LIST OF DOCUMENTS FOR RENEWAL / UP-GRADATION OF FIRMS (CONSTRUCTORS/OPERATORS) Sr. No. Documents to be submitted along with duly filled Application form in CAPITAL letters. Tick (√) Yes 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. Previous Original PEC License Original Fee payment voucher; a. On-line MCB Bank account: 0685583041005497 (Branch code 0069). b. On-line HBL Bank account: 00427901578603 (Branch code 0602). c. Foreign Currency account is in process. d. Payment through Demand Draft or Pay Order is not acceptable. Bank statement for last one year / Accounting record verified by Chartered Accountant/ Audited financial statement Following documents are required in support of newly employed Engineer / Supervisory Certificate holder(s):i) Copy of appointment letter duly signed by employer and engineer employed/agreement signed with Engineer holding Supervisory Certificate. ii) Detailed CV duly signed by Engineer(s) in original if not holding Supervisory Certificate. iii) Copy of valid PEC Renewal card of Engineer(s). iv) Bank Statement or Certificate from employer’s / employee’s Bank regarding transaction of salary into engineer’s account, duly supported with cross cheque / deposit slip/personal appearance of Engineer/copy of supervisory certificate. v) NTN of Engineer(s), if applicable / not applicable for Supervisory Certificate holders. In case of engineers of previous year application, following papers will be required:i) Copy of valid PEC Renewal Card of Engineer(s). ii) Bank Statement or Certificate from employer’s / employee’s Bank regarding transaction of salary into engineer’s account, duly supported with cross cheque / deposit slip/personal appearance of Engineer/copy of supervisory certificate. iii) NTN of Engineer(s), if applicable. In case of Engineer(s) is Owner/Shareholder/Partner:i) Undertaking by Engineer/Shareholder/Partner (Appendix-A). ii) Detailed CV duly signed by Engineer(s) in original. iii) Copy of valid PEC Renewal Card of Engineer (s). iv) NTN of Engineer(s), if applicable. i. The Affidavit on stamp paper of Rs. 100/- duly notarized and signed by the CEO/Chairman/Owner of the firm/company of the works in progress/completed along with their performance/satisfactory completion report (Appendix-B) ii. Affidavit from CEO/Chairman/Managing Partner or Director as per Appendix-C. Previous New Change of Ownership / Partnership / Shareholding Yes / No List of running / workable Machinery and Equipment owned by the company duly signed by CEO / Shareholder / Partner and contract agreement with machinery supplier, if any (Not applicable for C-6 to C-4) Enclosed Documents are page numbered from----------------to ---------------I undertake that above mentioned information/documents provided by the undersigned are correct to the best of my knowledge and belief and nothing has been concealed. Dated: __________________ Signature______________________ (CEO/Chairman/Managing Partner or Director) Note:- Please provide additional documents in support as per miscellaneous checklist against any change, if applicable. 1 No MISCELLANEOUS CHECK LIST (FOR UP-GRADATION) (IF APPLICABLE) 01. 02. 04. 05. 06. 07. 08. For change in ownership of firm i) Sole Proprietor i) Affidavit of sole proprietor ii) Transfer deed with attestation of first class magistrate (in case of change of sole proprietor) ii) Partnership Concern i) Duly attested copy of partnership deed ii) Form C/ H issued by respective Registrar of firms iii) Form D And Dissolution deed (in case of cancellation/change in partnership) iii) Private Limited i) Certificate of incorporation ii) Article of Association(AOA) iii) Memorandum of Association(MOA) iv) Form 29 v) Form A iv) Public Limited Co. / Public Limited Co. i) SECP Documents ii) Stock Exchange Documents v) Statutory Body i) Copy of notification issued by competent authority vi) In case of death of owner/shareholder/partner i) Death certificate of owner/shareholder/partner ii) Power of attorney attested by 1st class Magistrate iii) Transfer deed with list of heirs attested by 1st class Magistrate iv) No objection certificate from heirs v) Succession certificate vii) Readable copy of Identity Card of Owner/Shareholder(s)/partner in each above mentioned case Change in name of firm/address i) Request from owner/ shareholder/partner ii) Affidavit for change in name of firm/status iii) Newspaper clipping for change in name of firm iv) Documentary evidence in support issued by Registrar of firms/SECP(as the case may be) For addition of specialization codes i) Request for addition of code on official letter head ii) Detailed CV of engineer(s) showing experience relevant to the desired codes supported by experience certificates iii) Documentary evidence of Firms experience/work done relevant to desired codes iv) Original PEC Licence For consideration of works in private Sector i) Copy of Contract/agreement between Prime Constructor and Sub-constructor. ii) Performance Certificate from Consultant engaged with Constructor duly verified by employer or client. iii) Evidence of payments through cheques, bank statement and amount deducted as Income Tax thereof. iv) Amount of work awarded to sub-constructor within its limit specified in license. For issuance of duplicate licence i) Request from owner/ shareholder/partner ii) Affidavit for lost of licence of firm iii) Copy of FIR iv) Newspaper clipping For down gradation of firm i) Request on official letter head with desired category mentioned on it ii) Original PEC licence iii) Application on prescribed PEC form For closure of firm i) Request from owner/shareholder/partner ii) Affidavit for closure of firm iii) Original PEC Licence iv) Payment of all outstanding dues 2 PAKISTAN ENGINEERING COUNCIL Ataturk Avenue (East), Sector G-5/2, Islamabad UAN: 111-111-732 Fax: 051-2780346 E-mail: [email protected] URL: http://www.pec.org.pk FOR OFFICE USE ONLY Application Tracking No. Receiving Date Application form for Up-gradation as Constructor/Operator From C/O ___ to C/O _____ (To be filled in CAPITAL letters) Category: C or O Licence No. _________________ Valid upto 31/12/20____ (Attach Original Previous Licence) 1- Name of the Firm: ________________________________________2-NTN: 3- Name of CEO: ________________________________________________________________ 4- Mailing Address: ______________________________________________________________ ______________________________________________________________ YES Engr. Owner/Shareholder: YES NO Courier service availability: NO (Tick the appropriate box) (Tick the appropriate box) Mob: ___________________ Tele: _____________ Fax: ____________ E-mail: _______________ 5- Type of Ownership Individual Private Ltd Co. Public Ltd Co Others ____________________ Sole-Proprietorship SMC (Pvt) Ltd Co Partnership Statutory Body (Tick the appropriate box) Any Change, be described (Supported by legal Documents) ___________________________________ 6- Detail of Engineers employed by the firm: Sr. Name of Engineer PEC Reg. No. Renewed upto Year of birth Year of graduation Employed Since 1 2 3 4 Add separate sheet (if required) 7- Major works executed after previous Up-gradation: Year of Award Value of Work (Rs) %age of Completion Deptt / Org Description of Work 1 2 3 4 Add separate sheet (if required) (Attach copy of Work Order, agreement and Performance Certificate duly verified by Concerned Department) 8- Code(s) of specialization required: (Supported with documents and employment of relevant Engineer(s)) : ______________________________________________ _________________________________________________ 3 9- UNDERTAKING I undertake that; a) the information given above and documents/papers attached herewith are correct and accurate to the best of my knowledge and belief and nothing has been concealed. b) I will abide by the provisions of PEC Act 1976 and Construction & Operation of Engineering Works Bye-Laws 1987. c) I shall be responsible if any information, document or paper submitted by me is found incorrect or forged. d) I will inform the council if any of above mentioned engineer(s) leaves the firm. e) I will inform the council about any event taking place after grant of licence, which render our firm ineligible for continuation of licence, reduction in the category, suspension or cancellation of the licence as per Bye-laws 8(2). Company/Firm’s Seal Signature: _________________________ Name: _________________________ Mobile No: _________________________ Date: _______________ CNIC No. (CEO/ Chairman/ Managing Partner or Director) PENALTIES VIZ-À-VIZ THE NATURE OF MISCONDUCT Besides provisions stated in the PEC Construction & Operation of Engineering Works Bye-laws 1987, following penalties will be imposed. Nature of misconduct Penalty to be Imposed In case, a firm has executed work without having PEC license and 1. desires initial registration with PEC in Rs.250/- per day per PCP. any higher category other than C-6 category In case a firm submits an (i) Suspension of licence for 03 months on 1st occurrence 2. incorrect/fake affidavit of engineer to (ii) Suspension of licence for 09 months on 2nd occurrence PEC. (iii) De-registration of firm on 3rd occurrence). In case a firm submits fake/tampered (i) Suspension of licence for six months on 1st occurrence. 3. PEC Licence to any employee or (ii) Suspension of licence for one year on 2nd occurrence. PEC. (iii) De-registration on 3rd occurrence. In case a firm submits (i) Suspension of licence for six months on 1st occurrence. fake/forged/incorrect work order(s) or (ii) Suspension of licence for one year on 2nd occurrence. 4. performance certificate / report to (iii) De-registration on 3rd occurrence PEC. As decided by the Enrolment Committee, on case to case basis 5. Any other misconduct. under the provisions of PEC Act and Byelaws I fully understand the above mentioned penalties viz-à-viz the nature of misconduct. I shall be liable to punitive action taken by PEC in event of misconduct committed by me or the firm. Company/Firm’s Seal Signature: _________________________ Name: _________________________ Mobile No: _________________________ Date: _______________ CNIC No. (CEO/ Chairman/ Managing Partner or Director) 4 [For official use only] DECISION OF ENROLMENT COMMITTEE ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ CONVENER ENROLMENT COMMITTEE Prescribed fee of Rs. ……………………………………………. has been received and credited vide Receipt No. ……………………………. Dated ………….……………… Bank Draft No. ………………….. Dated ……………… Amount Rs .……………….. Signature of Accounts Official: _______________ Signature of Internal Auditor:______________________ Category: ______ Licence No:_________ Date of Approval : Licence Serial No: ___________________ Date of Issue _____ Valid Upto:31/12/20__ Initial of Section Incharge: Initial of Scrutiny Official : Registrar PEC 5 INSTRUCTIONS FOR FILLING IN APPLICATION FORM FOR UPGRADATION OF CONSTRUCTOR/OPERATOR LICENCE 1. Before filling in the application form, please see clause 4 and 8 of the Construction and Operation of Engineering Works Bye-laws, 1987 2. The annual application fee for all Constructor/Operator category licence, Financial Limits and PCP’s required for upgradation of licence is mentioned below, the evidence of payment should accompany the application form 3. For upgradation, the applicant for the constructor’s or operator’s licence shall submit application to the Council in the prescribed form. The application for renewal/upgradation shall be submitted to the Council by the 5th day of November of the year based on the constructor’s or operator’s status as on the 31 st day of October of the same year. The licence shall stand expired on 31st day of December each year. If the renewal is not submitted by 31st day of March, a surcharge of 2% will be levied. 4. A licensee shall inform the Council of any events taking place after grant of a licence to him or renewal thereof, which render him ineligible for continuation of licence in accordance with the clauses of aforesaid bye-laws. On receipt of such information, the Council may decide to reduce the category of licence or suspend or cancel the licence as it may deem fit. Sr. # 1 2 3 4 5 6 7 8 Sr. # 1 2 3 4 5 6 7 8 Constructors’ categories, Fee, Financial Limits and other Associated Parameters Fee (Rs) Limit of Fee (Rs) Minimum Requirement of (Foreign Category Construction Cost PCPs (Local Engineers Firms) of Project Firms) Two P.Es with 20 years of C-A No Limit 150 Rs.250,000/- Rs.1,500,000/Experience each + RE Two P.Es with 15 years of C-B Up to Rs.3000 M 100 Rs.200,000/Rs.750,000/Experience each + RE Two P.Es with 10 year of C-1 Up to Rs.1800 M 75 Rs.120,000/Rs.600,000/Experience each + RE C-2 One P.E + R.Es 30 Rs.100,000/Up to Rs.800 M Rs.400,000/C-3 One P.E + R.E 15 Rs.60,000/Up to Rs.400 M Rs.250,000/C-4 One P.E + R.E 10 Rs.40,000/Up to Rs.150 M Rs.150,000/C-5 One R.E 5 Rs.25,000/Up to Rs.50 M Rs.100,000/C-6 One R.E 5 Rs.15,000/Up to Rs.20 M Rs.50,000/Operators’ categories, Fee, Financial Limits and other Associated Parameters Limit of Fee (Rs) Minimum Requirement of Fee (Rs) Category Operational Cost of PCPs (Foreign Engineers (Local Firms) Project Firms) Two P.Es with 20 years of O-A No Limit 120 Rs.250,000/- Rs.1,500,000/Experience each + REs Two P.Es with 15 years of O-B Up to Rs.1500 M 75 Rs.200,000/Rs.750,000/Experience each + REs Two P.Es with 10 years of O-1 Up to Rs.900 M 50 Rs.120,000/Rs.600,000/Experience each + REs O-2 Up to Rs.400 M One P.E + R.Es 30 Rs.60,000/Rs.400,000/O-3 Up to Rs.150 M One P.E + R.Es 15 Rs.40,000/Rs.250,000/Rs.25,000/O-4 Up to Rs.75 M One P.E OR R.Es 10 Rs.150,000/Rs.15,000/O-5 Up to Rs.30 M One R.E 5 Rs.100,000/Rs.10,000/O-6 Up to Rs.15 M One R.E 5 Rs.50,000/- Note: A late fee @2% per month will be charged after 31st march of the current year subject to maximum of 18% of the annual fee. 6 Fee for up-gradation for constructor/operators firm Following fee shall be charged for up-gradation of the category of licence-: I. a. One step up fee of desired category; b. two steps up 2 times of desired category; c. three steps up 3 times of desired category; d. four steps up 4 times of desired category; e. five steps up 5 times of desired category; f. six steps up 6 times of desired category; Fee table for up-gradation (Constructors) Category C-6 To→ ↓From 15,000/C-6 (In Rupees) C-5 C-4 C-3 C-2 C-1 C-B C-A 40,000/- 95,000/- 195,000/- 415,000/- 615,000/- 1,350,000/- 1,765,000/- C-5 - 25,000/- 65,000/- 145,000/- 505,000/- 420,000/- 1,025,000/- 1,525,000/- C-4 - - 40,000/- 100,000/- 240,000/- 400,000/- 840,000/- 1,290,000/- C-3 - - - 60,000/- 160,000/- 300,000/- 660,000/- 1,060,000/- C-2 - - - - 100,000/- 220,000/- 500,000/- 850,000/- C-1 - - - - - 120,000/- 320,000/- 620,000/- C-B - - - - - - 200,000/- 450,000/- C-A - - - - - - - 250,000/- II. Fee table for up-gradation (Operators) Category O-6 To→ ↓From 15,000/O-6 (In Rupees) O-5 O-4 O-3 O-2 O-1 O-B O-A 40,000/- 95,000/- 195,000/- 415,000/- 615,000/- 1,350,000/- 1,765,000/- O-5 - 25,000/- 65,000/- 145,000/- 505,000/- 420,000/- 1,025,000/- 1,525,000/- O-4 - - 40,000/- 100,000/- 240,000/- 400,000/- 840,000/- 1,290,000/- O-3 - - - 60,000/- 160,000/- 300,000/- 660,000/- 1,060,000/- O-2 - - - - 100,000/- 220,000/- 500,000/- 850,000/- O-1 - - - - - 120,000/- 320,000/- 620,000/- O-B - - - - - - 200,000/- 450,000/- O-A - - - - - - - 250,000/- 7 REGISTRATION CATEGORIES, CODE AND SPECIALIZATION OF CONSTRUCTOR/ OPERATORS CATEGORY CODE SPECIALIZATION DESCRIPTION CIVIL ENGINEERING CONSTRUCTION (CE) CE01 Road and Pavements Drainage & Retaining Structure Construction of road and road reinstatement, pavement, bus bays, open car parks and related works such as kerbs, footways. Signcraft Installation Installation of an integrated sign posting system for complexes, airports, shopping centres, etc. Also includes setting up of exhibition stands and road signs. CE02 Airports Taxiways, runways, aprons, aircraft parking bays, baggage handling system, track transit system, etc. Construction of concrete, masonry, timber or steel bridges. Bridge Structures Piling CE03 Installation of all types of piling sheet piles, driven precast reinforced and prestressed concrete piles, bored cast in situ piles and timber piles etc. Construction of marine structure such as jetties, ports, wharves, harbours, sea and river walls offshore construction works etc. Marine Structures Dredging Underwater Works CE04 CE05 CE06 CE07 CE08 CE09 Dams/Water Retaining Structures Irrigation & Flood Control Systems Offshore Works Tunneling and underpinning Railways Tracks Earth work/dredging in canal, river and offshore. Offshore construction works including related works. Tunneling and underpinning works. Installation of railway tracks, distressing of rails and tracks. Installation, maintenance and repair of oil and gas pipelines. Sewerage pipelines, disposal works, sewerage treatment works and allied works. Oil and Gas Pipe Lines Sewerage Works Water Supply CE10 Underwater construction works and maintenance of underwater construction works. Construction of water retaining structure such as dams, reservoirs, aqueducts, treatment plants, pipe laying works etc. General Civil Engineering Works 8 Installation, maintenance and repair of water supply pipelines, pumping stations, tube wells, water treatment works etc. General civil engineering works, including earthworks, sub-soil drainage, etc. Slope Protection System Slope protection works. Concrete Repairs Reinforcement of structures by way of pressure grouting, guniting, etc. Soil Investigation and Services include sampling, investigation Stabilization and testing services to determine soil classifications, strength and composition. Also includes soil stabilization works such as micro piling, ground anchoring, sand drains and ground grouting. BC01 MECHANICAL ENGINEERING (ME) Landscaping & Horticulture Provision of Landscaping services including tree planting, turfing, horticulture etc. Reclamation Works Reclamation works. General Buildings and Maintenance General building works, including fixing partitions, roofing and general maintenance of buildings. Waterproofing Water proofing of basement, roofs and walls. Construction of buildings and industrial plants using prefabricated components and systems. Construction of steel framed buildings and industrial plants. Prefabricated Buildings and Steel Framed Buildings and Industrial Plants BC02 Airports Terminal buildings, Satellite buildings, cargo terminals, air traffic control towers, contact piers, passenger loading bridges. Building restoration and conservation. ME02 Fire Prevention and Protection System Installation, Commissioning maintenance and repairs of air conditioning, refrigeration, cold rooms and ventilation system. Installation and maintenance of fire alarms, prevention and protection systems. Restoration and Conservation BC03 High Rise Buildings ME01 HVAC ME03 Lifts and Escalators 9 Installation, commissioning and maintenance of lifts, escalators, travel lators and conveyor systems Compressor Generators ME04 Building Automation System ME05 Workshop, Mill, Quarry System Installation, maintenance and repair of centrifugal compressor, reciprocating compressor, air compressor, skid, rotary compressor, pipeline valves, blowers, liquid ring compressor, gas turbine generator, steam generator, diesel generator, solar photometric, water turbine generator and hybrid system. Building automation, industrial and process control systems, include installation and maintenance of microprocessors or computer based building control systems and industrial process control systems. Installation, commissioning and maintenance of workshop, mill and quarry systems such as cranes, hoist, crushing and screening plant, asphalt mixing plant, etc. Erection, maintenance and repair of exhaust stocks, tanks, reactors, separators, filters, scrubbers, dehydrators, evaporators, pipings, furnaces, grit blasting and painting, hot and cold insulation, flare system, bearing and welding. ME06 Specialized Fabrication and Treatment Medical Equipment Installation, commissioning and maintenance of medical equipment such as: - Kitchen and Laundry Equipment Compressed air systems Hot water installation Sterilizer and autoclave Medical gas installation Hydrotherapy system Dental chair Mortuary refrigerator etc. Installation, commissioning and maintenance of cooking and kitchen equipment, laundry equipment, etc. Installation, commissioning maintenance and repair of boiler plant, heat exchangers, absorption chillers, unfired pressure vessels and hot water systems, etc. Heat Recovery System Pollution Control System Landfill technology, separators. Miscellaneous Mechanical Equipment Installation, testing commission, maintenance and repair of mechanical based systems such as pumping installation, sewerage treatment plant installation, water treatment plant installation, rotary pumps, reciprocating pumps, centrifugal pumps 10 incinerator, oil and special purpose pumps, etc. ELECTRICAL ENGINEERING (EE) Chiller for Power Generation Installation, maintenance and repair of gas turbine driven chiller, steam turbine driven chiller and centrifugal chiller. Specialized Plant Erection, maintenance and repair of compressor station, metering station, onshore terminal station, co-generation plant, gas processing plant, petrochemical plant, oil refinery, aviation re-fuelling and de-fuelling system, petrol station, heating ventilation and air-conditioning. Public address system, audiovisual system, conference system, intercom system and MAT. Installation and maintenance of security, safety and surveillance systems (security, alarm, car park security control and card access control systems. CCTV, sensor/detection system, vibration monitoring system, gas protection system, platform alarm system, aircraft warning system, fire protection system and earthing and lighting protection. Building Automation, industrial and process control system, included installation and maintenance of microprocessors or computer based building control systems and industrial process control systems, includes installation and maintenance of energy generation systems General wiring and control system wiring works not exceeding 1 KV. Installation and maintenance of low tension overhead lines and underground cabling not exceeding 1KV. Also includes installation and maintenance of generating plant and equipment not exceeding 1 KV. Installation and maintenance of high voltage equipment and underground cabling, high-tension overhead line including transmission tower exceeding 1kV. Also includes installation and maintenance of generator plant and equipment exceeding 1KV. Installation and maintenance of street lighting, stadium floodlighting, traffic lighting, airfield lighting, high mast lighting installation, laser system, stage lighting, special effect lighting, navigational aid, underwater lighting, platform lighting, petrochemical plant lighting, oil refinery plant lighting, etc. EE01 Sound System EE02 Security, Safety Surveillance System EE03 Building Automation System and Energy Generation System EE04 Low Voltage Installation EE05 High Voltage Installation EE06 Specialized Lighting System 11 ELECTRONICS ENGINEERING EE07 Telecommunication Installation EE08 External Telecommunication Works EE09 IT & Software Engg EE10 Miscellaneous Specialized Any other works* Telephone cabling and internal ducting, radio based communication system, PABX, microwave system, multiplex and signaling troposcatter system, satellite system, radar surveillance system, data communication equipment, remote subscriber system, vessels and navigational specialized system, etc. Telecommunication cabling (underground/ overhead), manholes, underground ducting/pipes. Installation, commissioning and maintenance of surgical/operating theater table and lights, radiography equipment, radiotherapy equipment, nurse call system, electronic scoreboard, uninterruptible power supply (UPS) system, etc. Any work not covered in above categorization and description relevant to any engineering discipline. *Provide herein code(s) (CE11, BC04, ME07, EE11) as applicable and define work. *Note: Following code will be awarded to C-6/O-6 firm on demand, if they provide agreement with engineer holding supervisory certificate:Code C-6(11) i) All types of repair / maintenance works ii) Minor construction works along with allied Electrical, Mechanical, Water supply, Sanitary, Plumbing works iii) Minor road works including culverts Code O-6(11) i) ii) All types of operational works Toll collection, operation and management works APPENDIX – ‘A’ UNDERTAKING BY ENGINEER OWNER/SHAREHOLDER/PARTNER (The affidavit would be on Rs.10/- stamp paper duly notarized) I, Engr. ________________________________ bearing PEC Regn No.___________ am a. Sole proprietor OR 12 b. Partner with _____ % share (s) OR c. Shareholder with ____ % share (s) of the firm M/s. ___________________________________________________________ to be registered with PEC as Constructor / Operator in category C/ O._______. Signature: ________________________________ Name of Engr______________________________ CNIC No: _________________________________ PEC Reg. # _______________________________ Contact No________________________________ Date: ____________________________________ 13 APPENDIX – ‘B’ UNDERTAKING FROM CEO / CHAIRMAN / MANAGING PARTNER OR DIRECTOR (The affidavit would be on minimum Rs. 10/- stamp, issued in the name of undersigned duly notarized with Notary Public) I, Mr. ____________________ S/o _______________ adult resident of _____________ do hereby solemnly affirm on oath as under: That I am CEO / chairman / Managing Partner or Director of the firm “M/s. ___________________________________________________________”. That the name of my firm is not struck off or black-listed from any department. That there is no litigation in the Court or any other department (i.e. Public / Private) against the firm That I on behalf of my firm shall always abide by the rules and regulations of Pakistan Engineering Council. That the contents of the above mentioned affidavit are true to the best of my knowledge, belief and information and nothing has been concealed by me. DEPONENT Signature: _________________________ Name_____________________________ CNIC No: _________________________ Dated: ____________________________ APPENDIX – ‘C’ 14 The Registrar, PEC, HQ, Islamabad Subject: Registration with PEC as Constructor/Operator in Category C/O. ______. Dear Sir, Please register my firm in accordance with PEC Construction & operation of Engineering Works Bye-laws 1987 with name and style M/s…………………………………………………………………………………………………. If a firm with name requested above is already registered with PEC, either of the following names may be considered as an alternate for registration, which will be acceptable to me. a. First Choice: M/s ……………….……………………………………………… b. Second Choice: M/s ……………………………………………………………. c. Third Choice: M/s ……………………………………………………………..… Signature: ……………………………. Name of Owner: …………….……….. CNIC No of Owner: .....………………. Dated: ………………………………… 15 APPENDIX – ‘D’ PERFORMANCE CERTIFICATE (For each major work during last three years) NAME OF EMPLOYER: __________________________________________________ NAME OF PROJECT: ____________________________________________________ NAME OF CONSULSTANT (IF EMPLOYED): _________________________________ STARTING DATE: _________________ ORIGINAL COMPLETION DATE: _________________ ACTUAL COMPLETION DATE: ___________________ DELAY PERIOD: ______________________________ LIQUIDATED DAMAGES: ________________________ ORIGINAL CONTRACT VALUE: ___________________ VALUE OF WORK DONE UPTO FINAL BILL: _________ PERCENTAGE OF WORK DONE WITH DATE: _______________________________ ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK Sr. Name of Engineer Date of Birth PEC Reg. No. Date of Reg Renewed upto Employed From Employed To 1 2 3 4 QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER To be filled by contractor Name of Owner/ Share holder:__________________________ Mobile No: ___________________________ Signature: ____________________________ Date: __________________________________ To be filled by employer Name & designation of employer :_______________________ Fax No: ___________________________ Mobile No: _________________________ Date: _____________________________ Official seal/stamp Company seal/stamp 16 APPENDIX – ‘E’ PERFORMANCE CERTIFICATE (For each major work in hand) NAME OF EMPLOYER: ____________________________________________________ NAME OF PROJECT: _____________________________________________________ NAME OF CONSULSTANT (IF EMPLOYED): ___________________________________ STARTING DATE: _________________ ORIGINAL COMPLETION DATE: _________________ ACTUAL COMPLETION DATE: ___________________ DELAY PERIOD: ______________________________ LIQUIDATED DAMAGES: ________________________ ORIGINAL CONTRACT VALUE: ___________________ VALUE OF WORK DONE UPTO FINAL BILL: _________ PERCENTAGE OF WORK DONE WITH DATE: __________________________________ ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK Sr. Name of Engineer Date of Birth PEC Reg. No. Date of Reg Renewed upto Employed From Employed To 1 2 3 4 QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER To be filled by contractor Name of Owner/ Share holder:__________________________ Mobile No: ___________________________ Signature: ____________________________ Date: __________________________________ To be filled by employer Name & designation of employer :_______________________ Fax No: ___________________________ Mobile No: _________________________ Date: _____________________________ Official seal/stamp Company seal/stamp 17 APPENDIX – ‘F’ UNDERTAKING OF CHANGE OF NAME/STATUS (The affidavit would be on Rs.10/- stamp paper and attested by a First Class Magistrate/Oath Commissioner) It is requested that I/we ------------------------------------------------------------------------------------Owner/Partner(S) of M/s -----------------------------------------------------------------------------------Address --------------------------------------------------------------------------------------------------------want to change the name/status of my/our firm to state that: My/our previous firm M/s ----------------------------------------------------------------------------------Address --------------------------------------------------------------------------------------------------------has not been blacklisted by any department and has no liability from any department/financial institution. If any, such liability is detected by any department/financial institution at any stage, I shall be responsible for the same. Reason(s) for change of name/status is ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Name of Contractor:________________________ Name of Partner(s)/Director(s) :_______________ CNIC No. ________________________________ Contact No: ______________________________ Permanent Address: _______________________ ________________________________________ Dated: ___________ Signature: __________________________ 18
© Copyright 2025 Paperzz