Quarterly Review January 24, 2002 QUARTERLY REVIEW January 24, 2002 1 Quarterly Review January 24, 2002 Agenda • • • • • • • • 0830 0930 0945 1045 1100 1200 1300 1330 • 1400 QR - Project Overview break QR - Technical Progress Break QR - Management Lunch Tour of design area workstations Hardware tour - Instrument Shop - EE Lab - Blue Room Software - Hardware Demo 2 Quarterly Review January 24, 2002 GNIRS Quarterly Review Table of Contents • Introduction • Project Summary • Configuration & Integration • Project Management • Appendices Pg 4 Pg 6 Pg 23 Pg 43 Pg 64 3 Quarterly Review January 24, 2002 Introduction • This is the 7th GNIRS Quarterly Review • GNIRS is in the final design and fabrication phase – – – – – All bench assemblies are complete Bulkhead and Dewar Shell assemblies are complete Mechanism fabrication is complete Mechanism testing is underway OIWFS integration is complete except for the detector • We are on track for delivery in October of 2002 4 Quarterly Review January 24, 2002 Outline • Project summary – Last QR Response – Progress Overview – Cost and Schedule Status • • • • • Problems and Concerns Configuration Update Technical Progress Project management Plans for next review 5 Quarterly Review January 24, 2002 Project Summary • • • • • Response to last QR report Progress overview Summary schedule Work left Budget and expenditures to date 6 Quarterly Review January 24, 2002 Response to October QR - Issues to be Reviewed • Completion of items – – – – – – – – OIWFS integration Lens delivery/testing Mechanism fabrication Mechanism/optical testing Fixed Assy 3D/2D design TE fabrication Bulkhead fabrication Dewar component fabrication – Optics procurement • ATP (Plan) • Design delays – Radiation Shields • • • • • Rework items OIWFS issues IFU late delivery Change orders Documentation approach 7 Quarterly Review January 24, 2002 Task Status ITEM STATUS COMMENT OIWFS component integration Complete – Detector installation on hold Lens delivery/testing Complete Mechanism fabrication Complete Some rework in process Mechanism/optical testing Not Complete – delayed because of fabrication delays Should complete in March Fixed Assembly 3D/2D design Not Complete – Radiation shields still in process Completion expected in January TE fabrication Complete Bulkhead fabrication Complete Dewar component fabrication Complete Optics procurement Not Complete – Simulator optics not yet purchased Waiting for Gemini decision on prism. February cut-off date. Fit checks complete except for radiation shields Simulator is in design stage. Not a pacing item. Rescheduled to a later 8 date. Quarterly Review January 24, 2002 Response to October QR • Planned Completions by this Quarterly Review – – – – 3D and 2D design of all fixed assemblies Fabrication of all mechanisms Fabrication of the Bulkhead Assembly Mechanical fabrication except for: • Rework items • Shipping container • Items associated with flexure testing – Mechanism and optical subassembly testing – Receive all optics – Electronics fabrication and checkout except for: • Some cables • Rework items – – – – – Initial software coding Component controller software testing OIWFS component integration Change orders for Chile Delivery and for Differential Pressure Switch Manual outlines 9 Quarterly Review January 24, 2002 Response to October QR • ATP – A draft of the ATP and commissioning plan was submitted to Gemini for review; returned with minor comments last week • Change Orders are in process – For Chile delivery – For the Differential Pressure Switch • Manual outlines – Maintenance Manual in process – Software and Operation manuals are not started 10 Quarterly Review January 24, 2002 Response to October QR • Software coding – Component controller software • Coding is complete • Checkout complete as far as can be done without actual hardware to exercise • All checks with the electronics are complete – EPICS software is 95% complete • IFU late delivery – Proceeding with mass modules – We will try to integrate the IFU when it becomes available 11 Quarterly Review January 24, 2002 Summary Project Plan N D J F M A M CY-2000 J J A S O N D J F M A M CY-2001 J J A S O J F M A M CY-2002 J J A S O N D Systems Engineering Rotary Mechanism Rotary Mechanism Flexure Tests Flexure Tests Risk Reduction Prototypes Fixed Assemblies Design/Fab PFR Integration/Alignment Structural Analysis MFR ATP IFU Modules Bench Design/Fab/Assy Ship Manuals OIWFS/Post-Slit/Pre-Slit Training WFS Integration/Alignment OIWFS Hardware OIWFS Prism Mechanism Design/Fab/Assy/Test 9 Mechanisms Flexure Testing Software Development/Code/Test SW Plan/Low-Level/High-Level Code Electronics Design/Fab/Test Optics Procurement Mirrors/Lenses/Filters/Gratings/Prisms 12 Quarterly Review January 24, 2002 Revised Bench Integration Plan 12/1 12/15 1/1 1/15 2/1 2/15 3/1 3/15 4/1 4/15 5/1 5/15 6/1 Active Shield Design/Fab Passive Shield Design Fab Install Cold Shields & Finish Wiring Install PS & Bulkhead Clean & M t Hdwr Wire Cold Tests FlexureTest - cryocoolers IF U IF U not Plug/Play F ilt e r Whe e l S lit D e c k e r C a m e ra Plug/Play Pre-Slit Eng Array Bench Sci Array OIWFS SD/FW Cold Test Prism Clean/Test Wire G ra t ing T urre t PS Int Cold Instl Test Test optics Clean/Test Wire F o c us Cold Test Instl optics Clean/Test Cold Wire Test P ris m T urre t s Warm Test Instl mux Clean/Test Cold Install Wire Test Prisms A c q M irro r C o llim a t o r Clean/Test Cold Bench Wire Test Test Clean Adj Wire Bench Heaters, Etc. 13 Quarterly Review January 24, 2002 Work Left – Integration Plan • Two critical areas – Radiation shields – Mechanism testing • Need passive shields first so bulkhead can be assembled and wired • Active shields needed for integration of bench into dewar • Key resources – – – – – Electrical technician for wiring M&P engineer and technician for cleaning and prep work Scientists for testing Mechanical engineers and designers for shields Instrument makers for assembly/rework/testing 14 Quarterly Review January 24, 2002 Project Status - Progress from August ’99 WBS element 5.0 Overall project 5.1 Management & Reporting 5.2 Systems Engineering 5.3 Mechanical 5.3.1 Mechanisms 5.3.2 Benches 5.3.3 Fixed Assemblies 5.4 Electronics 5.5 Software 5.6 Integration 5.7 Deliverables 5.8 Procurement Mar 53% 51% 100% 52% 66% 55% 16% 63% 49% 0% 0% 54% June October January 66% 80% 86% 61% 71% 80% 100% 100% 100% 70% 87% 94% 84% 92% 97% 70% 100% 96% 36% 62% 84% 59% 86% 71% 63% 85% 86% 0% 2% 23% 0% 0% 45% 67% 77% 86% 15 Quarterly Review January 24, 2002 Progress Overview • The delivery date of the instrument is now October 24, 2002 – Delay radiation shield design – Delay in mechanism testing • The project is currently 86% complete overall • We have completed 170 of 226 total project milestones • Our critical path(s) are – Radiation Shields: 3D and 2D design and fabrication – Mechanism testing • Electronics fabrication left is mechanism and dewar wiring • Software Component Controller code is essentially complete 16 Quarterly Review January 24, 2002 Focus of Last Quarter of Work • Design/fabrication activity concentrated on – – – – – – – – Radiation shield design Bulkhead Assembly fabrication/acceptance tests/fit checks Fit checks and fixes Mechanism warm tests, flexure tests, rework Assembly cleaning and wiring, prep for integration and/or cold testing Final fixed assembly fabrication: trusses, etc. Telescope simulator design General design cleanup (configuration control) • Procurement – Mechanical – Optical 17 Quarterly Review January 24, 2002 Progress and Schedule Comments • Mechanical design virtually complete – Radiation Shields and the Thermal Distribution Assembly remain • Fabrication will continue through March on shields • Sub-assembly flexure testing complete • Mechanism fabrication is essentially complete – Minor rework in process • Focus mechanism • Prism turret – Filter wheel cleaned and wired, ready for final warm test – Grating Turret ready for cleaning and wiring – Camera cleaning and wiring in progress 18 Quarterly Review January 24, 2002 Budget and Expenditures • Baseline Estimate (Jan 99 to completion) • • • Labor Capital Total $3,391,232 $ 836,462 $4,227,694 • Current Forecast (Jan 99 to completion) March Labor Capital Total $2,866,775 $1,074,798 $3,941,573 June $3,002,938 $1,181,900 $4,184,838 October $2,957,389 $1,138,285 $4,095,674 January $2,986,915 $1,384,670 $4,371,585 • Performance ratios March BCWS BCWP ACWP CPI SPI $1,754,979 $1,611,542 $1,742,651 0.92 0.92 June $2,863,855 $2,011,383 $2,113,212 0.95 0.70 October $3,085,811 $2,526,319 $2,762,963 0.91 0.82 January $3,263,216 $2,899,362 $3,339,222 0.89 0.87 19 Quarterly Review January 24, 2002 Problems and Concerns • Top level integration has been delayed by 2 months until April 1st – Radiation shield design taking longer than expected – Mechanism rework required to pass flexure tests and fit checks – Focus mechanism design/fab/assembly took longer than expected • Radiation shield fabrication will extend into March • Documentation (Manuals) – Maintenance manual outline started; procedures documented as carried out – delayed by focus on mechanism testing and radiation shields • OIWFS prism installation – OIWFS complete except for installing detector – prism needs to be installed and tested before benches integration into the dewar – latest date for receipt is 3/4/2002 (with installation hardware) • IFU – Proceeding with mass models – There is a chance for integration if it arrives in February 20 Quarterly Review January 24, 2002 This Page Intentionally Left Blank 21 Quarterly Review January 24, 2002 22 Quarterly Review January 24, 2002 GNIRS Configuration • Most design work complete • Remaining work as “punch list” 23 Quarterly Review January 24, 2002 GNIRS TO DO LIST Priority Item Actionee Status 1 COLD STATIONING EAH 80% DESIGN COMPLETE 1 ALL ACTIVE SHIELDS EAH 60% DESIGN COMPLETE, 1 ALL PASSIVE SHIELDS GPM DESIGN 100% COMPLETE, DRAFT 55% COMPLETE ~124 DWGS 2 COLD STRAPPING ASSY'S BETWEEN MOTORS AND ACTIVE SHIELDS MED 80% DESIGN COMPLETE 2 COLD STRAPS BETWEEN CRYO COOLERS AND ACTIVE SHIELDS GPM 0% DESIGN COMPLETE 2 ADD HOLES IN FWD BHD AND AFT BHD FOR MOUNTTING PASSIVE SHIELDS STEIN READY TO ADD HOLES 3 THERMAL DISTRIBUTION CONNECTOR ASSY GPM 95% DESIGN COMPLETE 3 WOLLASTON PRISM ADAPTER JRA 0% DESIGN COMPLETE 3 NEED TO STIFFEN PRISM MASKS ON PRISM TURRET (REDESIGN) GPM 0% DESIGN COMPLETE 4 PRE AMP BOX HINGE MOUNT FOR EASY ACCESS TO CIRCUIT CARDS JRA 0% DESIGN COMPLETE 5 TELESCOPE SIMULATOR ? 0% DESIGN COMPLETE 6 LN2 PRECOOL CHECK VALVE & PRESSURE GAUGE FOR GHe PURGE GPM 0% DESIGN COMPLETE DRAWING STATUS RELEASED UNRELEASED ASSEMBLIES 197 DETAILS 763 ASSEMBLIES 65 DETAILS 101 TOTAL NUMBER OF MECHANICAL DRAWINGS DEFINED ON INSTRUMENT 1126 PERCENT OF DRAWINGS RELEASED 85% 24 Quarterly Review January 24, 2002 Shield Status • Passive shields (2 sets) – 3D design complete – Detailing in progress – Fabrication proceeding as design completes • Active shields – 3D design in progress – Accurate weight estimate possible 25 Quarterly Review January 24, 2002 Active Shield 26 Quarterly Review January 24, 2002 Passive & Active Shields (exploded) 27 Quarterly Review January 24, 2002 Weight Budget • Revised Value = 4052 lb – limit = 4409 lb – increase 56 lb from last QR, -61 lb from 3/01 – change mainly due to shields, hence only small c.g. change • Spot check hardware against models – true weights within 2% of models 28 Quarterly Review January 24, 2002 This Page Intentionally Left Blank 29 Quarterly Review January 24, 2002 GNIRS Subsystem tests 01/17/2002 Subsystem Test Type Test Status Warm Shop Environmental Cover M Partial Requires dewar shell for completion Complete Bench O,E Pre-Slit Bench Offner+Pickoff Filter Wheels (2) Slit+Decker Slides M O M M Done Cold check in assembled instrument after integration Fit check Done Done IFU assumed "plug&play" Post-Slit Bench Collimator/Compensator Prism Turret Grating Turret Acquisition Mirror Camera Turret M M,O M M M M,O Done Waiting for completion of mechanism tests Focus Mechanism Detector Mount M E Partial OIWFS Gimbal Mirror Filter Wheel O,E M M Done Focus Stage Detector Mount M E Warm Clean Cold Integrate Remarks Done Done Done Done Done Clean test after integration into bench Optics tests on assembly done warm after cold mechanical tests Flexure test needed In detector test dewar Done Done Done Done Done Done Done Done Done Done Done Done Done Test Types: M: mechanical, including optomechanical and switches O: optical E: detector tests Test not possible or not required Done Testing complete for this phase Waiting for OIWFS prism & main bench Mechanisms tested at IfA Mechanisms tested at IfA; no cold testing on FW Mechanisms tested at IfA Only MUX tested at IfA; detector tested at mfr.; detector installation awaiting prism 30 Quarterly Review January 24, 2002 Subsystem Testing • Basic philosophy remains unchanged – All subsystems tested prior to integration – Quantify performance for mechanism motion tables, flexure compensator 31 Quarterly Review January 24, 2002 Subsystem Testing (2) • All mechanisms have undergone functional testing – Some testing on focus remains (1/17) – Need to complete clean/cold tests – Turrets flexure performance determined, provides initial input for flexure compensator settings • Optical tests on camera, collimator remain – No alignment required – Fore-optics aligned and tested 32 Quarterly Review January 24, 2002 Subsystem Testing (3) • OIWFS integration nominally complete – System aligned and tested with warm MUX – Need to install science detector – Still limited time to install and check S-H prism 33 Quarterly Review January 24, 2002 OIWFS Issues • • • • • • All OIWFS software accounted for MUX readout working Some setup information incomplete Electronics documentation incomplete Operating software is working Mechanism status (9/20/01) – Zero is displaced on gimbal Y-axis – Otherwise, hardware appears OK 34 Quarterly Review January 24, 2002 Software Components • Top Level – Instrument Sequencer – Interfaces to detector, wavefront sensor, components controller, OCS • Components Controller – Control (CAD, CAR, Apply) – Status and Alarm database (SAD) • Low Level Software – Motor control – Temperature readback – Pressure monitoring 35 Quarterly Review January 24, 2002 Software Work Remaining - Design • Alarm and Status Propagation – Complete • WCS/DHS header information – If necessary 36 Quarterly Review January 24, 2002 Software Work Remaining - Coding • Low Level (Hardware Interfacing) – No remaining coding planned • Components control – Tweak engineering user interface • Instrument Sequencer and Interfaces – Engineering User interface (ongoing) 37 Quarterly Review January 24, 2002 Software Work Remaining - Testing • Low Level – Prefer fully wired system for end-to-end test – Motors • • • • Multiple motors simultaneously Determine distances between limits, switches, etc Set speeds, acceleration, backlash parameters Actual mechanism(s) needed – Temperature Probes • Set calibration curve and individual offsets – Pressure Sensor • Verify operation in final configuration 38 Quarterly Review January 24, 2002 Software Work Remaining - Testing • Upper Level -- EPICS – Engineering screens provide next level of test • Top Level -- OCS compliance – use OCSwish • new tool, in use in Hawaii, verifies OCS interface 39 Quarterly Review January 24, 2002 Software Work Remaining • Simulation allows testing without hardware – Works only for motors. • Additional work – – – – Lab Support Conversion to GEM7 or GEM8 powerPc on Detector controller Mechanism testing • Set configuration files 40 Quarterly Review January 24, 2002 Software Work Remaining • Software is done when – Motors, temperature readback, etc, work at command line (low level) – Engineering Screens provide required control and readback – OCSwish/Acceptance test proves compliance with Gemini system – GNIRS works on the telescope 41 Quarterly Review January 24, 2002 Software Interface Issues • Array Controller – Interfaced correctly to instrument sequencer? • OCS – OCSwish will help, but it’s new to us • OIWFS – real testing is not GNIRS concern. 42 Quarterly Review January 24, 2002 Project Management • • • • • • Project Status Schedule & Planning Milestones Budget and Expenditures Organization Plans for Next Review 43 Quarterly Review January 24, 2002 Project Status – Overview • We are still on track for 2002 delivery – current ship date Oct 3 • Critical path is Radiation Shield design and fabrication • Mechanism testing and bench integration is a close second – Mechanism-to-bench fit checks are done – Mechanism cold tests are beginning – Bench integration completes in March • Assembly of Post-Slit bench – Bench +Prism, Grating and Camera Turrets, Acquisition Mirror and Collimator • Assembly of Pre-Slit bench – FW, Slit/Decker, and fore-optics • Mating of Pre-Slit, OIWFS and Post-Slit benches • Software and electronics are working – Test and debug completed – Software checks with actual hardware in process • OIWFS integration is complete – Detector installation remains to be done at a later date 44 Quarterly Review January 24, 2002 Project Status – WBS 5.2 Systems Engineering • All planned tasks in this work element are complete • Activities over this quarter included – – – – – – Oversight of the top level design and interfaces Coordination of mechanism cleaning and assembly Mechanism warm tests Mechanism flexure tests Fore-optics testing Resources • 1.5 Scientists 45 Quarterly Review January 24, 2002 Project Status – WBS 5.3 Mechanical Mechanism % Fixed Assembly Camera Detector Focus Environ Cover Acquisition Mirror Slit Decker Filter Wheel Grating Turret Gratings Prism Turret Prisms Motor Drives 99 92 99 89 95 95 98 100 95 100 100 Bench % Post-Slit OIWFS Collimator POM/Offner 100 100 95 100 Entrance Window Cryo-cooler Molecular Sieve Thermal Dist. LN2 Pre-Cool Opt Bench Mount Environ Cover Filter Bulkhead Passive Rad Shield Active Rad Shield Front Dewar Shell Rear dewar Shell Vert Inst Frame Horiz Inst Frame Dewar Mount Truss TE Mount Truss Shipping Container Handling Fixture Ballast Weights % 100 59 100 75 83 100 100 100 68 17 100 100 100 100 100 100 0 100 100 46 Quarterly Review January 24, 2002 Project Status – WBS 5.3 Mechanical • All mechanism fabrication complete – Only activity is in rework of items found in testing • Collimator assembly complete – waiting assembly/alignment • Fixed assembly 3D/2D design and fabrication remaining – Radiation shields (passive and active) – Thermal distribution assembly – Cryo-cooler and manifold • Resources – 2 ME’s, 3 MD, 4 IM, 1 M&P Eng, 1 Procurement 47 Quarterly Review January 24, 2002 Project Status – WBS 5.4 Electrical • Design activities are completed • Instrument Controller electronics thermal enclosure complete • Work remaining – – – – – Fabricate the Thermal Enclosure to Dewar cables Harness the cold mechanisms and cold bench as they become available Support software testing Harness the Bulkhead Assembly Dewar warm-up controller fabrication • Resources – 0.25 EE, 1 ET 48 Quarterly Review January 24, 2002 Project Status – WBS 5.5 Software • Component Controller code complete • Code has been tested as far as possible before integration • Testing with mechanisms is underway • Lookup tables for individual mechanisms remain • Array controller code interface is yet to be verified • High level (EPICS) code 99% complete • Resources – 1 SE 49 Quarterly Review January 24, 2002 Project Status – WBS 5.8 Procurement • Major items remaining in procurement – Passive and Active radiation shields – Cryo-cooler assembly – LN2 Pre-cool assembly • There are no major vendor fabrication contracts – Remaining work is radiation shields and small parts/components • Resources – 1 Tech Associate, production 50 Quarterly Review January 24, 2002 Project Status – Optics • Instrument optics procurement complete – Optics for Telescope Simulator remain • Filters (still an open item) – 7 filters ordered through UH consortium; 2 failed spec and vendor may replace • Tasks left include – Camera alignment(s) – Collimator alignment – Optics alignment tests of assembled benches • Resources – 1 Optical Tech, 0.25 OE 51 Quarterly Review January 24, 2002 This Page Intentionally Left Blank 52 Quarterly Review January 24, 2002 Project Milestones by Quarter Number of Number of Calendar Milestones Running Milestones Running Year Quarter Due Total Comp Total 1999 4th 1 1 1 1 2000 1st 15 16 15 16 2000 2nd 13 29 13 29 2000 3rd 8 37 8 37 2000 4th 18 55 18 55 2001 1st 19 74 19 74 2001 2nd 34 108 34 108 2001 3rd 29 137 29 137 2001 4th 28 165 28 165 2002 1st 47 212 5 170 2002 2nd 8 220 0 170 2002 3rd 2 222 0 170 2002 4th 4 226 0 170 TOTAL 226 170 As of 1/16/02 53 Au g99 Oc t-9 9 De c -9 9 Fe b00 Ap r-0 0 Ju n-0 0 Au g00 Oc t-0 0 De c -0 0 Fe b01 Ap r-0 1 Ju n-0 1 Au g01 Oc t-0 1 De c -0 1 Fe b02 Ap r-0 2 Ju n-0 2 Au g02 FTE Quarterly Review January 24, 2002 GNIRS Staffing FTE by Month 40.0 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 Month Plan FTE Actual FTE 54 Au g -9 9 Oc t-9 9 De c -9 9 Fe b-0 0 Ap r-0 0 Ju n-0 0 Au g -0 0 Oc t-0 0 De c -0 0 Fe b-0 1 Ap r-0 1 Ju n-0 1 Au g -0 1 Oc t-0 1 De c -0 1 Fe b-0 2 Ap r-0 2 Ju n-0 2 Au g -0 2 Hours Quarterly Review January 24, 2002 GNIRS Work by Month 5000 4000 3000 2000 1000 0 Month Actual Baseline Jan'02 Plan 55 Quarterly Review January 24, 2002 Planned FTE Projection Jan FTE Type ME ME MD MD MD MD EE ET IM IM IM IM OPT P P OE GT ENG PA AA PE PS PSS PM Name Muller Hileman Andrew Downey Rosin Circle Penegor George Stein Bennett Harris Lederer Camacho Wolff Ruckle Ming Pina Distler Eklund Bowersock Davis Elias Joyce Gaughan Total Hours Spend Rate ($/mo) Total $ to go 18 16 Feb Mar Apr May Jun Jul Aug Sept Oct 1 0.5 0.75 1 1 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 1 1 1 1 1 1 1 1 1 0.5 0.25 0.25 0.25 0.75 1 1 1 1 1 0.1 1 0.25 0.5 0.5 0.25 0.75 0.75 0.75 0.5 0.75 0.25 0.75 1 1 1 1 1 0.1 1 0.25 0.5 0.75 0.25 0.75 1 0.75 0.5 1 0.25 0.75 1 0.1 0.75 1 0.1 0.75 1 0.1 0.75 1 0.1 0.75 0.1 0.75 0.25 1 0.5 1 1 1 1 0.1 1 0.25 0.5 0.75 0.25 0.75 1 0.75 0.5 1 1 1 1 1 1 1 1 0.5 0.25 0.25 0.75 1 0.75 0.5 0.75 0.5 0.25 0.25 0.75 1 0.75 0.5 1 0.5 0.25 0.25 0.75 1 0.75 0.5 1 0.5 0.25 0.25 0.75 0.5 0.25 0.25 0.75 0.5 0.25 0.25 0.75 0.5 0.25 0.75 0.75 0.5 0.75 0.75 0.5 0.75 0.75 0.5 1 0.75 0.5 1 16.35 2616 $99,408 16.6 2656 $100,928 11.6 1856 $70,528 10.35 1656 $62,928 10.6 1696 $64,448 10.6 1696 $64,448 7.35 1176 $44,688 6.85 1096 $41,648 7.25 1160 $44,080 6.5 1040 $39,520 $632,624 16648 Jan 15.85 Feb 14.1 Mar 11.1 Apr 10.35 May 10.6 Jun 10.6 Jul 7.35 Aug 6.85 Sept 7.25 Oct 6.5 14 12 10 FTE 8 6 4 2 0 Jan Feb Mar Apr May Jun Jul Aug Sept 56 Quarterly Review January 24, 2002 FTE Projection • Table shows the resources forecast through delivery and training • Approximately 16,600 hrs total needed to finish the project – This does not include commissioning or the impact of the pending change order for delivery to Chile 57 Quarterly Review January 24, 2002 GNIRS Cumulative Work 90000 79,725h 80000 78,766h [72,677h wo/sci.] 70000 63,693h 50000 40000 30000 20000 10000 -9 O 9 ct -9 De 9 c9 Fe 9 b0 Ap 0 r-0 Ju 0 n0 Au 0 g0 O 0 ct -0 De 0 c0 Fe 0 b0 Ap 1 r-0 Ju 1 n0 Au 1 g0 O 1 ct -0 De 1 c0 Fe 1 b02 Ap r-0 Ju 2 n0 Au 2 g02 0 Au g Hours 60000 Month Actual Baseline Jan'02 Plan 58 Quarterly Review January 24, 2002 GNIRS Capital Spend Plan $1,400,000 $1,298,66 5 $1,200,000 $1,260,245 $800,000 $759,192 $600,000 $400,000 $200,000 $0 Au g9 O 9 ct -9 De 9 c9 Fe 9 b0 Ap 0 r-0 Ju 0 n0 Au 0 g0 O 0 ct -0 De 0 c0 Fe 0 b0 Ap 1 r-0 Ju 1 n0 Au 1 g0 O 1 ct -0 De 1 c0 Fe 1 b0 Ap 2 r-0 Ju 2 n0 Au 2 g02 Dollars $1,000,000 Month Actual Baseline Jan'02 Plan 59 Quarterly Review January 24, 2002 Organization Chart 60 Quarterly Review January 24, 2002 Director, NOAO J. Mould ETS L. Daggert Gemini Projects Project Manager N. Gaughan Project Assistant D. Eklund (.5) Administrative Assistant M. Bowersock Project Scientist, Systems Engineering J. Elias Mechanical Engineers G. Muller Optical Engineer M. Liang Programmer P. Ruckle Support Scientists D. Joyce B. Gregory Mechanical Designers J. Andrew D. Rosin E. Downey Instrument Makers J. Stein R. Bennett R. Harris J. Irvine M&P B. Ditsler Electrical Engineer J. Penegor Procurement & Vender Liaison A. Davis Electrical Tech R. George General Technician J. Pina 61 Quarterly Review January 24, 2002 Plans for Next Review • The next Quarterly Review will be held in the April 2002 timeframe • The project will be into the Integration and Test Phase – Flexure testing planned start in late April • Mechanical design will be complete • Mechanical fabrication will be complete – except for items associated with flexure testing and shipping container – Some rework items as identified in integration may remain • Electronics fabrication and checkout completed – Some rework items as identified in integration may remain • Component Controller Software completed and operating with the Electronics – EPICS level software will still be in work • OIWFS integration will be completed • Manuals will have started – Outlines will be done – Manual drafts will have started 62 Quarterly Review January 24, 2002 Conclusions • The current project status shows us to be over 86% complete • We are on track to deliver in October 2002 • We are near the end of the design phase – Radiation shield design is taking longer than anticipated – Mechanism testing and rework is taking longer than planned • We are near the end of the fabrication phase • All mechanisms have passed warm functional and flexure tests – Exception is focus mechanism which has yet to be fully tested • The estimated cost of GNIRS is $ 4,371,585 – January ’99 to delivery 63 Quarterly Review January 24, 2002 Appendix A – Images Appendix B – Milestones, WBS Chart 64 Quarterly Review January 24, 2002 Appendix A Configuration and Fabrication Images 65 Quarterly Review January 24, 2002 OIWFS with Assemblies 66 Quarterly Review January 24, 2002 Complete Foreoptics Assembly 67 Quarterly Review January 24, 2002 Short Cameras Fit-Checked on Turret 68 Quarterly Review January 24, 2002 Four Cameras – Long Blue and Red (far left and right) and Short Blue and Red (center) 69 Quarterly Review January 24, 2002 Detector Focus Frame Assembly 70 Quarterly Review January 24, 2002 Grating & Prism Turrets and Cold Test Fixtures 71 Quarterly Review January 24, 2002 Grating Turret Fit Check into Optical Bench 72 Quarterly Review January 24, 2002 Pre-Slit Bench Fit Check 73 Quarterly Review January 24, 2002 Prism Turret Mounted to Cold Test Fixture 74 Quarterly Review January 24, 2002 Slit Slide Fit Check 75 Quarterly Review January 24, 2002 Optical Bench Preliminary Fit Check 76 Ed Hileman Quarterly Review January 24, 2002 Optical Bench Fit Check & Team 77 Randy Bennett, Ed Hileman, Al Davis, John Stein, Gary Muller, Dick Joyce, John Andrew Quarterly Review January 24, 2002 View down Collimator to Optical Path 78 Quarterly Review January 24, 2002 Assembled Bulkheads & Dewar Shells before Painting 79 Quarterly Review January 24, 2002 Vacuum Testing of Chamber 80 Quarterly Review January 24, 2002 Tangent Bars & Collimator Gimbal Mount Ring 81 Quarterly Review January 24, 2002 Bulkhead after Painting 82 Quarterly Review January 24, 2002 Bulkhead Detail 83 Quarterly Review January 24, 2002 Bulkheads being Assembled 84 Al Davis, Gary Muller Quarterly Review January 24, 2002 Fully Assembled Bulkhead & Dewar Shells Ed Hileman 85 Quarterly Review January 24, 2002 Full Assembly on Handling Cart 86 Quarterly Review January 24, 2002 Appendix B Milestones WBS Chart 87 Quarterly Review January 24, 2002 Milestones since MFR (3/01) Bas e line Plan WBS TASK 5.8.1.1.1 RMI Optics Acceptance 3/1/01 3/1/01 5.2.5.5 Design Axis 2 Wiring Diagram NA 3/12/01 3/12/01 5.2.5.6 Fab/Test Axis 2 Wiring Harness NA 5.2.5.8 Mechanism Test Set Complete 5.3.3.1.3.5 6/16/00 Es t. Plan Act. Finis h 3/12/01 3/12/01 9/29/00 3/12/01 3/12/01 Entrance Window Assembly Fabrication Complete 6/8/01 3/12/01 3/12/01 5.3.3.16.1.4 Dew ar Mount Truss Assembly Design Complete 1/5/01 3/13/01 3/13/01 5.4.1.2.5 Motor Drive / Cryohead Control Chassis Complete 8/29/00 4/9/01 4/9/01 5.3.1.8.2.6 Grating Turret Draf ting Complete 6/7/00 4/10/01 4/10/01 5.3.3.9.1.5 Bulkhead Assembly Design Complete 9/26/00 4/10/01 4/10/01 10/4/00 4/13/01 4/13/01 8/2/00 4/16/01 4/16/01 5/31/00 4/17/01 4/17/01 4/18/01 4/18/01 5.3.1.2.2.2.4 Long Red Camera Draf ting Complete 5.3.1.104.5 Motor Drive Assembly Complete 5.3.1.2.3.1.3 Long Blue Camera Design Complete 5.5.4.1 Channel Access NA 5.3.2.4.2.3.3 Of f ner Assembly Fabrication Complete 9/11/00 4/24/01 4/24/01 5.3.3.14.1.4 Vertical Installation Frame Assembly Design Complete 12/4/00 4/27/01 4/27/01 5.3.3.15.1.5 Horizontal Installation Frame Assembly Design Complete 12/5/00 4/27/01 4/27/01 5.3.3.17.1.5 Thermal Enclosure Mount Assembly Design Complete 1/23/01 4/30/01 4/30/01 5.3.3.19.4 Handling Fixtures Complete NA 5/18/01 5/18/01 5.3.2.3.3.2.4 Collimator Compensating Mount Design Complete NA 5/23/01 5/23/01 5.5.4.2 NA 5/24/01 5/24/01 5/5/00 5/30/01 5/30/01 Instrument Coordination 5.3.2.3.2.1.5 Collimator Cover Box Design Complete 5.3.3.13.1.5 Rear Dew ar Shell Design Complete 3/29/01 5/31/01 5/31/01 5.3.3.9.2.6 Bulkhead AssemblyDraf ting Complete 2/21/01 6/1/01 6/1/01 5.3.1.8.6.4 Grating Fabrication Complete 11/28/00 6/1/01 6/1/01 5.3.3.12.1.5 Front Dew ar Shell Design Complete 2/26/01 6/1/01 6/1/01 5.3.3.6.1.3 LN2 Pre-Cool Assemby Design Complete 11/16/00 6/6/01 6/6/01 11/27/00 6/6/01 6/6/01 3/14/01 6/8/01 6/8/01 8/7/00 6/11/01 6/11/01 5.3.1.2.3.2.4 Long Blue Camera Draf ting Complete 5.3.3.17.2.6 Thermal Enclosure Mount Assembly Draf ting Complete 5.3.2.3.2.2.4 Collimator Cover Box Draf ting Complete 5.3.1.7.3.2 Filter Wheel Assembly Fabrication Complete 1/10/01 6/11/01 6/11/01 5.3.3.3.1.4 Cryo Cooler Design Complete 9/26/00 6/12/01 6/12/01 5.3.3.2.2.4 Detector Mount Assembly Draf ting Complete 1/4/01 6/15/01 6/15/01 5.3.3.12.2.6 Front Dew ar Shell Draf ting Complete 3/16/01 6/19/01 6/19/01 5.3.2.1.8.3.2 Bottom Camera Cover Fabrication Complete 7/21/00 6/25/01 6/25/01 5.3.2.1.8.4.4 Bottom Camera Cover Complete 7/26/00 6/28/01 6/28/01 6/28/01 6/28/01 5.3.3.13.2.6 Rear Dew ar Shell Draf ting Complete 5.3.2.2.3.1 Receive and Inspect IFA WFS electronics NA 9/5/00 6/29/01 7/3/01 5.3.1.6.5.3.2 Slit/Decker Assembly Fabrication Complete 3/5/01 6/29/01 6/29/01 5.3.2.1.6.3.2 LCFMH Fabrication Complete 8/1/00 6/29/01 6/29/01 5.8.1.3.1 Flat Mirrors Acceptance 6/2/00 6/29/01 6/29/01 5.3.1.3.2.4 Detector Focus Assembly Draf ting Complete 1/26/01 7/2/01 7/2/01 12/4/00 7/5/01 7/5/01 8/4/00 7/5/01 7/5/01 9/22/00 7/16/01 7/16/01 7/19/01 7/19/01 7/23/01 7/23/01 5.3.1.2.6.3.4 Camera Hub Fabrication Complete 5.3.2.1.6.4.4 LCFMH Complete 5.3.2.4.2.4.4 Of f ner Assembly Complete 5.3.2.3.3.3.4 Collimator Compensating Mount Draf ting Complete 5.3.3.3.2.4 Cryo Cooler Draf ting Complete NA 11/21/00 88 Quarterly Review January 24, 2002 WBS - Total Project 89 Quarterly Review January 24, 2002 This Page Intentionally Left Blank 90
© Copyright 2026 Paperzz