DOC - World bank documents

E4011 V16 rev
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
World Bank-financed Jiangxi Poyang Lake Basin and
Ecological Economic Zone Small Town Development
Demonstration Project
Ruijin City Mianjiang River (Lucao Lake) Wetland
Protection and Utilization Subproject
Environmental Codes of Practice
For
Wetland Protection and Rehabilitation
Institute of Poyang Lake Eco-economics, Jiangxi University of Finance and
Economics
Beijing Huaqing Lishui Environmental Technology Co., Ltd.
Environmental Engineering Technology Development Center, Jiangxi Academy
of Sciences
September 2012
Ⅰ
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
TABLE OF CONTENTS
1 FOREWORD ............................................................................................................ 1
2 MAIN ENGINEERING CONTENTS .................................................................. 1
3 KEY POINTS OF BIDDING FOR DESIGN ......................................................... 2
4 ENVIRONMENTAL CODES OF PRACTICE IN CONSTRUCTION PERIOD
....................................................................................................................................... 3
4.1 SITE ARRANGEMENT AND TEMPORARY FACILITIES CONSTRUCTION................................................ 3
4.2 SURFACE WASTE R ENVIRONMENT QUALITY MANAGEMENT .......................................................... 3
4.3 SOLID WASTE ENVIRONMENT QUALITY MANAGEMENT .................................................................. 4
4.4 ECOLOGICAL RESOURCES PROTECTION AND MANAGEMENT ........................................................... 4
4.5 OCCUPATIONAL HEALTH.................................................................................................................. 5
4.6 MANAGEMENT AND MAINTENANCE ................................................................................................ 6
APPENDIX 1 CHECKLIST OF ENVIRONMENTAL PROTECTION AT CONSTRUCTION SITE ................. 8
MAP 1 GEOGRAPHIC LOCATION MAP ............................................................................................ 13
MAP 2 PROCESS FLOW CHART OF WETLAND PROTECTION AND REHABILITATION WORKS .......... 14
Ⅰ
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
1 Foreword
World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone
Small Town Development Demonstration Project is a demonstration project of
Jiangxi Province, which aims to promote the harmonious development of ecological
protection and urban construction, to improve urban and rural infrastructure, and to
accelerate the urban and rural integration of the province by introducing international
experiences with loan project as carrier, and according to Chinese urbanization
development strategy as well as the urbanization demand of Jiangxi Poyang Lake
Basin and Ecological Economic Zone. This annex includes the specific environmental
impact analysis and corresponding Environmental Codes of Practice for the wetland
protection and rehabilitation scheme involved in Ruijin City Mianjiang River (Lucao
Lake) Wetland Protection and Utilization Subproject under the World Bank-financed
Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town Development
Demonstration Project; and together with the Environmental Codes of Practice for
Small Civil Works (Annex 1.1), it forms complete Environmental Codes of Practice
for wetland protection and rehabilitation works. In preparing this ECOP, we made
reference to Detailed Rules of Jiangxi Province on Safe Construction, EHS Guidelines
and safeguard policies of the World Bank and Technical Specifications for
Constructed Wetland Wastewater Treatment Works of the Ministry of Environmental
Protection. For the geographic location, please refer to Figure 1.
2 Main Engineering Contents
Main engineering contents of wetland protection and rehabilitation works under
Ruijin City Mianjiang River (Lucao Lake) Wetland Protection and Utilization
Subproject are shown in Table 1-1.
Table 1-1 Main Engineering Contents of Wetland Protection and Rehabilitation
Works
Code
1
Component Name
Brief introduction of Works
Wetland protection
and purifying area in
the upstream of
Mianjiang River
(Rentian wetland
purifying, protection
and utilization area)
It is planned to construct ecological wetland and shoal
rehabilitation works in the reasonable utilization area of
Gaoxuan Village, and to restore wetland in shrubbery,
thick growth of grass, and shoal. The project will take in
waste r from Mianjiang River, and purify the waste r up to
the quality standard of this river section. The ecological
wetland planned to construct covers a land of 9.5ha, and
has a hydraulic load of q=0.1m3 / m2・d.
On the overflow land which covers a large area and does
not affect flood drainage in riverway, native tree species
will be adopted for protection and rehabilitation of forest
and shoal wetlands, such as pond cypress, dawn redwood,
1
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Chinese ash, Sapium sebiferum, and some berry trees. The
trees shall be planted according to professional
afforestation design.
2
Wetland ecology
restoration and
utilization area in the
middle and lower
reaches of Mianjiang
River (Yeping
wetland purifying,
protection and
utilization area)
It’s planned to construct artificial ecological wetland at
Xinyuan Village, Yeping Town. The project will take in
waste r from Mianjiang River and its tributaries, and purify
the waste r up to the quality standard of this river section.
The ecological wetland planned to construct covers a land
of 195ha, and has a hydraulic load of q=0.1m3 / m2・d.
By arranging floating plants, floating-leaved plants,
submerged plants and emergent aquatic plants, etc., the
ecological wetland and shoal rehabilitation works will
have a vegetation coverage ratio of at least 70%.
3 Key Points of Bidding for Design
At each stage of construction design, the construction design unit shall bring forward
relieving measures aiming at potential negative environmental impacts. Precisely, it
shall carry out environmental impact assessment and compile the environmental codes
of practice at the stage of feasibility study; shall fulfill the environmental impact
assessment document and the environmental protection measures set forth in the
environmental codes of practice at the stage of preliminary design; and shall design
the environmental protection works according to the opinions on preliminary design at
the stage of construction design.
The following key points shall be emphatically considered in design:
1) Site selection for the wetland protection and rehabilitation works shall meet the
requirements of local urban overall development planning and environmental
protection planning, as well as local requirements on waste r pollution prevention and
control, waste r resources protection, and natural ecology protection; and shall also
consider the factors like traffic, land ownership, and current land use state, etc.
comprehensively.
(2) The site selection for wetland sewage treatment works shall consider natural
background conditions, including land area, landform and topographic feature, soil,
meteorology, hydrology, animals and plants, and other ecological factors, etc., and
shall be executed after investigation on geology and hydrogeology, etc.
(3) The site for the wetland protection and rehabilitation works shall not be threatened
by flood, tide waste r or waste rlogging.
(4) The distance of the site for the wetland protection and rehabilitation works from
residence shall meet the requirements of health protection, and shall be affirmed
through environmental impact assessment and environmental risk assessment.
(5) Landscapes under the works shall be constructed in line with the principles of
2
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
being harmonious, natural and balanced, and by comprehensively considering the
contour of artificial wetlands, the arrangement of different types of artificial wetlands,
the deployment of aquatic plants, the design of waste r-body landscapes in artificial
wetlands, and the construction of auxiliary facilities along the bank of artificial
wetlands, etc.
(6) The plants for the wetland protection and rehabilitation works shall be selected
according to their pollution resistance, growing ability, development degree of root
system, as well as economic and aesthetics value, etc.; meanwhile, local varieties of
plants shall be adopted to ensure the adaptation to local climate. New foreign and
invaded varieties of trees shall be introduced.
(7) For the wetland protection and rehabilitation works, the emergent aquatic plants
available to select include reed, waste r bamboo, scirpus tabernaemontani, calamus,
bulrush, and bog rush, etc.; floating plants include eichhornia crassipes, duckweed,
and lotus, etc.; and submerged plants include waste rweed, waste r nymph, hornwort,
and black algae, etc. The wetland protection and rehabilitation works may select one
or several kinds of plants as dominant species, plant them in pairs or groups, and
arrange the spatial and time distribution as per certain proportion according to the
characteristics of ambient conditions and phytocoenosis, in order to meet the
requirements of high-efficiency operation and stable & sustainable utilization of
ecological system.
4 Environmental Codes of Practice for Construction Period
4.1 Site Arrangement and Temporary Facilities Construction
(1) Wetland protection and rehabilitation works shall be arranged reasonably and
compactly according to the functional and process requirements of artificial wetland,
by making the best of the beneficial conditions of natural environment, considering
the landscape function of constructed wetland in the project area as well as the
planning for recycling of artificial wetland, and combining with the factors like
landform, wind direction, geological conditions, and sanitary protection distance, etc.
(2) Production management buildings and living facilities shall be arranged
collectively at possibly reasonable position and orientation, and shall be kept a certain
distance from processing structures.
(3) Select proper plants for greening according to local natural conditions. The
greening coverage ratio shall meet the requirements of local urban regulations.
(4) Consider whether the height of wetland plants is harmonious with landscape in
other components of the works.
4.2 Surface Waste r Environment Quality Management
During the construction of wetland protection and rehabilitation works, the main
factors affecting the surface waste r are the construction camp, building materials
storage yard, construction personnel’s domestic sewage, waste oil from construction,
and soil loss, etc. Aiming at the abovementioned influential factors, the paper brings
3
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
forward the following drainage control measures:
(1) Construction camp and building materials storage yard, etc. must built up possibly
away from surface waste r bodies like wetland, etc., and common building materials
that must be stacked temporarily nearby waste r bodies actually upon the demand of
works construction must be protected with a cover and enclosure.
(2) We shall set up an oil separator in dining hall, and entrust a garbage collection unit
to clear away the garbage in time. Here, the garbage collection unit shall hold the
certificate of qualification for waste disposal and the business license issued by
relevant departments. At construction camp, there shall be an temporary toilet with
septic tank, and the septic tank of the temporary toilet shall be subject to seepage
prevention treatment. Also, there shall be drainage ditch and sedimentation tank. The
sewage pipeline of dining hall, washroom and shower room shall be equipped with
filtering net, and construction sewage shall be subject to sedimentation prior to being
drained into municipal sewage pipe network or river; and meanwhile, the drainage
ditch shall be guaranteed to be clean and smooth.
(3) Construction personnel’s domestic solid waste shall not be thrown away at random,
or poured into the waste r bodies along the line, but must be collected and disposed
periodically by environmental protection department.
(4) Waste oil and other solid waste arising from construction shall never be poured or
thrown into or stacked nearby waste r bodies, but shall be cleared and transported to
specified place in time.
4.3 Solid Waste Environment Quality Management
Solid waste in construction period are mainly construction garbage and domestic solid
waste. Aiming at the characteristics of solid waste arising from construction project,
this paper brings forward the following discharge control measures: Construction
garbage and domestic solid waste shall not be thrown away at random or poured into
waste r bodies along the line, but must be collected and disposed periodically by
environmental protection department.
4.4 Ecological Resources Protection and Management
The main works of wetland protection and rehabilitation is to arrange floating plants,
floating-leaved plants, submerged plants and emergent aquatic plants, etc. in newly constructed
natural ecological wetland, in order to ensure a vegetation coverage ratio of at least 70% of the
ecological wetland protection and rehabilitation works. The main factors affecting
ecological resources include the selection of species, the planting time of vegetation,
and the planting density, etc. The main measures taken include:
(1) The design of wetland protection and rehabilitation works shall increase the
diversity of plants, raise their performance of sewage treatment, and extend their
service life at the largest degree.
(2) The planting soil for wetland protection and rehabilitation works shall be of clay~
doras and 20cm ~ 40cm in thickness, and have a permeation efficiency of
4
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
0.025cm/h~0.35cm/h. It is available to adopt local surface-layer planting soil nearby.
In case local raw soil is inapplicable to the growth of plants in artificial wetlands, it
may be replaced.
(3) The planting/ transplanting of plants under wetland protection and rehabilitation
works includes the transplanting of seedling, the breeding of seeds, the transplanting
of harvested plants, and the planting of pot culture, etc.
(4) The best time for planting of plants under the wetland protection and rehabilitation
works is spring or early summer, and planting in late summer or early autumn is also
available. In case of starting constructed wetlandin the first year of planting, we may
execute planting 3-4 months ahead of the ending of growing season or the coming of
frost period.
(5) The transplanting density of plants under the wetland protection and rehabilitation
works shall be at least 3 plants /m2, and the planting density in subsurface flow
constructed wetland shall be 9 plants/m2~25 plants/m2.
4.5 Occupational Health
The construction unit and supervisory institution shall have the responsibility to take
all reasonable measures to protect the workers and buildings nearby from accidental
injuries, and ensure their safety. For the wetland protection and rehabilitation works,
we shall employ a contractor who has the ability to manage its employees’
occupational health and safety, and shall make the contractor execute the enterprise’s
danger management rules by means of signing formal purchasing agreement. The
construction safety and health of this project includes the design and operation of
common facilities, communication and training, and personal danger and supervision.
(1) In design, construction and production of the wetland protection and rehabilitation
works, we must pay much attention to labour safety, take effective countermeasures
and various preventive means, and execute Chinese relevant laws and rules,
departmental regulations and standards strictly.
(2) The construction unit must ensure that safety and health facilities are put into use
when the wetland protection and rehabilitation works is completed and put into
operation.
(3) The wetland protection and rehabilitation works shall set up necessary lighting
system.
(4) Strengthen employees’ awareness of safety protection. Operators must wear
necessary labor protection articles.
(5) Operating personnel at each post must accept and pass pre-job training, then do
corresponding job with certificate, and accept education and training periodically.
(6) Establish and execute periodic and frequent safety examination system strictly,
eliminate accident threats in time, and especially, pay attention to fire safety in
autumn and winter.
(7) Ensure that safety and health facilities are put into use when the works is
completed and put into operation.
5
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
(8) Establish and execute periodic and frequent safety examination system strictly,
eliminate accident threats in time, and especially in autumn and winter, dispose
harvested plants in constructed wetland properly in order to avoid fire disaster.
4.6 Management and Maintenance
4.6.1 Adjust the Waste r Level at Proper Time during Operation of the Wetland
Protection and Rehabilitation Works:
(1) We may adjust the waste r level according to various ultimate situations like
rainstorm, flood, drought, and icing period, etc., but shall surely prevent damming at
waste r inlet end and submerging at waste r outlet end;
(2) We may adjust the waste r level in case of short-lived flow of artificial wetland.
4.6.2 The Following Measures May be Adopted for Plants Management and
Maintenance under the Wetland Protection and Rehabilitation Works:
(1) We shall fill waste r into constructed wetland after planting of plants, and shall
adjust the waste r level at the early stage in order to promote the development of root
system of plants;
(2) After establishment of plant system, we shall surely provide sewage continuously,
and guarantee the density and positive growth of aquatic plants;
(3) We shall supplement seedling, clear off weeds, harvest plants at proper time, and
control plant diseases and insect pests, etc. according to the growth of plants. Here,
herbicide and insecticide, etc. are prohibited;
(4) For sewage treatment of large-scale artificial wetland, we shall consider the
arrangement of devices for bio-energy utilization of plants.
4.6.3 The Following Measures May be Adopted in Case of Operation in
Low-Temperature Environment:
(1) Take heat preservation measures for constructed wetland to ensure the waste r
temperature to be at least 4℃;
(2) Test the depth of frozen soil in constructed wetland periodically to command the
operating status of constructed wetland system;
(3) Strengthen pretreatment, and relieve the pollution load of constructed wetland
system.
4.6.4 The Following Measures May be Adopted for Preventing Blocking during
Operation of the Wetland Protection and Rehabilitation Works:
(1) Control the concentration of suspended solids in the sewage entering into
constructed wetland system;
(2) Adopt intermittent operation mode properly;
6
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
(3) Change local base material of constructed wetland system.
7
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Appendix 1
Checklist of Environmental Protection at
Construction Site
World Bank-financed Jiangxi Poyang Lake Basin No.:
and Ecological Economic Zone Small Town Date:
Development Demonstration Project
Notes for filling out the table: This table is a general checklist for inspection of environmental
protection during construction period of the “World Bank-financed Jiangxi Poyang Lake Basin
and Ecological Economic Zone Small Town Development Demonstration Project”, and may be
added or adjusted properly if necessary according to concrete sub-projects, local environmental
status and relevant environmental protection measures.
Subproject name:
Contract No. And subproject location:
Name of project construction site:
Current construction stage:
Date of environmental protection inspection:
Concrete time:
Weather of inspection day:
Environment inspector:
Inspection result(“√”)
Not
Inspection item
Yes
No
involve
d
Whether the site selection for the wetland protection and
rehabilitation works meets the requirements of local urban overall
development planning and environmental protection planning, as
well as local requirements on waste r pollution prevention and
control, waste r resources protection, and natural ecology
I. Key Points of Bidding for Design
protection; and whether the factors like traffic, land ownership, and
current land use state, etc. are considered comprehensively
1.2 Whether the site selection for wetland sewage treatment works
considers natural background conditions, including land area,
landform and topographic feature, soil, meteorology, hydrology,
animals and plants, and other ecological factors, etc., and is
executed after investigation on geology and hydrogeology, etc.
1.3 Whether the site for the wetland protection and rehabilitation
works is not threatened by flood, tide waster or waste logging
1.4 Whether the distance of the site for the wetland protection and
rehabilitation works from residence meets the requirements of
health protection, and is affirmed through environmental impact
assessment and environmental risk assessment
8
Remark
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Inspection result(“√”)
Not
Inspection item
Yes
No
involve
d
1.5Whether landscapes under the works are constructed in line with
the principles of being harmonious, natural and balanced, and by
comprehensively considering the contour of artificial wetlands, the
arrangement of different types of artificial wetlands, the
deployment of aquatic plants, the design of waste r-body
landscapes in artificial wetlands, and the construction of auxiliary
facilities along the bank of artificial wetlands, etc.
1.6 Whether the plants for the wetland protection and rehabilitation
works are selected according to their pollution resistance, growing
ability, development degree of root system, as well as economic
and aesthetics value, etc.; meanwhile, whether local varieties of
plants are adopted to ensure the adaptation to local climate, instead
of introducing new foreign and invaded varieties of trees
1.7 For the wetland protection and rehabilitation works, whether
it’s that, the emergent aquatic plants available to select include
reed, waste bamboo, scirpus tabernaemontani, calamus, bulrush,
and bog rush, etc.; floating plants include eichhornia crassipes,
duckweed, and lotus, etc.; and submerged plants include waste
rweed, waste r nymph, hornwort, and black algae, etc. Whether the
wetland protection and rehabilitation works selects one or several
kinds of plants as dominant species, plants them in pairs or groups,
and arranges the spatial and time distribution as per certain
proportion according to the characteristics of ambient conditions
and phytocoenosis, in order to meet the requirements of
high-efficiency operation and stable & sustainable utilization of
ecological system
Others (specified in detail)
Construction
II. Site Arrangement and Temporary Facilities
2.1Whether wetland protection and rehabilitation works is arranged
reasonably and compactly according to the functional and process
requirements of artificial wetland, by making the best of the
beneficial conditions of natural environment, considering the
landscape function of constructed wetlandin the project area as
well as the planning for recycling of artificial wetland, and
combining with the factors like landform, wind direction,
geological conditions, and sanitary protection distance, etc.
2.2Whether production management buildings and living facilities
are arranged collectively at possibly reasonable position and
orientation, and are kept a certain distance from processing
structures
9
Remark
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Inspection result(“√”)
Not
Inspection item
Yes
No
involve
d
Others (specified in detail)
3.1 Whether the construction camp and building materials storage
yard, etc. are built up possibly away from surface waste r bodies
like wetland, etc., and whether common building materials that
must be stacked temporarily nearby waste r bodies actually upon
the demand of engineering construction are protected with a cover
and enclosure
3.2 Whether we have set up an oil separator in dining hall, and
III. Surface Waste r Environment Quality Management
entrusted a garbage collection unit to clear away the garbage in
time; whether the garbage collection unit holds the certificate of
qualification for waste disposal and the business license issued by
relevant departments. At construction camp, whether there is an
temporary toilet with septic tank, and whether the septic tank of the
temporary toilet is subject to seepage prevention treatment. Also,
whether there are drainage ditch and sedimentation tank. Whether
the sewage pipeline of dining hall, washroom and shower room are
equipped with filtering net, and construction sewage is subject to
sedimentation prior to being drained into municipal sewage pipe
network or river; and meanwhile, whether the drainage ditch is
guaranteed to be clean and smooth
3.3 Whether construction personnel’s domestic solid waste are not
thrown away at random, or poured into the waste r bodies along the
line, but are collected and disposed periodically by environmental
protection department
3.4 Whether waste oil and other solid waste arising from
construction are not poured or thrown into or stacked nearby waste
r bodies, but are cleared and transported to specified place in time
Others (specified in detail)
IV. Solid Waste
Environment
Quality
Management
4.1Whether construction garbage and domestic solid waste are
prohibited from throwing away at random or pouring into waste r
bodies along the line, and are collected and disposed periodically
by environmental protection department
Protection and
Management
V. Ecological Resources
5.1 The planting soil for wetland protection and rehabilitation
works shall be of clay~doras and 20cm~40cm in thickness, and
have a permeation efficiency of 0.025cm/h ~ 0.35cm/h. It is
available to adopt local surface-layer planting soil nearby. In case
local raw soil is inapplicable to the growth of plants in artificial
wetlands, it may be replaced
10
Remark
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Inspection result(“√”)
Not
Inspection item
Yes
No
involve
d
5. The planting/ transplanting of plants under wetland protection
and rehabilitation works includes the transplanting of seedling, the
breeding of seeds, the transplanting of harvested plants, and the
planting of pot culture, etc.
5.3 The best time for planting of plants under the wetland
protection and rehabilitation works is spring or early summer, and
planting in late summer or early autumn is also available. In case of
starting constructed wetland in the first year of planting, we may
execute planting 3-4 months ahead of the ending of growing season
or the coming of frost period.
5.4 Whether the transplanting density of plants under the wetland
protection and rehabilitation works is at least 3 plants /m2, and the
planting density in subsurface flow constructed wetland shall be 9
plants/m2~25 plants/m2.
6.1 In design, construction and production of the wetland
protection and rehabilitation works, whether we pay much attention
to labour safety, take effective countermeasures and various
preventive means, and execute Chinese relevant laws and rules,
departmental regulations and standards strictly
6.2 Whether the construction unit ensures that safety and health
facilities are put into use when the wetland protection and
VI. Occupational Health
rehabilitation works is completed and put into operation
6.3 Whether the wetland protection and rehabilitation works sets up
necessary lighting system
6.4 Whether employees’ awareness of safety protection is
strengthened, and whether operators
wear necessary labor
protection articles
6.5 Whether operating personnel at each post have accepted and
passed pre-job training, then done corresponding job with
certificate, and accepted education and training periodically
6.6 Whether we have established and executed periodic and
frequent safety examination system strictly, eliminated accident
threats in time, and especially, paid attention to fire safety in
autumn and winter
Maintenance
VII. Management and
7.1 Whether the waste r level is adjusted according to various
ultimate situations like rainstorm, flood, drought, and icing period,
etc., preventing damming at waste r inlet end and submerging at
waste r outlet end
7.2 Whether the waste r level is adjusted in case of short-lived flow
11
Remark
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Inspection result(“√”)
Not
Inspection item
Yes
No
Remark
involve
d
of artificial wetland.
7.3 Whether waste r is filled into constructed wetland after planting
of plants, and whether the waste r level is adjusted at the early
stage in order to promote the development of root system of plants
7.4 Whether continuous sewage supply is ensured after
establishment of plant system to guarantee the density and positive
growth of aquatic plants
7.5 Whether proper actions are taken according to the growth of
plants, like supplementing seedling, clearing off weeds, harvesting
plants at proper time, and controlling plant diseases and insect
pests, etc., without using herbicide and insecticide, etc.
7.6 Whether devices for bio-energy utilization of plants are
considered for sewage treatment of large-scale artificial wetland
7.7 Whether heat preservation measures are taken for constructed
wetland to ensure the waste r temperature to be at least 4℃
7.8 Whether the depth of frozen soil in constructed wetland is
tested to command the operating status of constructed wetland
system
7.10 Whether the concentration of suspended solids in the sewage
entering into constructed wetland system is controlled
7.11 Whether intermittent operation mode is adopted properly;
7.12 Whether the base material of constructed wetland system is
changed locally
Others (specified in detail)
Signature of on-site inspector: _________ Signature of the person in charge of environmental supervision:
__________
NOTES: ① In “Remark” column, it is available to fill out the problems discovered, to describe the noncompliance,
and to bring forward suggestions on rectification and prevention, etc.;
② In case the measures are discovered in on-site examination to be disqualified or have some points to be
improved, the environmental supervisor shall issue the “Environmental Rectification Notice” to contractor
immediately, and record the serial number of the “Environmental Rectification Notice” in remark column. The
contractor’s rectification shall be recorded in detail separately.
12
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Map 1 Geographic Location Map
Ecological wetland to
be constructed 9.5ha
Rentian Wetland Protection and Rehabilitation Scheme
Ecological wetland to
be constructed 19ha
Yeping Wetland Protection and Rehabilitation Scheme
13
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Map 2 Process Flow Chart of Wetland Protection and Rehabilitation Works
Normal water level
River levee
of
natural
Normal water level
wetland-0.005
Domestic
sewage
pipeline network
Overflow pipe
Lattice,
chamber
and
grit
Anaerobic hydrolysis
pond
Waterfall aeration
oxidation pond
contact
Artificial wetland
Natural wetland
Original
Countersignature
Note:
1. The elevation in the drawing takes meter as the unit.
Legend
Scale
2. The height ±0.000 in the drawing gives priority to the elevation of outdoor floor on grade
Sewage pipeline
of engineering wetland.
Engineering drawing
number
World Bank-financed Jiangxi Poyang Lake Basin and Ecological
Economic Zone Small Town Development Demonstration Project
Wetland Protection and Utilization Subproject
Process flow chart of engineering wetland
14
Design stage
Feasibility study
Drawing
number
Time
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
Berm
Mianjiang River
Water inlet
Sedimentation area 1.5m deep
Profundal zone 1.2m deep
Aquatic plant belt 0.3m deep
Aquatic plant belt 0.3m deep
Normal
water
level ±00.0
Profundal zone 1.2m deep
Aquatic plant belt 0.3m deep
Shoal area 0.8m deep
Water outlet
Mianjiang River
Mianjiang River
Wetland process chart
Countersignature
Scale
Engineering drawing
number
World Bank-financed Jiangxi Poyang Lake Basin and Ecological
Economic Zone Small Town Development Demonstration Project
Wetland Protection and Utilization Subproject
Process flow chart of engineering wetland
15
Design stage
Feasibility study
Drawing
number
Time
Jiangxi Ruijin
Environmental Codes of Practice for Wetland Protection and Rehabilitation
16