Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Properties Before Works Started 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 1 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Existing furniture removed and given to registered charity. •Existing furniture removed and given to registered charity. • Existing internal fixtures and fittings removed. • Existing internal fixtures and fittings removed. •Existing carpets and floor coverings removed. •Existing carpets and floor coverings removed. •Demolition of extension •Wall paper and surface coverings stripped. •Wall paper and surface coverings stripped. •Internal doors and architraves removed. •Internal doors and architraves removed. •Citex screen installed to windows and doors. •Citex screens installed to windows and doors. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 2 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Services and cabling stripped out and removed from site. •Services and cabling stripped out and removed from site. •Temporary supply installed. •Temporary supply installed. •Site welfare installed. •Damaged lathe and plaster ceilings/walls stripped. •Site welfare installed. •Trial pit to expose foundations to extension party wall. •Trial hole excavated to confirm floor slab build up. •Site welfare installed. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 3 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •100mm Celotex GA4000 wall insulation cut and laid in position onto external walls. •100mm Celotex GA4000 wall insulation cut and laid in position onto external walls. •Trial fixing undertaken to see if fixings hold. •Scaffolding erected •Redundant fire place s infilled with stud work, external ventilation to be installed at later date. •Scaffolding erected Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 4 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •First fix electrics undertaken, all previous wiring completely removed. New cabling pulled through. •External wall insulation fixed into place with 50x50mm timber battens, battening allows to fix insulation in place and provide a void for services. •Drainage Survey completed to both properties. • All joints between insulation board are taped to provide a vapour barrier and improved air tightness. •First fix electrics undertaken, all previous wiring completely removed. New cabling pulled through. • Windows and Doors measured by Window supplier Mumford and Wood. Windows to be timber frame double glazed units to match the existing window fenestration. •External wall insulation fixed into place with 50x50mm timber battens. •All joints between insulation board are taped to provide a vapour barrier and improved air tightness. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 5 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •First fix mechanical, stripping out of all existing pipe work and installing 1st fix heating. •Construction of internal studwork partitions between living room and bedroom two and three. •Lifting up of floor boards to allow pipework runs to be installed. •Installation of straps to strengthen internal walls to first floor. •Plasterboard dry lining internal walls, and plasterboard fixed to ceilings. •Construction of fire resistant partition in loft space between 47 and 49 Addington Road. •Construction of internal studwork partitions, alteration of bathroom door opening. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 6 47 Addington Road – Performance House •First fix mechanical, installation of underfloor heating manifold. 12 Palmer Park Avenue - Cost House •Stripping off roof coverings and temporary storm protection installed. •Installation of 325mm loft insulation. •Rear redundant chimney to be taken below roof height and capped off. Front chimney taken down and rebuilt to match existing. •Lifting up of floor boards and clearing between joists ready for insulation to be installed. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 7 47 Addington Road – Performance House •Structural engineer inspect ed the roof structure following stripping of roof coverings. 12 Palmer Park Avenue - Cost House •100mm hemp Insulation to the intermediate timber floors. •Replacement and reinstatement of timber floor boards. • Floor boards lifted to ground floor and rubble removed to allow 325mm ground floor hemp insulation to be installed. •Front chimney to the main building is taken down and rebuilt to match existing. •Rear chimney to the main building is taken down below roof level and capped off. •Stripping of roof coverings for inspection by structural engineer •Opening formed for access to loft for services access. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 8 47 Addington Road – Performance House •Reinforcement to roof purlins, carried out due to the additional roof load as a result of installing photo voltaics. 2no struts installed to the existing purlins. 12 Palmer Park Avenue - Cost House •Existing insulation to the main roof is removed. • The top section of the roof is insulated with 325mm. •Strengthening to floor joists beneath staircase landing. •325mm hemp insulation installed between the floor joists . The insulation is positioned in place on netting. •80mm Celotex GA4000 insulation installed between the rafters to the sloped ceiling within the attic room. •12mm TB4000 insulation installed internally to prevent cold bridging of through the rafters. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 9 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Additional purlin to provide roof strengthening ahead of installation of PV panels to the rear elevation of the main roof. •The footings for the extension are excavated ready for inspection by building control and foundations to be poured. •Steel strengthening is installed to the floor joists that have been notched for under floor heating manifold. •The rear addition roof structure was condemned by the structural engineer, the joists were undersized and coming away from the wall plate. •The rear addition roof structure was completely stripped and replaced. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 10 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Window installation started to the bay windows. Installed with 5mm Spacetherm Aerogel blanket to the perimeter to of the window and lapped on to the internal wall insulation. This is to prevent cold bridging and stop there being a break in the insulation and forming cold spots. •Training given to roofing contractor by Solar Century to install solar tiles to front elevation of 47 Addington Road. •Return walls to both properties insulated with 12mm Celotex TB4000 . •Foundations poured for the extension, poured in sections to allow bridging of existing sewer pipe running across the back of property. •Adaptations made to main incoming water supply . A loop was installed external to the building to future proof the building should the supply change. •The chimney breast to rear bedroom and kitchen is insulated with 50mm insulated plasterboard due to space restrictions. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 11 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •50mm insulated plasterboard installed to external wall on the stairs due to limited space on the stairs. •Opening made for the installation of Velux window above first floor landing •Plasterboard installed internally to external walls. •Floor slab excavated for the extension, and low level external wall started. •Thermocouples for the BMS system installed to the external walls between insulation and internally to monitor temperature and monitor performance of insulation. • Thermocouples for the BMS system installed to the external walls between the insulation and internally to monitor temperature difference and monitor performance of insulation. •The windows installed to the rear addition are fitted to timber external frames to allow the external insulation to overlap forming a new window reveal and stop cold bridging. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 12 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Self levelling screed applied to solid ground floor prior to installing Sempafloor insulation. •Velux window installed and light well formed to bring light into the first floor landing area. Plasterboard light well lined with 100mm Celotex insulation to prevent the area becoming a cold spot. •Plastering to rear first floor bedrooms. •Solar tiles installed to the front elevation and roof tiling in progress. •External insulation installed to the rear addition. •Timber frame being constructed to the extension. •Roof tiles installed to rear addition roof pitch. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 13 47 Addington Road – Performance House •Solar tiles installed and roof coverings completed. •Windows installed with revised construction detail closing off the cavities. •External walls and timber frame structure to extension progressed. 12 Palmer Park Avenue - Cost House •External insulation rendered and reveals to openings formed. •Skirting board and door linings installed. •5mm Sempafloor insulation laid onto the concrete slab floor. The insulation is lapped up onto the external wall insulation to prevent cold spot between the floor and wall insulation. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 14 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Walls skimmed and plastered, including window reveals. •Loft access door installed, fitted with insulation and draught stripping . •2nd fix plumbing under way, hot water cylinder installed to cylinder cupboard. Pipework to the extension run into position. •Sunspot to first floor landing installed. •Fireplace insulated with rock wool slab insulation •Walls skimmed and plastered, including window reveals. •Insulated air tight loft hatch installed to loft access. •Cement pointing undertaken to window surrounds externally. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 15 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Solar thermal panels installed to the rear addition roof. These are left with covers on until the system is complete and commissioned. •Wood stove and slate hearth installed. The fire placed is lined with glass reinforced plasterboard. •The roof tiling to the main roof is now completed with brackets installed for the photovoltaic panels to be fixed to. •Cement pointing undertaken to window surrounds externally. •The roof deck to the extension is complete and the first waterproofing membrane layer is laid. •Plaster board installed to the extension internally. •The second fix for the mechanical is in progress with radiators and TRVs installed. •Skirting boards and door frames are being fixed into position. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 16 47 Addington Road – Performance House •Insulated board is installed above the ply deck and felt covering . Insulation board installed provides the fall to the roof. Drainage chute formed to the end parapet wall. 12 Palmer Park Avenue - Cost House •Internal decoration to the first floor underway, undercoat coat applied. •Installation of Solar thermal boiler controller and expansion vessel to loft space. •Under floor heating installed the kitchen and extension. The under floor heating to the solid floored extension is laid on 5mm pre grooved insulation directly on to the floor slab. •PV panels installed by solar century to rear main roof pitch. •Decorative ridge tiles installed and finials to the front of the building. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 17 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Internal decoration to the first floor in progress. •Internal decoration progressed, first coat applied throughout including decoration to timber work. •Internal window cills installed •Internal doors delivered to site and hung. •Plastering internally to extension underway. •Kitchen units installed and vinyl flooring laid. •Internal doors delivered to site and installed. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 18 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Minor repairs made to stair treads, banister extended to 2nd floor stair case. •Sedum roof covering and drainage perimeter installed to the extension flat roof deck. •2no replacement windows to rear installed. Original windows manufactured to the wrong size following a mistake by the manufacturer. •Felt flashing and air vent installed to the cavity between the extension and adjacent property to ensure that cavity is can ventilate. •Internal decorations progressed throughout using Duluxe Eco Sure Paint. Internal doors decorated and ironmongery installed. •External decorations and repairs to bay windows. •Tiling to kitchen and bathroom completed. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 19 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Soakaway excavated for the overflow to the rain water harvesting tank and rain water run off from the green roof. •In situ concrete pad poured for the rain water harvesting tanks to sit on. •Landscaping started with existing concrete paths broken out and removed. •Reveals formed around existing subfloor ventilation and part filled with pea shingle. •Marmoleum flooring installed to kitchen and bathrooms. •Garden area cleared out, existing shed removed. Existing pathways broken out. •Excavation to the perimeter of the external insulation atl ow level to allow installation of 40mm insulation below DPC. •Concrete poured into excavation to ensure integrity of the shallow foundations . Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 20 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Garden wall rebuilt to side and front of the front garden. Metal railings removed to be overhauled. •Drainage connections for rain water over flow complete and kitchen waste complete. •Mastic weather bead installed to windows. •Mastic weather bead installed to the perimeter of the windows. •Type 1 aggregate sub base laid and compacted prior to the installation of the Sudscape porous hard landscaping. •New ThermL insulated timber doors with U value of 1.5W/m2K installed to front and rear entrance. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 21 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Shed to rear garden removed to expose unstable rear garden wall. Wall had to be dismantled as it was unstable. •Chamois Eco Kitchen manufactured from recycled materials installed. •Pump installed to the rain water harvesting tanks , system fully connected and system commissioned. •Metal railings to front of properties repaired and decorated. •Sudscape installed to the rear and front garden. •Lagging to mechanical pipe work complete. Trunking to cabling in the cylinder cupboard and metering cupboard. •Penetrations for pipework, flues, and cabling ect through external envelope sealed for air tightness. Sudscape installed to the rear and front garden. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 22 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Front and rear garden rotovated and levelled. •Front door to installed and porch decorated internally. •Trimming and cutting back hedges gardens. •Front and rear garden rotovated and levelled ready for turf to be laid. •White render to the rear addition cleaned and touched up. •Trimming and cutting back hedges gardens. •Shed installed to the rear of the garden and trellis installed around rain water harvesting tank. •Solar Thermal metering points and in line metering points to the gas supply installed to the BMS system. •6ft ship lap garden fence installed in place of dilapidated rear garden wall. •Solar Thermal metering points and in line metering points to the gas supply installed to the BMS system. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 23 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House •Final snagging internally and externally of building works. •Final snagging internally and externally of building works. •Solar thermal system and heating fully commissioned and running. •White goods delivered and installed to both properties. •Turf installed to rear and front gardens. •Turf installed to rear and front gardens . •Carpets installed •Carpets installed. •BMS system commissioned and tested. •BMS system commissioned and tested. Eco-Refurbishment Project 47 Addington Rd & 12 Palmer Park Avenue Week 24 – Practical Completion 47 Addington Road – Performance House 12 Palmer Park Avenue - Cost House
© Copyright 2026 Paperzz