440.00 Calendar Calendar Calendar Calendar from 21st onwards CNY 640.00 775.00 Calendar from 5th to 14th from 15th onwards CNY CNY from 05th to 10th from 11th to 20th from 21st onwards CNY CNY CNY from 8th to 15th CNY CNY CNY from 8th to 14th from 15th to 21st from 21st onwards CNY from 8th to 14th from 15th to 21st from 22nd onwards from 5th to 10th from 11th to 20th from 21st onwards from 8th to 15th from 16th to 20th from 21st onwards from 08th to 14th from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards from 05th to 14th from 15th onwards CNY CNY CNY from 05th to 10th from 11th to 20th from 21st onwards CNY CNY CNY from 8th to 15th CNY CNY CNY 190.00 380.00 570.00 from 8th to 14th from 15th to 21st from 22nd onwards CNY 120.00 CNY from 8th to 14th from 15th to 21st from 22nd onwards from 5th to 10th from 11th to 20th from 21st onwards from 8th to 15th CNY CNY CNY RF(20') 4 days Calendar RF(40') 4 days Calendar 7 days Calendar from 16th to 20th from 21st onwards Calendar Calendar Calendar 440.00 880.00 Calendar 190.00 380.00 570.00 606.00 909.00 1818.00 285.00 570.00 1040.00 120.00 240.00 340.00 240.00 480.00 640.00 Calendar 303.00 455.00 909.00 190.00 380.00 570.00 240.00 480.00 640.00 606.00 909.00 1818.00 285.00 570.00 970.00 Calendar Calendar Calendar Calendar Calendar General Special Equipment 7 days 7 days Calendar Merged 4 days Calendar Special Equipment Merged 7 days Calendar General Merged 7 days Calendar High cube 7 days Merged Calendar RF(20') 4 days Calendar RF(40') 4 days Calendar 7 days Calendar from 16th to 20th from 21st onwards CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 100.00 200.00 320.00 CNY CNY 440.00 880.00 200.00 400.00 640.00 200.00 400.00 640.00 Calendar Calendar 260.00 520.00 800.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 220.00 440.00 775.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 606.00 909.00 1818.00 285.00 570.00 1040.00 Calendar 240.00 480.00 640.00 Calendar 240.00 340.00 CNY CNY 303.00 455.00 909.00 240.00 480.00 640.00 606.00 909.00 1818.00 CNY 190.00 285.00 Calendar Calendar Calendar Calendar Calendar General Remakrs: 7 days Calendar DG from 8th to 14th from 15th to 21st from 22nd onwards from 5th to 10th from 11th to 20th from 21st onwards from 8th to 15th from 16th to 20th from 21st onwards 120.00 240.00 340.00 Calendar Calendar Calendar Calendar Calendar 400.00 640.00 200.00 400.00 Merged Reefer CNY 190.00 380.00 570.00 200.00 Reefer General from 8th to 14th from 15th to 21st from 22nd onwards from 16th to 20th from 21st onwards Calendar 200.00 320.00 Merged Special Equipment Export (Shekou Container Terminal) CNY CNY CNY 606.00 909.00 1818.00 285.00 570.00 1040.00 100.00 rated twice on the based rate. Reefer monitoring RMB 150.00 / 20' / day Reefer monitoring RMB 250.00 / 40' / day from 8th to 15th Remark Calendar Calendar CNY CNY CNY CNY Reefer RMB80.00 RMB120.00 RMB80.00 RMB120.00 RMB120.00 RMB200.00 CNY CNY CNY 220.00 440.00 775.00 Calendar Calendar Calendar Calendar Calendar Calendar CNY Highcube Merged 11-24 Days 25 Days onwards 4-17 Days 18 Days onwards 4-17 Days 18 Days onwards from 05th to 10th from 11th to 20th from 21st onwards Charge day type from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th Calendar 10 days 440.00 880.00 45' HC from 08th to 14th Merged General CNY CNY 200.00 400.00 640.00 200.00 400.00 640.00 7 days Reefer Import (Shekou Container Terminal) 100.00 200.00 320.00 Calendar Merged Special Equipment China, Shekou CNY CNY CNY CNY CNY CNY Merged Any excess day abv the first 10 days will be Export from 08th to 14th from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards from 5th to 14th from 15th onwards General (Guangdong) (Chiwan Container Terminal) ANL Detention / Demurrage Tariff Cost per day Currency 20' 40' General Merged China, Chiwan Thereafter Highcube Merged 7 days Calendar Merged 4 days Calendar Special Equipment 7 days Reefer CNY Calendar Calendar 260.00 520.00 800.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar 40'HC same rate as 40'GP Merged China, Nansha / Huangpu Import/Export (Guangdong) General 10 days 11 onwards RMB8.00 RMB16.00 Any excess days from 15 days to 30 days will be rated additional 30%. (Nansha Stevedoring Co. Ltd Any excess days over 30 days will be rated additional 50%. Port of Guangzhou) Any DG excess days over 30 days will be rated additional 100%. Reefer / DG 2 days/1 day 2 days/1 day onwards RMB63.00/R MB16.00 RMB94.00/RMB32.00 Import Reefer power fee: RMB180/RMB200 per day per 20'/40'. Reefer 3 days 5 onwards 4 onwards RMB 4.00 RMB 4.00 RMB 8.00 Reefer monitoring RMB 200.00 / 20' / day Reefer monitoring RMB 300.00 / 40' / day (Customer account directly) Merged Calendar from 15th to 20th CNY 200.00 400.00 Calendar from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards from 5th to 14th from 15th onwards CNY CNY CNY CNY 320.00 640.00 220.00 400.00 640.00 CNY CNY 440.00 880.00 Calendar RF(40') 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards CNY Calendar from 16th to 20th from 21st onwards 7 days from 8th to 14th from 15th to 21st from 22nd onwards CNY from 8th to 14th from 15th to 21st from 212nd onwards from 5th to 10th from 11th to 20th from 21st onwards from 8th to 15th from16th to 20th from 21st onwards CNY CNY CNY from 08th to 15th from 16th to 20th from 21st onwards CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 76.00 152.00 303.00 303.00 455.00 909.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 320.00 560.00 1120.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 CNY CNY CNY 182.00 364.00 600.00 300.00 600.00 1200.00 CNY CNY CNY CNY 76.00 152.00 303.00 152.00 303.00 606.00 192.00 highcube 7 days Merged Calendar RF(20') RF(20') 4 days Import / Export (Dalian Container Terminal) General 2 days Reefer 0 day Import High Cube 7 days Merged Calendar Reefer 4 days Calendar (XRCT), (XSCT) Export Terminal Storage Tariff Calendar 7 days Calendar from 8th to 15th Reefer Merged 4 days Calendar Special Equipment 7 days Calendar from from from from General Merged 07 days 7 days Calendar from 8th to 15th Merged Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards Special Equipment 7 days Merged Calendar from 8th to 15th from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards Reefer Monitoring included in the storage tariff All charges after freedays on Customer account General Merged Calendar for Import and Export on Line account. Highcube 7 days 1 to 10 days 11 to 20 days RMB 16.00 RMB 32.00 RMB 32.00 RMB 64.00 Reefer power fee: RMB4.063/RMB5.955 per hour Merged Calendar from 16th to 20th from 21st onwards 21 onwards RMB 48.00 RMB 96.00 Reefer Merged 4 days Calendar Special Equipment 7 days Calendar from from from from General Merged 07 days Low Level DG 0 free day DG class included: IMCO 1.5/1.6/2.1/2.2/3.1/3.2/3.3/4.1/ 4.2/4.3/5.1/5.2/8/9 General 10 days (FICT) (Fujian Province) Export 5th day 6th day from 7th to 9th from 10th to 14th from 15th onwards from 1st to 4th 5th day 6th day from 7th to 9th from 10th to 14th from 15th onwards from1st to 4th 5th day 6th day from 7th to 9th from 10th to 14th from 15th onwards RMB6 RMB8 RMB10 RMB13 RMB16 RMB7 RMB7 RMB12 RMB18 RMB24 RMB30 RMB10 RMB10 RMB14 RMB16 RMB22 RMB26 RMB12 RMB16 RMB20 RMB26 RMB32 RMB14 RMB14 RMB24 RMB36 RMB48 RMB60 RMB20 RMB20 RMB28 RMB32 RMB44 RMB52 4 days free Please directly consult XMN agent should the STO rate not reflected in this sheet for any specify shipment Import RMB 14.00 RMB 18.00 RMB 22 RMB 44 RM28 RM56 0 day 0 day 45HC to be apply as:- 125% of 40'st China, Fuqing 1 onwards 1 onwards RMB 7.00 RMB 9.00 RMB 11 RMB 22 RMB14 RMB28 1 onwards 1 onwards 1 onwards 0 free day General Reefer 7 days Nil 07 days from 16th to 20th from 21st onwards RMB 32.00 1 onwards Reefer from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards RMB 8.00 RMB 16.00 0 days 0 day 0 day Remarks: 5th to 10th 11th to 20th 21st onwards 8th to 15th RMB 4.00 RMB 8.00 0 days General Calendar from 16th to 20th from 21st onwards RMB 16.00 Reefer IMPORT 07 days General Merged 30 onwards General Low Level DG High Level DG Special EQ OOG 7 days Highcube Merged per 20'/40'. Reefer Monitoring RMB 120.00 / 20' / day Reefer Monitoring RMB 190.00 / 40' / day Import 81 - 100 days 8 - 20 days 21 - 40 days RMB 64.00 RMB 4.00 RMB 8.00 RMB 128.00 RMB 8.00 RM 16.00 41 - 60 days 61 - 80 days 81 - 100 days RMB 16.00 RMB 32.00 RMB 64.00 RMB 32.00 RMB 64.00 RMB 128.00 1 onwards RMB 80.00 RMB 130.00 Import Calendar CNY 325.00 475.00 950.00 190.00 380.00 570.00 240.00 480.00 640.00 650.00 950.00 1900.00 285.00 570.00 970.00 CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 303.00 455.00 909.00 182.00 364.00 560.00 76.00 152.00 303.00 303.00 455.00 909.00 182.00 364.00 560.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 192.00 384.00 768.00 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 303.00 455.00 909.00 Merged Calendar CNY CNY CNY 182.00 364.00 600.00 300.00 600.00 1200.00 Calendar Calendar Calendar General Merged Calendar 100.00 200.00 320.00 45'HC Merged Calendar CNY CNY CNY CNY CNY CNY 200.00 400.00 640.00 175.00 310.00 615.00 Calendar Calendar Calendar Calendar Calendar Calendar Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards 7 days from 8th to 15th from 16th to 20th from 21st onwards from 08th to 14th from 15th to 21st from 22nd onwards from 8th to 14th from 15th to 21st from 22nd onwards CNY CNY CNY CNY 325.00 475.00 950.00 190.00 380.00 570.00 650.00 950.00 1900.00 285.00 570.00 970.00 Calendar Calendar Calendar Calendar 120.00 240.00 340.00 240.00 480.00 640.00 240.00 480.00 640.00 650.00 950.00 1900.00 285.00 570.00 970.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar 7 days General Merged 07 days Calendar Merged 7 days Calendar Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards 7 days from 8th to 15th from 16th to 20th from 21st onwards from 08th to 14th from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards General Merged 07 days Calendar 7 days 45'HC Merged Calendar Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards Special Equipment 7 days from 8th to 15th from 16th to 20th from 21st onwards from 08th to 14th from 15th to 21st from 22nd onwards from 8th to 14th from 15th to 21st from 22nd onwards General 07 days Merged Calendar Highcube Merged 7 days Calendar Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 325.00 475.00 950.00 190.00 380.00 570.00 CNY 325.00 475.00 950.00 190.00 380.00 570.00 200.00 400.00 640.00 200.00 400.00 640.00 650.00 950.00 1900.00 285.00 570.00 970.00 CNY 120.00 240.00 CNY CNY CNY CNY CNY CNY CNY CNY 240.00 340.00 480.00 640.00 240.00 480.00 640.00 650.00 950.00 1900.00 CNY 100.00 200.00 320.00 325.00 475.00 950.00 Special Equipment Calendar Calendar Calendar from 8th to 15th from 16th to 20th from 21st onwards from 08th to 14th from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards 07 days 76.00 152.00 303.00 260.00 520.00 800.00 from 5th to 10th from 11th to 20th from 21st onwards from 16th to 20th from 21st onwards CNY CNY CNY CNY CNY CNY CNY CNY CNY 384.00 768.00 606.00 909.00 1818.00 320.00 560.00 1120.00 Use the "ALL SP" rates Calendar Calendar 7 days Calendar Export 240.00 480.00 640.00 4 days Calendar Calendar Reefer storages inclusive of power and monitoring from 08th to 15th from 16th to 20th from 21st onwards CNY CNY Reefer Merged Special Equipment RMB 8.00 RM 16.00 RMB 32.00 RMB 64.00 from 16th to 20th from 21st onwards from 8th to 15th Highcube RMB 4.00 RMB 8.00 RMB 16.00 RMB 32.00 5th to 10th 11th to 20th 21st onwards 8th to 15th 7 days Calendar Calendar 11 - 20 days 21 - 40 days 41 - 60 days 61 - 80 days from 8th to 15th Merged Special Equipment High Level DG rates will be double 120.00 240.00 340.00 Calendar Calendar Calendar Calendar Calendar Special Equipment Calendar (Customer account directly) Export 190.00 380.00 570.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 High Cube Export Calendar Special Equipment 3 to 10 days 11 to 30 days Export China, Xiamen from 8th to 15th Calendar Calendar Calendar Calendar 650.00 950.00 1900.00 285.00 570.00 1040.00 CNY CNY CNY CNY CNY 250.00 440.00 775.00 General High Cube China, Dalian Calendar Calendar RMB 8.00 Export Calendar 220.00 RF(40') Import 570.00 970.00 110.00 Special Equipment Merged 4 days 380.00 570.00 CNY Merged General CNY from 08th to 14th Calendar Import / Export (FICT, TPCT Xingang - Tianjin Port Alliance) CNY 7 days Merged China, Xingang from 16th to 20th from 21st onwards General Merged Special Equipment Export Calendar 192.00 384.00 768.00 220.00 440.00 775.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment Calendar 260.00 520.00 800.00 calendar Calendar 220.00 440.00 775.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Remarks: Fuqing 40'HC is the same rate as 40'st Calendar Calendar 260.00 520.00 800.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Remarks: Fuqing 40'HC is the same rate as 40'st Special Equipment 7 days Calendar China, Lianyungan g Import/ Export (Lianyungang New Oriental International Container Terminal co.,ltd) General Reefer 6 days RMB 4.00 7 - 10 days RMB 8.00 11 - 20 days To this analogizes,each 10 days additional storages is rmb4/day. 4 day 5 onwards RMB 100 Above shifting per 20' 40' Above shifting per 20' 40' RMB 8.00 RMB 12.00 RMB 150 DG 3 day 4 onwards RMB 100 10 days additional charges RMB 49.50 and RMB 74.30 per Import 10 days additional charges RMB 53.70 and RMB 82.50 per Supervised fee for each bill DG is RMB200 RMB 150 Export China, Qingdao Import General / Reefer 4 days 5 onwards RMB4.20 RMB 8.40 Export General / Reefer 5 days 6 onwards RMB 4.20 RMB 8.40 Import Reefer Monitoring RMB 260.00 / 20' and RMB 500.00 / 40' lump sum during freedays Export Reefer Monitoring RMB 260.00 / 20' and RMB 500.00 per 40' lump sum during freedays Import (Qingdao Qianwan Container Terminal(QQCT)) (Customer account directly) Reefer Monitoring RMB 50.00 / 20' / day and RMB 100.00 per 40' / day after freedays (Customer account directly) Export China, Shanghai Import / Export General / Reefer 4 days 5 - 15 days 16 - 20 days 21 onwards RMB 4.00 RMB 5.00 RMB 6.00 RMB 8.00 RMB 10.00 RMB 12.00 Reefer Monitoring RMB 100.00 / 20' / day Reefer Monitoring RMB 200.00 / 40' / day Import Wai Gao Qiao 2 Phase - Shanghai SPCWT Terminal, Wai Gao Qiao Terminal Phased 2 (SECT), Wai Gao Qiao Terminal Phased 4 (SECT), Yangshan Deep Water Port Phase 1, Yangshan Terminal Phase 2, Yangshan Terminal Phase 3 07 days from 8th to 15th from 16th to 20th from 21th onwards CNY from 08th to 15th from 16th to 20th from 21st onwards General Merged Calendar Highcube Merged 7 days Calendar from 8th to 15th from from from from from 16th to 20th from 21st onwards Reefer Merged 4 days Calendar Special Equipment 7 days Calendar 5th to 10th 11th to 20th 21st onwards 8th to 15th General Merged 07 days Calendar Highcube Merged 7 days Calendar from 8th to 15th Reefer Merged 4 days Calendar Special Equipment 7 days Calendar from from from from General Merged 07 days Calendar Highcube Merged 7 days Calendar from 8th to 15th from from from from from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards from 16th to 20th from 21st onwards 5th to 10th 11th to 20th 21st onwards 8th to 15th from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards from 16th to 20th from 21st onwards Reefer Merged 4 days Calendar Special Equipment 7 days Calendar General Merged 07 days Calendar Highcube Merged 7 days Calendar Reefer Merged Calendar from 11th to 20th from 21st onwards Special Equipment (OT/FR) 7 days Merged Calendar from 8th to 15th from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards 4 days 07 days 5th to 10th 11th to 20th 21st onwards 8th to 15th from 16th to 20th from 21st onwards from 08h to 15th from 16th to 20th from 21st onwards from 8th to 15th from 16th to 20th from 21st onwards from 5th to 10th General Merged Calendar Highcube Merged 7 days Calendar from 8th to 15th Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards 7 days Calendar from 8th to 15th Merged General Merged Calendar Highcube Merged 7 days Calendar from 8th to 15th Reefer Merged 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards 7 days Calendar from 8th to 15th Merged from 16th to 20th from 21st onwards 190.00 380.00 570.00 285.00 570.00 970.00 Calendar CNY CNY CNY CNY CNY CNY 76.00 152.00 303.00 152.00 303.00 606.00 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 303.00 455.00 909.00 182.00 364.00 560.00 76.00 152.00 303.00 CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 76.00 152.00 303.00 303.00 455.00 909.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 320.00 560.00 1120.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 CNY CNY CNY 182.00 364.00 600.00 300.00 600.00 1200.00 CNY CNY CNY CNY CNY CNY CNY CNY CNY 76.00 152.00 303.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 182.00 364.00 560.00 76.00 152.00 303.00 303.00 455.00 909.00 320.00 560.00 1120.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 CNY CNY CNY 182.00 364.00 600.00 300.00 600.00 1200.00 CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY CNY 76.00 152.00 303.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 320.00 560.00 1120.00 152.00 303.00 606.00 CNY CNY 303.00 455.00 909.00 182.00 364.00 600.00 303.00 455.00 909.00 182.00 364.00 560.00 76.00 152.00 303.00 303.00 455.00 909.00 606.00 909.00 1818.00 320.00 560.00 1120.00 152.00 303.00 606.00 192.00 384.00 768.00 606.00 909.00 1818.00 300.00 600.00 1200.00 Calendar Calendar 192.00 384.00 768.00 192.00 384.00 768.00 192.00 384.00 768.00 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment Calendar Calendar Calendar 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment (OT/FR) Export 07 days from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards from 16th to 20th from 21st onwards 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment Special Equipment (OT/FR) China, Ningbo Import General Reefer 4 days 4 days 5 onwards 5 onwards RMB 4.00 RMB 6.00 RMB 8.00 RMB 12.00 Export Gangji Terminal, Ningbo Beilun Container Terminal Phase 3 (BLCT 3), Ningbo Beilun International Container Terminal (NBCT), Ningbo Beilun Second Container Terminal General Reefer 1 days 4 days 2 onwards 5 onwards RMB 4.00 RMB 6.00 RMB 8.00 RMB 12.00 Import Reefer Monitoring RMB 250.00 / 20' and RMB 450.00 / 40' lump sum during freedays (On Carrier account) . After freedays , the reefer monitoring RMB 80.00/20'GP and RMB 145.00 .(Customer account directly) Import Export Reefer Monitoring RMB 200.00 / 20' and RMB 380.00 per 40' lump sum during freedays (On Carrier account). Reefer Monitoring RMB 80.00 / 20' / day and RMB 145.00 per 40' / day after freedays. (Customer account directly) Export 07 days from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards General Merged Calendar Highcube Merged 7 days Calendar from 8th to 15th Reefer Merged 4 days Calendar Special Equipment 7 days Calendar from from from from 07 days from 16th to 20th from 21st onwards 5th to 10th 11th to 20th 21st onwards 8th to 15th from 16th to 20th from 21st onwards from 08th to 15th from 16th to 20th from 21st onwards General Merged Calendar Highcube Merged 7 days Calendar from 8th to 15th 7 days Calendar from 8th to 15th CNY from 16th to 20th from 21st onwards 4 days Calendar from 5th to 10th from 11th to 20th from 21st onwards CNY CNY CNY CNY CNY 7 days from 08th to 14th from 15th to 20th from 21st onwards from 8th to 14th from 15th to 20th from 21st onwards from 5th to 14th from 15th onwards from 05th to 10th from 11th to 20th from 21st onwards CNY CNY CNY from 8th to 15th CNY CNY CNY from 8th to 14th from 15th to 21st from 22nd onwards CNY CNY CNY CNY from 16th to 20th from 21st onwards 303.00 455.00 909.00 182.00 364.00 560.00 76.00 152.00 303.00 CNY CNY CNY 192.00 384.00 768.00 Calendar Calendar Calendar 192.00 384.00 768.00 192.00 384.00 768.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment (OT/FR) Merged Reefer Export (SHANTOU INTERNATIONAL China, Shantou General 7 days 8 onwards RMB 30 RMB 60 Import CONTAINER TERMINAL) General Merged High cube 7 days Merged Calendar (Guangdong) Reefer Merged Special Equipment Export Calendar RF(20') 4 days Calendar RF(40') 4 days Calendar 7 days Calendar 300.00 600.00 1200.00 606.00 909.00 1818.00 Calendar Calendar Calendar Calendar Calendar Calendar CNY CNY CNY CNY CNY CNY 100.00 200.00 320.00 200.00 400.00 640.00 200.00 400.00 640.00 Calendar Calendar Calendar Calendar Calendar Calendar CNY CNY 440.00 880.00 220.00 440.00 775.00 Calendar Calendar Calendar 190.00 380.00 570.00 606.00 909.00 1818.00 285.00 570.00 1040.00 120.00 240.00 340.00 240.00 480.00 640.00 Calendar 260.00 520.00 800.00 303.00 455.00 909.00 190.00 380.00 570.00 240.00 480.00 640.00 606.00 909.00 1818.00 285.00 570.00 970.00 330.00 450.00 330.00 440.00 880.00 1573.00 450.00 550.00 440.00 550.00 990.00 1760.00 Calendar 600.00 1100.00 550.00 1000.00 1600.00 2585.00 600.00 1100.00 550.00 1000.00 1600.00 2585.00 Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar General Merged Remarks 7 days Calendar CNY Merged 4 days Calendar Special Equipment Merged 7 days Calendar General Detention(local) Detention(PRC) 4 days Calendar 7 days Calendar Demurrage 5 days Calendar 6 - 9 days from 10th onwards HKD HKD 220.00 330.00 220.00 330.00 495.00 803.00 3 days Calendar 7 days Calendar 5 days Calendar from 4th to 8th from 09th onwards HKD HKD HKD HKD HKD HKD 460.00 660.00 440.00 660.00 1200.00 1485.00 Reefer HONG KONG Reefer Detention (Local) Detention (PRC) Demurrage 7 days CNY from 8th to 14th from 15th to 21st from 22nd onwards from 5th to 10th from 11th to 20th from 21st onwards from 8th to 15th from 16th to 20th from 21st onwards from 5th to 07th from 08th onwards 8 - 9 days from10th onwards Highcube Merged Import from 16th to 20th from 21st onwards 182.00 364.00 600.00 303.00 455.00 909.00 Calendar from 8th to 9th from 10th onwards from 6th to 8th from 9th to 10th CNY CNY CNY CNY CNY CNY HKD HKD HKD HKD 40'HC same rate as 40'GP Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Calendar Special Equipment Same free days as dry GP but double of GP rate Calendar Calendar NOTE: Hong Kong port storage cost are included in the Line Demurrage Reefer power / Monitoring is inclusive in the storage cost which is under Customer account. Export General Detention Demurrage Reefer Detention Demurrage Calendar from 11th onwards HKD 1500.00 2700.00 2700.00 7 days Calendar 7 days Calendar from from from from 8th to 9th 10th onwards 8th to 9th 10th onwards HKD HKD HKD HKD 220.00 330.00 495.00 803.00 330.00 440.00 880.00 1573.00 440.00 550.00 990.00 1760.00 Calendar Calendar Calendar Calendar 7 days Calendar from 8th to 9th from 10th onwards 5 days from 6th to 08th from 9th to 10th from 11th onwards HKD HKD HKD 440.00 660.00 1200.00 550.00 1000.00 1600.00 550.00 1000.00 1600.00 Calendar Calendar Calendar HKD 1485.00 1500.00 2585.00 2700.00 2585.00 2700.00 Calendar Calendar Calendar HKD Calendar
© Copyright 2026 Paperzz