CONTRACT DOCUMENTS Date: 2012-09-14 Last day for submission 2012-10-08 of tender: Ref no: IFM-2012-00421 Validity of tender: 2013-01-09 Procurement procedure: Simplified procurement You are hereby invited to submit a tender for an ION TRAP MS INSTRUMENT for the Dept. of Physics, Chemistry and Biology (IFM) at Linköpings universitet, Sweden according to the conditions stated in these contract documents. 1(20) 1. ADMINISTRATIVE REGULATIONS 1.1 GENERAL INFORMATION The Dept. of Physics, Chemistry and Biology (IFM) at Linköpings universitet intends to buy an Ion Trap MS Instrument, with a possible trade in of the existing system, a LCQ Deca, bought 1998. 1.1.1 Scope An offer must be given for a complete Ion trap MS Instrument and should include a trade in of the existing system, as specified in chapter 2 and 3. 1.2 CONTRACTING ENTITY Linköpings universitet Dept. of Physics, Chemistry and Biology (called IFM) SE-581 83 Linköping Sweden 1.2.1 Contact person Questions regarding the Contract documents must be submitted directly to the contact person for this procurement. Answers to questions important for the tender submittal, will be announced at www.liu.se/upphandlingar Name: Jenny Adolfsson E-mail: [email protected] 1.2.2 Complementary additions/Amendments Complementary additions/amendments according to the enquiry information are only binding if being announced at www.liu.se/upphandlingar 1.2.3 Questions Last day for submittal of questions regarding this procurement is 2012-09-28. Questions submitted after this date will not be answered. 1.3 CONTRACT DOCUMENTS 1.3.1 List of documents The contract documents consist of the following documents and appendices: This document (administrative regulations, technical specifications and commercial conditions), Appendix 1: ALOS 05 E Appendix 2: “Tender form/Declaration of truthfulness” The tenderer is solely responsible for obtaining complete documentation according to this list of documents. 2(20) 1.3.2 Disposition of the contract documents The administrative regulations contain requirements about formality and administration and also describe how the qualification of the tenderer and evaluation of the tender is performed. The technical specifications contain specific requirements concerning the procurement object. The commercial conditions stipulate requirements for the public contract. 1.4 PROCUREMENT PROCEDURE This is a simplified procedure, in accordance with the Swedish law of Public procurements. Tenders may be accepted without former negotiation. 1.5 THE TENDER-FORMAL REQUIREMENTS 1.5.1 Formality and validity of the tender The tender must: be signed by an authorised representative of the tendering company, be submitted no later than October 8th, 2012. The tenderer is solely responsible for the timely arrival of the tender. A tender that arrives later than stipulated, will not be considered, be valid until January 9th, 2013, which explicitly must be confirmed in the tender. 1.5.2 Submission of tender The tender can either be sent by post, by express or be delivered personally at the address stated below. Opening hours: Monday – Friday 08.00 – 17.00 A notification of reception will be sent upon formal opening of the tenders. Please note: submit the tender in a closed envelope/package, mark the envelope/package “Tender “ and ref. number IFM-2012-00421, submit the tender in original and one (1) complete copy. Tenders submitted by fax or e-mail will not be accepted, since confidentiality cannot be guaranteed. Address: Linköping University Dept. of Physics, Chemistry and Biology Att: Jenny Adolfsson SE-581 83 Linköping Sweden 3(20) 1.5.3 Language The tender and all correspondence must be in Swedish or English. Questions submitted in English will be answered in English etc. 1.5.4 Disposition of the tender The tenderer is requested to follow the order and numbering of this document. The tender must contain statements on all requirements stipulated in the Technical specifications (chapter 2) and the Commercial conditions (chapter 3). If no statement is made, IFM is entitled to interpret this as if the requirement is not fulfilled/accepted. 1.6 QUALIFICATION OF THE TENDERER To ensure that the tenderer is suitable as a supplier for the specified procurement, the down below requirements must be fulfilled. 1.6.1 Juridical standard The tenderer will be excluded from participation in the award procedure if he is bankrupt or is being wound up, his affairs are being administered by the court, he has entered into an arrangement with his creditors, he has suspended payments, or he is subject to an injunction against carrying on business, or is the subject of proceedings for a declaration of bankruptcy, for an order for compulsory winding up or administration by the court or for an arrangement with creditors or similar proceedings, or has been convicted of an offence concerning his professional conduct by a judgement which has the force of res judicata, or has been guilty of grave professional misconduct and the contracting entity can furnish proof this circumstance, or has not fulfilled obligations relating to registration in a professional trade register, or has furnished incorrect information requested below and may be excluded if he has not fulfilled obligations relating to the payment of social insurance fees or taxes in the country in which he is established or the country in which procurement takes place, or has in some material respect failed to furnish required information requested as mentioned below The tenderer must confirm that there are no grounds for excluding him according to the above, through leaving the below mentioned documents. Tenderers located abroad The following national official documents must be enclosed to the tender: 1) certificate of enrolment in a professional trade register, 2) certificate that the tenderer has fulfilled obligations relating to the payment of social security contributions, 3) certificate that the tenderer has fulfilled obligations relating to the payment of taxes. 4(20) Swedish tenderers “Registreringsbevis” from Bolagsverket must be enclosed to the tender. The Swedish tenderers may be checked with Skatteverket and Kronofogden. All tenderers Appendix no 2, “Tender form/Declaration of truthfulness” must also be signed and enclosed to the tender. 1.7 SUBCONTRACTOR If the tenderer intends to engage subcontractors to perform certain parts or services, these shall be, stated, and specified in the tender. The same certificates concerning the company must be appended for any subcontractors, as presented in section 1.6.1. 1.8 EVALUATION PROCESS Before the evaluation process starts the formal requirements, in accordance with 1.5, are checked. If any of those are not fulfilled, the tender in question may not be taken into consideration. 1.8.1 Qualification of the tenderer During the evaluation it is ascertained that the criteria for qualitative selection of a tenderer, in section 1.6, are fulfilled. If any of those is not fulfilled, information being omitted or incorrect, the tender may be rejected. 1.8.2 Examination of tender The requirements indicated as “must” in chapter 2, Technical specifications, and chapter 3, Commercial conditions, are checked. For further evaluation all those requirements must be fulfilled/accepted. If no statement is made with respect to a “must” requirement, IFM is entitled to interpret that as if the requirement is not fulfilled/accepted. Please observe that the requirements of the Commercial conditions indicated as “must” also must be accepted, and when asked for, commented. 1.8.3 Evaluation of tender Only tenders that have passed the above mentioned examination successfully will be evaluated further. The public contract will be awarded to the tenderer with the lowest price (according to information given in connection with 3.15.1). Criteria 1. Weight Lowest price 100 % 5(20) 1.9 COMMERCIAL SECRECY In accordance with the Official Secrets Act (Offentlighets- och sekretesslag (2009:400)) all data pertaining to a matter of procurement is subject to secrecy until an agreement has been entered into or the procurement has otherwise been concluded. Any data mentioned may be subject to secrecy even after the aforementioned time. Note, however that only in exceptional cases is price information considered to be of such nature that it may be held secret for commercial reasons. With respect to commercial secrecy for the protection of tenderers data, the requirement is that the data in question refers to the tenderers business- or service conditions and that there is a specific reason to presume that the tenderer will suffer damages if the data is disclosed. If a tenderer considers the data submitted in connection with this procurement matter fulfils the aforementioned requirements for commercial secrecy, the tenderer should submit a request for commercial secrecy, in writing; with clarification concerning the data referred to and what damage the tenderer would suffer if the data were disclosed. 1.10 NOTIFICATION OF DECISION At least 10 days before signing the public contract, notification of IFM’s decision in this matter of procurement will be sent in writing to all tendering companies. Until the public contract being signed, an appeal for reconsideration of this decision may be made to Förvaltningsrätten i Linköping (the Administrative Court of Linköping). Address: Box 406, SE-581 04 Linköping, Sweden [email protected] http://www.forvaltningsrattenilinkoping.domstol.se 1.11 AGREEMENT Please note that there is no legally binding agreement until the public contract is signed by both parties. 6(20) 2. TECHNICAL SPECIFICATION 2.1 INTRODUCTION 2.2 TECHNICAL SPECIFICATIONS The following specifications must be fulfilled: 2.2.1 Fulfilled YES NO Electro spray Ion source must be compatible with liquid flow rates of < 1 µL/min to 1 mL/min, without splitting. 2.2.2 Integrated Divert Valve Fully-automated data system control Fulfilled YES NO Must enable user to divert to waste the solvent front, gradient end point and any other portion of the HPLC run. 2.2.3 Integrated Syringe Pump Fulfilled YES Must allow automated infusion under data system control. 7(20) NO 2.2.4 Scan Functions Fulfilled YES NO Must include: • Full-scan feature provides full-scan mass spectra for sensitive analyses and produces spectra for rapid screening of unknown compounds • Selected Ion Monitoring (SIM) monitors selected ions for target compound analysis • Full-scan MS/MS produces fast, full scan, information rich, product ion spectra • Selected Reaction Monitoring (SRM) • MSn for multi-stage MS experiments to probe the structure of ions • ZoomScan a high-resolution, full-range scan • TurboScan, an ultra-fast scan to improve signal-to-noise and sampling rate 2.2.5 Exclusive Technologies Fulfilled YES Must be: • Unique, proprietary Automatic Gain Control (AGC) to ensure that the ion trap is always filled with the optimum number of ions for any scan type • Dynamic Exclusion allows acquisition of MS/MS and MSn spectra from lower intensity ion species • WideBand Activation generates more structurally informative spectra • Normalized Collision Energy compensates for the massdependent energy deposition characteristics, providing reproducible data from instrument to instrument • Pulsed-Q Dissociation (PQD) – enables trapping of low mass fragment ions 8(20) NO 2.2.6 Mass range Fulfilled YES NO Mass Range must be m/z 15 – 4000 2.2.7 Resolution Fulfilled YES NO Must be: • Down to 0.3 FWHM (full width half maximum) • <100 msec between positive and negative MS Scan Power 2.2.8 Fulfilled YES The offered instrument must be compatible with HPLC Alliance 2690. 9(20) NO 3. COMMERCIAL CONDITIONS 3.1 DELIVERY 3.1.1 Delivery and installation time Fulfilled YES NO The delivery, installation and testing of the equipment must take place within six (6) months after received order. 3.1.2 Delivery terms Fulfilled YES NO The delivery term must be: DAP Linköpings universitet, Fysikhusets godsmottagning, Linköping. (DAP=Delivered at place according to INCOTERMS 2010) 3.1.3 Delivery notification Fulfilled YES IFM must be kept informed about all the stages of the delivery process. Delivery notification must be sent to IFM no later than 2 working days before delivery. Delivery must take place during working days between 9 to 16 o’clock. The goods must be delivered to the Physics Building’s goods office. The agent handling this part of the delivery must be informed about this procedure. 10(20) NO 3.2 DELAYED DELIVERY 3.2.1 Notification of delayed delivery Fulfilled YES NO If the Contractor finds that the agreed time of delivery cannot or appears unlikely to be met, IFM must without delay be notified of this in writing to: [email protected], specifying the contract number. Such notification must include the reason for the delay and, if possible, the time when it is expected that delivery can be made. If delay in delivery is due to IFM, circumstances within IFM’s control or circumstances specified in ALOS 05, article 25, Grounds for release (Force majeure), and notification has been given as specified above, the time of delivery must be extended to a time justified by the circumstances. 3.2.2 Liquidated damages Fulfilled YES If delivery has not been performed within the agreed time and the time of delivery has not been extended in accordance with clause 3.2.1 Notification of delay in delivery, IFM must be entitled to liquidate damages of 1 % per week of the value of the part of the goods that as a consequence of the delay could not be put to its intended use. IFM must be entitled at its own discretion to credit itself accrued damages either by deducting damages from the price when making payment for the delayed delivery or by presenting the Contractor a specific demand for payment. If such a demand is presented, payment shall be made within 30 days of the day the demand is presented. If delivery is delayed, the Contractor must also pay interest on any sum paid in advance for a period corresponding to the delay. The interest rate must equal the discount of the Bank of Sweden plus 8 percentage units. 11(20) NO 3.2.3 Maximum liquidated damages Fulfilled YES However, IFM’s maximum entitlement to liquidated damages pursuant to the above must be 10 % of the above mentioned value, excluding VAT. 12(20) NO 3.3 INSTALLATION/INSTALLATION TEST Fulfilled YES The equipment will be placed at a laboratory of IFM, Linköpings universitet with necessary connections. The installation of the equipment and a test on site in Linköping must be performed by the Contractor and IFM in co-operation. The test at LiU must include the installation and function of the equipment, as well as agreed performance specifications and the documentation, and must be documented by the Contractor in form of a test report. The cost of the installation and all additional devices needed during installation, or needed in order to demonstrate that the system fulfil the technical specifications, must be included in the price and be provided by the Contractor. Any special requirements for installation at the laboratory must be stated in the quotation and it must be stated to what degree the supplier takes responsibility for the installation and start-up of delivered equipment. The Contractor must within the offered price take full responsibility for the installation. LiU will assist in making necessary extensions and connections of e.g. power, water, and gas supplies to the equipment. If the test shows that the delivered equipment meet all the must-specifications in chapter 2, the Technical specifications, and is working according to agreed specifications, the installation test will be approved. If the tests show that the delivered equipment does not fulfil agreed performance specifications, IFM must be entitled to cancel the contract in accordance with 3.17. 13(20) NO 3.4 FINAL ACCEPTANCE TEST Fulfilled YES NO After an approved installation test, the equipment must be at IFM’s disposal for tests during two (2) months. If the equipment is working according to the agreed performance specifications and without significant faults or malfunctions during these months, the system will be accepted. If not, the faults or malfunctions must be amended by the supplier and another test period of two months must start. A maximum of three test periods will be allowed. If the equipment can’t be finally accepted within three test-periods negotiations to solve the problem without losses for IFM must be initiated and IFM must have the right to cancel the contract. 3.5 WARRANTY 3.5.1 Warranty period Fulfilled YES The warranty time for all the delivered equipment must be three (3) years from approved installation of the system and must be a full warranty against defects in material and workmanship for the delivered equipment. All costs in connection with guarantee actions are to be borne by the Contractor, including travelling expenses, excluding consumables. The user must have the possibility to either extend the warranty period or sign for a service contract following the above mentioned warranty period, when awarding the contract. 14(20) NO 3.5.2 Warranty prolongation Fulfilled YES NO Standstill periods during the warranty period caused by defects or malfunctions notified by the Purchaser must result in a prolongation of the warranty period. The prolongation is to correspond to at least the total standstill period. 3.6 SAFETY AND HEALTH REQUIREMENTS Fulfilled YES NO The system must fulfil all legal regulations on safety and health requirements. ELSÄK-FS 2000:2 or comparable European standard applies. Connections must be for 3 x 380/400 V AC or 220/230 V AC, 50 Hz. Any necessary transformers must be included. The equipments must be protected against electricity failure. 3.7 CE MARKING AND CONFORMITY TO EU REGULATIONS Fulfilled YES NO The tenderer must explicitly verify in the offer that the complete system and any separate parts will comply in conformity with the appropriate, relevant EU directive, (declaration of conformity), including CE marking. 3.8 TRAINING Fulfilled YES Training necessary to be able to operate the offered equipment must be included. Training for two (2) IFMtechnician regarding basic operation and service of the instruments must be included in the price. 15(20) NO 3.9 SERVICE ORGANISATION Fulfilled YES NO The tenderer must describe their service organization, e.g. base of the service engineer(s) and where to send the equipment in case of repair. 3.10 SERVICE ENGINEERS 3.10.1 Fulfilled YES NO The user must have the possibility to order service without a signed service contract for a period of at least 10 years after delivery. 3.10.2 Fulfilled YES NO Qualified service engineers must be available for on-site visits for a period of at least 10 years after delivery. 3.11 CONSUMABLES Fulfilled YES The Purchaser must have the possibility to purchase consumables, for a period of at least 10 years after delivery. 16(20) NO 3.12 SPARE PARTS Fulfilled YES NO The Purchaser must have the possibility to purchase Spare parts, for a period of at least 10 years after delivery. 3.13 SUPPORT Fulfilled YES NO 10 years availability of support by phone or mail must be guaranteed. 3.14 DOCUMENTATION Fulfilled YES NO Detailed documentation of all delivered equipment, its operation, maintenance and service in English and/or Swedish must be included and supplied on delivery. User and service manuals in English and/or Swedish for the equipment must be included and supplied on delivery. 3.15 PAYMENT 3.15.1 Contract price Fulfilled YES The total price must be given for: The equipment, warranty, documentation, training (including travelling costs), installation of the equipment, testing, delivery and insurance costs. The total contract price must be given as a fixed price in SEK, excluding VAT. 17(20) NO 3.15.2 Trade in Tenderers should accept a trade in of the existing equipment (“LCQ Deca” (from year 1998)). The equipment is currently located at storage in Stockholm. The tenderer should specify the price reduction that this trade in generates. The sum will be deducted from the offered contract price given in 3.15.1. Specify the price reduction of the trade-in: 3.15.3 Payment terms Fulfilled YES NO The payment terms must be as follows: 1. 80 % of the total price on approved delivery, meaning on-site check showing that the delivery is complete and undamaged. 2. 20 % of the total price on approved “Final acceptance test” (3.4) All payments must be against invoice 30 days net. 3.16 INVOICE ADDRESS Fulfilled YES Invoices must to be sent to the following address: Linköping University Fakturasupport Att: 1201 Jenny Adolfsson SE-581 83 Linköping Sweden 18(20) NO 3.17 CANCELLATION Fulfilled YES NO IFM must be entitled to cancel all or parts of the contract with immediate effect a) if delivery and installation is not performed within two months from the agreed time and this is not due to IFM or circumstances on their part, or b) if the equipment cannot be accepted after the installation-tests, provided that this is not caused by IFM, or c) if delivery is defective and this is not due to IFM or circumstances on their part and the defect may be regarded as a substantial breach of contract; or d) if the Contractor fails to perform other conditions of the contract and this may be regarded as constituting a substantial breach of contract, or e) if enforcement by a legal authority of a judgement or an enforceable decision of any other kind has shown the Contractor to be lacking the means of making full payment of a claim which is the subject of the judgement or decision, has suspended payments, applied for the appointment of an administrator pursuant to a composition legislation act or has been declared bankrupt. If cancellation is made, all payments made on the delivered equipment must be refunded IFM within 30 days from cancellation. 3.18 APPLICABLE LAW Fulfilled YES The contract must be governed by Swedish law. 19(20) NO 3.19 GENERAL TERMS AND CONDITIONS Fulfilled YES In other respects ALOS 05 must apply. (ALOS 05= General terms for supply of goods to the public sector). 20(20) NO
© Copyright 2026 Paperzz