USER - JK Lakshmi Cement

K S PANDEY
QR NO-E-O3,JAYPEE NAGAR, REWA
MADHYA PRADESH, PIN-(486450)
[email protected]
DATE(RECEIVER’S NAME)
( COMPANY’S ADDRESS
EMAIL ID
HIRING MANAGER ADDRESS)
DEAR (HR’S NAME),
•
•
I would likely to apply for the advertised post of(
) your company advertised on
paper or website. I am currently working in JAYPEE CEMENT LIMITED, where I am
recognized as (your current post) in mechanical department Experienced in administring
project activities from stage of conceptualization to execution including developing technical
specifications, spare parts planning, procurment, inspections, progress monitoring, site
management, inventory management, environment management and manpower planning in Cement
Division.
Proficient in implementing maintenance schedules (electrical, electronics & mechanical),
executing periodic checks on equipment and supervising technical documentation for large power
projects
Excels in anchoring erection & commissioning of machines & equipment and ensuring completion of
project in minimum turnaround time along with effective resource utilization to maximize the
output
Please have a look at my enclosed resume for detailed information about my work
experience and education.
Sincerely
K S PANDEY
Kulshekhar Pandey
E-Mail: [email protected]
Phone: 09425185983
High-Performance Senior Management Professional
Operations & Maintenance/ Erection & Commissioning/ Troubleshooting
Achievement-driven and high performance management executive & high-energy project manager with 25.6 years
excellence in executing prestigious project lifecycle, maintenance, control & instrumentation projects of large magnitude
within strict time schedules, budgets, safety & quality
Preferred Industry: Power/ Cement/ Coal
Preferred Location: Rajasthan / MP/ Jharkhand
PROFILE SUMMARY
•
•
•
•
•
Experienced in administring project activities from stage of conceptualization to execution including developing
technical specifications, spare parts planning, procurment, inspections, progress monitoring, site management,
inventory management, environment management and manpower planning in Cement Division
Excels in anchoring erection & commissioning of machines & equipment and ensuring completion of project in minimum
turnaround time along with effective resource utilization to maximize the output
Proficient in implementing maintenance schedules (electrical, electronics & mechanical), executing periodic checks on
equipment and supervising technical documentation for large power projects
Proven skills in managing technically advanced, cost-efficient & state-of-the-art-utility maintenance to ensure top &
bottom line profitability within pre-set cost, time & quality parameters
Possess excellent interpersonal, analytical and negotiation skills with proven track record of utilizing a process-oriented
approach towards the accomplishment of cost, profit, service & organizational goals
CORE COMPETENCIES
Operations & Maintenance
Energy Conservation Practices
Inventory Planning / Cost Control
Erection & Commissioning
Safety Management
Supplier Resource Management
Troubleshooting
Best Practices
Continual Improvements
ORGANISATIONAL EXPERIENCE
Jaypee Rewa Cement Plant, Rewa
Sr. Manager Mech.
Since Apr’96
General & Shut Maintenance Section kiln, Cooler, Raw mill, & L.S. Crusher, Plant Capacity-3300TPD & L.S. Crusher APM-1822,
650 TPD & APPM-1822, 1000 TPD
Growth Path
Apr’96 to Mar’97
Apr’97 to Mar’98
Apr’98 to Mar’01
Apr’01 to Mar’05
Apr’05 to Mar’07
Apr’07 to Mar’09
Apr’09 to Mar’15
Since Apr’15
Engineer-II Mech. (LS Crusher Shift Operation & Shut Maintenance)
Engineer-II Mech. (Cement Mill Shift Operation & Shut Maintenance)
Engineer-I Mech. (Kiln Section Shift Operation & Shut Maintenance)
Sr. Engineer Mech.
Plant Engineer Mech.
Deputy Chief Engineer Mech.
Chief Engineer Mech.
Sr. Manager Mech.
Key Result Areas






Spearheading project activities involving working out various requirements & monitoring overall project operations for
ensuring timely completion of the same
Supervising the preparation and modification of reports, specifications, plans, schedules, environmental impact studies
and designs for project
Managing complete installation & commissioning activities as well as conducting tests & inspections to ensure
operational effectiveness of utilities
Administering execution of preventive maintenance of instruments comprising of schedules / shutdown maintenance to
ensure trouble-free & seamless operations
Preparing various project reports for identifying areas of obstruction / defects, conducting troubleshooting, service and
repair functions to rectify the equipment
Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and
meeting of production targets
Highlights:
 Established operations and maintenance system, maintenance planning, operation efficiency, energy conservation
 Commissioned kiln, Cooler, Raw mill, & L.S. Crusher, Plant Capacity-3300TPD & L.S. Crusher APM-1822, 650 TPD &
APPM-1822, 1000 TPD
 Prepared MIS, ISO documents relating to all plant and equipment
Projects Handled:
Title:
Period:
Operation & Maintenance In-charge L.S. Crusher APM-1822, 650 TPD & APPM-1822, 1000 TPD
Since Since Apr’15
Role:
Sr. Manager Mech.
Title:
Period:
Fabrication, Erection & Commition of Amelia Coal handling Circuit for Wagon Loading
Sep’14 to Mar’15
Role:
Chief Engineer Mech.
Title:
Period:
Fabrication, Erection & Commition of packing plant Wagon Loading m/c.
Jul’12 to Sept’14
Role:
Chief Engineer Mech.
Title:
Period:
Rotten & Shut Maintenance. Section kiln, Cooler, Raw mill. PlantCapacity-4600 TPD
Apr’07 to Mar’09
Role:
Deputy Chief Engineer Mech.
Title:
Period:
Erection & commition Of L.S. Crusher-400TPH, Stacker & Reclaimer in Jaypee Babupur
Apr’07 to Mar’09
Role:
Deputy Chief Engineer Mech.
Title:
Period:
Rotten & Shut Maintenance. Section kiln, Cooler, Raw mill, Plant Capacity-4600TPD
Apr’05 to Mar’07
Role:
Plant Engineer Mech.
Title:
Erection & commition of L.S. Crusher-1000TPH, Stacker & Reclaimer in Jaypee Bhagwar - Sidhi Both spillage
(chain & scraper type) replace by belt Conveyor to control brake down, accident of apron conveyor Aumund
Period:
Apr’05 to Mar’07
Title:
Period:
Running & Shut Maintenance. Section kiln, Cooler, Raw mill, Plant Capacity-4600TPD.
Apr’01 to Mar’05
Role:
Sr. Engineer Mech.
Title:
Period
Both spillage (chain & scraper type) replace by belt Conveyor to control brake down, accident of apron
conveyor Aumund & Tangle
Apr’01 to Mar’05
Role:
Sr. Engineer Mech.
Title:
Period:
Erection & Commition of L.S. Crusher- 1000TPH & 1.6 KM Cross country Belt (garland)
Apr’01 to Mar’05
Role:
Sr. Engineer Mech.
Title:
Period:
Shift Operation & Shut Maintenance. Section kiln, Cooler, Raw Mill, Plant Capacity - 4600 TPD
Apr’98 to Mar’01
Role:
Engineer-I Mech.
Role:
Plant Engineer Mech.
PREVIOUS EXPERIENCE
Raymond Cement Works, Bilaspur
Jr. Engineer Mech.
Jun’93 to Apr’96
Shift Operation from L.S. Crusher to Packing Plant & Shut Maintenance Section kiln, Cooler & Raw mill, Plant Capacity-3300TPD
Dhār Cement Limited, Ditrict Dhar
Jr. Engineer Mech.
Jul’90 to Jun’93
Shift Operation L.S. Crusher to Packing Plant, Shut Maintenance Section kiln & Raw mill, Plant Capacity - 800TPD
ACADEMIC DETAILS
1989
1984
1981
Diploma in Mechanical (Production Engineering) from I.E.R.T. Allahabad
XII from The U.P.S.C, C.Intrer College. Dalla, U.P. Allahabad
X from The U.P.S.C, C.Intrer College. Dalla, U.P. Allahabad
PERSONAL DETAILS
Date of Birth:
Languages Known:
Present Address:
Permanent Address:
15th December
1966
Hindi & English
QR.NO.-E-03 ,Jaypee Nagar,Jaypee Rewa Plant, Rewa ,M.P., PIN-486450
Village –Bashdih, Post –Banshdih, P.S.-Bashdih , Distt-Ballia (U.P.)