SLAC Area Map

27
28
29
Sand Hill Road
Loo
pR
oa
d
G
33
2
3
34
25
82
36
15
447
280
23
26
MEDICAL
85
16
34
35
36
37
38
39
40
A
84
52
50
28
B
720
F
6
61
62
5
131
113
750
930
910
104
680
Main Traffic Routes
Radiation Fence
660
F
940
G
650
Alpine
640
s Ro
ces
d
Ac
a
685
E
767
950
901
121
54
D
620
55
117
W 137 E
282
9
621
120
86
31
C
730
D
E
40
49
C
53
267
266
29 30
299
245
Loop R
SUSB
Under Contruction
51
44
33
To Stanford Campus
41
280
27
24
35
81
A
B
C
32
235 83
A
48
H
31
d
oa
N
30
To Interstate 280
PE
PR
ing R
oad
26
H
88
I
J
Property Boundary
3-2014
8356A14
SLAC Area Map
Building
Grid
Number Number
Administration and Engineering Building (A&E)
41
30-C
Alpine Gate Entrance (badge required for access)
88
40-I
Arrillaga Recreation Center
55
37-D
Auditorium and Visitor Center (under construction)
53
32-C
Auxiliary Control Building
3
27-F
Beam Switch Yard Access
9
32-G
Cafeteria (under construction)
53
32-C
Central Hazardous Waste Management Area
245
27-G
Central Laboratory
40
31-D
Central Laboratory Annex
84
32-D
Central Utility Building
23
31-D
Chemical Storage Building
36
29-E
Cleaning Facility Building
30
29-F
Collider Experimental Hall (CEH)
750
39-E
Communications Office
266, 267
30-E
Computer Building (SCS)
50
32-E
Controls Building
34
28-F
Cryogenics Laboratory
6
33-E
End Station A (ESA)
61
34-E
End Station B
62
34-F
Environmental Protection Restoration
299
28-F
Environmental Safety and Health (ES&H)
24
28-E
Exercise Room/Shops Dining Room
27
28-E
Experimental Facilities Department Shops (EFD)
104
35-F
Fire Station (no longer in service)
82
30-D
Gate 17 (badge required for access)
86
33-D
General Services Building (Shipping & Receiving)
81
26-E
Hazardous Waste Storage Area
447
28-G
Heavy Fabrication Building
26
30-E
Kavli Building
51
31-B
Klystron Gallery (Visitors Alcove, Sector 27)
2
27-F
Laboratory Offices and Shops (LOS)
137
33-E
LCLS Beam Transport Hall
910 33/34/35-F
LCLS Far Hall Tunnel Entrance
767
40-E
LCLS Near Hall
930/940/950
37/38-F
Building
Number
LCLS Office Building
901
Light Assembly Building
33
Light Fabrication Building
25
Main Control Center (MCC)
5
Main Gate (Information Booth)
83
Master Substation
16
Medical (room 11)
28
Metal Stores Shelter
29
Operations Support Building
28
Parking Lots
A and C to H
PEP Beam Facility/SSRL
650
PEP Beam Facility/SSRL
730
PEP Control Room
685
PEP Interaction Region 2 (IR-2)
620
PEP Interaction Region 4 (IR-4)
640
PEP Interaction Region 6 (IR-6)
660
PEP Interaction Region 8 (IR-8)
680
PEP Interaction Region 12 (IR-12)
720
Physics and Engineering Building
280
Plant Maintenance and Utilities
35
Power Conversion
15
Research Office Building (ROB)
48
Research Support Building
52
Safeguards and Security
235
Sector 30 Guard House
85
SUSB (under construction)
53
SLC Engr. Trailer South (Fort Apache)
282
SPEAR Control Room
117
Stanford Guest House
49
Stanford Research Computing Facility
54
Stanford Synchrotron Radiation Lab (SSRL)
120
Stanford Synchrotron Radiation Lab (SSRL)
131
Test Beam Facility
121
Test Laboratory
44
Vacuum Assembly Building
31
Grid
Number
37-G
28-E
29-E
32-F
31-B
30-F
30-E
29-F
30-E
36-I
37-C
33-H
38-D
38-H
35-I
32-H
35-B
29-D
27-E
29-G
30-B
31-E
31-B
31-F
32-C
32-F
34-D
33-B
33-G
34-D
34-E
35-F
30-D
31-F