IEC 61400-27 Electrical simulation models for wind power generation Poul Sørensen Risø DTU Roskilde Denmark Outline of this presentation 1. 2. 3. 4. 2 Scope Participants and meetings Status Timeline Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Scope of IEC 61400-27 • Define standard dynamic simulation model for wind power • Application: • Power system and grid stability analysis • Applicable for dynamic simulations of • Short circuits (fault ride through) • Loss of generation or load • System separation • 2 parts 1. Wind turbines 2. Wind farms 3 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Scope of IEC 61400-27 – part 1 • Wind turbine modelling must define: • Generic dynamic models for topologies / concepts on market • Methodology to create models for new concepts • Model parameters • Models refer to wind turbine connection terminal • Independence on simulation tool • To outmost degree • With clear definition of interface to simulation tool • Validation • Shall include tests according to IEC 61400-21 • Response to voltage dips • Set point requests 4 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Scope of IEC 61400-27 – part 2 • Wind turbine modelling must define: • Generic dynamic models for topologies / concepts on market • Auxiliary equipment • Wind farm control • Methodology to create models for new concepts • Models refer to wind farm point of common coupling • Independence on simulation tool • To outmost degree • With clear definition of interface to simulation tool • Validation 5 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 IEC TC88 NWIP – Votes Country Australia Belgium Brazil Canada China Denmark Finland France Germany India Italy Korea (Rep. of) Netherlands Portugal Romania Russian Fed. Slovenia Spain Sweden U.S.A. United Kingdom Status O O O P P P P P P P P P P P O O O P P P P Received 2009-03-12 2009-02-13 2009-03-13 2009-03-05 2009-03-12 2009-03-12 2009-03-13 2009-03-04 2009-03-06 2009-03-09 2009-03-10 2009-03-13 2009-03-09 2009-03-13 2009-03-04 2009-03-13 2008-12-16 2009-03-13 2009-03-13 2009-03-13 2009-03-12 Approving Y A A A A Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Participation CDV CD N N Y N N N N N N N N N N N N N N Y Y N Y Y N Y Y N N N N Y N N Y N N N N Y N N N Y N N Y N N N N Y N N N Y Y N N N N Y Y N Y Result Approval Criteria Comments Y Y Y - Number of P-members: 19 P-members voting: 13 P-members approving: 13 = 100 % P-members ready to participate in the development and approving addition of the proposal: 5 6 Risø DTU, Technical University of Denmark > 50% >=4 (if <=16) >=5 (if >= 17) APPROVED APPROVED TC88 meeting Boulder March 2010 Members • WG27 has now 33 members from 14 countries. • Wind power vendors, • Sub suppliers, • Consultants, Certification, • Research and University • Grid operators • Transmission System Operator (TSO) • Distribution System Operator (DSO). 7 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Complete members list of WG 27 • Michael Ebnicher, Bachmann electronic GmbH (AT) • Jens Fortmann, REpower Systems AG (DE) • Frank Fischer, PowerWind GmbH (DE) • Frank Martin, Germanischer Lloyd Industrial Services GmbH (DE) • Jeferson Marques, Enercon (DE) • Vladislav Akhmatov, Siemens Wind Power (DK) • Björn Andresen, Siemens Wind Power (DK) • Poul Sørensen, Risø DTU (DK) • Knud Johansen, Energinet.dk (DK) • Bo Hesselbæk, Vestas Wind Systems A/S (DK) • Montserrat Mata, ECOTÈCMOA / ALSTOM (ES) • Emilio Gómez Lázaro, UCLM Research Institute (ES) • Alberto Molina Martín, ENERGY TO QUALITY S.L. (ES) • Javier Pérez-Jacoiste, Gamesa (ES) • J. Manuel Rodrigo, EDP Renovaveis (ES) • Jouko Niranen, ABB (FI) • Slavomir Seman, ABB (FI) 8 Risø DTU, Technical University of Denmark • • • • • • • • • • • • • • • • Jerome Duval, EDF R&D (FR) Graeme Bathurst, TNEI Services Ltd (GB) Junji Kondo, AIST (JP) Kazuo Shibata, Japan Electrical Manufacturers' Association (JP) Hee-Sang Ko, Samsung Heavy Industries (KO) Seung-Ho Song, Kwangwoon University (KO) Edwin Wiggelinkhuizen, ECN Wind Energy (NL) Jarle Eek, SINTEF Energiforskning (NO) Larisa Vladimirovna Varigina, RusHydro (RU) Åke Larsson, Vattenfall (SE) Yuriy Kazachkov, Siemens PTI (US) Pouyan Pourbeik, Electric Power Research Institute (US) Abraham Ellis, Sandia National Laboratories (US) Nicholas Miller, GE Energy (US) Eduard Muljadi, National Renewable Energy Laboratory (US) Robert M Zavadil, EnerNex (US) TC88 meeting Boulder March 2010 Meetings • Meetings held: • 1st WG meeting Roskilde, Denmark 6-7 October 2009 • 2nd WG meeting Barcelona, Spain 27-28 January 2010 • Planned meetings • 3rd WG meeting New Orleans, USA, 20-21 April 2010 • 4th WG meeting Helsinki, Finland, 31. August – 1 September 2010 9 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Status • Focus document • Responds and agrees to secretariat observation ”the initial task of the project team shall be focussed on clear broader definition of the outline to establish consensus providing sound basis for their work” • Drafted between 1st and 2nd meeting and discussed on 2nd meeting • First priority of WG27 is to perpare Focus document specifying in more details: • Applicability and limits of models and validation procedures • Requirements to models and validation procedures • 1st working draft now under preparation for 3rd meeting discussion, it will include: • Introduction • Definitions and references • Applicability and limitations • Verification first draft 10 Risø DTU, Technical University of Denmark TC88 meeting Boulder March 2010 Timeline Below is the time frame for part 1. Part 2 will be initiated when right after 2011-06-30 when 1CD is submitted. Stage Document Decision date Proposal PNW Approved ANW Preparatory 88/334/NP 2008-12-12 88/347/RVN 2009-04-24 Preparatory Preparatory Preparatory Preparatory Risø DTU, Technical University of Denmark Proposed target date 2009-04-30 WD1 - finalise purpose and limitations - draft validation specidications WD2 – validation specifications – outline model specifications WD3 – draft first model specification(s) WD4 – draft all model specifications WD5 – final WD before CD Committee 1CD Enquiry CDV Approval FDIS 11 Official target date 2010-03-31 2010-06-30 2010-10-31 2011-01-31 2011-04-30 2010-06-30 2011-06-30 2011-04 2012-04 2012-01 2013-01 TC88 meeting Boulder March 2010
© Copyright 2025 Paperzz