Oct. 2004 Experience in ERTMS level 2 Pardubice, Czech Republic - 25 Oct 2004 Dr G. de Tilière ALSTOM Solutions & Products Projects: Example of Switzerland (SBB-SA NBS) and Italy (IHSL) ALSTOM Return of experience Conclusion 2 ATLAS™ 200 solution ERTMS Level 2 Control Centre ATS track-side signals no longer required Movement authority by radio: Euroradio / GSM-R, ... Train position via Eurobalise Train Integrity via RBC “Radio-Based Centre” GSM-R local radio equipment RBC Radio Block Centre Local IXL Signal ERTMS on-board + cab-signaling Train detection Local IXL Point Machine Fixed Beacon relocalisation 3 ERTMS Product Experience On-board equipment: ALSTOM’s EVC platform>1000 in service (Belgium, Hong-Kong, Netherlands, UK) >2300 EVC to be delivered (including 194 computers for TASS, « Tilt Autorisation and Supervision System », for UK) ALSTOM ’s ETCS MMI (>200 in service) > 4000 to be delivered • ALSTOM ’s ETCS antenna similar to that of KVB, the ATC for SNCF (> 7000 in service) > 2500 to be delivered Odometers > 2500 to be delivered 4 4 ETCS Doppler radar has been tested on all Alstom Test Tracks > 2000 to be delivered Juridical Recorder Unit > 2000 to be delivered Cabradio datarack & MMI > 1000 sets GSM-R (Cab-Radio + 2 antennas +MMI) are to be delivered 5 5 Trackside Products ERTMS level 2 ERTMS level 1 Class B Class A (Start March 2005) EUROBALISES: ALSTOM’s experience comes from over 200,000 balises in service (with SNCF KVB), that are similar to Eurobalise. > 19’000 balises to be delivered LEU: Line-side Electronic Unit ALSTOM’s experience comes from 20,000 KVB encoders in service at SNCF/RFF. > 2000 encoders, « LEU », are to be delivered 6 6 RBC, main feature (ERTMS-L2) Fulfills the latest standards – EN50126/8/9, SIL 4 – Interoperability: UNISIG spec 2.2.2 – Euroradio FFFIS for GSM-R interface RBC Architecture – A 2oo3 safe computer system – Redundant safe I/O system – Industrial workstation for Maintenance and recording. ALSTOM tested the features of on-line RBC, on the 4 Test Tracks (France, Italy, Netherlands, UK) > 24 RBC are to be delivered 7 ERTMS ALSTOM Solutions & Products ALSTOM Projects; Example of Switzerland and Italy ALSTOM Return of experience Conclusion 8 ERTMS/ETCS trackside Level 1 current commercial projects CFL: ground board May 2005 TASS: board & ground 2003-04 SCMT: board & ground 2004 Zaragoza-Huesca Athens suburban: ground 2004 ground 2004 most projects: SRS 2.2.2 9 ERTMS/ETCS trackside Level 2 current commercial projects Belgium L3/L4: Level 1 & 2 (ground) 2006 Betuwe Route : Level 2 (ground) June 2005 SBB (Mattstetten-Rothrist) Levels 1 & 2 ~500 cabs 2004..2006 most projects: SRS 2.2.2 Rome – Naples Bologna – Florence Bologna –Milano Torino Novara (Milano) Level 2 (ground) 2004.. 10 ERTMS/ETCS carborne current commercial projects SNCB-M6: 32 cabs 2004-2007 CFL: 146 cabs May 2005.. France bi-std KVB STM: 2006..07 Czech Pendolinos EuroAVE Lanzaderas (1 & 2) ATB / ATB-NG 118 cabs 15 cabs May 2005 2004.. SBB (Mattstetten-Rothrist) Level 2 ~500 cabs 2004..2005 Cisalpino ETR500 New Pendolino 106 cabs 2004 Athens 16 cabs 2004 11 Switzerland: SBB - Mattstetten-Rothrist ERTMS/ETCS SBB Project 45 km double track 10 km single track ETCS Level 2 area 12 Switzerland Mattstetten-Rothrist Maximal speed: 200 km/h Mixed traffic on Level 1 line (Step 1): - ERTMS equipped rolling stock and - ZUB as fallback ( = reversed STM ) equipped rolling stock • Mixed traffic on Level 2 line (Step 2) Operational headway: 2 minutes Pure Class 1 specifications (SRS version 2.2.2) 13 13 Switzerland Mattstetten-Rothrist ALSTOM Scope : • Trainborne: > 500 cabs, including: ETCS (EVC, MMI, JRU...), GSM-R data, GSM-R voice, analogue radio • Trackside: 1 RBC and local peripherals - LCS for local train supervision, including implementation of TSR, (Temporary Speed Restrictions) - LMS, Local Maintenance Station • System Integration: • 1 electronic IXL + train detection products (Alcatel) • Balises (Siemens) • Interface with GSM-R network • Installation, Maintenance, After-sales support 14 Switzerland Mattstetten-Rothrist Step 1: Service in Dec. 2004 with partial ERTMS – ERTMS fallback:ERTMS L2 HW & SW but with specific dataprep for use of MMIs & interfaces – 130 trains in service, 250 trains for Dec 2004. – Target: 1 min delay per train per week for 12 Dec 2004 Step 2: Full ERTMS L2 functions – V&T trainborne and trackside passed – System FAT end of Nov 2004 – Pre system test on site in June-July 2004 – Full supervision – Entry-exit scenarios – Integration test IXL-RBC + Trackside-trainborne communication – SAT System planned for mid 2005 – Safety case “fit” for ERTMS L2 operation end 2005/2006 15 Switzerland Mattstetten-Rothrist Trackside Tests RB C RIS IXL Real HW/SW data used for system FAT 16 16 Switzerland Mattstetten-Rothrist Onboard Tests 17 17 IHSL Roma Napoli: ERTMS L2 Verone Moncenisi Milan o Moncenisio Trieste Padova Venise Turin Bologne Genova Florence Rome Naples Lines to be implemented Battipaglia Lines for which the detail design has been drawn up Planned lines ERTMS Level 2 on high-speed network 18 Rome-Naples Line characteristics Line – – – – 216 km and 18 Stations Max speed Operational headway Typical block 300 km/h 5 min 1500 m ERTMS (3 RBCs & 15’000 Balises) complete system test in 2004 – Trains runs at 300 km/h with overlap of 2 RBC/IXL achieved in May 2004 – August 27/04 system test in Tunnel provisional acceptance expected Jan 05, in revenue service in Dec 2005 Scope includes 27 trains ETR500 + 26 Pendolinos 19 ERTMS ALSTOM Solutions & Products ALSTOM Projects; Example of Switzerland and Italy ALSTOM Return of experience Conclusion 20 ERTMS: ALSTOM Experience Advance position in ERTMS contracts, strong return of experience on: Trackside - Trainborne - System Integration System integration & validation: on-board, trackside & system First experience on 4 test tracks Most advanced ERTMS L2 projects Interfaces RBC: - Interface developed with ALCATEL IXL (SA-NBS / SBB) ANSALDO IXL (IHSL / RFI) Siemens TCCS (SBB) - Euroradio + standard protocol Safety case ALSTOM has a generic safety case being assessed by ISA (Trackside/Trainboard) 21 21 ERTMS: ALSTOM Experience (2) ERTMS L2 Norms & operational rules: Strong experience in the process of implementation of rules and operational scenarios (critical point for operators). Strong Return of experience on Products : ERTMS L1: Athens (Operation for Olympic Games) ERTMS L2: IHSL & SBB => Product improvement, including Ergonomic SBB: Return on experience based on 130 trains in operation Generic on-board solutions: - Implemented on various types of trains - Interfaces developed with - GSM-R networks - Onboard central units ALSTOM has now an advanced return of experience in ERTMS as: - Product provider - System integrator 22 22 Experience in ERTMS Test Scheme - RBC interface tests - Complete subsystem integration tests - Integration test of indoor equipment before site delivery - Integrated tests to secure delivery of reliable equipment Test phase is critical for successful implementation of projects 23 ERTMS Test Bench Experience : - Thousands of tests for RBC and EVC Train-borne - Used by SBB and RFI/FS for validation - Recognized by ISA for Acceptance Network Transmission Gateway 24 ERTMS ALSTOM Solutions & Products ALSTOM Projects; example of SANBS and IHSL ALSTOM Return of experience Conclusion 25 CONCLUSION With around 15 ERTMS projects in parallel, among which 5 major ones, ALSTOM has a leading position in ERTMS: •ALSTOM Baseline SRS 2.2.2 already in hands: Strong return of experience through full-scale tests and operation •Improved Engineering Processes based on current advanced and challenging projects ALSTOM reference solution is in operation with stabilised generic platforms 26 April 2002 Thanks www.alstom.com www.ertms.com 27
© Copyright 2026 Paperzz