27 28 29 Sand Hill Road Loo pR oa d G 33 2 3 34 25 82 36 15 447 280 23 26 MEDICAL 85 16 34 35 36 37 38 39 40 A 84 52 50 28 B 720 F 6 61 62 5 131 113 750 930 910 104 680 Main Traffic Routes Radiation Fence 660 F 940 G 650 Alpine 640 s Ro ces d Ac a 685 E 767 950 901 121 54 D 620 55 117 W 137 E 282 9 621 120 86 31 C 730 D E 40 49 C 53 267 266 29 30 299 245 Loop R SUSB Under Contruction 51 44 33 To Stanford Campus 41 280 27 24 35 81 A B C 32 235 83 A 48 H 31 d oa N 30 To Interstate 280 PE PR ing R oad 26 H 88 I J Property Boundary 3-2014 8356A14 SLAC Area Map Building Grid Number Number Administration and Engineering Building (A&E) 41 30-C Alpine Gate Entrance (badge required for access) 88 40-I Arrillaga Recreation Center 55 37-D Auditorium and Visitor Center (under construction) 53 32-C Auxiliary Control Building 3 27-F Beam Switch Yard Access 9 32-G Cafeteria (under construction) 53 32-C Central Hazardous Waste Management Area 245 27-G Central Laboratory 40 31-D Central Laboratory Annex 84 32-D Central Utility Building 23 31-D Chemical Storage Building 36 29-E Cleaning Facility Building 30 29-F Collider Experimental Hall (CEH) 750 39-E Communications Office 266, 267 30-E Computer Building (SCS) 50 32-E Controls Building 34 28-F Cryogenics Laboratory 6 33-E End Station A (ESA) 61 34-E End Station B 62 34-F Environmental Protection Restoration 299 28-F Environmental Safety and Health (ES&H) 24 28-E Exercise Room/Shops Dining Room 27 28-E Experimental Facilities Department Shops (EFD) 104 35-F Fire Station (no longer in service) 82 30-D Gate 17 (badge required for access) 86 33-D General Services Building (Shipping & Receiving) 81 26-E Hazardous Waste Storage Area 447 28-G Heavy Fabrication Building 26 30-E Kavli Building 51 31-B Klystron Gallery (Visitors Alcove, Sector 27) 2 27-F Laboratory Offices and Shops (LOS) 137 33-E LCLS Beam Transport Hall 910 33/34/35-F LCLS Far Hall Tunnel Entrance 767 40-E LCLS Near Hall 930/940/950 37/38-F Building Number LCLS Office Building 901 Light Assembly Building 33 Light Fabrication Building 25 Main Control Center (MCC) 5 Main Gate (Information Booth) 83 Master Substation 16 Medical (room 11) 28 Metal Stores Shelter 29 Operations Support Building 28 Parking Lots A and C to H PEP Beam Facility/SSRL 650 PEP Beam Facility/SSRL 730 PEP Control Room 685 PEP Interaction Region 2 (IR-2) 620 PEP Interaction Region 4 (IR-4) 640 PEP Interaction Region 6 (IR-6) 660 PEP Interaction Region 8 (IR-8) 680 PEP Interaction Region 12 (IR-12) 720 Physics and Engineering Building 280 Plant Maintenance and Utilities 35 Power Conversion 15 Research Office Building (ROB) 48 Research Support Building 52 Safeguards and Security 235 Sector 30 Guard House 85 SUSB (under construction) 53 SLC Engr. Trailer South (Fort Apache) 282 SPEAR Control Room 117 Stanford Guest House 49 Stanford Research Computing Facility 54 Stanford Synchrotron Radiation Lab (SSRL) 120 Stanford Synchrotron Radiation Lab (SSRL) 131 Test Beam Facility 121 Test Laboratory 44 Vacuum Assembly Building 31 Grid Number 37-G 28-E 29-E 32-F 31-B 30-F 30-E 29-F 30-E 36-I 37-C 33-H 38-D 38-H 35-I 32-H 35-B 29-D 27-E 29-G 30-B 31-E 31-B 31-F 32-C 32-F 34-D 33-B 33-G 34-D 34-E 35-F 30-D 31-F
© Copyright 2026 Paperzz