E4011 V16 rev Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project Ruijin City Mianjiang River (Lucao Lake) Wetland Protection and Utilization Subproject Environmental Codes of Practice For Wetland Protection and Rehabilitation Institute of Poyang Lake Eco-economics, Jiangxi University of Finance and Economics Beijing Huaqing Lishui Environmental Technology Co., Ltd. Environmental Engineering Technology Development Center, Jiangxi Academy of Sciences September 2012 Ⅰ Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation TABLE OF CONTENTS 1 FOREWORD ............................................................................................................ 1 2 MAIN ENGINEERING CONTENTS .................................................................. 1 3 KEY POINTS OF BIDDING FOR DESIGN ......................................................... 2 4 ENVIRONMENTAL CODES OF PRACTICE IN CONSTRUCTION PERIOD ....................................................................................................................................... 3 4.1 SITE ARRANGEMENT AND TEMPORARY FACILITIES CONSTRUCTION................................................ 3 4.2 SURFACE WASTE R ENVIRONMENT QUALITY MANAGEMENT .......................................................... 3 4.3 SOLID WASTE ENVIRONMENT QUALITY MANAGEMENT .................................................................. 4 4.4 ECOLOGICAL RESOURCES PROTECTION AND MANAGEMENT ........................................................... 4 4.5 OCCUPATIONAL HEALTH.................................................................................................................. 5 4.6 MANAGEMENT AND MAINTENANCE ................................................................................................ 6 APPENDIX 1 CHECKLIST OF ENVIRONMENTAL PROTECTION AT CONSTRUCTION SITE ................. 8 MAP 1 GEOGRAPHIC LOCATION MAP ............................................................................................ 13 MAP 2 PROCESS FLOW CHART OF WETLAND PROTECTION AND REHABILITATION WORKS .......... 14 Ⅰ Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation 1 Foreword World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project is a demonstration project of Jiangxi Province, which aims to promote the harmonious development of ecological protection and urban construction, to improve urban and rural infrastructure, and to accelerate the urban and rural integration of the province by introducing international experiences with loan project as carrier, and according to Chinese urbanization development strategy as well as the urbanization demand of Jiangxi Poyang Lake Basin and Ecological Economic Zone. This annex includes the specific environmental impact analysis and corresponding Environmental Codes of Practice for the wetland protection and rehabilitation scheme involved in Ruijin City Mianjiang River (Lucao Lake) Wetland Protection and Utilization Subproject under the World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project; and together with the Environmental Codes of Practice for Small Civil Works (Annex 1.1), it forms complete Environmental Codes of Practice for wetland protection and rehabilitation works. In preparing this ECOP, we made reference to Detailed Rules of Jiangxi Province on Safe Construction, EHS Guidelines and safeguard policies of the World Bank and Technical Specifications for Constructed Wetland Wastewater Treatment Works of the Ministry of Environmental Protection. For the geographic location, please refer to Figure 1. 2 Main Engineering Contents Main engineering contents of wetland protection and rehabilitation works under Ruijin City Mianjiang River (Lucao Lake) Wetland Protection and Utilization Subproject are shown in Table 1-1. Table 1-1 Main Engineering Contents of Wetland Protection and Rehabilitation Works Code 1 Component Name Brief introduction of Works Wetland protection and purifying area in the upstream of Mianjiang River (Rentian wetland purifying, protection and utilization area) It is planned to construct ecological wetland and shoal rehabilitation works in the reasonable utilization area of Gaoxuan Village, and to restore wetland in shrubbery, thick growth of grass, and shoal. The project will take in waste r from Mianjiang River, and purify the waste r up to the quality standard of this river section. The ecological wetland planned to construct covers a land of 9.5ha, and has a hydraulic load of q=0.1m3 / m2・d. On the overflow land which covers a large area and does not affect flood drainage in riverway, native tree species will be adopted for protection and rehabilitation of forest and shoal wetlands, such as pond cypress, dawn redwood, 1 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Chinese ash, Sapium sebiferum, and some berry trees. The trees shall be planted according to professional afforestation design. 2 Wetland ecology restoration and utilization area in the middle and lower reaches of Mianjiang River (Yeping wetland purifying, protection and utilization area) It’s planned to construct artificial ecological wetland at Xinyuan Village, Yeping Town. The project will take in waste r from Mianjiang River and its tributaries, and purify the waste r up to the quality standard of this river section. The ecological wetland planned to construct covers a land of 195ha, and has a hydraulic load of q=0.1m3 / m2・d. By arranging floating plants, floating-leaved plants, submerged plants and emergent aquatic plants, etc., the ecological wetland and shoal rehabilitation works will have a vegetation coverage ratio of at least 70%. 3 Key Points of Bidding for Design At each stage of construction design, the construction design unit shall bring forward relieving measures aiming at potential negative environmental impacts. Precisely, it shall carry out environmental impact assessment and compile the environmental codes of practice at the stage of feasibility study; shall fulfill the environmental impact assessment document and the environmental protection measures set forth in the environmental codes of practice at the stage of preliminary design; and shall design the environmental protection works according to the opinions on preliminary design at the stage of construction design. The following key points shall be emphatically considered in design: 1) Site selection for the wetland protection and rehabilitation works shall meet the requirements of local urban overall development planning and environmental protection planning, as well as local requirements on waste r pollution prevention and control, waste r resources protection, and natural ecology protection; and shall also consider the factors like traffic, land ownership, and current land use state, etc. comprehensively. (2) The site selection for wetland sewage treatment works shall consider natural background conditions, including land area, landform and topographic feature, soil, meteorology, hydrology, animals and plants, and other ecological factors, etc., and shall be executed after investigation on geology and hydrogeology, etc. (3) The site for the wetland protection and rehabilitation works shall not be threatened by flood, tide waste r or waste rlogging. (4) The distance of the site for the wetland protection and rehabilitation works from residence shall meet the requirements of health protection, and shall be affirmed through environmental impact assessment and environmental risk assessment. (5) Landscapes under the works shall be constructed in line with the principles of 2 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation being harmonious, natural and balanced, and by comprehensively considering the contour of artificial wetlands, the arrangement of different types of artificial wetlands, the deployment of aquatic plants, the design of waste r-body landscapes in artificial wetlands, and the construction of auxiliary facilities along the bank of artificial wetlands, etc. (6) The plants for the wetland protection and rehabilitation works shall be selected according to their pollution resistance, growing ability, development degree of root system, as well as economic and aesthetics value, etc.; meanwhile, local varieties of plants shall be adopted to ensure the adaptation to local climate. New foreign and invaded varieties of trees shall be introduced. (7) For the wetland protection and rehabilitation works, the emergent aquatic plants available to select include reed, waste r bamboo, scirpus tabernaemontani, calamus, bulrush, and bog rush, etc.; floating plants include eichhornia crassipes, duckweed, and lotus, etc.; and submerged plants include waste rweed, waste r nymph, hornwort, and black algae, etc. The wetland protection and rehabilitation works may select one or several kinds of plants as dominant species, plant them in pairs or groups, and arrange the spatial and time distribution as per certain proportion according to the characteristics of ambient conditions and phytocoenosis, in order to meet the requirements of high-efficiency operation and stable & sustainable utilization of ecological system. 4 Environmental Codes of Practice for Construction Period 4.1 Site Arrangement and Temporary Facilities Construction (1) Wetland protection and rehabilitation works shall be arranged reasonably and compactly according to the functional and process requirements of artificial wetland, by making the best of the beneficial conditions of natural environment, considering the landscape function of constructed wetland in the project area as well as the planning for recycling of artificial wetland, and combining with the factors like landform, wind direction, geological conditions, and sanitary protection distance, etc. (2) Production management buildings and living facilities shall be arranged collectively at possibly reasonable position and orientation, and shall be kept a certain distance from processing structures. (3) Select proper plants for greening according to local natural conditions. The greening coverage ratio shall meet the requirements of local urban regulations. (4) Consider whether the height of wetland plants is harmonious with landscape in other components of the works. 4.2 Surface Waste r Environment Quality Management During the construction of wetland protection and rehabilitation works, the main factors affecting the surface waste r are the construction camp, building materials storage yard, construction personnel’s domestic sewage, waste oil from construction, and soil loss, etc. Aiming at the abovementioned influential factors, the paper brings 3 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation forward the following drainage control measures: (1) Construction camp and building materials storage yard, etc. must built up possibly away from surface waste r bodies like wetland, etc., and common building materials that must be stacked temporarily nearby waste r bodies actually upon the demand of works construction must be protected with a cover and enclosure. (2) We shall set up an oil separator in dining hall, and entrust a garbage collection unit to clear away the garbage in time. Here, the garbage collection unit shall hold the certificate of qualification for waste disposal and the business license issued by relevant departments. At construction camp, there shall be an temporary toilet with septic tank, and the septic tank of the temporary toilet shall be subject to seepage prevention treatment. Also, there shall be drainage ditch and sedimentation tank. The sewage pipeline of dining hall, washroom and shower room shall be equipped with filtering net, and construction sewage shall be subject to sedimentation prior to being drained into municipal sewage pipe network or river; and meanwhile, the drainage ditch shall be guaranteed to be clean and smooth. (3) Construction personnel’s domestic solid waste shall not be thrown away at random, or poured into the waste r bodies along the line, but must be collected and disposed periodically by environmental protection department. (4) Waste oil and other solid waste arising from construction shall never be poured or thrown into or stacked nearby waste r bodies, but shall be cleared and transported to specified place in time. 4.3 Solid Waste Environment Quality Management Solid waste in construction period are mainly construction garbage and domestic solid waste. Aiming at the characteristics of solid waste arising from construction project, this paper brings forward the following discharge control measures: Construction garbage and domestic solid waste shall not be thrown away at random or poured into waste r bodies along the line, but must be collected and disposed periodically by environmental protection department. 4.4 Ecological Resources Protection and Management The main works of wetland protection and rehabilitation is to arrange floating plants, floating-leaved plants, submerged plants and emergent aquatic plants, etc. in newly constructed natural ecological wetland, in order to ensure a vegetation coverage ratio of at least 70% of the ecological wetland protection and rehabilitation works. The main factors affecting ecological resources include the selection of species, the planting time of vegetation, and the planting density, etc. The main measures taken include: (1) The design of wetland protection and rehabilitation works shall increase the diversity of plants, raise their performance of sewage treatment, and extend their service life at the largest degree. (2) The planting soil for wetland protection and rehabilitation works shall be of clay~ doras and 20cm ~ 40cm in thickness, and have a permeation efficiency of 4 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation 0.025cm/h~0.35cm/h. It is available to adopt local surface-layer planting soil nearby. In case local raw soil is inapplicable to the growth of plants in artificial wetlands, it may be replaced. (3) The planting/ transplanting of plants under wetland protection and rehabilitation works includes the transplanting of seedling, the breeding of seeds, the transplanting of harvested plants, and the planting of pot culture, etc. (4) The best time for planting of plants under the wetland protection and rehabilitation works is spring or early summer, and planting in late summer or early autumn is also available. In case of starting constructed wetlandin the first year of planting, we may execute planting 3-4 months ahead of the ending of growing season or the coming of frost period. (5) The transplanting density of plants under the wetland protection and rehabilitation works shall be at least 3 plants /m2, and the planting density in subsurface flow constructed wetland shall be 9 plants/m2~25 plants/m2. 4.5 Occupational Health The construction unit and supervisory institution shall have the responsibility to take all reasonable measures to protect the workers and buildings nearby from accidental injuries, and ensure their safety. For the wetland protection and rehabilitation works, we shall employ a contractor who has the ability to manage its employees’ occupational health and safety, and shall make the contractor execute the enterprise’s danger management rules by means of signing formal purchasing agreement. The construction safety and health of this project includes the design and operation of common facilities, communication and training, and personal danger and supervision. (1) In design, construction and production of the wetland protection and rehabilitation works, we must pay much attention to labour safety, take effective countermeasures and various preventive means, and execute Chinese relevant laws and rules, departmental regulations and standards strictly. (2) The construction unit must ensure that safety and health facilities are put into use when the wetland protection and rehabilitation works is completed and put into operation. (3) The wetland protection and rehabilitation works shall set up necessary lighting system. (4) Strengthen employees’ awareness of safety protection. Operators must wear necessary labor protection articles. (5) Operating personnel at each post must accept and pass pre-job training, then do corresponding job with certificate, and accept education and training periodically. (6) Establish and execute periodic and frequent safety examination system strictly, eliminate accident threats in time, and especially, pay attention to fire safety in autumn and winter. (7) Ensure that safety and health facilities are put into use when the works is completed and put into operation. 5 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation (8) Establish and execute periodic and frequent safety examination system strictly, eliminate accident threats in time, and especially in autumn and winter, dispose harvested plants in constructed wetland properly in order to avoid fire disaster. 4.6 Management and Maintenance 4.6.1 Adjust the Waste r Level at Proper Time during Operation of the Wetland Protection and Rehabilitation Works: (1) We may adjust the waste r level according to various ultimate situations like rainstorm, flood, drought, and icing period, etc., but shall surely prevent damming at waste r inlet end and submerging at waste r outlet end; (2) We may adjust the waste r level in case of short-lived flow of artificial wetland. 4.6.2 The Following Measures May be Adopted for Plants Management and Maintenance under the Wetland Protection and Rehabilitation Works: (1) We shall fill waste r into constructed wetland after planting of plants, and shall adjust the waste r level at the early stage in order to promote the development of root system of plants; (2) After establishment of plant system, we shall surely provide sewage continuously, and guarantee the density and positive growth of aquatic plants; (3) We shall supplement seedling, clear off weeds, harvest plants at proper time, and control plant diseases and insect pests, etc. according to the growth of plants. Here, herbicide and insecticide, etc. are prohibited; (4) For sewage treatment of large-scale artificial wetland, we shall consider the arrangement of devices for bio-energy utilization of plants. 4.6.3 The Following Measures May be Adopted in Case of Operation in Low-Temperature Environment: (1) Take heat preservation measures for constructed wetland to ensure the waste r temperature to be at least 4℃; (2) Test the depth of frozen soil in constructed wetland periodically to command the operating status of constructed wetland system; (3) Strengthen pretreatment, and relieve the pollution load of constructed wetland system. 4.6.4 The Following Measures May be Adopted for Preventing Blocking during Operation of the Wetland Protection and Rehabilitation Works: (1) Control the concentration of suspended solids in the sewage entering into constructed wetland system; (2) Adopt intermittent operation mode properly; 6 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation (3) Change local base material of constructed wetland system. 7 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Appendix 1 Checklist of Environmental Protection at Construction Site World Bank-financed Jiangxi Poyang Lake Basin No.: and Ecological Economic Zone Small Town Date: Development Demonstration Project Notes for filling out the table: This table is a general checklist for inspection of environmental protection during construction period of the “World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project”, and may be added or adjusted properly if necessary according to concrete sub-projects, local environmental status and relevant environmental protection measures. Subproject name: Contract No. And subproject location: Name of project construction site: Current construction stage: Date of environmental protection inspection: Concrete time: Weather of inspection day: Environment inspector: Inspection result(“√”) Not Inspection item Yes No involve d Whether the site selection for the wetland protection and rehabilitation works meets the requirements of local urban overall development planning and environmental protection planning, as well as local requirements on waste r pollution prevention and control, waste r resources protection, and natural ecology I. Key Points of Bidding for Design protection; and whether the factors like traffic, land ownership, and current land use state, etc. are considered comprehensively 1.2 Whether the site selection for wetland sewage treatment works considers natural background conditions, including land area, landform and topographic feature, soil, meteorology, hydrology, animals and plants, and other ecological factors, etc., and is executed after investigation on geology and hydrogeology, etc. 1.3 Whether the site for the wetland protection and rehabilitation works is not threatened by flood, tide waster or waste logging 1.4 Whether the distance of the site for the wetland protection and rehabilitation works from residence meets the requirements of health protection, and is affirmed through environmental impact assessment and environmental risk assessment 8 Remark Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Inspection result(“√”) Not Inspection item Yes No involve d 1.5Whether landscapes under the works are constructed in line with the principles of being harmonious, natural and balanced, and by comprehensively considering the contour of artificial wetlands, the arrangement of different types of artificial wetlands, the deployment of aquatic plants, the design of waste r-body landscapes in artificial wetlands, and the construction of auxiliary facilities along the bank of artificial wetlands, etc. 1.6 Whether the plants for the wetland protection and rehabilitation works are selected according to their pollution resistance, growing ability, development degree of root system, as well as economic and aesthetics value, etc.; meanwhile, whether local varieties of plants are adopted to ensure the adaptation to local climate, instead of introducing new foreign and invaded varieties of trees 1.7 For the wetland protection and rehabilitation works, whether it’s that, the emergent aquatic plants available to select include reed, waste bamboo, scirpus tabernaemontani, calamus, bulrush, and bog rush, etc.; floating plants include eichhornia crassipes, duckweed, and lotus, etc.; and submerged plants include waste rweed, waste r nymph, hornwort, and black algae, etc. Whether the wetland protection and rehabilitation works selects one or several kinds of plants as dominant species, plants them in pairs or groups, and arranges the spatial and time distribution as per certain proportion according to the characteristics of ambient conditions and phytocoenosis, in order to meet the requirements of high-efficiency operation and stable & sustainable utilization of ecological system Others (specified in detail) Construction II. Site Arrangement and Temporary Facilities 2.1Whether wetland protection and rehabilitation works is arranged reasonably and compactly according to the functional and process requirements of artificial wetland, by making the best of the beneficial conditions of natural environment, considering the landscape function of constructed wetlandin the project area as well as the planning for recycling of artificial wetland, and combining with the factors like landform, wind direction, geological conditions, and sanitary protection distance, etc. 2.2Whether production management buildings and living facilities are arranged collectively at possibly reasonable position and orientation, and are kept a certain distance from processing structures 9 Remark Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Inspection result(“√”) Not Inspection item Yes No involve d Others (specified in detail) 3.1 Whether the construction camp and building materials storage yard, etc. are built up possibly away from surface waste r bodies like wetland, etc., and whether common building materials that must be stacked temporarily nearby waste r bodies actually upon the demand of engineering construction are protected with a cover and enclosure 3.2 Whether we have set up an oil separator in dining hall, and III. Surface Waste r Environment Quality Management entrusted a garbage collection unit to clear away the garbage in time; whether the garbage collection unit holds the certificate of qualification for waste disposal and the business license issued by relevant departments. At construction camp, whether there is an temporary toilet with septic tank, and whether the septic tank of the temporary toilet is subject to seepage prevention treatment. Also, whether there are drainage ditch and sedimentation tank. Whether the sewage pipeline of dining hall, washroom and shower room are equipped with filtering net, and construction sewage is subject to sedimentation prior to being drained into municipal sewage pipe network or river; and meanwhile, whether the drainage ditch is guaranteed to be clean and smooth 3.3 Whether construction personnel’s domestic solid waste are not thrown away at random, or poured into the waste r bodies along the line, but are collected and disposed periodically by environmental protection department 3.4 Whether waste oil and other solid waste arising from construction are not poured or thrown into or stacked nearby waste r bodies, but are cleared and transported to specified place in time Others (specified in detail) IV. Solid Waste Environment Quality Management 4.1Whether construction garbage and domestic solid waste are prohibited from throwing away at random or pouring into waste r bodies along the line, and are collected and disposed periodically by environmental protection department Protection and Management V. Ecological Resources 5.1 The planting soil for wetland protection and rehabilitation works shall be of clay~doras and 20cm~40cm in thickness, and have a permeation efficiency of 0.025cm/h ~ 0.35cm/h. It is available to adopt local surface-layer planting soil nearby. In case local raw soil is inapplicable to the growth of plants in artificial wetlands, it may be replaced 10 Remark Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Inspection result(“√”) Not Inspection item Yes No involve d 5. The planting/ transplanting of plants under wetland protection and rehabilitation works includes the transplanting of seedling, the breeding of seeds, the transplanting of harvested plants, and the planting of pot culture, etc. 5.3 The best time for planting of plants under the wetland protection and rehabilitation works is spring or early summer, and planting in late summer or early autumn is also available. In case of starting constructed wetland in the first year of planting, we may execute planting 3-4 months ahead of the ending of growing season or the coming of frost period. 5.4 Whether the transplanting density of plants under the wetland protection and rehabilitation works is at least 3 plants /m2, and the planting density in subsurface flow constructed wetland shall be 9 plants/m2~25 plants/m2. 6.1 In design, construction and production of the wetland protection and rehabilitation works, whether we pay much attention to labour safety, take effective countermeasures and various preventive means, and execute Chinese relevant laws and rules, departmental regulations and standards strictly 6.2 Whether the construction unit ensures that safety and health facilities are put into use when the wetland protection and VI. Occupational Health rehabilitation works is completed and put into operation 6.3 Whether the wetland protection and rehabilitation works sets up necessary lighting system 6.4 Whether employees’ awareness of safety protection is strengthened, and whether operators wear necessary labor protection articles 6.5 Whether operating personnel at each post have accepted and passed pre-job training, then done corresponding job with certificate, and accepted education and training periodically 6.6 Whether we have established and executed periodic and frequent safety examination system strictly, eliminated accident threats in time, and especially, paid attention to fire safety in autumn and winter Maintenance VII. Management and 7.1 Whether the waste r level is adjusted according to various ultimate situations like rainstorm, flood, drought, and icing period, etc., preventing damming at waste r inlet end and submerging at waste r outlet end 7.2 Whether the waste r level is adjusted in case of short-lived flow 11 Remark Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Inspection result(“√”) Not Inspection item Yes No Remark involve d of artificial wetland. 7.3 Whether waste r is filled into constructed wetland after planting of plants, and whether the waste r level is adjusted at the early stage in order to promote the development of root system of plants 7.4 Whether continuous sewage supply is ensured after establishment of plant system to guarantee the density and positive growth of aquatic plants 7.5 Whether proper actions are taken according to the growth of plants, like supplementing seedling, clearing off weeds, harvesting plants at proper time, and controlling plant diseases and insect pests, etc., without using herbicide and insecticide, etc. 7.6 Whether devices for bio-energy utilization of plants are considered for sewage treatment of large-scale artificial wetland 7.7 Whether heat preservation measures are taken for constructed wetland to ensure the waste r temperature to be at least 4℃ 7.8 Whether the depth of frozen soil in constructed wetland is tested to command the operating status of constructed wetland system 7.10 Whether the concentration of suspended solids in the sewage entering into constructed wetland system is controlled 7.11 Whether intermittent operation mode is adopted properly; 7.12 Whether the base material of constructed wetland system is changed locally Others (specified in detail) Signature of on-site inspector: _________ Signature of the person in charge of environmental supervision: __________ NOTES: ① In “Remark” column, it is available to fill out the problems discovered, to describe the noncompliance, and to bring forward suggestions on rectification and prevention, etc.; ② In case the measures are discovered in on-site examination to be disqualified or have some points to be improved, the environmental supervisor shall issue the “Environmental Rectification Notice” to contractor immediately, and record the serial number of the “Environmental Rectification Notice” in remark column. The contractor’s rectification shall be recorded in detail separately. 12 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Map 1 Geographic Location Map Ecological wetland to be constructed 9.5ha Rentian Wetland Protection and Rehabilitation Scheme Ecological wetland to be constructed 19ha Yeping Wetland Protection and Rehabilitation Scheme 13 Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Map 2 Process Flow Chart of Wetland Protection and Rehabilitation Works Normal water level River levee of natural Normal water level wetland-0.005 Domestic sewage pipeline network Overflow pipe Lattice, chamber and grit Anaerobic hydrolysis pond Waterfall aeration oxidation pond contact Artificial wetland Natural wetland Original Countersignature Note: 1. The elevation in the drawing takes meter as the unit. Legend Scale 2. The height ±0.000 in the drawing gives priority to the elevation of outdoor floor on grade Sewage pipeline of engineering wetland. Engineering drawing number World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project Wetland Protection and Utilization Subproject Process flow chart of engineering wetland 14 Design stage Feasibility study Drawing number Time Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation Berm Mianjiang River Water inlet Sedimentation area 1.5m deep Profundal zone 1.2m deep Aquatic plant belt 0.3m deep Aquatic plant belt 0.3m deep Normal water level ±00.0 Profundal zone 1.2m deep Aquatic plant belt 0.3m deep Shoal area 0.8m deep Water outlet Mianjiang River Mianjiang River Wetland process chart Countersignature Scale Engineering drawing number World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development Demonstration Project Wetland Protection and Utilization Subproject Process flow chart of engineering wetland 15 Design stage Feasibility study Drawing number Time Jiangxi Ruijin Environmental Codes of Practice for Wetland Protection and Rehabilitation 16
© Copyright 2026 Paperzz