Session 4: You have viability evidence – so what? Consultation • Why • Who with • When • So what and what do you do with the results? Consultations Engagement • A fundamental part of plan making and a requirement of NPPF, CIL Regs, Harman Guidance • Don’t be afraid to ask the developers – For some evidence to support figures – To explain / for detail • Record process and comments METICULOUSLY • What have you actually asked and is it in the context of delivering the development plan Engagement Phases • Delay at your peril • Two or three stages Stage 1 Engagement • Background and why – Methodology – Viability test – Appraisal assumptions • Not results • Certainly not policy Stage 1 includes establishing agreement on methodology and assumptions (build costs, sale prices etc.) Does not include workings. Stage 2 Engagement • Changes made from first consultation (or not) – Methodology – Viability test – Appraisal assumptions • Draft Results • Emerging conclusions • Still not policy Stage 3 Engagement • • • • Results Factors other than viability to consider Emerging and developing policy Changes to existing policy • Approve now or hang on? WPV & plans found sound in 2014 Developer’s Profit Threshold Land Value 17% £370,000/ha Cannock Chase 20% on GDV £100,000-£400,000/ha Christchurch & East Dorset 20% on GDC £308,000/ha (un-serviced) £1,235,000/ha (serviced) 20% market/6% Affordable £450,000/ha Erewash 17% £300,000/ha Fenland 15-20% £1-2m/ha (serviced) 20% market/17.5% large sites/6% Affordable £370,000-£430,000/ha 17.5% market/6% Affordable £500,000/ha 20% (comprising 5% for internal overheads). £250,000/ha 17.5% market/6% Affordable £1.26-£1.41m/ha (serviced) 17.5% £100,000-£300,000/ha Local Authority Barbergh East Hampshire GNDP Reigate & Banstead Stafford Staffordshire Moorlands Warrington Confidentiality • FOI Act 2000 (Sections 41 and 43(2)) • Environmental Information Regulations 12(5)(e) • R (English) v East Staffordshire Borough Council and Anor (2010 EWHC 2744 • Heygate Decision (2014) • Recent ICO Decisions (2012-2014) • RICS GN – Paragraph 4.3 • “This viability report is provided on a confidential basis to the Council. We therefore request that the report should not be disclosed to any third parties (other than consultants instructed by the Council to review this report) under the Freedom of Information Act 2000 (sections 41 and 43(2)) or under the Environmental Information Regulations.” (para 4.3.3) • Planning Performance Agreements Case study: South Worcestershire Case Study – South Worcestershire Local Plan No additional requirements • No affordable housing • Built to Building Regulations (Part L) • Density informed by consultation with officers and developers – lower than policy to reflect current delivery (targets assume high content of flats etc) • Greenfield sites over 1 hectare have 40% open space • No CIL or s106 • All other requirements over high quality and locally distinctive design and safe design remain No additional requirements Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 SUE 1 SUE 2 Greenfield 1 Greenfield 2 Greenfield 3 Brownfield redev. L Urban Flats Brownfield redev. M Medium Brownfield Medium greenfield Urban edge Town centre flats Ex garage site Town Village Infill Small Village Scheme Village House Viability Appraisals. Alternative / Viability Threshold compared with Residual Values (£/ha) Malvern Hills Worcester Alternative Viability Residual Value Alternative Viability Residual Value Alternative Land Value Threshold Land Value Threshold Land Value 25,000 280,000 650,432 0 0 0 25,000 25,000 280,000 621,867 0 0 0 25,000 25,000 280,000 995,236 0 0 0 25,000 25,000 280,000 1,126,237 25,000 280,000 994,779 25,000 0 0 0 25,000 280,000 922,171 25,000 0 0 0 350,000 420,000 757,823 350,000 0 0 0 350,000 420,000 1,347,757 0 350,000 420,000 1,626,764 350,000 420,000 2,639,944 350,000 350,000 420,000 1,453,344 350,000 420,000 1,453,344 350,000 25,000 280,000 2,426,809 25,000 280,000 2,232,961 25,000 50,000 310,000 1,881,763 50,000 310,000 2,236,383 50,000 350,000 420,000 2,237,069 350,000 420,000 2,377,585 350,000 350,000 420,000 1,211,920 350,000 420,000 464,046 350,000 750,000 900,000 2,132,497 750,000 900,000 1,476,716 750,000 50,000 310,000 1,714,651 0 0 0 50,000 50,000 310,000 805,244 0 0 0 50,000 Wychavon Viability Residual Value Threshold 280,000 621,823 280,000 596,858 280,000 932,853 280,000 1,060,508 280,000 1,596,523 420,000 2,315,869 0 0 420,000 3,154,171 420,000 1,312,746 280,000 1,145,242 310,000 1,881,763 420,000 1,393,974 420,000 1,964,321 900,000 3,728,997 310,000 2,651,247 310,000 1,398,921 Build Standards • Code for Sustainable Homes Level 4 from April 2013 – Add 6% to cost of house • SWLP 26 Renewable and Low Carbon Energy (a) All new developments will be required to incorporate the generation of energy…by at least 10%. (b) All new development (as part of the major developments) will be required to incorporate the generation of energy…by at least 20%. – Add 2.5% to cost of house (+/- £2,500 /dwelling) • NOT JUST REDUCING USE – ACTUALLY ABOUT GENERATION • NO EVIDENCE OF ANY PRICE BENEFIT FROM REDUCED ENERGY BILLS CfSH Level 4 + Onsite Generation Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 SUE 1 SUE 2 Greenfield 1 Greenfield 2 Greenfield 3 Brownfield redev. L Urban Flats Brownfield redev. M Medium Brownfield Medium greenfield Urban edge Town centre flats Ex garage site Town Village Infill Small Village Scheme Village House Viability Appraisals. Alternative / Viability Threshold compared with Residual Values (£/ha) Malvern Hills Worcester Alternative Viability Residual Value Alternative Viability Residual Value Alternative Land Value Threshold Land Value Threshold Land Value 25,000 280,000 535,926 0 0 0 25,000 25,000 280,000 521,654 0 0 0 25,000 25,000 280,000 872,062 0 0 0 25,000 25,000 280,000 995,676 25,000 280,000 864,218 25,000 0 0 0 25,000 280,000 779,958 25,000 0 0 0 350,000 420,000 484,376 350,000 0 0 0 350,000 420,000 524,622 0 350,000 420,000 1,311,267 350,000 420,000 2,349,470 350,000 350,000 420,000 1,199,472 350,000 420,000 1,199,472 350,000 25,000 280,000 1,762,806 25,000 280,000 1,607,728 25,000 50,000 310,000 1,674,752 50,000 310,000 2,029,372 50,000 350,000 420,000 1,941,730 350,000 420,000 2,082,246 350,000 350,000 420,000 995,333 350,000 420,000 235,519 350,000 750,000 900,000 1,922,648 750,000 900,000 1,266,867 750,000 50,000 310,000 1,512,381 0 0 0 50,000 50,000 310,000 722,386 0 0 0 50,000 Wychavon Viability Residual Value Threshold 280,000 507,317 280,000 496,645 280,000 809,678 280,000 929,947 280,000 1,454,311 420,000 2,037,874 0 0 420,000 2,841,637 420,000 1,057,528 280,000 735,859 310,000 1,674,752 420,000 1,120,071 420,000 1,738,024 900,000 3,523,165 310,000 2,500,000 310,000 1,316,871 Affordable Housing • 15 or more 40% • 10 – 14 30% • 5–9 20% As social rented, affordable rented and intermediate tenure and provided on site NOT TESTED Less than 5, a financial contribution will be required. Affordable Housing Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 SUE 1 SUE 2 Greenfield 1 Greenfield 2 Greenfield 3 Brownfield redev. L Urban Flats Brownfield redev. M Medium Brownfield Medium greenfield Urban edge Town centre flats Ex garage site Town Village Infill Small Village Scheme Village House Viability Appraisals. Alternative / Viability Threshold compared with Residual Values (£/ha) Malvern Hills Worcester Alternative Viability Residual Value Alternative Viability Residual Value Alternative Land Value Threshold Land Value Threshold Land Value 25,000 280,000 332,757 0 0 0 25,000 25,000 280,000 324,151 0 0 0 25,000 25,000 280,000 574,023 0 0 0 25,000 25,000 280,000 656,141 25,000 280,000 453,169 25,000 0 0 0 25,000 280,000 379,850 25,000 0 0 0 350,000 420,000 -448 350,000 0 0 0 350,000 420,000 -1,163,134 0 350,000 420,000 951,958 350,000 420,000 1,239,168 350,000 350,000 420,000 625,000 350,000 420,000 361,330 350,000 25,000 280,000 1,464,601 25,000 280,000 1,100,887 25,000 50,000 310,000 1,259,642 50,000 310,000 1,341,269 50,000 350,000 420,000 1,357,721 350,000 420,000 1,630,041 350,000 350,000 420,000 872,319 350,000 420,000 144,924 350,000 750,000 900,000 2,132,497 750,000 900,000 1,476,716 750,000 50,000 310,000 1,714,651 0 0 0 50,000 50,000 310,000 805,244 0 0 0 50,000 Wychavon Viability Residual Value Threshold 280,000 195,205 280,000 203,879 280,000 405,338 280,000 478,409 280,000 769,128 420,000 906,356 0 0 420,000 1,513,254 420,000 245,641 280,000 419,301 310,000 1,071,326 420,000 844,132 420,000 1,333,809 900,000 3,728,997 310,000 2,651,247 310,000 1,398,921 Density • Density informed by consultation – lower than policy • Greenfield sites over 1 hectare have 40% open space • Brownfield sites NO Public Open Space • Greenfield sites less than 1ha but more than 5 units 20% open space Affordable Housing, Density, CfSH4, Onsite Generation, ‘No’ CIL Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 SUE 1 SUE 2 Greenfield 1 Greenfield 2 Greenfield 3 Brownfield redev. L Urban Flats Brownfield redev. M Medium Brownfield Medium greenfield Urban edge Town centre flats Ex garage site Town Village Infill Small Village Scheme Village House Viability Appraisals. Alternative / Viability Threshold compared with Residual Values (£/ha) Malvern Hills Worcester Alternative Viability Residual Value Alternative Viability Residual Value Alternative Land Value Threshold Land Value Threshold Land Value 25,000 280,000 218,251 0 0 0 25,000 25,000 280,000 223,909 0 0 0 25,000 25,000 280,000 450,848 0 0 0 25,000 25,000 280,000 525,581 25,000 280,000 322,609 25,000 0 0 0 25,000 280,000 239,889 25,000 0 0 0 350,000 420,000 -292,137 350,000 0 0 0 350,000 420,000 -2,048,052 0 350,000 420,000 633,442 350,000 420,000 932,511 350,000 350,000 420,000 361,544 350,000 420,000 89,196 350,000 25,000 280,000 991,346 25,000 280,000 701,754 25,000 50,000 310,000 1,050,650 50,000 310,000 1,132,277 50,000 350,000 420,000 1,083,111 350,000 420,000 1,334,701 350,000 350,000 420,000 643,792 350,000 420,000 -83,603 350,000 750,000 900,000 1,922,648 750,000 900,000 1,266,867 750,000 50,000 310,000 1,512,381 0 0 0 50,000 50,000 310,000 722,386 0 0 0 50,000 Wychavon Viability Residual Value Threshold 280,000 80,699 280,000 103,637 280,000 282,163 280,000 347,849 280,000 626,916 420,000 634,317 0 0 420,000 1,197,757 420,000 -30,053 280,000 151,304 310,000 862,335 420,000 548,379 420,000 1,107,512 900,000 3,523,165 310,000 2,500,000 310,000 1,316,871 Uncertain Market Average Prices Uncertain Market Indexed turn over (from January 2006) 5% fall in prices Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Site 7 Site 8 Site 9 Site 10 Site 11 Site 12 Site 13 Site 14 Site 15 Site 16 SUE 1 SUE 2 Greenfield 1 Greenfield 2 Greenfield 3 Brownfield redev. L Urban Flats Brownfield redev. M Medium Brownfield Medium greenfield Urban edge Town centre flats Ex garage site Town Village Infill Small Village Scheme Village House Viability Appraisals. Alternative / Viability Threshold compared with Residual Values (£/ha) Malvern Hills Worcester Alternative Viability Residual Value Alternative Viability Residual Value Alternative Land Value Threshold Land Value Threshold Land Value 25,000 280,000 147,873 0 0 0 25,000 25,000 280,000 160,872 0 0 0 25,000 25,000 280,000 368,502 0 0 0 25,000 25,000 280,000 436,846 25,000 280,000 240,000 25,000 0 0 0 25,000 280,000 152,118 25,000 0 0 0 350,000 420,000 -446,987 350,000 0 0 0 350,000 420,000 -2,437,676 0 350,000 420,000 448,113 350,000 420,000 707,161 350,000 350,000 420,000 180,971 350,000 420,000 -94,939 350,000 25,000 280,000 847,322 25,000 280,000 566,416 25,000 50,000 310,000 862,693 50,000 310,000 931,789 50,000 350,000 420,000 842,438 350,000 420,000 1,079,959 350,000 350,000 420,000 436,110 350,000 420,000 -260,893 350,000 750,000 900,000 1,648,413 750,000 900,000 1,035,523 750,000 50,000 310,000 1,265,299 0 0 0 50,000 50,000 310,000 611,018 0 0 0 50,000 Wychavon Viability Residual Value Threshold 280,000 11,615 280,000 41,742 280,000 201,689 280,000 261,086 280,000 518,310 420,000 441,647 0 0 420,000 968,147 420,000 -209,804 280,000 34,147 310,000 687,536 420,000 305,335 420,000 880,348 900,000 3,172,312 310,000 2,204,210 310,000 1,188,105 Viability Threshold MALVERN HILLS Site 1 SUE 1 Site 2 SUE 2 Site 3 Greenfield 1 Site 4 Greenfield 2 Site 5 Greenfield 3 Site 6 Brownfield redev. L Site 7 Urban Flats Site 8 Brownfield redev. M Site 9 Medium Brownfield Site 10 Medium greenfield Site 11 Urban edge Site 12 Town centre flats Site 13 Ex garage site Site 14 Town Village Infill Site 15 Small Village Scheme Site 16 Village House No Requirement CfSH4 + 2.5% Affordable Target Affordable, CfSH4 +2.5% and Density Affordable, CfSH4 +2.5% and Density Prices less 5% Cumulative Impact of Policies Affordable Housing, Density, CfSH4, Onsite Generation Alternative Land Value Residual Value 25,000 25,000 25,000 25,000 0 0 0 350,000 350,000 25,000 50,000 350,000 350,000 750,000 50,000 50,000 280,000 280,000 280,000 280,000 0 0 0 420,000 420,000 280,000 310,000 420,000 420,000 900,000 310,000 310,000 650,432 621,867 995,236 1,126,237 0 0 0 1,626,764 1,453,344 2,426,809 1,881,763 2,237,069 1,211,920 2,132,497 1,714,651 805,244 535,926 521,654 872,062 995,676 0 0 0 1,311,267 1,199,472 1,762,806 1,674,752 1,941,730 995,333 1,922,648 1,512,381 722,386 332,757 324,151 574,023 656,141 0 0 0 951,958 625,000 1,464,601 1,259,642 1,357,721 872,319 2,132,497 1,714,651 805,244 218,251 223,909 450,848 525,581 0 0 0 633,442 361,544 991,346 1,050,650 1,083,111 643,792 1,922,648 1,512,381 722,386 147,873 160,872 368,502 436,846 0 0 0 448,113 180,971 847,322 862,693 842,438 436,110 1,648,413 1,265,299 611,018 WORCESTER CITY Site 1 SUE 1 Site 2 SUE 2 Site 3 Greenfield 1 Site 4 Greenfield 2 Site 5 Greenfield 3 Site 6 Brownfield redev. L Site 7 Urban Flats Site 8 Brownfield redev. M Site 9 Medium Brownfield Site 10 Medium greenfield Site 11 Urban edge Site 12 Town centre flats Site 13 Ex garage site Site 14 Town Village Infill Site 15 Small Village Scheme Site 16 Village House 0 0 0 25,000 25,000 350,000 350,000 350,000 350,000 25,000 50,000 350,000 350,000 750,000 0 0 0 0 0 280,000 280,000 420,000 420,000 420,000 420,000 280,000 310,000 420,000 420,000 900,000 0 0 0 0 0 994,779 922,171 757,823 1,347,757 2,639,944 1,453,344 2,232,961 2,236,383 2,377,585 464,046 1,476,716 0 0 0 0 0 0 0 0 0 0 0 864,218 453,169 322,609 779,958 379,850 239,889 484,376 -448 -292,137 524,622 -1,163,134 -2,048,052 2,349,470 1,239,168 932,511 1,199,472 361,330 89,196 1,607,728 1,100,887 701,754 2,029,372 1,341,269 1,132,277 2,082,246 1,630,041 1,334,701 235,519 144,924 -83,603 1,266,867 1,476,716 1,266,867 0 0 0 0 0 0 0 0 0 240,000 152,118 -446,987 -2,437,676 707,161 -94,939 566,416 931,789 1,079,959 -260,893 1,035,523 0 0 WYCHAVON Site 1 SUE 1 Site 2 SUE 2 Site 3 Greenfield 1 Site 4 Greenfield 2 Site 5 Greenfield 3 Site 6 Brownfield redev. L Site 7 Urban Flats Site 8 Brownfield redev. M Site 9 Medium Brownfield Site 10 Medium greenfield Site 11 Urban edge Site 12 Town centre flats Site 13 Ex garage site Site 14 Town Village Infill Site 15 Small Village Scheme Site 16 Village House 25,000 25,000 25,000 25,000 25,000 350,000 0 350,000 350,000 25,000 50,000 350,000 350,000 750,000 50,000 50,000 280,000 280,000 280,000 280,000 280,000 420,000 0 420,000 420,000 280,000 310,000 420,000 420,000 900,000 310,000 310,000 621,823 596,858 932,853 1,060,508 1,596,523 2,315,869 0 3,154,171 1,312,746 1,145,242 1,881,763 1,393,974 1,964,321 3,728,997 2,651,247 1,398,921 507,317 496,645 809,678 929,947 1,454,311 2,037,874 0 2,841,637 1,057,528 735,859 1,674,752 1,120,071 1,738,024 3,523,165 2,500,000 1,316,871 195,205 203,879 405,338 478,409 769,128 906,356 0 1,513,254 245,641 419,301 1,071,326 844,132 1,333,809 3,728,997 2,651,247 1,398,921 80,699 103,637 282,163 347,849 626,916 634,317 0 1,197,757 -30,053 151,304 862,335 548,379 1,107,512 3,523,165 2,500,000 1,316,871 11,615 41,742 201,689 261,086 518,310 441,647 0 968,147 -209,804 34,147 687,536 305,335 880,348 3,172,312 2,204,210 1,188,105 So what? • You have a residual value – how to assess viability – Competitive returns – Harman (EUV Plus) v RICS (Market Value) – Cushion • EUV Plus – reality checked against the market Set it out – explain what you have done – don’t jump to a conclusion Appraisal considerations • Future considerations and viability over time • Scenario testing • Big impacts of little changes – hypersensitive model • Cumulative impact of policy • Pitfalls and preparing for the EiP Potential Pitfalls • • • • • • Out of date Local Plan adopted prior to NPPF Robust housing target and up to date SHMA Lack of 5 year supply 5% or 20% additional buffer on 5 year supply Onerous discretionary policies Approach to viability out of sync with RICS/Harman/Draft DCLG guidance website Context and Conundrum Informing plan making process v retrofitting evidence to policy • Can you proceed • Goes to the heart of soundness • Cumulative impact Don’t get into endless cycle of consultation, evidence, consultation, doubt, evidence, consultation…. Preparing for the EiP • • • • Examination Statements PAS NPPF conformity toolkit Participation Statement Duty to Cooperate Memorandum of Understanding • Statement of Common Ground • Evidence Base Technical Note Viability checklist • Would the approach to developer contributions/CIL have an unacceptably adverse impact on the economic viability of development, particularly when seen in the context of other future requirements? • Have you worked together with stakeholders to understand existing business needs and likely changes in economic markets operating in and across your area? • Are there enough sufficient sites, that are viable, to deliver the plan’s housing requirements over the plan period? Viability checklist • Are your assessments of and strategies for housing, employment and other uses integrated, and do they take full account of relevant market and economic signals? • Have you assessed the likely cumulative impacts on development in your area? • Have you discussed viability with your key stakeholders, under the duty to cooperate, particularly with regard to those strategic priorities set out in paragraph 156 of the NPPF? Viability checklist • Are affordable housing targets, thresholds and proportions fully justified and supported by an informed assessment of their economic viability; and will sufficient affordable housing be delivered to meet needs? • Do you have an understanding of changing needs and have you addressed barriers to investment in the Local Plan, including a lack of housing, infrastructure or viability? • Can you demonstrate that district-wide development/infrastructure costs have been considered alongside production of your Local Plan?
© Copyright 2026 Paperzz