Application of GridEye for Network Planning This document provides a use case for the application of GridEye measurements for the distribution network planning. GridEye modules primarily measure the electrical quantities and process the measurements using the distributed intelligence on every module. Thus, only useful data for the system operators and/or end-customers are communicated and stored. In this way, the high communication costs and big data issues are avoided. The transmitted data are analyzed on the server for which they can be used for the network planning studies. The addition of production and consumption in the grid needs to receive particular attention from the distribution system operators. Suitable decisions should be taken for the network planning in order to guarantee the secure and reliable operation of the grid. Based on the GridEye measurement, a network planning approach is developed for determining the maximum additional consumption and production that can be installed at every node of the grid. The developed approach allows comparing different solutions with each other and supports the system operators to take an appropriate decision for each specific grid. Author: Omid Alizadeh-Mousavi Date: March 8th, 2017 © DEPsys SA Application of GridEye for Network Planning 1 1. INTRODUCTION OF THE USE CASE AND GRIDEYE INSTALLATION The grid topology of the use case and the installation of GridEye modules are shown in Figure 1. The electricity consumptions in the grid are mainly residential and agricultural. Moreover, there are PV installations at three locations shown by G1, G2 and G3. In this use case, the distribution system operator is interested in monitoring of the low voltage grid and then using the measurement data for the network planning studies. In other words, the system operator can effectively utilize these measurements to determine extra production and consumption that can be added at every node while the secure operation of the grid is taken into consideration appropriately. Figure 1. The use case and the installation of GridEye modules. The installations of GridEye modules at MV/LV transformer as well as on distribution cabinets are demonstrated in Figure 2. a) MV/LV transformer b) Rogowski coils for the current measurements at transformer LV side c) Distribution cabinet d) PV power plant Figure 2. Installations of GridEye modules. Application of GridEye for Network Planning 2 2. NETWORK PLANNING USING GRIDEYE MEASUREMENTS A year of voltage, current, and power measurements provided by GridEye are used for the network planning studies. At first, the current situation of the network is studied by analyzing the maximum and minimum nodal voltage levels as well as the maximum loading levels of cables and transformers in the energy production and consumption sides. This information is used for identifying the critical points of the grid from the voltage and loading levels perspectives. Based on these statistics, the maximum consumption and production that can be added at every node is determined while the secure operation of the grid is guaranteed. Furthermore, the developed network planning approach allows the system operators evaluating the value of several alternative solutions, including i) upgrade of transformer / cable, ii) taking a certain level of overloading risk for of transformer / cable, and iii) deploying GridEye optimal control. 2.1. Analysis of current situation Based on GridEye measurements and the statistical analysis, we identify the important information related to the current operation of the grid, including: the maximum and minimum voltage levels at every node and the maximum loading levels of cables and transformers for the consumption and production sides. This important information about the current situation of the grid is presented in Figure 3 which demonstrates the critical points of the grid. For this use case, the transformer has reached to its maximum loading in the consumption side and the voltages of node 101 and 102 have almost reached to the maximum allowed voltage level. The rest of the loading and voltage levels are within acceptable ranges. Moreover, Figure 3 allows distinguishing the available margins for the loading of transformer / cables at consumption and production sides as well as for the voltages of the nodes. Figure 3. Important information related to the current situation of the network. This information is used in the developed network planning approach to support the system operators for determining the additional consumption / production that can be added at every node such that the technically secure operation of grid is guaranteed. Application of GridEye for Network Planning 3 2.2. Network planning approach 2.2.2. The developed network planning approach is based on the provided statistics from the GridEye measurements. In this respect, further consumption and production that can be added at every node of the grid are investigated in following subsections. The addition of production increases the loading of transformer / cables in the production side and increases the maximum voltage level of nodes. In the developed network planning approach, the impact of the new production on the maximum loading of transformer / cables and the maximum voltage level of nodes are taken into consideration. Thus, the system operator can decide about the additional production that can be added at every node without deviating the voltage and current limits. 2.2.1. Addition of consumption The addition of consumption increases the loading of transformer / cables in the consumption side and decreases the minimum nodal voltages. In the developed network planning approach, the impact of the new consumption on the maximum loading of transformer / cables and the minimum voltage level of nodes are taken into consideration. Therefore, the system operator can determine the maximum additional consumption that can be added at every node without deviating the voltage and current limitations. Moreover, the system operators may permit additional consumption by allowing the overloading of their assets for a short period of time and taking a certain amount of overloading risk. The overloading risk is effectively quantified using the statistics provided by GridEye measurements. For instances, for the use case shown in Figure 1, further consumption cannot be added without causing overloading at the transformer since the transformer has already reached its nominal capacity. However, as mentioned earlier, the system operator can permit additional consumption in the grid by accepting a certain level of risk. The risk is presented as the sum of the products of the overloading level and the corresponding number of hours. It should be noted that the maximum additional consumption is the minimum of the values corresponding to the risk level and the voltage limits. For instances at node 102, the consumption of 20 kW can be added by allowing the transformer’s loading up to 110%. Nevertheless, even by allowing the transformer’s loading up to 140% the consumption cannot be added more than 60 kW at this node due to the voltage limitation. It is worth noting that the upgrade of the transformer is an alternative solution which is expensive and allows increasing the additional consumption in the grid. The impact of the transformer upgrade on the increase of consumption can be also analyzed through the developed network planning approach. Addition of production Moreover, the system operators may permit additional production by allowing the overloading of their assets for a short period of time and taking a certain amount of overloading risk. The overloading risk is effectively quantified using the statistics provided by GridEye measurements. The alternative expensive solution is the upgrade of the assets for increasing their thermal limits and improving the voltage stability. The impact of the transformer upgrade on the maximum additional production can be also analyzed through the developed network planning approach. Furthermore, the optimal control of GridEye can be deployed to increase the maximum additional production that can be installed. Using the GridEye optimal control and curtailment of a small amount of production for a short period of time in the case of overvoltage and/or overcurrent ensures the secure operation of the grid with the additional production. Therefore, the benefit from the installed production is achieved for most of the time while the secure operation of grid is ensured and high grid reinforcement expenditures are avoided. For the use case shown in Figure 1, the additional production that can be added to every node of the grid is limited by the upper voltage limit (i.e. +10%). It should be noted that the maximum additional production, in general, is the minimum of the value corresponding to the risk level and the upper voltage limit. For instances at node 102, taking high level of overloading risk does not allow increasing the additional production above 4 kW due to the upper voltage limit. Application of GridEye for Network Planning 4 2.2.3. Network planning for neighbourhood Transformer is allowed to be operated up to 120% of its nominal capacity Figure 4. Additional production and consumption at every node of the network. The described method for determining the consumption and production that can be added at every node is deployed for all the nodes of the use case in Figure 1. Figure 4 shows the additional production and consumption that can be added at every node of the network while the voltages remain within the limits and the transformer is operated up to 120% of its nominal capacity. Note that the given values in Figure 4 indicates the amount of consumption / production that can be added for every node independent of other nodes. For instances, the addition of 42 kW of production in node 104 raises the voltage of this node to its upper limit without additional production at other nodes of the network. Similarly, for the consumption side, by adding 45 kW of consumption at node 104 the network reaches to its limit, without additional consumption at other nodes. For this network, it is observed that the transformer loading is the limiting factor for addition of consumption, whereas the upper voltage limit is the binding factor for additional production. Figure 5. Existing voltage distribution at node 102 (left), voltage distribution at node 102 by adding 20 kW of production (right). Application of GridEye for Network Planning 5 2.2.4. Advantages of GridEye control for network planning The GridEye capability to control the productions / consumptions can provide important advantages for the network planning through the management of voltages and congestions, and consequently postponing of expensive grid reinforcements. For instances, the distribution of voltage at node 102 for one year of measurements is shown in Figure 5left. Adding 20 kW of production at this node results in the new voltage distribution shown in Figure 5-right. It is observed that the new voltage distribution deviates the upper voltage limit (i.e. +10%) for a small number of hours. The GridEye optimal control can be used to curtail the production at the instances when the voltage is higher than the allowed limits. In this way, the 20 kW production can be installed at node 102 and the owner can benefit from its installation while the system operator is ensured about the secure operation of grid without high grid reinforcement expenditures. For more information please contact: DEPsys SA Route du Verney 20B 1070 Puidoux, Switzerland Phone : +41 21 546 23 05 Omid Alizadeh-Mousavi R&D Director [email protected] Antony Pinto Electrical Engineer [email protected] Joël Jaton Chief Technology Officer [email protected] www.depsys.ch Application of GridEye for Network Planning 6
© Copyright 2026 Paperzz