Requirements Specification 1st and 2nd Fix Plumbing Installation Project Site Location Client Client Address Client Contact Client Phone Client Email New build dwelling – 3 storeys, 5 beds, 4 baths Land adjacent to 7 Lime Walk, Maidenhead, Berkshire, SL6 6QB Kingsacre Homes Ltd 7 Lime Walk, Maidenhead, Berkshire, SL6 6QB Malcolm Booker 0797 707 2262 [email protected] Requirements We are undertaking a new build and require a quotation for the following works on a supply and fit basis unless otherwise stated. Quote to exclude sanitaryware. Kitchen layout and final requirements are TBD but an estimate of requirements has been included in the figures below. Split the quote out between first fix and second fix since this has to be budgeted for in our cash flow. All works shall comply with all NHBC, Building Control, Gas Safe, and Thames Water requirements. Boiler Room (Second Floor Eaves) Description First Fix Second Fix Total First Fix Second Fix Total Supply and fit 2 x 40 CDI conventional boilers & roof flues Supply and fit 2 x CL250 HE mega flows Pipe up heating valves, boilers and mega flows Electric and wiring not included, to be completed by other contractors Ground Floor Description All copper pipes in screed to be covered by Denso tape – and insulation? Size up gas pipe & run gas stove 1st and 2nd fix Size up gas pipe & run gas fire in lounge 1st and 2nd fix Carcass hot and cold supplies on ground floor to kitchen and cloak room WCs and basins Supply and fit 2 x outside taps Fit 2 x sinks (not required in this quote – just run pipes ready to fit sinks) Fit 2 x dishwashers (not required in this quote – just run pipes ready to fit dishwashers) Connect cold feed to coffee machine, fridge, steamer, filtered drinking 81900739 1 of 3 31/07/2017 water & zip tap (not required in this quote – just run pipes ready to fit these items) Connect waste disposal tap (not required in this quote – just run pipes ready to fit these items) Fit water softener supplied by customer (moved from boiler cupboard to kitchen as this is a better location?) Supply and fit extractor fans to kitchen and WC (electrics by others) 1st and 2nd fix WC & basin taps, mastic where appropriate Run 28mm flow and return from boiler to the Underfloor Heating manifold in the kitchen then connect up to UFH when UFH is installed and passes pressure tests First Floor Description First Fix Second Fix Total First Fix Second Fix Total Second Fix Total Carcass hot and cold pipes 1st and 2nd fix family bathroom – 2 basins, 1 toilet, 1 bath, 1 shower, shower screens, towel radiator, mastic where appropriate 1st and 2nd fix master en-suite wet room – 2 basins, 1 toilet, 1 freestanding bath, 1 shower, shower screen, towel radiator, mastic where appropriate Supply and fit extractor fans to family bathroom and master ensuite (electrics by others) Supply and fit clothes dryer vent from family bathroom (electrics by others) 1st and 2nd fix washing machine in master bathroom Run 22mm flow and return from boiler to the Underfloor Heating manifold in family bathroom then connect up to UFH when UFH is installed and passes pressure tests Second Floor Description Carcass hot and cold pipes 1st and 2nd fix 2 x ensuites wet rooms – 2 basins, 2 toilets, 2 showers, 2 shower screens, 2 towel radiators, mastic where appropriate Supply and fit extractor fans to 2 x ensuites (electrics by others) Run 22mm flow and return from boiler to the Underfloor Heating manifold in the boiler cupboard then connect up to UFH when UFH is installed and passes pressure tests Under Floor Heating (assume 1st fix flow and returns are included above) Description First Fix Supply and fit poly-pipe under floor heating Supply controls and rooms stats to be wired up by other contractors Under floor heating to be fitted on all 3 floors (some others may need to change) Labour and materials Supply floor insulation and damp proof membrane Fit floor insulation and damp proof membrane 81900739 2 of 3 31/07/2017 Wastes Description First Fix Second Fix Total First Fix Second Fix Total First Fix Second Fix Total First Fix Second Fix Total First Fix Second Fix Total Connect onto soil wastes above ground Supply and fit four x soil pipes internally as per architect’s drawings with tile vents Connect into wastes from bathroom Run wastes into bathrooms Connect and run wastes to kitchen, WC, all bathrooms, boiler and Megaflow overflows as applicable. Generally Description Commission and test system (including pressure tests) Issue Gas Safe certificate Provide for future swimming pool area Description Carcass hot and cold pipes for WC, basin, shower, pool filler tap Consider the waste drainage requirements of these items in waste drainage design. Price Option Description Price option to fit (not supply) hot water solar panel Price option to supply and fit hot water solar panel Separate Quote to fit kitchen appliances Description Fit 2 x sinks Fit 2 x dishwashers Connect cold feed to coffee machine, fridge, steamer, filtered drinking water & zip tap Connect waste disposal tap Mastic where appropriate Price option to fit (not supply) hot water solar panel Price option to supply and fit hot water solar panel 81900739 3 of 3 31/07/2017
© Copyright 2024 Paperzz