REDCAR & CLEVELAND BOROUGH COUNCIL FINAL PLAYING PITCH STRATEGY OCTOBER 2011 Integrity, Innovation, Inspiration 1-2 Frecheville Court off Knowsley Street Bury BL9 0UF T 0161 764 7040 F 0161 764 7490 E [email protected] www.kkp.co.uk Quality assurance Name Date Report origination Kirsty Freely, Claire Fallon 26th July 2011 Quality control Dave McHendry 3rd August 2011 Client comments Claire Fallon 20th September 2011 Final approval Claire Fallon 31 October 2011 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY CONTENTS PART 1: INTRODUCTION ................................................................................................ 5 PART 2: FUNDING PLAN............................................................................................... 11 PART 3: SUMMARY OF ISSUES FROM ASSESSMENT REPORT ............................... 16 PART 4: A STRATEGIC FRAMEWORK FOR FACILITY IMPROVEMENTS................... 20 PART 5: MANAGEMENT OBJECTIVES......................................................................... 21 PART 6: ACTION PLAN ................................................................................................. 51 PART 7: SETTING PLAYING PITCH STANDARDS ....................................................... 63 PART 8: MONITORING AND REVIEW ........................................................................... 70 PART 9: CONCLUSIONS ............................................................................................... 71 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 1: INTRODUCTION This is the Playing Pitch Strategy for Redcar and Cleveland Borough Council (RCBC). Building upon the preceding Assessment Report, it provides a clear, strategic framework for the maintenance and improvement of existing playing pitches, outdoor sports facilities and ancillary facilities between 2011 and 2026. This Strategy will be capable of: Providing a clear investment strategy for outdoor sports facility provision within the local authority area; Providing a clear framework for all outdoor sports facility providers, including the public, private and third sectors; Clearly addressing the needs of all identified sports within the local area, picking up particular local demand issues; Addressing issues of population growth, and or major growth/regeneration areas up to 2026; Addressing issues of cross boundary facility provision; Addressing issues of accessibility, quality and management with regard to facility provision; Standing up to scrutiny at a public inquiry as a robust study; Providing realistic aspirations which are implementable within the local authority’s budgetary position and procurement regime. 1.1: Vision In keeping with the vision within the Sustainable Communities Strategy (2008 – 2021), which sets out the Boroughs priorities to enhance the quality of life of local communities and to improve the long term economic, social and environmental well-being of the Borough, the proposed vision for playing pitches and outdoor sports facilities (including ancillary facilities) in Redcar & Cleveland is that: By 2026 we want Redcar and Cleveland to be the place to offer increased opportunities to participate in both formal and informal outdoor sports activity, thereby enhancing the quality of life and health of residents. 1.2: Structure The Strategy has been developed from research and analysis of playing pitch and outdoor sports facility provision and usage within the Borough and it provides: A strategic framework for improvement, maintenance, development and, as appropriate, rationalisation of the playing pitch and outdoor sports facility stock in the Borough. A strategic vision for the future improvement and prioritisation of playing pitch and outdoor sports facilities (including ancillary facilities) in Redcar & Cleveland. Robust evidence to support work on the Redcar & Cleveland Local Development Framework (which the LDF Core Strategy Development Plan Document forms part of). An Area-wide and area-by-area sport-by-sport action plan. A site-specific action plan (where action is deemed necessary to maintain or improve quality). October 2011 Final Strategy: Knight Kavanagh & Page 5 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY The Strategy and Action Plan recommends a number of priority projects for the Borough, which should be implemented from 2011 to 2026. It should be recognised that the Strategy and Action Plan is outlined to provide a framework and, although resources may not currently be in place to implement it, partners and possible sources of external funding have been identified. There is a need to build key partnerships with schools, community clubs, town and parish councils and private landowners to maintain and improve playing pitch and outdoor sports facility provision. In these instances the potential for the Council to take a strategic lead is more limited. This document provides clarity about the way forward, and allows the Council to focus on key issues that it can directly influence and achieve. The site-by-site Action Plan provides recommended actions for each site, based on current levels of usage, quality and future demand, as well as the potential of each site for enhancement. 1.3: Strategic framework for playing pitch facility improvements The objectives set within this Strategy have been developed via the combination of information gathered during consultation, site visits and analysis. They reflect key areas to be addressed over its lifetime. However, implementation must be considered in the context of financial implications and the need for some proposals to also meet planning considerations. 1.4: National context The provision of high quality and accessible range of community outdoor sports facilities at a local level is a key requirement for achieving the targets set out by the Government and Sport England. It is vital that this strategy is cognisant of and works towards these targets in addition to local priorities and plans. The following section summarises the key strategic documents relevant to this Strategy and link, where appropriate, to the aims and objectives set out later. The recent Localism Bill, introduced in December 2010, contains the Government’s measures for strengthening local democracy. It establishes an aim to shift decision making powers from central Government to local councils and communities, giving them the legal support and confidence to deliver more innovative and efficient services. Plans include: Devolving significant new powers to councils. Establishing powerful new rights for local people and communities. Radically reforming planning. Making housing fairer and more democratic. Creating powerful incentives for economic growth. One of the key aspects of the Bill with regard to open space, sport and recreation provision is the creation of the Community Right to Build. This will give communities more control over local housing decisions. It removes the need for any organisation bringing forward developments under this power to apply for planning permission, as long as it meets minimum criteria and is supported locally. It is part of the legislation’s wider Neighbourhood Planning reforms, which also sees the introduction of a New Homes October 2011 Final Strategy: Knight Kavanagh & Page 6 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Bonus. The scheme offers cash for councils that allow new homes to be built in their area, through matching council tax revenue raised on each new house for six years. The long term implementation of the legislation is yet to be seen. However, the importance of councils having an up to date and clear understanding of sport and recreation provision is vital. Schemes such as the Community Right to Build and the New Homes Bonus are likely to increase the need for councils to be able to provide a sufficient amount of provision to an acceptable standard of quality. Sport England Strategy Sport England has recently clarified its primary role; to grow, sustain and excel participation in community sport. Its ambition is to get more people playing and enjoying sport and to help those with talent get to the very top. It seeks to achieve this through working closely with national governing bodies of sport and building strong partnerships with local authorities. The strategy commits Sport England to deliver on a series of demanding targets by 2012/13: One million people doing more sport. A 25% reduction in the number of 16-18 year olds who drop out of five key sports. Improved talent development systems in at least 25 sports. A measurable increase in people’s satisfaction with their experience. A major contribution to the delivery of the five hour sports offer for children and young people. A Sporting Future for the Playing Fields of England It is Sport England’s policy to object to any planning application, which will result in the loss of a playing field, unless it meets one of five exceptions as defined in A Sporting Future for the Playing Fields of England. Protection of playing fields was further enhanced in 1998 with Circular 9/98 (replaced in 2009 by Circular 02/09) which stipulates that where a local authority is minded to grant planning permission against Sport England’s advice on land owned by a local authority or used for educational purposes, then the application should be referred to the relevant Government Office for possible ‘call in’. As a statutory consultee for the loss of playing fields, Sport England is a key partner. Regional planning officers should be kept informed of developing projects/schemes and can provide essential guidance and advice throughout the process, not just at planning application stage. The Football Association (FA) The FA’s National Game Strategy (2007-2012) provides a strategic framework that sets out the key priorities, expenditure proposals and targets for the national game (i.e., football) over a six year period. October 2011 Final Strategy: Knight Kavanagh & Page 7 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY The main issues facing grassroots football are identified as: Growth and retention (young players) Growth and retention (adult players) Football for All Raising standards and behaviour Player development Running the game Football work force Facilities Partnerships and investment Promotion The Strategy also reinforces the urgent need to provide affordable, new and improved facilities in schools, clubs and on local authority sites. Over 75% of football is played on public sector facilities rather than in private members’ clubs. The leisure budgets of most local authorities have been reduced over recent years as priorities have been in other sectors. This has resulted in decaying facilities that do not serve the community and act as a disincentive to play football. The loss of playing fields has also been well documented and adds to the pressure on the remaining facilities to cope with the demand, especially in inner city and urban areas. The growth of the commercial sector in developing custom built 5-a-side facilities has changed the overall environment. High quality, modern facilities provided by Powerleague, Goals, JJB (now DW) and playfootball.net for example, have added new opportunities to participate and prompted a significant growth in the number of 5-a-side teams in recent years. To some extent this growth has impacted on the demand for traditional grass pitches. On-going engagement with the FA is an important part of the sustainability and implementation of the Playing Pitch Strategy. KKP would recommend RCBC further engages with the FA Regional Facility Manager (North and Yorkshire) as part of the delivery of this Strategy. Rugby Football Union (RFU) The National Facilities Strategy provides a framework for the sustainable development of facilities for rugby union in England, at a national, regional and local level. The framework enables clubs, Constituent Bodies (CBs), the Rugby Football Union (RFU) and the Rugby Football Union for Women (RFUW) and other partners to: Identify priorities for facility developments to meet the various needs of the sport. Identify what facilities are required to meet the needs of the Government sports policy and the RFU’s Strategic Plan. Support the prioritisation of investment and funding through a detailed set of developmental criteria, technical requirements, management / operational structures and potential financial viability which will be critical to the provision of quality rugby facilities. Prioritise future investment to ensure that the right facilities are provided in the right locations and for the right reasons. Identify and deliver a minimum standard for all facility provision. October 2011 Final Strategy: Knight Kavanagh & Page 8 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY The strategy shows clubs what facilities are needed to provide these different programmes, from grass roots through to the professional game. On-going engagement with the RFU is an important part of the sustainability and implementation of the Playing Pitch Strategy. KKP would recommend RCBC further engages with the RFU Regional Funding and Facilities Manager (North) as part of the delivery of this Strategy. English Cricket Board (ECB) Grounds to Play – ECB Strategic Plan (2010 – 2013) continues to focus on the four pillars, as identified| in the previous strategy: Building Partnerships. The pillars are: Energising people and partnerships to deliver national goals at local level: Having streamlined the management of ECB and established the County Boards, where feasible, services currently provided from the centre will be transferred to County Boards; Enhance asset growth through continuing interest free loans to community clubs, expanding NatWest Cricket Force, seeking to support corporate or public sector cricket grounds under threat of closure through the England and Wales Cricket Trust, and seeking to expand partnerships for Indoor Cricket. Vibrant domestic game. Enhancing facilities, environments and participation: The focus of this plan will be on providing facilities to sustain participation levels rather than a focus on a substantial increase in participation; The Cricket Foundation’s ‘Chance to Shine’ programme has been an outstanding success in reintroducing cricket into state schools. ECB will prioritise investment in the programme; To further expand club/ school links and position the cricket club at the heart of the community, ECB will provide £1.5 million per annum capital improvement grants to local clubs that make their club facilities available to the local community and to local schools. Successful England teams. The following actions executed during the duration of Building Partnerships provide a strong base for this new plan. Actions include: Streamlining ECB governance. Building participation by more than 20% per annum (as measured through ECB focus clubs and County Boards). Developing women’s cricket. Attracting volunteers. Expanding cricket’s spectator base. Introducing grants and loans to clubs. Developing disabilities cricket. The theme of this plan therefore progresses to Grounds to Play and it is in the areas of facilities and coaches where ECB investment will be focussed. Partnership funding and support will play a key role in the delivery of actions and maintaining the strength of the pillars. October 2011 Final Strategy: Knight Kavanagh & Page 9 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Partners particularly applicable to community cricket include: England and Wales Cricket Trust - to provide up to £5 million of interest free loans to member clubs for recreational projects and to work with grounds in inner city areas to provide greater community use by 2013. Sport England - to enhance the Whole Sport Plan award of £38 million by obtaining a further £10 million of lottery aid support by 2013. On-going engagement with the ECB is an important part of the sustainability and implementation of the Playing Pitch Strategy. KKP would recommend RCBC further engages with the Regional Funding and Facilities Manager (North) as part of the delivery of this Strategy. 1.5 Local planning context The Core Strategy sets out a vision for how the Borough will change and develop during the period until 2021. It recognises a range of key challenges facing the regeneration of the Borough, including population decline, unemployment, urban deprivation, housing market failure and areas of poor environmental quality, particularly in the urban area. The document sets out key themes and policies that aim to address these issues and deliver the vision. The sites at Low Grange Farm, South Bank and Coatham Enclosure, Redcar have both been identified in the Core Strategy for priority regeneration development. These key strategic sites will provide a mix of uses, and are essential for delivering the strategy and achieving the regeneration elements of the vision. The regeneration of East Cleveland is also supported where it will not hinder the regeneration of the two priority areas. The Core Strategy also requires that sites be phased to support the regeneration priorities in Greater Eston and Redcar. The Local Development Framework (LDF) is a series of documents that will eventually replace the Redcar and Cleveland Local Plan that was adopted in 1999. It considers how the Borough (outside the North York Moors National Park) will develop over the next 15 years or so. It will provide the spatial planning framework for many plans and strategies prepared by the Council and other bodies including members of the Redcar and Cleveland Local Strategic Partnership. The Council has already adopted two key LDF documents in July 2007; the Core Strategy Development Plan Document (DPD) and the Development Policies DPD. The Communities DPD is the third DPD to be prepared by the Council and is being prepared to set out the Council's planning policies, allocations and designations for housing and community facilities (including outdoor sports facilities) for the period to 2026. Once adopted, the DPD will become part of the Council's Local Development Framework and will be used to guide development proposals and in the consideration of planning applications. An assessment of playing pitches in Redcar and Cleveland was carried out in 2007 forming part of its Leisure Needs Assessment and the evidence within it used to help inform the emerging policies set out within Communities DPD. Redcar and Cleveland Borough Council acting upon advice from Sport England, decided to update the study of outdoor sports facilities within the Borough. Sport England provided advice and guidance on the study’s production. October 2011 Final Strategy: Knight Kavanagh & Page 10 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 2: FUNDING PLAN 2.1: Funding opportunities In order to deliver much of the Action Plan it is recognised that external partner funding will need to be sought. Although seeking developer contributions will go some way towards meeting deficiencies, other potential sources of funding should be investigated. Below is a list of funding sources that are relevant for community improvement projects involving sports facilities. Awarding body The Coalfields Regeneration Trust http://www.coalfieldsregen.org.uk/maingrantsprogramme/default.as p Big Lottery Fund http://www.biglotteryfund.org.uk/ Sport England : Sustainable Facilities Fund Sportsmatch Small Grants Themed rounds Protecting Playing Fields Inspired Facilities Iconic Facilities http://www.sportengland.org/funding.aspx October 2011 Description Grants provided by The Coalfields Regeneration Trust can be for capital or revenue projects for up to three years or until the end of the programme. Support is available to projects that fit into one or more of the following funding themes: Supporting communities - aimed at supporting communities to play an active part in regeneration Learning communities - to make sure that coalfield communities have the best possible learning facilities and resources Enterprising communities - to increase the range and diversity of the social economy by encouraging social enterprise and supporting organisations to generate income Supporting people into work - to build on government employment schemes by supporting new, forward-looking and locally designed approaches that get people into work Big invests in community groups and to projects that improve health, education and the environment Sport England is keen to marry funding with other organisations that provide financial support to create and strengthen the best sports projects. Applicants are encouraged to maximise the levels of other sources of funding, and projects that secure higher levels of partnership funding are more likely to be successful. Final Strategy: Knight Kavanagh & Page 11 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Awarding body Description Football Foundation This trust provides financial help for football at all levels, from national stadia and FA Premier League clubs down to grass-roots local development. http://www.footballfoundation.org.uk/ Rugby Football Foundation - The Loans Scheme http://www.rfu.com/microsites/rff/index.cfm?fus eaction=loans.home The Loans Scheme helps finance projects that contribute to the retention and recruitment of rugby players. Projects eligible for loans include: 1. Club House Facilities: General structural improvements, general refurbishment, storerooms and offices, kitchen facilities, training areas. 2. Grounds (other than pitches): Car parking facilities, ground access improvements, fencing, security measures. Rugby Football Foundation - The Grant Match Scheme http://www.rfu.com/microsites/rff/index.cfm?fus eaction=groundmatch.home The Grant Match Scheme provides easy-toaccess grant funding for playing projects that contribute to the recruitment and retention of community rugby players. Grants are available on a ‘match funding’ 50:50 basis to support a proposed project. Projects eligible for funding include: 1. Pitch Facilities – Playing surface improvement, pitch improvement, rugby posts, floodlights. 2. Club House Facilities – Changing rooms, shower facilities, washroom/lavatory, and measures to facilitate segregation (e.g. women, juniors). 3. Equipment – Large capital equipment, pitch maintenance capital equipment (e.g. mowers). Biffaward http://www.biffaward.org/about Biffaward is a multi-million pound fund which awards grants to community and environmental projects across the UK. The fund's money comes from landfill tax credits donated by Biffa Waste Services. Biffaward is managed by the Royal Society of Wildlife Trusts (RSWT) on Biffa's behalf. Under the Main Grants Scheme, grants are awarded to projects that provide or improve community spaces, cultural facilities and places for outdoor recreation. EU Life Fund http://ec.europa.eu/environment/funding/intro_ en.htm October 2011 LIFE is the EU’s financial instrument supporting environmental and nature conservation projects throughout the EU. Final Strategy: Knight Kavanagh & Page 12 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Protecting Playing Fields SE has recently launched a funding programme; Protecting Playing Fields (PPF ) as part of its Places People Play Olympic legacy mass participation programme and is investing £10 million of National Lottery funding in community sports projects over the next three years (2011-2014). The programme is being delivered via five funding rounds (with up to £2 million being awarded to projects in each round). Its focus is on protecting and improving playing fields and developing community sport. It will fund capital projects that create, develop and improve playing fields for sporting and community use and offer long term protection of the site for sport. Projects are likely to involve the construction of new pitches or improvement of existing ones that need levelling or drainage works. Sport England’s ‘Inspired Facilities’ funding programme will be delivered via five funding rounds and is due to launch in Summer 2011 where clubs, community and voluntary sector groups and local authorities can apply for grants of between £25k and £150k where there is a proven local need for a facility to be modernised, extended or modified to open up new sporting opportunities. The programmes three priorities are: Organisations that haven’t previously received a Sport England Lottery grant of over £10k Projects that are the only public sports facility in the local community, Projects that offer local opportunities to people who do not currently play sport. There may be opportunities for Redcar and Cleveland to access this funding 2.2: Funder’s requirements Below is a list of funding requirements that can typically be expected to be provided as part of a funding bid, some of which will fall directly out of the Playing Pitch Strategy: Identify need (i.e., why the Project is needed) and how the Project will address it. Articulate what difference the Project will make. Identify benefits, value for money and/or added value. Provide baseline information (i.e., the current situation). Articulate how the Project is consistent with local, regional and national policy. Financial need and project cost. Funding profile (i.e., Who’s providing what? Unit and overall costs). Technical information and requirements (e.g., planning permission). Targets, outputs and/or outcomes (i.e., the situation after the Project/what the Project will achieve) Evidence of support from partners and stakeholders. Background/essential documentation (e.g., community use agreement). Assessment of risk. October 2011 Final Strategy: Knight Kavanagh & Page 13 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY 2.3: Indicative costs The indicative costs of implementing key elements of the Action Plan are based on the following information taken from the Sport England kitbag. The costs below are for the development of community sports facilities and are based on providing good quality sports facility for the 2nd Quarter 20111. These rounded costs are based on schemes most recently funded through the Lottery, updated to reflect current forecast price indices for 1st Quarter 2010 provided by the Building Cost Information Service (BCIS), prepared by Technical Team Lead of Sport England. New work output is forecast to fall a little in 2011 as the cuts in public sector spending start to make their mark, partly mitigated by private sector output starting to recover more strongly. It is anticipated that there will be a return to sluggish growth in 2012, as public sector cuts deepen. The BCIS forecast is for tender prices to rise by 2.8% in the year to 4th quarter 2011, rising by 3.1% over the following year. Tender prices could also be affected as a result of a new Government and potential impact on public spending. General building costs are likely to be further affected by environmental and sustainability considerations: Facility Outdoor tennis court Synthetic turf pitches Grass pitch Multi–use games areas Athletics track Cricket wicket Bowls Changing rooms Type 2 court, macadam, fenced and floodlit 23mm Sand Filled, Fenced and Floodlit) (106 x 71) Water based 101.4 x 63.0m fenced and floodlit Third generation turf pitch (3G) 65mm fenced and floodlit Senior football pitch 107.90 x 71.33m Floodlighting 36.60 x 21.35 fenced and floodlit 6 lane floodlit Artificial Crown green Floodlighting 2 team changing pavilion 4 team changing pavilion Modular outdoor changing room Indicative cost £145,000 £730,000 £815,000 £840,000 (have been built in the Region for between £360 - £600k) £75,000 (regionally the average to drain and build a senior pitch is £40k) £50,000 £115,000 £1,080,000 £30,000 £110,000 £27.500 £250,000 £575,000 £55,000 The costs above include allowances for external works (car parks, roads, paths, services connections etc) are included at an average rate of 15% addition to the cost of the works. 1 http://www.sportengland.org/facilities__planning/planning_tools_and_guidance/planning_kitbag/fac ilities_costs_-_1st_quarter.aspx October 2011 Final Strategy: Knight Kavanagh & Page 14 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Maintenance of natural turf pitches It is estimated to perform the requisite amount of maintenance on a natural turf pitch costs in the region of £12,700/annum2. Maintenance of artificial turf pitches The maintenance of artificial turf pitches should only be undertaken by fully trained and competent persons. It has been estimated that the current maintenance cost for a floodlit community/school soccer size pitch is in the region of £10,000/annum. Rejuvenation processes, which may be necessary in five years, can cost in the region of £30,000 plus VAT. Current estimates for resurfacing a soccer size pitch at today’s rates is in the region of £200,000. This does not allow for any other incidental costs such as repairs to fencing, floodlighting, etc, and assumes a life cycle of 10 years. 2 Assumes grounds maintenance is contracted out on a senior football pitch. October 2011 Final Strategy: Knight Kavanagh & Page 15 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 3: SUMMARY OF ISSUES FROM ASSESSMENT REPORT This section summarises the key issues identified in the Assessment Report. The Strategy has been developed in recognition of the consultation findings whilst drawing upon a core series of objectives which should be applied across the board and should not be attributed to any one particular type of facility. The Action Plans which form Part Six of this report are intended to focus specifically on particular sport/facility issues. Football The audit identifies 31 sites which are available for community use, providing a total of 100 pitches. In addition, there are eight sites containing 23 pitches, which are not currently accessible to the community. KKP identified a total of 189 teams playing in Redcar and Cleveland. A large number of education sites provide pitches that are not available and/or used for community use. There is some potential to increase community access to school sites to help alleviate overplay on the existing sites. Team generation rates (TGRs) highlight that participation rates in Redcar and Cleveland are higher than national and regional averages. To sustain participation, large clubs have to use facilities across a range of sites. A significant number of clubs report latent demand for access to additional pitches (13.5 junior pitches and 2 senior). This suggests that the majority of demand cannot be accommodated by the current levels of provision. A number of clubs are currently seeking opportunities to develop more pitches to accommodate current demand. There is a general perception amongst users that there has been a decline in the quality of football pitches. Litter/dog fouling and changing accommodation are considered to be the poorest aspects of clubs’ home grounds. 13 sites are overplayed by 7.0 matches each week. The majority of football sites are underplayed. However, this is generally only small spare capacity spread across a number of sites which is not generally reflective of an overall surplus of senior pitches. Most underplay is expressed at De Brus Centre and Redcar Town FC. Both sites suffer from reduced quality due to unofficial use creating additional wear and tear on the pitches and therefore although pitches may appear to have spare capacity this is not a true picture of demand. There is a significant deficit of junior pitches across the Borough. Taking into account high levels of latent demand also expressed, the current playing pitch stock should be protected and consideration should be given to changing the designation of some senior pitches to cater for junior football. The small surplus of mini pitches does not take account of local predicted participation growth, which suggests that mini soccer will grow in the next couple of years. It is likely that the FA would support the provision of two 3G pitches in the Borough. Although this does not take into consideration the indoor pitch at Middlesborough FC in the Community, given its restricted use. October 2011 Final Strategy: Knight Kavanagh & Page 16 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Cricket 13 clubs, generate 61 teams. Participation has generally remained static over the last few years, although junior participation at some clubs has increased. There is currently no womens cricket being played competitively and although girls are participating (within junior teams) there are also no specific girls’ teams. Some demand exists for this and Guisborough CC has identified latent demand for a girls’ team but it is difficult to sustain without a local league structure to support it. There are few schools participating in cricket in the Borough. Where artificial wickets do exist, these are generally poor quality and unsuitable for community use. Partnerships could be strengthened between Guisborough CC and Laurence Jackson School to help meet identified demand. There is little spare capacity at Premier club pitches (such as Redcar, Guisborough and Saltburn), with most being played to or over capacity. However, there is some spare capacity that could be utilised at Category B clubs (such as Moorsholm CC and Skelton Cricket Club). Consultation and analysis of supply/demand suggests that the number of cricket pitches in the Borough is sufficient to meet levels of current demand. However, some clubs report an issue accommodating 3rd/4th or junior teams. Two pitches are not used for community use but have the potential to be brought back into use should demand be identified locally. However, both are assessed as poor quality and as such would require investment. Consultation suggests that demand exists in Brotton to rejuvenate a club. Three clubs report enough demand to increase the number of teams they provide but report difficulty in being able to secure appropriate access to pitches. The PPM analysis of cricket pitches highlights a small current shortfall of pitches across the Borough, most pronounced in Greater Eston. Together with latent demand, this picture is further exacerbated. Rugby The two main clubs (Redcar and Guisborough) play on pitches at privately owned venues. Greater Eston RFC plays at Eston Park School. Guisborough RFC has to use neighbouring Laurence Jackson School for junior matches. Nine pitches are available for community use, of which, all were assessed to be good quality. At present there are no women’s and girls’ rugby teams. However, Redcar RFC has plans to field an U14 and U15 team, which will play at its home ground (McKinley Park). Furthermore, Guisborough RFC also has plans to develop a women’s and girls’ rugby union team and has cited in its facility development plan to provide segregated changing rooms to cater for this. The Club believes its expansion plans can be accommodated within an extended existing site. However, the landowner may not, of course, necessarily support this proposal. Three sites; Redcar RFC, Guisborough RFC and Eston Park School are overplayed. This is predominately due to match pitches being used for weekly training sessions. All pitches available for community use in the Borough are overplayed. If access to more dedicated grass training pitches and AGPs were available this would alleviate pressure on pitches and help to sustain current quality. No latent demand has been identified by clubs in the Borough as priority is currently being given to accommodating existing play. October 2011 Final Strategy: Knight Kavanagh & Page 17 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY There are not enough senior pitches to meet current and future demand. Although there is also a shortfall of mini pitches, it is thought that provision of more dedicated provision at existing sites could help to meet the deficiency. Hockey Two sites accommodate sand filled AGPs in the Borough; Middlesbrough Football in the Community and Rye Hills School. However, only Rye Hills is used for hockey by Redcar HC. Guisborough HC travels to Stockton-on-Tees to access a pitch. General pitch quality is considered to be good at both sites in Redcar and Cleveland. Redcar HC is keen to further develop and sustain junior hockey participation. However, the Club suggests it is restricted due to the cost of pitch hire at Rye Hills School. The AGP at Middlesbrough Football in the Community is used to capacity for football, but remains unused for hockey as the cost is seen as prohibitive, coupled with a perception that it is a football facility. Sport England’s FPM demonstrates a shortfall of just over two pitches in the Borough. The amount of unmet demand expressed is the highest level of unmet demand in the Tees Valley. Bowls There are 10 bowling greens in the Borough which are located across a range of sites including parks and private social clubs. In addition, there are three indoor bowling greens located in the Borough. Redcar Borough Park and Locke Park have plans to increase the number of playing members which suggests the greens are not played to capacity. The quality of greens across the Borough is generally very good with site assessments rating the facilities as good or excellent quality. Tennis Redcar and Cleveland has 54 tennis courts, including 35 courts which are located at school sites. In total, there are three tennis clubs in the Borough (Saltburn, Guisborough and Marske). Consultation responses have been variable in terms of membership trends. Saltburn and Guisborough tennis clubs have aspirations to install floodlighting to help increase court capacity and help to attract additional playing members. There is no identified latent demand for additional courts. This would suggest that demand can be satisfied by existing provision. The majority of tennis courts were assessed as either excellent or good quality. The majority of tennis courts were assessed as either excellent or good quality. However, Guisborough TC rates the quality of its courts as poor. It believes that if the court quality improved this would help the Club to attract additional members. October 2011 Final Strategy: Knight Kavanagh & Page 18 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Athletics There are two athletic clubs in the Borough; New Marske (predominantly at Laurence Jackson School but also run sessions in New Marske) and Redcar Running Club (Based at Redcar Cricket Club). There is one, four lane (floodlit) athletic track in the Borough located at Guisborough Leisure Centre (dual use with Laurence Jackson School). Site assessments score the athletic track as good quality. However, there are areas of the track that require improvement. MUGA Each analysis area in the Borough is served with MUGAs provision. However, there are areas of highest population density with no provision. No demand has been identified during consultation for additional MUGAs. This would suggest the current level of provision is sufficient. Golf There are four golf clubs in Borough, providing four 18-hole courses and one floodlit driving range. There is generally good coverage of provision in the Borough. Guisborough is suitably served by provision in Redcar and Middlesborough. Sport England Active Places Power identifies that the number of holes per 1,000 population in Redcar and Cleveland is lower than regional (0.70) and national (0.68) averages. Saltburn Golf Club seeks to purchase land to develop a driving range to service demand it has identified. Active People Survey identifies that golf participation in Redcar and Cleveland has increased since 2005/06. This corresponds with trends in neighbouring local authorities. October 2011 Final Strategy: Knight Kavanagh & Page 19 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 4: A STRATEGIC FRAMEWORK FOR FACILITY IMPROVEMENTS 4.1: Introduction The following section provides a framework for RCBC and its partners to maintain and improve the playing pitch and outdoor sports facilities across the Borough. The overall vision in Redcar and Cleveland is to achieve an increase in sport and physical activity in line with regional and national targets and aspirations. In order to achieve this, it is vital that the Strategy, emerging from the Assessment Report, provides all stakeholders in the Borough with an opportunity to deal with the issues inside a clear, yet achievable, framework. This includes the opportunity to galvanise the strength of the Redcar & Cleveland Physical Activity Network (PAN) as a recognised body which monitors and evaluates the delivery of facility improvements across the Borough, notwithstanding the Council’s overall strategic lead role. The Strategy will also respond to other drivers including the Sustainable Community Strategy, sports development objectives and planning gain. 4.2: Strategic objectives The proposed vision is based upon a clear, achievable framework of strategic objectives (within boxed text which should be adopted as policy) which are supported by a range of management objectives. The management objectives need to be implemented to enable the policy objectives to be delivered. It is recommended that RCBC adopt the following strategic objectives (as policy) to enable it to achieve the vision of the Strategy: OBJECTIVE 1 To address quantitative deficiencies to meet existing unmet demand and plan for new provision (as and where required). OBJECTIVE 2 To address qualitative deficiencies and enhance existing provision to support high levels of participation. OBJECTIVE 3 To maximise access to all outdoor facilities across the Borough (including education sites). OBJECTIVE 4 To ensure that unmet current demand and future demand is accommodated through planned increases in provision. OBJECTIVE 5 To support the development of local sports clubs to meet their needs within the Borough. October 2011 Final Strategy: Knight Kavanagh & Page 20 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 5: MANAGEMENT OBJECTIVES The management objectives need to be implemented to enable the policy objectives to be delivered. It is recommended that RCBC also adopt the following management objectives across a range of departments to enable it to achieve the vision of the Strategy: OBJECTIVE 1 To address quantitative deficiencies to meet existing unmet demand and plan for new provision (as and where required). a. Adopt minimum levels of provision which are accessible and sustainable and which commensurate to supporting current and future demand. b. Regularly review and refresh area by area plans taking account of any improvements in pitch quality (and hence increases in pitch capacity) and also any new negotiations for community use of education sites in the future. c. Rectify inadequacies and meet identified shortfalls as outlined in the Assessment Report through improvements to the current pitch stock and ancillary facilities in line with the Action Plan. For example, seek to address this through maximising the use of areas around pitches and re-designating a proportion of the surplus adult pitches for other sports with an identified shortfall (e.g. junior football and mini-soccer), where another solution has not been identified (i.e. access to additional provision). d. Identify opportunities to add to the overall pitch stock in the Borough to accommodate both latent and potential future demand. e. Establish an approach to securing developer contributions which prioritises projects according to a range of core criteria (which as a core should identify strategic need, sports development objectives, sustainability of provision and work with target groups). f. Work with facility providers to establish an approach to co-ordinate investment to address the community’s needs, to target priority areas and to reduce duplication of provision. Management objective (a) - Adopt minimum levels of provision which are accessible and sustainable and which commensurate to supporting current and future demand. In order to achieve the management objectives set out within the core strategic objective it is vital that RCBC has a clear understanding of the surpluses and deficiencies on an area by area basis both now and in the future. The following tables provide a summary of the surpluses and deficiencies (for playing pitches) identified at present and the future levels in 2026. The supporting commentary suggests how such issues can be tackled. October 2011 Final Strategy: Knight Kavanagh & Page 21 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Deficiencies in the supply of playing pitches are expressed by a range of instances which include an overall shortage and/or when existing pitch(es) cannot accommodate existing demand, particularly at peak periods and as a result of poor quality facilities which do not offer sufficient capacity. It is important that some surpluses (i.e. spare capacity) are built into the pitch provision and indeed all outdoor sports facilities across the Borough as an integral aspect of allowing rest and rotation of pitches and also ensuring that pitches are available for training purposes and to support informal play. The following tables address the issues associated with surpluses and deficiencies in provision which arise across the analysis areas. Recommendations identify the need for additional provision, by analysis area, as identified through playing pitch modelling for the future (2026). It is important that the recommendations for pitches are placed within the wider context of demand and housing development and considers facility development which may be feasible in the long-term and where the latent demand/pressure for additional pitches both now and in the future has been identified. The identified deficiencies should be addressed through a range of actions including improvements to the current pitch stock and re-aligning a proportion of the existing pitch stock i.e. changing some senior pitches to junior pitches. Demand for junior provision should be updated in three years (i.e. 2013) to further quantify it in terms of provision required. It is important that the Strategy also recognises the long term need for senior pitches as juniors progress into senior football, cricket and rugby. At Borough level there is currently an oversupply of adult football pitches (42) and mini pitches (4.5) and an undersupply of junior (-18.5). Modelling the future 2026 scenario (which falls in line with the Core Strategy) maintains an oversupply of adult pitches (41.7) and mini pitches (4.3), whilst the undersupply of junior football on the whole remains the same (-18.7). Cricket pitches are currently at an undersupply of (-5.5) pitches likely to increase to (-5.7) pitches by 2026 whilst there is a deficiency of senior rugby pitches (12.5). By 2026 the undersupply of senior pitches is anticipated to have increased to (12.7). However, these surpluses and deficiencies must be considered within the context of other findings within the report including: Variable community use of school pitches which can contribute to the overall pitches stock. The number of sites which are currently not operating at capacity. The number of sites which are only used informally. The potential to re-align the pitch stock i.e. surplus adult pitches could be re-marked as junior pitches. However it is important to note that adult pitches should not be lost completely and levels should also be maintained to support future requirements (i.e. as junior teams progress to adult football) and to ensure capacity at peak usage time is retained. To ensure that there is an element of future-proofing built into the Strategy we have modelled future scenarios based on population increases up to 2026. Whilst making accurate predictions is very difficult and can change with lifestyle changes and demographic changes very significantly over a period as short as 11 years, the scenarios for the future show, with some certainty that the pressure on junior football and minisoccer pitches and all rugby pitches will increase. October 2011 Final Strategy: Knight Kavanagh & Page 22 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Generally identified deficiencies can be overcome either by further securing community use at existing sites, for example at education sites. In some instances, the realignment and improvement of existing stock will meet the assessed deficiencies. However, for football, provision of new pitches and facilities will be required in the future to support the predicted future demand. It is also important, particularly in planning future provision that surpluses and deficiencies are understood on an area by area basis particularly given the different issues which face the areas. Although the Council is a lead partner in pitch provision, it should support the needs of all sporting clubs and bodies to work together to make the recommendations of this strategy a reality. In effect the PAN provides a suitable network to direct future recommendations. The following tables provide a summary of the surpluses and deficiencies (for playing pitches) identified at present and the future levels in 2026. The supporting commentary suggests how such issues can be tackled. Area-by-area analysis of deficiencies East Cleveland The former school playing fields at Rosecroft, Loftus could help to meet identified deficiencies in East Cleveland (particularly junior and mini football). However, as there are no changing rooms, this would require significant investment in order for the site (or part of) to be brought back into use. Summary of surpluses/deficiencies Key issues Proposed action Senior football All sites providing senior pitches have small amounts of spare capacity to accommodate additional play. It is vital that all current sites are protected from development. There are no designated junior football pitches available for community use in this analysis area. As a result, junior teams are playing on/across senior pitches. It is vital that all current sites are protected from development. Surplus of 2.5, estimated to decrease slightly to 2.4 by 2026. Junior football Deficiency of -2.5 estimated to remain the same by 2026. October 2011 Given the small levels of surpluses RCBC should seek to maintain this level of provision and to allow for a strategic reserve of pitches for rest and recover. The undersupply of junior pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior sized. Increased community use at school sites. Final Strategy: Knight Kavanagh & Page 23 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Summary of surpluses/deficiencies Key issues Proposed action Mini soccer De Brus Centre is the only site to accommodate four designated mini pitches. It is vital that all current sites are protected from development. There is spare capacity for pitches in the area to accommodate additional teams (senior or junior). It is vital that all current sites are protected from development. Deficiency of -1.5 estimated to remain the same by 2026. Cricket Surplus of 0.5 estimated to remain the same by 2026. The undersupply of mini pitches should be rectified through a range of methods including: The conversion of some senior pitches into mini pitches. Increased community use at school sites. The surplus is negligible but should be retained to accommodate future increases in participation. Greater Eston Summary of surpluses/deficiencies Key issues Proposed action Senior football The surplus of senior pitches is attributed to significant spare capacity at sites located in the analysis area i.e., Harcourt Road, South Bank, Smiths Dock Park and Grangetown Youth & Community Centre. It is important that some of the surplus is maintained to support senior football in the future. Surplus of 15.0, estimated to decrease slightly to 14.9 by 2026. Senior football is strong in the area. RCBC should seek to maintain at least two senior pitches to accommodate overplay at other sites across the area and at least a further two pitches as strategic reserve (i.e. 10% of the stock in the area) and for the fulfilment of latent demand. Further investigate opportunity to help align under provision and oversupply at Smith’s Dock Park in partnership with South Park Rangers. Junior football Deficiency of - 4.5, estimated to remain the same by 2026. October 2011 There are a significant number of junior teams in this analysis area including South Bank Rangers FC, Middlesbrough Ladies Juniors FC and Grangetown YCC 2004 FC & Grangetown Boys Club FC. Junior teams are playing on/across adult pitches. It is vital that all current sites are protected from development. The undersupply of junior pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior pitches. Increased community use of school sites. Final Strategy: Knight Kavanagh & Page 24 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Summary of surpluses/deficiencies Key issues Proposed action Mini soccer There is spare capacity for pitches in the area to accommodate additional mini teams. It is vital that all current sites are protected from development. The deficiency is brought about by the high number of senior teams playing across sites in the area in particular at Normanby Hall and Ormesby Hall cricket clubs. It is vital that all current sites are protected from development and that clubs are supported to increase the availability of artificial wickets for seniors. The deficiency of pitches in the area comes from Eston Park School (school team equivalents). It is vital that all current sites are protected from development. Summary of surpluses/deficiencies Key issues Proposed action Senior football The surplus relates to the apparent availability King George V Playing Fields, Guisborough and Laurence Jackson School. Some of the surplus should be maintained to support senior football in the future. Surplus of -1.5, estimated to remain the same by 2026. Cricket Deficiency of -5.0, estimated to increase to 5.1 by 2026. Rugby Deficiency of -1.5, estimated to increase to -2.5 by 2026. The surplus is negligible but should be retained to accommodate future increases in participation. Guisborough Surplus of 5.0, estimated to remain the same by 2026. RCBC should seek to maintain this level of provision to allow for a strategic reserve of pitches for rest and recovery. It is important that there is management of use at overplayed sites whereby play and training is distributed to underplayed locations. Junior football Deficiency of -3.0, estimated to remain the same by 2026. Mini soccer Deficiency of -0.5 estimated to remain the same by 2026. October 2011 There are a significant number of junior teams, for example Guisborough Town Juniors FC playing in this analysis area on/across adult pitches. It is vital that all current sites are protected from development. The deficiency of mini-soccer pitches is negligible and it is likely that any future requirements could be satisfied through reconfiguration of the existing stock. It is vital that all current sites are protected from development. The undersupply of junior pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior pitches. Increased community use of school sites. Final Strategy: Knight Kavanagh & Page 25 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Summary of surpluses/deficiencies Key issues Proposed action Cricket The deficiency of pitches in the area comes from Guisborough CC and mostly relates to the number of juniors allocated to the pitch. It is vital that all current sites are protected and that clubs are supported to increase the availability of practice wickets or artificial wickets for juniors. Demand for rugby pitches in the area is high and is reflected in the large number of teams being accommodated at Guisborough RFC. In the long-term it is likely that additional pitches will be needed. Guisborough RFC has aspirations to develop an area of land owned by Guisborough Estates next to the site which could provide a training/match pitch to cater for mini/midi rugby. This would help to relieve pressure on grass pitches in the area. Partnership working with the landowner will be crucial to the success of this proposal. Deficiency of -0.3, estimated to remain the same by 2026. Rugby Deficiency of -6.0, estimated to decrease to -5.1 by 2026. Marske & Saltburn As proposed in the LDF/Regeneration Masterplan there is significant housing growth in this area. This may present an opportunity to provide additional pitch space as specified below, particularly for junior and mini football pitch provision. Summary of surpluses/deficiencies Key issues Proposed action Senior football Marske & Saltburn has the fewest senior adult pitches in the Borough. RCBC should seek to maintain at least two senior pitch to accommodate overplay at other sites across the area and at least one pitch as strategic reserve (i.e. 10% of the stock in the area) and for the fulfilment of latent demand. Surplus of 5.5, estimated to remain the same by 2026. Senior football is delivered by a small number of teams and the TGR for the area is the lowest across the Borough. It is important that there is management of use at overplayed sites whereby play and training is distributed to underplayed locations. Junior football Deficiency of -5.0, estimated to increase to -5.1 by 2026. October 2011 Junior football is strong in the area and is delivered by clubs including Saltburn Athletic FC and New Marske FC. The undersupply of junior pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior pitches. Increased community use of school sites. Final Strategy: Knight Kavanagh & Page 26 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Summary of surpluses/deficiencies Key issues Proposed action Mini soccer The deficiency of pitches in the area comes from New Marske FC and mostly relates to the number of mini teams allocated to pitches at New Marks Sports Club and Grewgrass Lane. It is vital that all current sites are protected from development. Deficiency of -1.0, estimated to remain the same by 2026. Cricket Surplus of 0.1 estimated to remain the same by 2026. There is slight capacity at New Marske Sports Club Cricket pitch to accommodate additional play. The undersupply of pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior pitches. Increased community use of school sites. Utilisation of areas of land on playing pitches which are available and suitable in size. It is vital that all current sites are protected from development/ The surplus of negligible but should be retained to accommodate future increases in participation. Redcar There are major existing areas of informal pitch space not included in the audit, including The Ings Estate and at the western end of Dormanstown Recreation Ground, plus the proposed site at Meggits Lane for Dormanstown JFC. These spaces could significantly increase current pitch stock, thereby reducing pressure on existing senior/junior football provision. Summary of surpluses/deficiencies Key issues Proposed action Senior football Senior football is strong in the area. Hence it is important that some of the surplus is maintained to support senior football in the future. RCBC should seek to maintain at least one senior pitch to accommodate overplay at other sites across the analysis area and at least a further four pitches as strategic reserve (i.e. 10% of the stock in the area) and for the fulfilment of latent demand. Surplus of 14.0, estimated to decrease slightly to 13.9 by 2026. However, if the recommendations are followed in re-designating adult football pitches to junior football and mini-soccer pitches, the level of underutilised pitches will be much reduced. October 2011 It is important that there is management of use at overplayed sites whereby play and training is distributed to underplayed locations. Final Strategy: Knight Kavanagh & Page 27 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Summary of surpluses/deficiencies Key issues Proposed action Junior football There are a significant number of junior teams, for example Redcar Athletic FC, Redcar Town FC and Dormanstown FC playing in this analysis area on/across adult pitches. It is vital that all current sites are protected from development. The deficiency of mini-soccer pitches is negligible and it is likely that any future requirements could be satisfied through reconfiguration of the existing stock. The undersupply of mini-soccer pitches should be rectified through a range of methods including: The conversion of some senior pitches into minisoccer pitches. Increased community use of school sites. Utilisation of areas of land on playing pitches which are available and suitable in size. It is vital that all current sites are protected and that clubs are supported to increase the availability of practice wickets or those for juniors on the square. Deficiency of -3.5, estimated to remain the same by 2026. Mini soccer Deficiency of -2.0, estimated to decrease slightly to 1.9 by 2026. Cricket Deficiency of -0.8, estimated to remain the same by 2026. Rugby Deficiency of -5.0, estimated to increase slightly to -5.1 by 2026. The deficiency is brought about by the high number of teams playing at Redcar CC. The deficiency is brought about by the high number of teams playing and training at Redcar RFC. The undersupply of junior pitches should be rectified through a range of methods including: The conversion of some senior pitches into junior pitches. Increased community use of school sites. In the long-term additional pitches are needed to support current and future need. Management objective (b) - Regularly review and refresh area by area plans taking account of any improvements in pitch quality (and hence increases in pitch capacity) and also any new negotiations for community use of education sites in the future. It is important that RCBC maintains the data contained with the accompanying Playing Pitch Database. This will enable RCBC to refresh and update area by area plans on a regular basis. The accompanying databases are intended to be refreshed on a season by season basis and it is important that there is cross-departmental working, including for example, the Countryside Service and the Sports Development Team, to ensure that this is achieved and that results are used to inform subsequent annual facility development plans. Results should be shared with partners across the Borough via a consultative mechanism such as the PAN. October 2011 Final Strategy: Knight Kavanagh & Page 28 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Management objective (c) - Rectify inadequacies and meet identified shortfalls as outlined in the Assessment Report through improvements to the current pitch stock and ancillary facilities in line with the Action Plan. For example, re-designate a small proportion of the surplus adult pitches for other sports with an identified shortfall (e.g. junior football and mini-soccer), where another solution has not been identified (i.e. access to additional provision). RCBC and partners should rectify identified inadequacies and meet identified shortfalls as outlined in the Assessment Report through improvements to the current pitch stock and ancillary facilities. It is important that the current levels of pitch provision are protected, maintained and enhanced to secure provision now and in the future. The enhancement of provision should be viewed against the backdrop of reduced public funding, including LA budgets, for all community facilities. Lower land and property values may also restrict the potential to secure contributions from private developers. Latent demand, national changes in sport participation and proposed housing growth should be recognised and factored into future facility planning. Assuming an increase in participation and housing growth occurs, it will obviously impact on the future need for certain types of sports facilities. Sports development work also approximates latent demand which cannot currently be quantified (i.e., it is not being suppressed by a lack of facilities) but is likely to occur. The following table highlights the main development trends in each sport and their likely impact on facilities. However, it is important to note that these may be subject to change. There is latent demand for senior, junior and mini football pitches as well as cricket pitches. The Sport England Playing Pitch Model (PPM) used in the Assessment Report highlights an anticipated future surplus of senior and mini football pitches. Whilst these predictions should not be used in isolation, they are in line with issues highlighted. This type of surplus is important to overall levels of provision in the context of using senior pitches to accommodate junior football as multifunctional pitches. Furthermore surplus pitches allow some to be rested to protect overall pitch quality in the long term. Therefore, whilst in some instances it may be appropriate to re-designate a senior pitch where there is no demand identified, a holistic approach should be taken to re-designation for the reasons cited. The site-by-site action planning will seek to provide further clarification on where re-designation is suitable. Table 5.1: Likely future sport-by-sport demand trends Sport Future development trend Strategy impact Football Likely that junior clubs will continue to grow in number and to develop into large multi-team entities. Consider re-allocating leases to Charter Standard clubs with a large number of teams. Work with clubs to identify facility development opportunities. October 2011 Final Strategy: Knight Kavanagh & Page 29 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Sport 3 Future development trend Strategy impact Demand for senior football is also likely to be sustained by the high levels of junior participation onward flow of players and supported by the FA’s National Strategy. FA targets for growth are 20,500 new teams by 2012.3 Continually invest in the improvement of ‘key centres’ to improve ancillary facilities (see site by site action plan). Cricket Clubs have strong and active senior and junior sections which access a range of club facilities across the Borough. North Yorkshire Cricket Board recognises the gap and is keen to further develop girls’ in the Borough. A number of clubs with large junior sections are likely to require access to additional pitches and to be supported to make improvements to ancillary facilities. Rugby union There are three rugby union clubs in the Borough. Guisborough RUFC has facility development plans which are likely to support the on-going growth and development of the club. RFU Strategic Plan focuses on a 2% growth year on year until 2013 for adults. Existing clubs are likely to field more teams in the future, and therefore have a demand for more pitches. It is important, therefore, to work with clubs to maintain the current pitch stock and to support facility development where appropriate. Hockey Membership is generally static at clubs across the Borough. Redcar Hockey Club is the only club to field junior players. Sport England Facilities Planning Model identifies a current available supply of 1.95 pitches, giving a shortfall of just over two pitches in the Borough. Bowls It is likely that club membership will remain constant. Likely that any future increases will be accommodated on existing facilities. Golf The Active People Survey identifies that golf participation in Redcar and Cleveland has increased from 3.63% in 2005/06 to 4.61% in 2009/10. Tennis It would appear that all clubs are currently operating under capacity. Therefore, it is likely that any increase in participation will be accommodated at existing courts in the Borough. No demand for additional facilities and a recognition that junior participation should be encouraged to support future demand. Increases in participation can be achieved through floodlighting courts to provide additional hours and the re-surfacing of courts. MUGAs MUGAs can support a wide range of formal and informal participation opportunities. The Council has sought to ensure sufficient access to facilities across the Borough. AGPs Demand for AGPs for football is on the increase. Provision of 3G pitches can help to reduce overplay of football and rugby pitches. Continue to work with schools and clubs to identify partnership arrangements. Football Association National Game Strategy 2008 – 2012. October 2011 Final Strategy: Knight Kavanagh & Page 30 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Management objective (d) - Identify opportunities to add to the overall pitch stock in the Borough to accommodate both latent and potential future demand. The Council should use, and regularly update, the Action Plan within this Strategy for improvements to its own pitches whilst recognising the need to support partners including clubs across the Borough. This Action Plan should list the improvements to be made to each site. As developer contributions are secured the upgrades can occur. Contributions should be focused upon both qualitative and quantitative improvements as appropriate in each analysis area. Furthermore any potential school sites which become redundant over the lifetime of the Strategy may offer potential for meeting community needs on a localised basis. Where schools are closed their playing fields may be converted to dedicated community use to help address any unmet community needs. Management objective (e) - Establish an approach to securing developer contributions which prioritises projects according to a range of core criteria. It is important that this strategy informs policies and emerging supplementary planning documents by setting out the Council approach to securing sport and recreational facilities through new housing development. The guidance should form the basis for negotiation with developers to secure contributions for the provision of appropriate facilities and their long term maintenance. A Community Infrastructure Levy (CIL) could also be used to improve the condition and maintenance regimes on the pitches. A number of management objectives should be implemented to enable the above to be delivered: Continue to ensure that where sites are lost, through development or closure, that facilities of the same or improved standard are provided to meet the continued needs of residents. Where pitches are lost due to redevelopment, re-provision or a contribution for investment should be sought for elsewhere as appropriate in an accessible location. Planning consent should include appropriate conditions and/or be subject to a CIL. A ‘central pot’ for developer contributions across the Borough should be established to put towards playing pitch facility provision and maintenance, whilst recognising that contributions will need to be ring fenced for use within the area of the Borough that they originated. Where new pitches are provided, changing rooms should be located on site. Redcar and Cleveland is keen to implement a Community Infrastructure Levy. In order to effectively develop a CIL, an understanding of the required infrastructure to address the needs of planned and natural population growth is required. From this evidence base it will be possible to develop a clear programme of capital investment in playing pitches for this first 5-year period, including funding streams, through which it will be possible to identify investment projects that are most appropriately funded by a CIL. Should delivery of a CIL not be possible for any reason, then the consideration of an alternative approach will be required in order to address need, such as one based on a form of S106 tariff. Therefore, a full appraisal of the derivation of local standards and their application to section 106 calculations is provided as part of this report. October 2011 Final Strategy: Knight Kavanagh & Page 31 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Management objective (f) - Work with facility providers to establish an approach to co-ordinate investment to address the community’s needs, to target priority areas and to reduce duplication of provision. It is likely that the majority of investment in new provision across the Borough will not be made by RCBC directly, it is important that it seeks to direct and lead a strategic and coordinated approach to facility development by schools, colleges, sports clubs and the commercial sector to address community needs whilst avoiding duplication of provision. In delivering this objective RCBC should maintain a regular dialogue with local partners and that work continues with sports clubs through the PAN. OBJECTIVE 2 To address qualitative deficiencies and enhance existing provision to continue to support high levels of participation. g. Adopt a Borough wide quality standard. h. Increase the capacity of sites. i. Invest in key strategic multi-pitch/sport sites across the Borough which accommodate the greatest number of teams and are located in the areas of highest population density including for example Smiths Dock Park. j. Projects should improve pitch/surface quality as a priority and improvements to ancillary facilities including changing accommodation and parking. k. Secure developer contributions wherever possible to improve the quality of existing outdoor playing fields in the Borough and provide new ones where a shortfall has been identified or is predicted to be significant in the future. Management objective (g) – Adopt a Borough wide quality standard To support achievement of this objective RCBC should adopt the following quality standard for provision, to be achieved by 2026: ‘All outdoor sports facilities should be rated as good quality4’ This standard, based on an achievable target using existing quality scoring to provide a baseline, should be used to identify deficiencies and hence investment should be prioritised to those sites which fail to meet the proposed quality standard (using the site audit database, provided in electronic format). The policy approach to these outdoor recreation facilities achieving these standards should be to enhance quality and therefore the planning system should seek to protect them. 4 Based on the SE ‘Towards a Level Playing Field’ toolkit assessment and achieving 65% score. October 2011 Final Strategy: Knight Kavanagh & Page 32 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Good quality refers to facilities that have, for example, good grass cover, an even surface, are free from vandalism, litter etc, have access for disabled people and are supported by good quality ancillary facilities including changing accommodation, toilets and car parking. Please refer to the Sport England quality assessment carried out in the Assessment Audit. Management objective (h) – Increase the capacity of sites RCBC and partners should work to deliver improvements to pitch sites which are rated as average quality or below. This will assist in increasing the capacity of sites across the Borough. Those sites which require capacity improvements include those sites identified as poor quality in the Assessment Report. Management objective (i) – Invest in key strategic multi-pitch/sport sites across the Borough which accommodate the greatest number of teams and are located in the areas of highest population density including De Brus Centre, Eston Recreation Ground and Smiths Dock Park. Consultation highlighted a number of key sites across the Borough. These are the sites which are considered to be the most popular. They need to be high quality in order that they can accommodate a sufficient number of matches per week. Partners should extend this provision model to recognise the supply and demand issues identified throughout the Assessment Report (i.e. current levels of overplay) and the investment necessary to improve all sites in the area based on current levels of usage. The identification of sites is based on strategic importance in a Borough-wide context (i.e. they accommodate the majority of play). In addition, there are a number of sites which have been identified as accommodating both senior and junior matches, sometimes concurrently. Not only could such sites require a mixture of mini, junior and senior pitches, but they also require splitlevel ancillary facilities, in order to maximise their usage at all times. Management objective (j) – Projects should improve pitch/surface quality as a priority and improvements to ancillary facilities including changing accommodation and parking It is vital that local clubs and organisations have access to the best facilities possible, both to accommodate current levels of participation and to stimulate new activity. These facilities must meet the minimum specification requirements set out by governing bodies of sport, leagues/competitions as well as (as far as possible) meet the aspirations of sports clubs in the Borough. There are some key sites that have poor quality facilities. The lack of (or poor) quality facilities is not conducive to retaining existing players nor attracting new participants. Consultation suggests that it is one of the primary reasons limiting participation, as many clubs identify latent demand. October 2011 Final Strategy: Knight Kavanagh & Page 33 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Due to local authority budget constraints, it is clear that, across the life of this strategy, not all of those sites currently without changing facilities can be upgraded to have suitable changing facilities. Furthermore in some locations the provision of changing accommodation is not economic or efficient. It is therefore important to prioritise those sites which, by upgrading the changing facilities, will have the greatest impact on the largest number (and variety) of teams. The following sites should therefore be considered short-term priorities for partners to upgrade the changing facilities: Table 5.4: Short-term priority sites for changing facilities 5 Site Analysis area Current quality5 Comments Recommendation Lakes Estate Playing Field Redcar N/A The site is not current serviced by a changing pavilion. RCBC are in the process of replacing but may need to seek additional funding from the Football Foundation. Work to ensure that access to changing rooms is secured. Eston Recreation Ground Greater Eston N/A The site is not current serviced by a changing pavilion. Work to ensure that access to changing rooms is secured. De Brus Playing Fields East Cleveland Excellent Insufficient level of changing provision to accommodate the number of teams at peak times (i.e. weekend usage). Work with Skelton United to increase changing at the site which will also help to increase the capacity of pitches. Grangetown Youth Centre Greater Eston Average Grangetown YCC Juniors & Grangetown Boys Club FC has plans to improve the changing facilities. Work with the clubs based at the site to upgrade changing accommodation. Mount Pleasant East Cleveland Poor Changing provided in temporary porta cabin structures. New purpose build changing facility required, suitable for males/females with separate junior/senior areas and which is of an appropriate size and satisfied league requirements. North Skelton Playing Fields East Cleveland Average Changing facilities do not comply with football league requirements (i.e. Saturday). Work with Saltburn Town FC to upgrade the changing at the site to support the development of Club. Based on either KKP site assessments or information from consultation. October 2011 Final Strategy: Knight Kavanagh & Page 34 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY In order to improve the overall quality of the playing pitch stock, it is necessary to ensure that pitches are not overplayed beyond recommended weekly carrying capacity (Sport England suggests that a good pitch can accommodate two matches per week). This is determined by assessing pitch quality and allocating a weekly match limit to each. Sites played beyond capacity may require remedial action to help reduce this, for example at Eston Recreation Ground where pitches scored as poor and are overplayed due to poor pitch quality. Whilst this works both ways in so much as poor pitch condition is a symptom of pitches being played overcapacity, potential improvements may make sites more attractive and therefore more popular. Hence creating a continuous cycle of overplay. There is a need to balance pitch improvements alongside the transfer of play to alternative pitch sites. Management objective (k) – Secure developer contribution wherever possible to improve the quality of existing outdoor playing fields in the Borough and provide new ones where a shortfall has been identified or is predicted to be significant in the future Partners, led by RCBC, should ensure that developer contributions are directed to areas of need, underpinned by a robust strategy for improvement in playing pitch and outdoor sports facilities. OBJECTIVE 3 To maximise access to outdoor sports facilities across the Borough. l. Adopt accessibility standards. m. Work in partnership with local schools to maintain, improve and encourage community use of school facilities. n. Secure tenure and access to sites across the Borough for high quality, development minded clubs through lease arrangements. Management objective (l) – Adopt accessibility standards Community access to outdoor sport and recreation facilities in Redcar & Cleveland is important. The use of accessibility standards enables the identification of areas of deficiency. Accessibility in this instance refers to the distance to travel to provision, rather than to access for disabled people. The methodology used to identify catchment areas takes data from user surveys and takes the distance from which the majority of users have travelled to reach sites. The results are rationalised into walking, cycling and for larger sites, public transport and/or driving distances. The approach used adopts 5, 10, 15 or 20 minute travel times and converts them into distances using typical walking, cycling, and public transport or driving times. Taking both into account, we have then recommended a 15 minute walk time distance threshold is applied to outdoor sports in Redcar & Cleveland. This standard has then been used to map pitch and non-pitch facilities to identify deficiencies. October 2011 Final Strategy: Knight Kavanagh & Page 35 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Figure 5.2: Pitch facilities with a 15 minute walk time Figure 5.3: Pitch facilities with a 15 minute drive time October 2011 Final Strategy: Knight Kavanagh & Page 36 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Through application of a fifteen minute walk time, it is evident that whilst the main settlement areas (which thus correlate with the patterns of population density) are well served by playing pitch facilities, with only minor gaps in provision. Application of a 15 minute drive-time suggests that the vast majority of the Borough is well served by pitch provision, with the exception of the southernmost tip of Guisborough Analysis Area and a small proportion of Redcar Analysis Area. Figure 5.4: Non pitch facilities with a 15 minute walk time Again through application of a fifteen minute walk time, it is evident that the outskirts of main settlement areas are not well served by non-pitch facilities, the main gaps remain in the more densely populated areas of Greater Eston and Redcar analysis areas, though to a more extent than the gaps identified for pitches, and some small areas of Marske & Saltburn and East Cleveland. October 2011 Final Strategy: Knight Kavanagh & Page 37 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Figure 5.5: Non pitch facilities with a 15 minute drive time Application of a 15 minute drive-time mirrors the deficiencies of pitch facilities and shows the whole Borough is well served by non pitch provision and indeed is likely to service significant areas of neighbouring authorities include Scarborough, Hambleton and Middlesbrough. However, it is important to note that whilst adults are able to travel further to access provision there is a need for more localised provision to support participation for younger players and hence a walk time catchment is widely considered to be more appropriate for all facility types. Management objective (m) – Work in partnership with leisure services and local schools and colleges to maintain, improve and encourage community use of school facilities Colleges, secondary schools, and indeed primary schools where the facilities exist, have an important role in a playing pitch strategy. It is not uncommon for school pitch stock not to be fully maximised for community use. Even on established dual use sites, community access to outdoor sports facilities is limited. The Assessment Report identified several issues relating to the use of school facilities: Community use is limited and often based on informal agreements between individual schools and clubs. There is no strategic guidance as to which clubs are allocated the use of playing pitch facilities (i.e. in accordance with a strategic need). School facilities are, in general, unattractive to community clubs (e.g., because of the lack of ancillary facilities). October 2011 Final Strategy: Knight Kavanagh & Page 38 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY There are no identified standard community use agreements between clubs and schools for outdoor pitches. There are management issues inherent in developing, implementing and managing dual-use agreements. Advice and guidance can be obtained from Sport England’s Planning Bulletin 16 – School Sites and Community Provision (2004). (www.sportengland.org/planningkitbag). During the production of this assessment the Building Schools for the Future (BSF) programme has been revoked by the Government. The programme had sought to provide a new range of shared sports facilities in Redcar & Cleveland to help meet both the current and future needs of the area. It is therefore advocated that a similar programme be developed in partnership with the Council, local schools, School Sports Partnerships and sports clubs to secure the long term use of school sites for public use. Where appropriate, it will be important for schools to negotiate and sign formal and longterm agreements that secure community use. This should be supported by Redcar and Cleveland’s Leisure Services for sites including Laurence Jackson School and Rye Hills School. The proposals in this document, therefore, need to be examined against these issues: Whilst BSF presented an opportunity to deal with some of the issues outlined above it is important to note that it is not the only solution and should only be seen as one part of the strategic approach to the future provision of outdoor sports facilities. The analysis provides a clear indication of the future pitch requirements and provides a basis for partners to negotiate. It is recommended that a working group, led by a partner from the education sector (i.e. through the School Sports Partnership) but supported by a range of other sectors including sport and leisure, is established to implement the strategic direction in relation to the increased use of school facilities. This should incorporate the following representation: Sports development officers. Partnership development manager(s). PE/Education officers. Individual school representative. Parks/grounds maintenance professionals. Broadly speaking, its role should be to: To better understand current community use, practices and issues by ‘auditing’ schools. Identify and pilot one school/club formal community use agreement with a view to rolling out the model across the area. Ensure that funding to improve the quality of the facilities is identified and secured. As part of any agreement secure a management arrangement for community access, which does not rely on existing school staff structures. Ensure that pitch provision at schools meets the needs of the local community and contributes towards overcoming deficiencies in the area (as identified in the assessment above). October 2011 Final Strategy: Knight Kavanagh & Page 39 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Management objective (n) - Secure tenure and access to sites across the Borough for high quality development minded clubs through lease arrangements As well as improving the quality of well-used, local authority sites, there are a number of sites which have poor quality (or no) ancillary facilities. These have not been included in the list identified in Table 5.4 as they are used by a single club on a season-by-season basis. Such sites are therefore considered the ‘home ground’ of the club, despite not always having a long-term lease. It is recommended that security of tenure should be granted to the clubs playing on these sites (minimum 20 years) so the clubs are in a position to apply for external funding to improve the ancillary facilities. There is already an effective leasing system in place in Redcar & Cleveland which should be used as the foundation for is further development. There is potential for a number of sites in the Borough to be leased to sports clubs and/or organisations. Each club will be required to meet service and/or strategic objectives set out by the Borough Council. However, an additional set of criteria should be considered, which take into account the quality of the club, aligned to its long term development objectives and sustainability. In the context of the Comprehensive Spending Review, which announced public spending cuts, it is increasingly important for the Council to work with voluntary sector organisations in order that they may be able to take greater levels of ownership and support the wider development and maintenance of facilities. To facilitate this, the Council should support and enable clubs to generate sufficient funds to allow this. Table 5.5: Recommended criteria for lease of sport sites to clubs/organisations Club Site Clubs should have Clubmark/FA Charter Standard accreditation award. Sites should be those identified as tier C sites for new clubs (i.e. not those with a Boroughwide significance) but which offer development potential. For established clubs which have proven success in terms of selfmanagement tier A and B sites are appropriate. Clubs commit to meeting demonstrable local demand and show pro-active commitment to developing school-club links. Clubs are sustainable, both in a financial sense and via their internal management structures in relation to recruitment and retention policy for both players and volunteers. Ideally, clubs should have already identified (and received an agreement in principle) any match funding required for initial capital investment identified. Clubs have processes in place to ensure capacity to maintain sites to the existing standards. As a priority, sites should require capital investment to improve (which can be attributed to the presence of a Clubmark/Charter Standard club). Sites should be leased with the intention that investment can be sourced to contribute towards improvement of the site. An NGB/RCBC representative should sit on a management committee for each site leased to a club. RCBC will further recognise the value of Clubmark/Charter Standard by adopting a policy of prioritising the clubs that are to have access to these better quality facilities. This may be achieved by inviting clubs to apply for season long leases on a particular site as an initial trial. October 2011 Final Strategy: Knight Kavanagh & Page 40 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Club outcomes for self-management agreements RCBC should establish a series of core outcomes to derive from clubs taking on a lease arrangement to ensure that the most appropriate clubs are assigned to sites. As an example outcomes may include: Increasing participation. Supporting the development of coaches and volunteers. Commitment to quality standards. Improvements (where required) to facilities, or as a minimum retaining existing standards. October 2011 Final Strategy: Knight Kavanagh & Page 41 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY OBJECTIVE 4 To ensure that unmet current demand and future demand is accommodated through planned increases in provision. o. Adopted a tiered approach to the management and improvement of facilities which allows for facility developments to be programmed within a phased approach including ancillary facilities such as changing accommodation and car parking. p. To use the findings of the Strategy to provide an evidence base for the Local Development Framework to secure new provision from new development in the Borough. Management objective (o) – Adopt a tiered approach to the management and improvement of facilities which allows for facility developments to be programmed within a phased approach including ancillary facilities such as changing accommodation and car parking Redcar & Cleveland has a small number of ‘key centres’, which are sites which are considered to be the most popular and therefore need to be of a high standard in order that they can accommodate a sufficient number of matches per week. This applies mainly to football pitch hire. However, RCBC should extend this provision model to recognise the supply and demand issues identified throughout the Assessment Report (i.e. current levels of overplay) and the investment necessary to improve all sites in the Borough based on current levels of usage. The identification of sites is based on their strategic importance in a Borough-wide context (i.e. they accommodate the majority of play). In addition to this, there are a number of sites which have been identified as accommodating both senior and junior matches, sometimes concurrently. Not only could such sites require a mixture of mini, junior and senior pitches, but they also require split-level ancillary facilities, in order to maximise their usage at all times. In the context of developing a tiered model approach to the management of sports facilities, Redcar & Cleveland has a large number of multi-team junior clubs which place a great demand on the pitch stock across the Borough. Therefore, there are a number of sites which are still owned and maintained by the local authority, but are actually booked by the clubs for the entire season. The sites are then recognised as the ‘home ground’ of the club. Such sites are fundamentally different from those which can be hired on a regular basis because they are, in effect, ‘allocated’ to a certain club and management responsibility, in terms of allocating teams to pitches, is transferred to the individual club. October 2011 Final Strategy: Knight Kavanagh & Page 42 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Table 5.6: Proposed tiered site criteria Tier A Tier B Tier C Tier D Key centres Senior/junior sites Club sites Strategic reserve Strategically placed in the Borough context. Strategically placed in the local and Borough context. Strategically placed in the local context. Strategically placed in the local context. Could accommodate more than five pitches/courts. Could accommodate more than three pitches/courts. Could accommodate more than one pitch/court. Likely to be singlepitch/court sites with limited demand. Can serve a range of sports. Can be single sport provision. Can be single sport provision. Supports informal demand and/ or training etc. Management control remains within the local authority or with an appropriate club on a lease arrangement. Management control remains within the local authority or with an appropriate club on a lease arrangement. Club either has a long-term lease on site, or hires the pitch for the entire season. Held as strategic reserve. Good quality ancillary facility on site, with sufficient changing rooms to serve the number of pitches. Adequate changing to accommodate both senior and junior teams concurrently or which specifically serve one or the other. Maintenance can be either by the club or remain with the local authority. Maintenance should remain with the local authority or other management body. Tier A sites are sites that have been identified as having Borough-wide significance. These are the identified ‘key centres’ and are often multi-pitch sites catering for more than one type of sport and on a weekly basis cater for a high level of play. They should be maintained to a high standard, although in some instances improvements in the quality of these pitches will relieve pressure on football pitches across the Borough and increase the capacity and adequacy of the pitch stock. It is recommended that tier A sites are continually improved in order to preserve their status as the key football sites in the Borough. As multi-pitch sites they should be able to accommodate all types of football concurrently, including male/female mixed mini-soccer, junior male/female 11-a-side football and senior male/female, as well as small-sided football if deemed appropriate (in the form of MUGAs etc.). As a consequence, the following recommendations relate to all tier A sites: All sites should have segregated changing facilities with suitable shower facilities. All sites should have dedicated changing facilities for junior, male and female teams that are of sufficient size and quality for the target user group. It is vital that the changing rooms should be totally secluded for a range of obvious reasons, including child protection issues etc. A mixture of senior, junior and mini-soccer pitches should be located on tier A sites to actively encourage a cross-section of teams to make use of the facilities. The types of pitches should be driven by local deficiencies in pitch types as highlighted in the Assessment Report. October 2011 Final Strategy: Knight Kavanagh & Page 43 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY It is therefore anticipated that a significant amount of the annual maintenance budget, and any available capital investment (planning gain etc.) should be spent on such sites. Due to the recommendations highlighted above, any initial investment is considered to be at least a medium-term priority. Tier B sites recognise the growing emphasis on dedicated football venues catering for both senior and junior (especially mini-soccer) matches. The conditions recommended for junior football are becoming more stringent. This should be reflected in the provision of a unique tier of pitches for junior football solely that can ensure player safety, as well as being maintained more efficiently. At present, there are no dedicated junior and minisoccer sites in the Borough. It is anticipated that both junior and mini-football matches will be played on these sites. Initial investment could be required in the short term. Additionally, it is considered that some financial investment will be necessary to improve the ancillary facilities at tier A and B sites in order that they complement the pitches in terms of access, flexibility (i.e. single-sex changing if necessary), quality and that they meet the rules and regulations of local competitions. They should be designated as medium priority for investment. As previously referenced, tier C sites refer to those sites which are hired to clubs for a season, or are sites which have been leased on a long-term basis. The level of priority attached to them for Council-generated investment is relatively low and consideration should be given, on a site-by-site basis, to the feasibility of a club taking a long-term lease on the site, in order that external funding can be sought. It is possible that sites could be included in this tier which are not currently hired or leased to a club, but have the potential to be leased to a suitable club. Such sites will require some level of investment, either to the pitches or ancillary facilities, and is it anticipated that one of the conditions of offering a hire / lease is that the club would be in a position to source external funding to improve the facilities. Tier D sites are those which are to be made available as strategic reserve which could be used for summer ‘friendly’ matches, training purposes or informally. They could be singlepitch sites with limited usage, or have no recognised current usage. Management objective (p) - To use the findings of the Strategy to provide an evidence base for the Local Development Framework to secure new provision from new housing development in the Borough This is important as the assessment has provided the evidence base to justify protecting facilities to meet existing/future needs and therefore the development of appropriate policies through the LDF to secure protection, are required. October 2011 Final Strategy: Knight Kavanagh & Page 44 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY OBJECTIVE 5 To support the development of local sports clubs to meet their needs within the Borough. q. Support high levels of participation at clubs which contribute to the achievement of sports development objectives. r. Work with local clubs which have achieved quality accreditation to, where relevant, identify and secure facility improvements, appropriate sites for new facility development and funding opportunities. Management objective (q) – Support participation at clubs which contribute to the achievement of sports development objectives It is important that sports development objectives, to some extent, dictate and are embedded within the outcomes of the Strategy. To this end, the following objectives are suggested for use to monitor and evaluate the future sustainability, and relative success, of facility projects which are identified and supported: Increasing participation. Raising standards. Workforce development. Improving facilities. Management objective (r) - Work with local clubs which have achieved quality accreditation to, where relevant, identify and secure facility improvements, appropriate sites for new facility development and funding opportunities RCBC should adopt a policy/charter which supports quality accredited clubs (http://www.clubmark.org.uk/files/images/clubmark-charter-large.gif). Clubmark and FA Charter Standard helps clubs to achieve their own aims and ambitions and to support the complementary objectives and targets of partners in local authorities, schools/school sport partnerships and other community agencies. Support to quality accredited clubs may include offering discounted facility hire and priority bookings slots as well as assembling bespoke benefits packages incorporating free or reduced cost access to courses. The adoption of a charter as policy also benefits partners: Grow: Research suggests that Clubmark clubs are better equipped to drive and manage increased levels of participation; particularly, but not solely, for young people. Meeting targets: Having Clubmark clubs to work with will assist local authorities and SSPs to achieve targets for youth participation and school-club links. Parental confidence: Being seen to actively address issues such as equity and child protection gives parents confidence when considering or choosing a club for their children - thus helping to boost introductory participation. October 2011 Final Strategy: Knight Kavanagh & Page 45 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Sustaining participation levels: Clubmark stimulates innovation and improvements to how clubs cater for junior (and all) members. The culture it promotes boosts the morale of players and ensures that volunteers are recognised for their contribution. Continuous improvement: Accreditation encourages clubs to adopt better, more organised systems and structures, helping them to run more effectively and efficiently. Coaches and coaching: Research suggests Clubmark clubs both deploy more, and work harder to develop the skills of, coaches. This leads to better quality provision and improved player performance. School-club links: Increasingly, schools are seeking guarantees of quality and the presence of child-friendly systems and procedures. Clubmark clubs are the first invited to work with local school sport partnerships and individual schools. Teachers and schools staff are actively encouraged to signpost pupils to them. Management objective (s) – Support local clubs to demonstrate sustainability Local sports clubs should be supported to have demonstrable sustainability across a range of areas including management, membership, funding, facilities, volunteers and partnership working. For example, the Council should continue to support club development and encourage clubs to develop evidence of business plans and sports development plans to generate an income through their facilities. All clubs should be encouraged to register as Community Amateur Sports Clubs (CASC) 6. Clubs should also be encouraged to work with partners locally whether volunteer support agencies or linking with local businesses. 6 http://www.cascinfo.co.uk/cascbenefits October 2011 Final Strategy: Knight Kavanagh & Page 46 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY 5.1: Sport specific objectives Sports development objectives should also guide delivery of sports specific objectives and should be read within the context of the summary findings identified by the Assessment Report. FOOTBALL OBJECTIVE To meet identified deficiencies in junior and mini football provision. Senior football Protect the current playing pitch stock. Work with clubs to ensure that sites are not played beyond their capacity and encourage play, where possible, to be transferred to alternative venues which are not operating at capacity. The anticipated surplus of senior pitches should be considered in contributing towards addressing the current and future deficit of junior and mini pitches. Where appropriate, develop lease arrangements with large, sustainable, development-minded (i.e. Charter Standard) clubs to manage their own ‘home’ sites thus facilitating club development. This could include varying levels of shared management between the club and the local authority. Development and management criteria need to be established in order to maintain the viability and financial security of these sites. Continue to support clubs in the management and identified improvements to their provision. Maximise community use of education sites. Work with clubs to secure potential sites to accommodate latent demand identified. Support clubs with facility development aspirations through the planning and application stages as far as possible. Women and girls’ football Invest in central venue sites able to accommodate anticipated growth in girls’ football. Increase the quality and standard of changing rooms to accommodate segregated changing. Junior boys’ football Work towards meeting likely future deficiencies in junior pitches by also utilising pitch provision at school sites. Encourage greater use of primary school sites to cater for mini-soccer demand and ensure site security and access to changing facilities is enhanced. Work with clubs to achieve Charter Standard accreditation. As a target the Borough should work to achieve at least 75% (form the current baseline of 53%) of youth and mini teams playing within a Charter Standard football club (in line with National targets) by 2012. Where appropriate, develop lease arrangements with large, sustainable, development-minded (i.e. Charter Standard) clubs to manage their own ‘home’ sites thus facilitating club development. Development and management criteria need to be established in order to maintain the viability and financial security of these sites. Improve the quality and capacity of existing pitch stock. October 2011 Final Strategy: Knight Kavanagh & Page 47 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Mini football Meet likely future deficiencies in mini pitches by utilising senior pitches in areas of oversupply and creating more pitches where land is available. Increase the quality and standard of changing rooms to accommodate segregated changing. Encourage greater usage of primary school sites to cater for mini-soccer demand. CRICKET OBJECTIVE To maintain current provision levels and quality but work to increase access to single team club pitches for those clubs expressing demand. Encourage Premier Clubs to establish partnerships/agreements with Category B clubs. Support clubs to develop their ancillary facilities to further meet local needs. Ensure that any facilities developed support opportunities for senior women’s and junior girl’s competitive cricket. Increase the quality of cricket pitches where necessary. Encourage and support development of junior girls’ and women’s cricket. Support clubs to develop and improve practice facilities. Support the development of cricket informally within parks in the Borough. RUGBY OBJECTIVE To work towards meeting identified deficiencies and increase quality as required. As a priority, support club development plans to increase the capacity of sites, particularly to accommodate junior and mini-rugby. Work with Guisborough and Redcar rugby clubs to support facility development plans. Encourage and support development of junior girls’ and women’s’ rugby. HOCKEY OBJECTIVE To maintain current levels of provision. Work to ensure that plans are in place to maintain AGP quality in the long term. Work to make quality improvements to AGPs to address current issues. BOWLS OBJECTIVE To support and encourage junior bowls development in order to sustain future participation levels in the sport. Support clubs to improve green quality. Increase the quality and standard of changing rooms to accommodate segregated changing. Ensure bowling greens and pavilions are safe, secure facilities. Encourage clubs to increase membership levels. Support and encourage clubs to provide pay and play opportunities. October 2011 Final Strategy: Knight Kavanagh & Page 48 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY GOLF OBJECTIVE To support clubs to develop facilities and improve course quality and to promote the sport to junior members. Support club development plans. Support National Governing Body and club plans to promote the sport to junior members. Encourage and support clubs to deliver the Community Links programme to help to increase junior participation. Improve the safety of courses through appropriate access controls which will help to reduce levels of vandalism on courses. TENNIS OBJECTIVE To work with clubs to make plans to accommodate future increases. Work with clubs to make plans to accommodate future increases. Where demand exists, support tennis clubs to improve court quality and/or install floodlighting (in order to increase the capacity) of existing tennis court provision. Continue to support and encourage junior development at key tennis clubs in order to increase participation levels in the sport. Where necessary, improve the quality of education courts (at Nunthorpe and Eston Park schools) as a priority and at local authority sites where necessary (King George V Playing Fields, Guisborough). ATHLETICS OBJECTIVE To improve and maintain current provision. Quality of the athletic track facilities should be maintained and improved as required. Further support club and school athletic activities through school club links. MUGA OBJECTIVE To consolidate the existing stock. Continue to maintain existing stock to current standards through a rolling programme of maintenance. Through sports development provide regular animation of MUGAs to encourage use and to support participation in sport and physical activity. Consider opportunities to increase the capacity of facilities through floodlighting (subject to resources). October 2011 Final Strategy: Knight Kavanagh & Page 49 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY EDUCATION OBJECTIVE To work with schools to encourage greater community use, particularly for mini-football at appropriate sites. Secure existing community use through implementation of formal community use agreements where they are not currently in existence in order to provide sustainable community access. In particular, the following should specifically have agreements in place: Redcar College (Corporation Road site) Freeborough College, Eston Park School, Gilbrook College, Nunthorpe Comp, St. Peter's Roman Catholic Comp., Bydales College, Sacred Heart School. Ensure appropriate access to changing provision on school sites to support community use. Despite the revocation of the BSF programme the Borough should, where feasible, work to make improvements to sports pitch facilities. October 2011 Final Strategy: Knight Kavanagh & Page 50 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 6: ACTION PLAN 6.1: Introduction The Action Plan does not identify all quality improvements required. Specific details on how this is best achieved can be found in the accompanying assessment database. Prioritisation of improvements should be led through the annual maintenance planning programme. Timescales: (S) -Short (1-2 years); (M) - Medium (3-5 years); (L) - Long (6+ years). 6.2: Justification of sites within the action plan The Action Plan details policy options relating to individual sites and the need to enhance and develop new provision. The following criteria have been used to identify priorities and justify the inclusion of sites within the Action Plan. Just one of the following may apply: A project is currently underway to enhance the existing site and/or funding has been secured. An evaluation of site use is required as it is of poor quality and is reportedly underused. The desired action is small scale, short term and will enhance the quality of current provision, whilst aiding community use. The importance of the site is identified in other strategies. 6.3: Management and development The following issues should be considered when undertaking site development or enhancement: Financial viability. Security of tenure. Planning permission requirements and any foreseen difficulties in securing permission. Gaining revenue funding from planning contributions in order to maintain existing sites. Gaining planning contributions to assist with the creation of new provision where need has been identified. Analysis of the possibility of shared site management opportunities. The availability of opportunities to lease sites to external organisations. Options to assist community groups to gain funding to enhance existing provision. Negotiation with landowners to increase access to private strategic sites. The following tables set out a series of recommended actions relating to sport and site specific issues within the Borough. October 2011 Final Strategy: Knight Kavanagh & Page 51 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Area by area specific action plan The Action Plan has been created to be undertaken over a fifteen-year timescale. The information within the Assessment Report, Strategy and Action Plan will require updating as developments occur. It is not feasible to include all sites with identified development issues. Only sites, which meet the criteria listed above, have, therefore, been included. East Cleveland Summary of surplus and deficiency East Cleveland Football Current Senior 2.5 Junior -2.5 Mini 1.5 2026 2.4 -2.5 1.5 Cricket Rugby union 0.5 Senior - Junior - Mini - 0.5 - - - Total pitches 2.0 2.0 Currently there is a significant under supply of junior pitches in East Cleveland. This is not uncommon, but RCBC should aspire to provide formal junior pitches to meet demand. This shortfall could be reduced by remarking a proportion of senior football pitches as juniors. Site De Brus Centre Skelton Cricket Club October 2011 KKP ref 103 91 Management RCBC (leased to Skelton United on a monthly license) Skelton Cricket Club Issue to be resolved Recommended actions Key site accommodating a large number of teams and is located in an area of highest population density. Site is underplayed due to poor quality as a result of unofficial use creating additional wear and tear. Insufficient level of changing provision and car parking to accommodate the number of teams at peak times (i.e. weekend usage). Good quality site which has some spare capacity. Work with Skelton United to improve both the quality of the pitches and ancillary facilities such as changing facilities and increasing the car parking provision. S Increase the number of teams using the site. S Final Strategy: Knight Kavanagh & Page Priority 52 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site KKP ref 27 Management Moorsholm Cricket Club 25 Moorsholm Cricket Club Carlin How Bowls Club 105 Loftus Cricket & Athletic Club 66 Carlin How Working Mens Club Loftus Cricket & Athletic Club North Road, Loftus October 2011 RCBC Issue to be resolved Recommended actions Priority Good quality site with access to changing provision which offers spare capacity. Old pavilion in need of replacing. It has secured planning permission and has match funding in place towards the proposed development. Good quality bowling green. Current standard should be maintained and considered for lease. S Support the club to secure match funding to replace the pavilion. M Current standard should be maintained. S Poor quality football pitches and dilapidated tennis courts no longer in use. Old wooden pavilion in poor quality. Support the Club to reinstate the football and tennis courts to offer community use. L Work with the Club to explore funding opportunities to improve the pavilion. Final Strategy: Knight Kavanagh & Page 53 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Greater Eston Summary of surplus and deficiency Greater Eston Football Senior Junior Mini Current 15.0 -4.5 2.5 2026 14.9 -4.5 2.5 Cricket Rugby union Total pitches Senior Junior Mini -5.0 -2.5 -0.5 - 9.0 -5.1 -2.5 -0.5 - 8.7 Currently there is a significant under supply of junior pitches in Greater Eston. This is not uncommon, but RCBC should aspire to provide formal junior pitches to meet demand. This shortfall could be reduced by remarking a proportion of senior football pitches as juniors and using available land at pitch sites for junior pitches. There is also an undersupply of cricket pitches. There is also a deficiency of senior and junior rugby pitches. Again greater use of school pitches could address this deficiency. Site Eston Recreation Ground Harcourt Road, South Bank 7 KKP ref 7 16 Management RCBC South Bank Community Football Association Issue to be resolved Recommended actions Priority Key site with two senior football pitches played beyond capacity due to poor quality. Site accommodates a large number of teams and is located in an area of highest population density. The site is not current serviced by a changing pavilion. There is significant spare capacity at the site. The Club has aspirations to compete at Step 7 and would like the site to comply with Step 7 minimum ground grading requirements. Improve the quality of the pitches (remedial action required) which will increase the capacity. M As a high priority, work to ensure that access to changing rooms is secured. S To address the shortfall of junior pitches RCBC should work with clubs in the area to establish the need for junior pitches and consider the conversion of senior pitches to junior. M Work with South Bank Community Football Association to meet minimum Step 7 Ground Grading requirements7. http://www.thefa.com/Leagues/NationalLeagueSystem/GroundGrading October 2011 Final Strategy: Knight Kavanagh & Page 54 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site KKP ref 24 Management Smiths Dock Park Grangetown Youth & Community Centre Ormesby Hall CC Middlesbrough Football in the Community (MFIC) Normanby Hall CC October 2011 Issue to be resolved Recommended actions MFIC There is significant spare capacity at the site. To address the shortfall of junior pitches RCBC should work with MFIC to establish the need for junior pitches and consider the conversion of senior pitches to junior. S 38 South Park Rangers FC The site should become a focus for the Dog Warden Service in the enforcement of the Dog Fouling Act. Work with the Club to investigate accommodating a small car parking area on the site. Support the Club with its long term aspiration to develop a training facility and additional pitches. L 50 RCBC Key site accommodating a large number of teams and is located in an area of highest population density. Litter/dog fouling and lack of car parking is a regular issue on the site. South Park Rangers FC long term aspiration is to develop a floodlit artificial training pitch and is currently identifying potential sites. It is in discussions with a local landowner of agricultural land (located next to Smiths Dock Park) to purchase the site which could potentially accommodate a floodlit training facility and additional pitches. Good quality site which offers spare capacity. Deficiencies expressed for junior pitches could be addressed through conversion of the senior football pitch to junior pitches. S 102 National Trust Poor access and drainage and car parking is limited. Any pitch/facility development plans would be at the discretion of the landowner. However, work with the landowner and club to improve the quality and accessibility of the site. M 109 Normanby Hall CC Low quality site assessed as below average (particularly the square). Work with the Club to address issues with the pitches and secure access to covers. M Final Strategy: Knight Kavanagh & Page Priority 55 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site Eston Park School October 2011 KKP ref 121 Management RCBC Issue to be resolved Recommended actions The School recently re-surfaced its rear playing fields with new drainage and grass. The fields are now re-opened and accommodates 3 adult football pitches at the front (previously 2 football and 1 rugby), 3 adult rugby pitches and 1 adult football at the back (previously open space). Work with the School to encourage greater use of its rugby pitches which will help to address the shortfall of senior rugby pitches in Greater Eston. Final Strategy: Knight Kavanagh & Page Priority S 56 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Guisborough Summary of surplus and deficiency Guisborough Football Senior Junior Mini Current 5.0 -3.0 -0.5 2026 5.0 -3.0 -0.5 Cricket Rugby union Total pitches Senior Junior Mini -0.3 -5.0 -2.5 -1.8 -8.1 -0.3 -5.1 -2.5 -1.8 -8.3 Currently there is a significant under supply of senior rugby pitches in Guisborough. This is not uncommon, given that rugby teams are training and playing on competitive pitches. Furthermore, there is a shortfall of junior and mini football pitches. This shortfall could be reduced by remarking a proportion of senior football pitches as juniors and using available land at pitch sites for mini-soccer pitches. There is also a slight undersupply of cricket pitches. However, it is likely that the current supply of pitches, particularly Boosbeck Playing Fields can accommodate the shortfall in the area. There is also a slight deficiency of junior and mini rugby pitches. Again greater use of school pitches could address this deficiency. Site Boosbeck Playing Field KKP ref 45 Management Issue to be resolved Recommended actions Priority Boosbeck Playing Fields Association Users report demand for cricket sight screens, covers and practice facilities on site. The football pitch has been assessed as poor quality and as a result is slightly overplayed. Work with clubs to develop cricket provision on the site. Improving the quality would increase the capacity of the site and reduce the extent of overplay. M Wandhill Playing Field 41 RCBC Good quality site which is played to capacity. Maintain current levels of quality and play. S King George V Playing Fields, Guisborough 43 RCBC Multi pitch site offering good quality sporting provision. However, the tennis courts are of poor quality. Work with Guisborough Tennis Club to identify funding opportunities to enhance the quality of the tennis courts. To address the shortfall of junior pitches BC should work with clubs in the area to establish the need for junior pitches and consider the conversion of senior pitches to junior and mini-soccer. M October 2011 Final Strategy: Knight Kavanagh & Page 57 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site Laurence Jackson School KKP ref 58 Management School Guisborough RFC 14 Guisborough RFC Guisborough Cricket Club 12 Guisborough Cricket Club October 2011 Issue to be resolved Recommended actions Potential to develop better links and facilities (including practice facilities) at Laurence Jackson in partnership with Guisborough CC. As a focus club for the ECB, it should be supported to secure funding for practice provision. This may also help to reduce levels of overplay at the site. M Good quality track. However, areas of the track require attention and suffer from moss from overhanging trees. The site is significantly overplayed. Guisborough RUFC has extensive facility plans which include pitch improvements, increasing the number of changing rooms and renovation of the clubhouse facility. The Club is operating at capacity. Work with users of the track (i.e. New Marske Harriers) to improve the track surface. M Work with the Club to secure access to additional training/match pitches which will help to reduce levels of overplay on its home ground pitches. Support the Club to secure funding for facility development plans. As a focus club for the ECB, it should be supported to access additional pitch provision to support junior girls’ cricket and any future growth. L Final Strategy: Knight Kavanagh & Page Priority M 58 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Marske & Saltburn Summary of surplus and deficiency Marske & Saltburn Football Senior Junior Mini Current 5.5 -5.0 -1.0 2026 5.5 -5.1 -1.0 Cricket Rugby union Total pitches Senior Junior Mini 0.1 - - - -0.4 0.1 - - - -0.5 Currently there is an under supply of junior and mini pitches in Marske & Saltburn, particularly junior. This is not uncommon, but RCBC should aspire to provide formal mini and junior pitches to meet demand. This shortfall could be reduced by remarking a proportion of senior football pitches as juniors and using available land at pitch sites for mini-soccer pitches. There is also a small oversupply of cricket pitches. However, it is likely, this will be absorbed by future participation rates in the area. Site Huntcliff School New Marske Sports Club Grewgrass Lane, New Marske October 2011 KKP ref 19 Management 26 New Marske Sports Club 47 RCBC New Marske FC Issue to be resolved Recommended actions The pitches are played over capacity. Work with teams using the site to identify alternative pitches to accommodate overplay. S Good quality site which has some spare capacity. The senior team competes in the Wearside League (National League Step Seven) and is currently top of the division. However, its current site does not meet the facility requirements of the National League System Step Six. Good quality site which has some spare capacity. Work with New Marske Sports Club to increase the number of teams using the site. S Support the Club to explore funding opportunities to develop the site to meet minimum facility requirements of the National League System Step Six. M The site can also be used to accommodate play from sites which are currently played overcapacity. M Final Strategy: Knight Kavanagh & Page Priority 59 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site Saltburn Cricket, Tennis & Bowls Club KKP ref 92 Management Issue to be resolved Recommended actions Saltburn Cricket, Tennis & Bowls Club Multi sports site offering indoor and outdoor sporting provision. Saltburn TC is in the process of re-instating the grass courts which will primarily be used for recreational tennis. Latent demand for better quality changing provision and/or segregated changing rooms. The Club is in the process of trying to purchase a local authority owned site on Hob Hill Lane, Saltburn, to accommodate a 25 bay driving range with practice additional practice facilities. Work with Saltburn TC to develop its tennis provision to offer both recreational and competitive tennis facilities. L Work with the Club to upgrade the quality of changing provision. M Work with the Club to investigate the demand for a driving range facility in the Borough. M Marske Cricket Club 93 RCBC Saltburn Golf Club 114 Saltburn Golf Club October 2011 Final Strategy: Knight Kavanagh & Page Priority 60 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Redcar Summary of surplus and deficiency Redcar Football Senior Junior Mini Current 14.0 -3.5 2.0 2026 17.3 7.1 8.0 Cricket Rugby union Total pitches Senior Junior Mini -0.8 -5.0 -3.0 -1.5 6.2 -5.0 -1.7 -1.5 -0.8 27.4 Currently there is a significant oversupply of senior and mini pitches in Redcar. This is not uncommon, but RCBC should aspire to provide formal junior pitches to meet demand. This shortfall could be reduced by remarking a proportion of senior football pitches as juniors pitches. There is also a minor undersupply of cricket pitches. However, it is likely, given some improvement to pitch quality at Corus Sports & Social Club for example, that capacity can be increased to accommodate shortfalls in the area on the current supply of pitches. Redcar CC should be encouraged to use spare capacity at Corus Sports & Social Club. There is also a significant deficiency of senior, junior and mini rugby pitches. Again greater use of school pitches could address this deficiency. Site Corus Sports & Social Club October 2011 KKP ref 2 Management Corus Sports & Social Club Issue to be resolved Recommended actions The site is the homeground of Dormanstown Football Club. The site management has plans to reduce the number of football pitches to two due to the quality of the cricket outfield being affected from football usage. As a result, the Club has identified an area of land (formerly used for housing) and is in discussions with RCBC to secure a long term lease on the site. Work with Dormanstown FC to secure access to additional pitches via a long term lease. Final Strategy: Knight Kavanagh & Page Priority M 61 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Site Green Lane, Redcar KKP ref 11 Management Redcar Athletic FC Redcar Community College Redcar RFC 31 RCBC 33 Redcar RFC Rye Hills School Redcar Town FC 34 RCBC 111 Redcar Town FC October 2011 Issue to be resolved Recommended actions Facility development plans include developing the senior pitch to comply with Step Six (FA) requirements, artificial training pitch and additional grass pitches to accommodate current and future demand. Good quality pitches. Good quality site with spare capacity. Support the Club to explore funding opportunities to deliver its facility development plans. Ensure the pitch quality is maintained. M Work with the College to develop greater community use of the sites S Site is overplayed as a result of the large number of teams using the pitches for training. Site is overplayed. Work with the Club to explore opportunities to access education sites to accommodate match/training fixtures. Work with the School to identify alternative sites to accommodate overplay. Partners should work with the Club to explore funding opportunities to develop the facilities. Further investigation should be carried out on demand for a small sided AGP. The site should become a focus for the Dog Warden Service in the enforcement of the Dog Fouling Act. S Facility development plans include provision of a small sided AGP, development of a clubhouse facility and provision of stand. Dog foul is an issue on the site. Final Strategy: Knight Kavanagh & Page Priority S M S 62 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 7: SETTING PLAYING PITCH STANDARDS 7.1: Introduction The Council has for a number of years used the ‘6 acre standard’ of FIT (Fields in Trust old NPFA), which requires a minimum of 6 acres (2.4ha) of outdoor play and recreation space for every 1,000 people. Within the Communities DPD Preferred Options, the Council sets out the following quantity standards, which the Council will aim to provide, maintain and improve open space, sport, recreation and community facilities to achieve: 0.8 hectare per 1,000 people in Loftus, Lingdale and Brotton. 0.9 hectare per 1,000 people in Redcar, Grangetown, South Bank, Eston, Normanby and Ormesby. 1.0 hectare per 1000 people in Guisborough, Boosbeck, Saltburn, Marske, New Marske and Skelton. One full-size floodlit synthetic turf pitch per 35,000 people. Broadly speaking, the current pitch stock generally meets these quantity standards. However, taking this analysis a step further to identify within the pitch stock, adequate and inadequate provision and levels of latent demand in the area, makes the standard significantly more representative of the local situation. By factoring in this information a ‘qualitative local standard’ is recommended for consideration. That is to say a local standard that takes into account local qualitative information. The qualitative local standard is calculated by adding the hectarage of pitch stock available for community use to the identified shortfall/surplus of pitches (latent and future demand) and applying it to potential future population growth. Playing pitch standards have been calculated in line with Sport England guidance set out in ‘Towards A Level Playing Field’. Within this report local standards or ‘local aspirations targets for provision’ in hectares per 1,000 population are derived as follows: Existing provision (within this a recognition of ‘poor quality’ provision) October 2011 + Additional provision to meet current unmet demand (latent demand identified through consultation) + = Local aspirational target for provision (per 1,000 population - taking into account population projections for 2026) Final Strategy: Knight Kavanagh & Page 63 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY The Assessment Report divides Redcar & Cleveland into five analysis areas. These have been adopted to allow more localised assessment of provision, examination of open space/facility surplus and deficiencies and local circumstances and issues to be taken into account. The following example calculation is applied to calculate how much provision per 1,000 people is needed to strategically serve Redcar & Cleveland in the future. Table 7.1: Local standards calculations Analysis area Current provision (ha) Current population Current standard (ha per 1,000 population) Provision to meet latent demand (ha) Total future provision (ha) Standard based on current demand A B C D E A+D F A/Bx1,000 E/Bx1,000 Future Total new population provision requirement by (2026) 2026 (ha) G H (FxG/1,000)-A The current level of provision (column A, B, C) The current level of provision is calculated using the information collected and is presented earlier within the Assessment Report and analysed using the playing pitch project database. Deficiencies (column D) Latent demand Latent demand is defined as the number of teams that could be fielded were access to a sufficient number of pitches available. Consultation reveals that several clubs currently consider themselves to have latent demand, which they cannot meet due to lack of access to good quality facilities. The table below provides a summary of latent demand identified across Redcar & Cleveland and feeds into the standards calculations. October 2011 Final Strategy: Knight Kavanagh & Page 64 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Table 7.2: Summary of latent demand Analysis area Pitches Football Total hectarage Cricket Rugby Senior Junior Mini All Senior Junior Mini East Cleveland 1.5 4 - - - - - 4.68 Greater Eston - 1.5 - 2 - - - 4.43 Guisborough - - - 1 - - - 1.60 Marske & Saltburn 0.5 - - - - - - 0.70 Redcar 1.5 4.5 - - - - - 5.79 Redcar and Cleveland 3.5 10 - 3 - - - 17.20 Total future provision (column E) This is calculated by adding latent demand (converted into hectares) to the total hectarage of current provision. Target standards (column F) Current population is applied to total future provision required to provide target standards by analysis area. October 2011 Final Strategy: Knight Kavanagh & Page 65 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Future population growth (column G) The Office of National Statistics has recently produced long term population projections. They project forward the midyear estimates of population for 2004 and give an indication of future trends by age and gender for next 25 years. Current total Borough population is 138,036 ONS (2008 mid-year population estimates). ONS population projections (2009 – 2026) show that by 2026 (to fit with the Core Strategy and the Regional Spatial Strategy) the Borough population is projected to be 139,416. Although a fairly small increase, this takes account of households leaving the Borough and still shows the reversal of a long-established trend of overall population decline in Redcar and Cleveland. This equates to a total increase of 1,380 or 1%, which has been applied to each analysis area to reflect the population projections at a local level: Analysis areas East Cleveland Greater Eston Guisborough Marske & Saltburn Redcar REDCAR & CLEVELAND Estimated Population 2008 (ONS) 1% increase to 2026 Future population (2026) 23,776 39,813 19,949 19,474 35,024 138,036 238 398 199 195 350 1,380 24,014 40,211 20,148 19,669 35,374 139,416 The projections are trend based projections and do not take into account future local, regional or national policy and strategies. Total new provision (column H) Target current standards are then applied to the future estimated population growth per area to tell us how much provision per 1,000 people is needed to strategically serve Redcar & Cleveland until 2026. October 2011 Final Strategy: Knight Kavanagh & Page 66 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY 7.2: Redcar and Cleveland outdoor sports pitch standards The following table summarises the recommended local provision standards for outdoor sports in Redcar & Cleveland. Target standards provide a guideline about how much provision per 1,000 people is needed to strategically serve the Borough until 2026. Table 7.5: Redcar & Cleveland outdoor sports8 pitch standards Analysis area Current provision (ha) Current population Current standard (ha per 1,000 population) Provision to meet latent demand (ha) Total future provision (ha) Standard based on current demand Future Total new population provision requirement by (2026) 2026 (ha) East Cleveland 19.27 23,776 0.81 5.38 24.65 1.04 24,014 5.63 Greater Eston 38.47 39,813 0.97 4.43 42.90 1.08 40,211 4.86 Guisborough 23.71 19,949 1.19 1.60 25.31 1.27 20,148 1.85 Marske & Saltburn 13.73 19,474 0.71 0.70 14.43 0.74 19,669 0.84 Redcar 49.99 35,024 1.43 5.79 55.78 1.59 35,374 6.35 REDCAR & CLEVELAND 145.17 138,036 1.05 17.90 163.07 1.18 139,416 19.53 It is important that all levels of analysis are kept up to date approximately every three years. In line with Sport England recommendations in Towards A Level Playing Field and that RCBC has a current audit and assessment of provision in order to respond appropriately to the needs of the local community. The recommended standard for planning is the standard based on current demand. 8 Includes all outdoor sports facilities (i.e. pitches, courts and greens are included). October 2011 Final Strategy: Knight Kavanagh & Page 67 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY 7.3: Developer contributions It is important that this document further informs policies and emerging supplementary planning documents by informing the approach to securing outdoor sport facilities through new housing development. The CIL, as an incoming funding mechanism for securing and allocating developer contributions is a more structured and strategic approach than S106. If successful it will constitute a ‘central pot’ for contributions for outdoor sports facilities. This guidance should form the basis for negotiation with developers to secure contributions for the provision of appropriate facilities and their long term maintenance. Contributions could also be used to improve the condition and maintenance regimes of the pitches. A number of management objectives should be implemented to help enable the above to be delivered: Continue to ensure that where sites are lost, through development or closure, that facilities of the same or improved standard are provided to meet the continued needs of residents. Capital receipts from disposals of playing pitch facilities should be ring-fenced specifically for investment into other playing pitch facilities. They should be invested in accordance with the aims of the Strategy. Where new pitches are provided, changing rooms should be located on site. The requirement for outdoor sports provision should be based upon the number of persons generated from the net increase in dwellings in the proposed scheme, using the average household occupancy rate of 2.4 persons per dwelling as derived from the Census 2001. On this basis 1,000 persons at 2.4 persons per household represents 417 dwellings. The first stage is to calculate the total number of persons in the development (dwellings in the development multiplied by 2.4 (persons per dwelling). For example, 500 dwellings at 2.4 persons per household represent 1,200 persons. The next stage is to calculate the hectarage required for the development. This is calculated by multiplying total persons in the development by the target local standard for the analysis area where the development is taking place and dividing the total by 1,000. For example, 1,200 persons multiplied by 1.80 (Guisborough Analysis Area) and divided by 1,000 equals 2.16 hectares required. Based on the figure that a senior football pitch (including run off) is 0.64 hectares9, this would equate to, for example, two senior and two junior football pitches. For full breakdown of playing pitch sizes used in this report, please refer to the Appendix. In addition to the standards calculations, the deficiencies and surpluses in provision identified within the PPM should also be taken into account, in terms of identifying where (by analysis area) provision is required. Please refer to the relevant pages within the sport by sport sections at the beginning of this report. 9 Dimensions of a senior football pitch have been taken from Sport England’s cost guidance (100 x 64m = 6,400 sqm or 0.64 ha). October 2011 Final Strategy: Knight Kavanagh & Page 68 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY Calculation: Number of dwellings x 2.32 Local standard x = (÷ 1,000) Hectares required for the proposed development = Changing rooms In the Borough, poor quality pitches are unable to accommodate the maximum number of weekly matches. In certain cases, this is due to either lack of changing facilities or current changing provision being poor quality. All playing pitches should be served by suitable, good quality ancillary facilities; these should be located in close proximity to the playing area. To achieve an increase in participation in sport and physical activity in the Borough, it is imperative that in addition to the need to secure developer contributions for pitch provision, contributions should also be sought for improving and providing changing room accommodation using the following guidelines: Figures based on the sports facility costs from Sport England for the 2nd quarter of this year http://www.sportengland.org/facilities__planning/planning_tools_and_guidance/planni ng_kitbag.aspx Therefore the calculations below would need to change each quarter. Changing provision requirements are reliant on the number of pitches not the size of pitches. Changing facilities are required for new pitches, whether they are on or off site. Example 1: Calculation for off site contribution for playing pitches: Hectares required (Based on Redcar and Cleveland standard) / 6,400sqm (or 0.64ha) (typical area of grass pitch identified by Sport Eng for calculation purposes) x £75,000 (cost of grass pitch per 6,400sqm as identified by Sport England for calculation purposes) = £ off-site contribution = £ off-site contribution Example 2: Calculation for off site contribution for changing rooms: No. of Pitches (Need 2 team changing room per pitch) x £555,000 (cost of 4 team changing room as identified by Sport England for calculation purposes) / 2 (based on 2 teams per pitch) NB – the total figures do not include land value contribution or commuted sum for future maintenance. October 2011 Final Strategy: Knight Kavanagh & Page 69 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 8: MONITORING AND REVIEW It is important that there is regular monitoring (i.e. quarterly) and review against the actions identified in the Strategy. The Council can monitor on an annual basis changes in the supply and demand for facilities by updating the assessment database with changes to site and team information. This is important as regular monitoring of changes in supply and demand can avoid the need for a complete review of the Strategy after three years. A Playing Pitch Strategy should be subject to a full review every three years under Sport England recommendations. However, regular monitoring of key supply and demand data can extend the life of the Playing Pitch Strategy to five years. October 2011 Final Strategy: Knight Kavanagh & Page 70 REDCAR & CLEVELAND BOROUGH COUNCIL PLAYING PITCH STRATEGY PART 9: CONCLUSIONS The Playing Pitch Strategy seeks to provide guidance for planning decisions made across the Borough in the eleven years up to 2026. By addressing the issues identified in the Assessment Report and using the strategic framework presented in this Strategy, the current and future sporting and recreational needs of Redcar & Cleveland can be satisfied. The Strategy identifies where there is a deficiency in provision and identifies how best to resolve this in the future. It is important that this document is used in a practical manner, is engaged with partners and encourages partnerships to be developed, to ensure that playing pitches and outdoor sports facilities are regarded as a vital aspect of community life and which contribute to the achievement of Redcar & Cleveland Council’s corporate. The production of this Strategy should be regarded as the beginning of the planning process. The success of this Strategy and the benefits that are gained are dependent upon regular engagement between all partners involved and the adoption of a strategic approach. The Strategy is intended to be flexible and regularly updated using the accompanying database tools provided. October 2011 Final Strategy: Knight Kavanagh & Page 71
© Copyright 2026 Paperzz