P21 Minor Works Contract - RCHT 2009 / 10 Task 8 - Chemotherapy Ward Alterations Line Name Start Duration End 2009 2010 December January February March April May June July August Sep 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 + 1 Pre Construction (Phase1) 24 Aug 09 22w 3d 05 Feb 10 + 2 Design Stage + 3 Issue Midas with Full Tender Pack 24 Aug 09 13w 2d 26 Nov 09 + 4 Pricing + 5 Cost Plan Preparation 19 Nov 09 4w 4d 22 Dec 09 + 6 Acceptance / Agreement of Value Engineering Options + 7 Decant Existing Office & Ward Space 11 Jan 10 16 Nov 09 + 8 Staffing & Prelims + 9 Lead in / Mobilisation Period 08 Feb 10 18ew 14 Jun 10 8+ 08 Feb 10 2w 2d 23 Feb 10 9 + 10 Lead in / Mobilisation Period + 11 Isolate / Screen Off Area & Redirect Signage as required 08 Feb 10 19 Nov 09 Pre Construction (Phase1) 19 Nov 09 23 Dec 09 1w 2d 08 Jan 10 4w 7w 2w 15 Feb 10 05 Feb 10 11 Jan 10 Pricing 5 Cost Plan Preparation 6 Acceptance / Agreement of Value Engineering Options Decant Existing Office & Ward Space + 19 Feb 10 Staffing & Prelims + Lead in / Mobilisation Period 10 15 Feb 10 Lead in / Mobilisation Period 11 Isolate / Screen Off Area & Redirect Signage as required + 12 Establish Traffic & Pedestrian Routes & Implement Fire Action Plan 15 Feb 10 15 Feb 10 + 13 Protect the Existing Surfaces as required 1d 15 Feb 10 12 Establish Traffic & Pedestrian Routes & Implement Fire Action Plan 3d 17 Feb 10 13 + 14 Erect Temporary Screens & Safety Signage + 15 Form Ramp for Temporary Access + 16 Construction Phase 15 Feb 10 1w 19 Feb 10 14 + 17 M&E Isolation & Disconnections + 18 Demolition & Strip Out 22 Feb 10 1w 26 Feb 10 17 22 Feb 10 2w 05 Mar 10 18 + 19 Internal Below Ground Drainage Alteration + 20 External Drainage Work 01 Mar 10 2w 12 Mar 10 15 Mar 10 3w 06 Apr 10 + 21 Stud Partitions + 22 Mechanical & Electrical First Fix (Containment & Cabling) 08 Mar 10 5w 13 Apr 10 21 08 Mar 10 6w 20 Apr 10 22 + 23 External Aluminium Doors + 24 Carpentry First Fix 22 Mar 10 2w 06 Apr 10 23 22 Mar 10 3w 13 Apr 10 24 + 25 Plastering & Making Good of the Existing Surfaces + 26 Secondary Steel for Light Fittings within the Treatment Room + 27 Fire Stopping & Soundproofing 22 Mar 10 4w 20 Apr 10 25 29 Mar 10 07 Apr 10 1w 2w 06 Apr 10 20 Apr 10 27 Fire Stopping & Soundproofing + 28 Wall Linings / Whiterock + 29 Mist Coat / Decoration 07 Apr 10 2w 20 Apr 10 28 Wall Linings / Whiterock 07 Apr 10 5w 12 May 10 29 + 30 IPS Units + 31 Carpentry Second Fix 14 Apr 10 2w 27 Apr 10 30 14 Apr 10 3w 05 May 10 31 + 32 Suspended Ceilings - Grid & Service Tiles + 33 Floor Finishing's 20 Apr 10 2w 04 May 10 21 Apr 10 3w 12 May 10 + 34 Mechanical & Electrical Second & Third Fix + 35 Suspended Ceilings - Final Tiles 14 Apr 10 6w 26 May 10 17 Feb 10 1w 23 Feb 10 22 Feb 10 16ew 14 Jun 10 11 May 10 4w 08 Jun 10 18 May 10 3w 08 Jun 10 + 38 Window Film + 39 Testing & Commissioning + 40 Final Clean & Corrective Works 01 Jun 10 1w 07 Jun 10 14 May 10 4w 11 Jun 10 28 May 10 2w 14 Jun 10 Date: 19/01/2010 Drawn by: Nick Gill Name Start Prog No.00 Checked by: Erect Temporary Screens & Safety Signage 15 Form Ramp for Temporary Access 16 Construction Phase M&E Isolation & Disconnections Demolition & Strip Out 19 Internal Below Ground Drainage Alteration 20 External Drainage Work Stud Partitions Mechanical & Electrical First Fix (Containment & Cabling) External Aluminium Doors Carpentry First Fix Plastering & Making Good of the Existing Surfaces 26 Secondary Steel for Light Fittings within the Treatment Room Mist Coat / Decoration IPS Units Carpentry Second Fix 32 Suspended Ceilings - Grid & Service Tiles 33 Floor Finishing's 34 Mechanical & Electrical Second & Third Fix 13 May 10 1w 19 May 10 + 36 Curtain Track & Blinds + 37 Final Fixtures, Fittings & Furnishings (Group 1 & 2) Line Protect the Existing Surfaces as required Duration End Revision N 35 Suspended Ceilings - Final Tiles 36 Curtain Track & Blinds 37 Final Fixtures, Fittings & Furnishings (Group 1 & 2) 38 39 Window Film Testing & Commissioning 40 Final Clean & Corrective Works 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 7 14 21 28 4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 December January February March April May June July August Sep 2009 2010 Revision Comments: General Notes: Project Ref. C:\Program Files\Asta\Asta Powerproject\Projects\C2643 Treliske & West Cornwall P21 Works\P21 Works Rev N .pp Start Date:15/02/2010 Finish Date:11/03/2011 Planned by Asta Powerproject
© Copyright 2026 Paperzz