Transmission Planning Attachment K Public Input Meeting FERC Order 1000, Quarter Three Meeting September 29, 2016 Agenda Pacific Time Topic Presenter 9:00 – 9:15 • • Jamie Austin Greetings and Introductions Explain planning process; o o Discuss status of the local planning process Discuss the draft Local Transmission Plan. 9:15 – 9:30 • TPL Studies 9:30 – 9:45 • Upcoming Area Studies 9:45 – 10:00 • PACW Area Study: o Adam Lint PACE Area Studies, Finding Reports o o o • Mark Adams, Kevin Putnam Grace, Idaho Smithfield/Preston, Utah/Idaho Price, Utah PACE Area, Kickoff Studies: o o o Tooele, Utah Southeast, Utah North Salt Lake, Utah Scott Murdock Carlton Jones Nicole DeGiulio Christiaan Riet Nicole DeGiulio Sachith Abayakoon PAGE 2 • North Oregon Coast Area Study Brett Allsup The Planning Process Jamie Austin 3rd Quarter Deliverables Process – Discuss status of the local planning process and interim iterations of the draft Transmission System Plan: Technical Studies – for designing a reliable system Economic Studies - economic analysis to identify transmission congestion – PacifiCorp has been Providing quarterly updates to Stakeholders on local transmission studies (5-yrs studies; reliability assessment studies) – Current plan includes posting a draft TSP in Q4, 2016 – Review of the Transmission System Plan Outline PAGE 4 – – – – – – – – – – – – – – – – INTRODUCTION FERC ORDER 890\1000, ATTACHMENT K, LOCAL TRANSMISSION PLANNING PROCESS DISCUSSION THAT TIES THIS WORK TO OUR EXISTING PLANNING LOCAL PLANNING OBJECTIVES OF THE TRANSMISSION SYSTEM PLAN SUB-REGIONAL & REGIONAL COORDINATION PLANNING PROCESS AND TIMELINE TRANSMISSION SYSTEM PLAN INPUTS AND COMPONENTS ASSUMPTIONS\DATABASES GENERAL DESCRIPTION OF PACIFICORP’S TRANSMISSION SYSTEM PacifiCorp East Balancing Area – Description PacifiCorp West Balancing Area – Description LOAD AND RESOURCE PROCESS RELIABILITY ASSESSMENT AREA PLANNING STUDIES 10-YEAR PLANNING HORIZON ECONOMIC STUDIES COST ALLOCATION PAGE 5 Transmission System Plan Outline Economic Planning Studies Background PAGE 6 The Economic studies identify “significant and recurring” congestion. Stakeholders can submit study requests through the OASIS process. No study requests were submitted in Q1 Next chance to submit requests will be in Q5 Local Participation Focus Groups The Transmission Provider (TP), PacifiCorp, may at its discretion but with stakeholder input, establish focus groups during Quarter 1, to identified area planning issues The focus group will review available data and the impact of any previous Transmission System Plan (TSP) on Transmission Service to the identified area, and provide recommendations to the TP to be considered for incorporation into the planning assumptions and/or final TSP. Membership to the focus groups will be open to all stakeholders, Network Customers, and Eligible Customers. The Transmission Provider will act as the facilitator for the focus group. The focus group shall address as many issues as possible via email and teleconference. Each focus group shall select a chairperson to set the timeline for discussion and developing recommendations within the scope of 8 Quarter Planning Cycle. All recommendations of the focus group must be based on the consensus of the focus group. The TP may consider but is not required to implement recommendations. PacifiCorp 8 Quarter Process PAC BIENNIAL TRANSMISISON PLANNING CYCLE 2014-2015 Quarter Date Technical Studies Economic Studies Activities Activities Q1 Data Collection Data Collection for Jan - Mar Economic Studies Q2 Reference Case Reference Case Apr - Jun Development Development Q3 Technical Studies to Economic Studies to Jul - Sep determine System Identify Congestion Adequacy Q4 Oct - Dec Draft Reporting Q5 Data Collection for ReDraft Report on System Study Adequacy Re-Study Requests Jan - Mar Economic Study Second Year Requests Q6 Q7 Q8 Apr - Jun Jul - Sep Oct - Dec Draft Report Review Draft Re-Study Review Final Report and Review Final Transmission Plan approval PAGE 8 Year 2 - 2017 Year 1 -2016 Time Line Local Area Studies Update - PACW Kevin Putnam Time-line Study Area State Crescent City CA Grants Pass OR Hood River OR Pendleton/Hermiston/EnterpriseOR Walla Walla/Wallula WA Roseburg OR Portland OR Dalreed/Arlington/Sherman County OR Klamath Falls OR Lakeview/Alturas OR Coos Bay OR North Oregon Coast OR Yakima WA Medford OR Willamette Valley OR Junction City/Cottage Grove OR Central Oregon OR Yreka CA Existing Study Update Completion Study Status Date Dec-08 85% Dec-15 Nov-15 Oct-09 70% Dec-09 Sep-10 5% Mar-11 Mar-11 10% May-11 May-11 Aug-11 Dec-11 25% Dec-11 10% Sep-12 Dec-12 Dec-12 Mar-13 Dec-14 PAGE 10 5-yr studies – West Local Area Studies Update - PACE Mark Adams Time-line 5-yrs studies – East State Last Studied Update Park City/Midway UT Dec-12 Scheduled for 2017 North Salt Lake UT Feb 13 Scheduled for 2017 Tooele UT Mar-13 Scheduled for 2017 Big Horn WY Sep-13 Scheduled for 2017 Wyoming (West) WY Oct-13 Scheduled for 2017 Salt Lake Valley UT July -14 Scheduled for 2017 Ogden UT July 14 Nebo UT Oct-14 Utah (Southwest) UT Dec-14 Pavant UT Feb 15 Goshen ID Aug 15 Powder River WY Nov 15 Honeyville/Malad UT Mar 16 Montpelier ID Mar16 Utah Valley UT Jun 16 Grace ID Aug 16 Smithfield ID Aug 16 Price UT Aug 16 Sigurd UT Dec-11 4th Q 2016 – 40% complete Wyoming (Southern) WY Aug -11 4th Q 2016 – 40% complete Utah (Southeast) UT Dec-11 4th Q 2016 – 30% complete Vernal UT Dec-11 4th Q 2016 – 60% complete PAGE 12 Study Area NERC TPL-001-4 Standard Overview Brett Allsup, Dir, Engrg Strategy & Cost Control Q & A Session PAGE 14 Contact Information – Link to PacifiCorp OASIS: http://www.oasis.pacificorp.com/oasis/ppw/main. htmlx For Attachment K related comments\questions, address your requests to: [email protected] Attachment K 2016-17 Biennial Planning Cycle Q4 Public Meeting December, 2016 PacifiCorp PAGE 16 Questions / Comments?
© Copyright 2026 Paperzz