SITE MONITORING REPORT Fees for Monitoring of Mining and Landfill Sites in England Please find detailed below the report for the site monitoring undertaken on 13 June 2012. If you should have any queries or require any photographs taken on site please do not hesitate to contact me. File Ref: 13 421 18/19 Monitoring Officer: Shelley Bailey Tel No: 01245 437577 Visit no: 4 of 4 Time on site: Time off site: 14:00 15:30 Site Co-ordinator: Shelley Bailey Tel No: 01245 437577 Site Name: Colchester Quarry (including Stanway Pit and Bellhouse Landfill), Warren Lane, Colchester. Operator: Tarmac Ltd and Cory Environmental Site Representative: Mark Murray (Tarmac) Terry Martin (Cory Environmental Resource Management) Permission no’s: Bellhouse and Abbotstone ESS/48/01/COL/R – Bellhouse Farm ROMP for LEX/266/69 ESS/07/01/COL/REV – Amendment to ESS/07/01/COL to provide for amended restoration contours at Bellhouse and Abbotstone, excluding ExWaste site. ESS/32/09/COL – Construction of waste reception and handling area at Bellhouse - issued 25 August 2009. ESS/65/98/COL – Cory offices. ESX/66/92/COL – Cory gatehouse, weighbridge and wheelwash. ESS/52/94/COL – Cory site accommodation and car park. ESS/31/11/COL – Environmental flare. West of Warren Lane (Tarmac) COL/1644/77 – Asphalt plant ESS/54/04/Col – Concrete batching plant. ESS/33/03/COL – Variation, time limit to extend use of Tarmac regional offices until 20 September 2020. ESS/28/02/COL – Lab, office and storage rooms (adj. asphalt plant). ExWaste ESS/41/03/COL – restoration of landfill to amenity afteruse ESS/2/94/COL – Power generation plant (located NW of Bellhouse) Stanway Hall Quarry ESS/06/09/COL – Variation to PP ref ESS/14/06/COL (which varied ESS/49/01/COL, the ROMP for LEX/342/68) conditions 6 and 15 to extend the time period for the submission of a detailed working and restoration scheme at Stanway. ESS/63/06/COL – MBT and AD plant. Issued 11 May 2009. ESS/17/05/COL – Relocation of inert recycling facility within Stanway Hall area (cessation 11/01/2015). ESS/51/04/COL – Variation to PP ref ESS/22/99/COL Condition 1 (time limit) to extend to 11 January 2015 and Condition 15 (HGV movements) to increase to 1600 per month at Stanway (Recycling Facility). ESS/07/05/COL – Dry Silo Mortar Plant and internal access improvements. Cease September 2020 or at cessation of extraction. ESS/24/00/COL – Power generation plant at Stanway Pit to utilise gas generated at Bellhouse landfill. ESS/05/99/COL – Workshop (expires on cessation of mineral extraction). ESS/21/02/COL - Processing Plant – expires 2020 or on completion of extraction. ESS/09/12/COL – New generator, flare and back-up generator within existing electricity generation compound – permitted 12 June 2012. 2 Permission Number & Romp Date Due: ESS/48/01/COL/R 09/04/2020 ESS/49/01/COL 09/04/2020 Outstanding Submission of details: Permission No. Condition Scope of Condition and Action to be No. taken ESS/48/01/COL(R) 6 Submission of a working scheme for remaining extraction areas within 6 months of date of permission (by 13 Oct 05). ESS/48/01/COL/R 24 Noise Monitoring. ESS/07/01/COL/REV 20 Details of allowances for settlement to be submitted (Overdue Feb 11). ESS/07/05/COL 10 Dust suppression. ESS/17/05/COL 14 Dust suppression. ESS/07/01/COL/REV 9 Noise monitoring (discrepancies re Sept 11 monitoring to be responded to). Constraints: Weather: Noise: Approach Roads: Ground: Access: Wheel Cleaning: Hose: Machinery: In correct position: Stockpiles: Bunds: Dry/ Windy / Rain / Snow Acceptable/ Not acceptable N/A Dry / Dusty / Wet / Muddy / Flooded Dry / Dusty / Wet / Damp / Muddy / Flooded Obstructed / Not Obstructed / Mud on Road / Ice / Slippery Washer / Spinner / Sweeper / none In use / Not in Use / N/A Working / Not working Yes / No / N/A Height = N/A Profiled / Grassed / Weeds/ NA Actions from last site visit: Submissions of details required as above by both companies. Tarmac Pipeline and cable to be removed from Hart Field and the land restored to agriculture as required by permission ref ESS/09/09/COL by end of w/c 27/02/12. Note: Since the visit it was discovered that this requirement was not carried out, however Tarmac have stated that the work has now commenced (on 12/03/12). Tarmac to confirm the extent of the new DSM area for compliance with permission ref ESS/07/05/COL. The open-sided container to the west of DSM area is to be removed. The haul route to Stanway Hall is to be kept clear of mud and debris. ESS/48/01/COL(R) condition 6 is overdue. This is a breach of the planning 3 permission. Details are to be submitted by end of March 2012 (this is a Bellhouse permission so Cory will also have involvement). A planning application is required for the temporary retention of surplus kit. This is overdue. The current operations of the asphalt plant should be confirmed. This is overdue. The Management Plan required by the S106 Agreement attached to permission ref ESS/07/02/COL/REV is overdue as of 18 February 2009 and must be submitted urgently (this is a Bellhouse permission so Cory will have involvement). My letter of 09 February 2012 is relevant and should be complied with. Cory Hardstanding area adjacent to current tipping area to be removed. Cory to clarify on a drawing what the current state of each phase is and provide details of the levels survey once results are in. Further details for condition 20 attached to ref ESS/07/01/COL/REV have still not been provided. It was agreed at the meeting on 23rd Feb that these would be submitted asap. Inspection Results Summary: Stanway Hall Farm and concrete plant/asphalt plant area There are still a lot of silos in the DSM area. The new area of hardstanding now has some silos on it. Confirmation is still required from Eric Turner regarding whether or not the new hardstanding area falls within the permission area of ESS/07/05/COL. The company running the recycling area have now left. This will be tidied up over the coming months. The pipeline in Hart Field has been completely removed as required by permission area ESS/09/09/COL. ESS/48/01/COL(R) condition 6 is overdue. This is a breach of the planning permission. Tarmac had previously agreed to submit this by end of March 2012. A planning application has been received for temporary retention of plant and kit in the vicinity of the asphalt plant. The current operations of the asphalt plant should be confirmed. This is overdue. The Management Plan required by the S106 Agreement attached to permission ref ESS/07/02/COL/REV is overdue as of 18 February 2009 and must be submitted urgently (this is a Bellhouse permission so Cory will have involvement). Sarah Branagan has taken over from Mark Murray. Tarmac have begun clearing in preparation to extract the next part of the void to the west of Warren Lane. This will comprise the southern part of 4 the ‘waste disposal’ phase of phase 4 shown on the S106 Agreement attached to permission ref ESS/07/01/COL/REV. Associated ecological work has been carried out. Silt from the existing lagoons is being pumped to Mitchells Lagoon. Bellhouse/Abbotstone The hardstanding area adjacent to current tipping area is still in place. The Enforcement Officer has visited the site and his decision will be sent to Cory Environmental in due course. Cory have sent a draft letter to the WPA clarifying that the existing phased working and restoration of Bellhouse is in Phase 4 of drawing B30/348 shown in the S106 Agreement attached to permission ref ESS/07/01/COL/REV. This has not been shown on a drawing and the results of the levels survey are still awaited (TM confirmed on site that the survey will be taking place w/c 18/06/12). Further details for condition 20 attached to ref ESS/07/01/COL/REV have still not been provided. It was agreed at the meeting on 23rd Feb that these would be submitted asap. ‘ExWaste’ Area The area covered by permission ref ESS/41/03/COL is yet to be fully restored. Essex County Council (as Waste Disposal Authority) is waiting for appropriate weather conditions to allow restoration to be completed. Permission No. Compliance with Conditions Condition Scope of Condition and No. Action to be taken ESS/48/01/COL(R) 6 Submission of a working scheme for remaining extraction areas within 6 months of date of permission (by 13 Oct 05). Noise Monitoring. ESS/48/01/COL/R 24 ESS/07/01/COL/REV 20 ESS/07/05/COL 10 Details of allowances for settlement to be submitted (Overdue Feb 11). Dust suppression. ESS/17/05/COL 14 Dust suppression. 5 Action to be taken by Operator or MPA/WPA Officer Operator. By end March 2012. Operator. Overdue and urgent. Operator. Overdue and urgent. Operator. Overdue and urgent. Operator. Overdue and ESS/07/01/COL/REV 9 Noise monitoring (discrepancies re Sept 11 monitoring to be responded to). Actions to be taken before next site visit: urgent. Operator. Overdue and urgent. Submissions of details required as above by both companies. Tarmac Confirmation is still required from Eric Turner regarding whether or not the new DSM hardstanding area falls within the permission area of ESS/07/05/COL. ESS/48/01/COL(R) condition 6 is overdue. The current operations of the asphalt plant should be confirmed. This is overdue. The Management Plan required by the S106 Agreement attached to permission ref ESS/07/02/COL/REV is overdue as of 18 February 2009 and must be submitted urgently (this is a Bellhouse permission so Cory will have involvement). Cory Topo survey results are required. Further details for condition 20 attached to ref ESS/07/01/COL/REV have still not been provided. It was agreed at the meeting on 23 rd Feb that these would be submitted asap. Note: The actions noted in this report are required in order to ensure adequate progress is made and to avoid potential enforcement action against a breach of planning control. 6
© Copyright 2026 Paperzz