TERQUIM SAN ANTONIO MAXIMUM NET RATES Validity: Since

TERQUIM SAN ANTONIO MAXIMUM NET RATES
Validity: Since February 18, 2016
CODE
TDL
TDC
TCL
TAR
TAA
SERVICE DESCRIPTION
Unloading of liquids(1)
Commercial storage of liquids
Loading of liquids (2)
Tank leasing
Tank leasing with inner lining
TAS
TCP
TDD
TTE
TLE
TPE
TAL
TCA
TDA
THH
Tank leasing with
insulation
Tank leasing with insulation and
heater
Heating of product
Loading of surplus
Transferring between tanks
Tank washing
Tank preparation
Laboratory analysis
Unloading from tanks to trucks
Loading from tanks to trucks
Use of plant after working hours
TDI
TCI
TEP
TAP
TDP
TCT
TBP
TLL
Unloading de Iso Tank
Loading from Iso Tank
Drumming
Drums storage
Dispatch and shipping of slops
Loading from drums to truck
Weighing scale service
Pipeline cleaning service
TAC
USD RATE
30
5
40
30
40
RATE UNIT
m3
m3/day
m3
m3/month
m3/month
40 m3/month
45 m3/month
60
35
10
10
10
150
10
10
250
30
30
10
50
600
3
1
3.000
Hour
m3
m3
m3
m3
Sample
m3
m3
Hour
m3
m3
Drum
Drum per week
Drum
Metric ton
Per unloaded
product
*These rates do not include IVA.
(1)
(2)
The rate of Unloading includes the commercial storage of the
liquids for the berthing time of the ship (time that passes
between the mooring of the first rope to the unmooring of
the last rope).
It is included on the Loading rate the commercial storage of
liquids for 72 hours before the mooring of the first rope,
in the Transferring area of the ship which is going to
receive the liquid, and also the berthing time of it.